NAVFAC MIDLANT
NAVFAC Southwest CONOPS Alignment, Core & IPT Integration
IPT Update and All HandsDecember 7, 2017
2
Agenda
• CO Opening Remarks and background• OPS Review of Organization• DOPS Review of Implementation• Q&A• CO Closing Remarks
3
What changed…
Ø Military-Led Organization- One Chain of Command- From “Vertical & Horizontal” to
“Commands & Communities”- Embed organizational learning
Ø Keystone Operating Philosophy- Focus on Warfighter- One team strengthening Units of Action- Enable success through Support and
Reach-Back
Ø IPT Construct- From “hardwired structure” to teaming- Increase agility, technical competency,
and mentorship- Position organization for the future
4
Integrated Product Teams
The DECISION - What is the intent…• Transition away from the “hard-wired” IPTs as they exist today • Maintain the IPT benefits of teams and customer relationships• Foster more consistent P&S delivery and advance technical competence
What it looks like:• Operations Officer will continue to directly oversee managerial positions • Continue support for Units of Action coordinated through OPS• Retain dedicated team that support the USMC• Personnel will centralize/co-locate within specific communities over time • Project management personnel may work directly for OPS or for BL/SL
5
Post-IPT Realignment Plan
• LANT e-mail of 28 Jun 17 tasking 2 outcomes:(1) Post-IPT organization plan
• Approved 18 Sep 17
(2) Co-location plans with ROM costs(A) Short-term: Co-locate within existing spaces (6 mos.)(B) Long-term: Organize in Government Administrative Facility (3+ yrs.)
6
Proposed SW OPS Organizational Chart
OPS Officer
Ops Staff
Deputy OPS Officer
Desert AOPS Coastal AOPS Marine Corps AOPS
PWD El Centro PWD Point Loma
PWD Coronado
PWD Fallon
PWD Reserves
PWD Ventura County
PWD Monterey FEAD MCRD
PWD Lemoore PWD Seal Beach
PWD San Diego
FEAD Barstow
FEAD MCAS Camp Pendleton
FEAD Bridgeport
FEAD Miramar
FEAD Camp Pendleton
Capital Improvements (CI)
Environmental (EV)
Asset Management (AM)
Public Works (PW)
Production Officer (MIL) PMs
(CI)
Supv PM
PMs(CI)
PWD China Lake
FEAD 29 Palms
FEAD Yuma
Desert Deputy AOPS Coastal Deputy AOPS Marine Corps Deputy AOPS
Supv PM
PMs(CI)
ROICC TravisNote: Shift of PWD Ventura County to Desert AOR and Seal Beach to Coastal AOR
7
SW Capital ImprovementsOrganizational Chart
CostFP
CivilElec.Mech.
Struct.
Arch.
CI BLL
CI 5CI 4CI 3
Design Production Director
CI41Arch. Branch Head/TDC
CI42Struct. Branch
Head/TDC
CI43Mech. Branch
Head/TDC
CI44Elec. Branch Head/TDC
CI45Civil Branch Head/TDC
CI46Fire Prot. Branch
Head/TDC
CI47Cost Branch Head/TDC
Arch. Supv. Mech. Supv. Elec. Supv. Civil Supv.
Community / QA Director
StaffGS-15 Management
GS-14 Supervisory
GS-13 Supervisory
GS-12/13
CO
LOR
KEY
Supported functions
CI Acq Readiness Director
PM TDC
Program Managers
Program Analysts
Admin
Notes:1. CI PMs remain in OPS. CI maintains Community Mgmt. for CI funded PMs via the PM TDC. Aligned as needed in support of geographic areas or specified
supported commanders.
OPS / DOPS
AOPSDAOPS
CI Project Managers
CI PM Supv.
CI PM Supv.
CI Project Managers
CI Project Managers
AOPSDAOPS
AOPSDAOPS
OPCON/ADCONDirect Support
Staff Staff
Interior Design Supv.
Interior Design
Landscape Design
CMs
Scheduler
Systems Acceptance
Community Mgmt
8
SW EnvironmentalOrganizational Chart
OPS/DOPS
EVBLL
EV1 CompliancePC
EV2 NEPA/NR/CRPC
EV24 (USMC)
PMs
EV25 (Desert)
PMs
EV26 (Coastal)
PMs
EV3 RestorationPC
EV34 (USMC)
PMs
EV35 (Desert)
PMs
EV36 (Coastal)
EV4 Res & Assessment
PMs
GS-15 Management
GS-14 Supervisory
GS-13 Supervisory
GS-12/13
CO
LOR
KE
Y
Supported functions
Notes:1. This structure mirrors the org charts developed by HQ & other FECs.2. No major changes to EV1 & EV4. Additional PAs from IPTs will be aligned under EV4.3. Areas of organization not changed are not shown on chart.4. PC = Production Coordinator5. Marine Corps compliance personnel will remain with current structure to maintain dedicated Marine Corps Team. 6. EV funded ACQ personnel will be aligned under EV ACQ Core.
OPCON/ADCON
Direct Support
AOPS/ DAOPSAOPS/ DAOPS
AOPS/ DAOPS
9
SW Asset ManagementOrganizational Chart
ASSET MANAGEMENTBUSINESS LINE LEADER
AM4ASSET UTILIZATION PRODUCT LINE LDR
AM 2/3FACILITY PLANNINGPRODUCT LINE LDR
AM 2 COASTALPRODUCTION
COORDINATOR
PLANNING
CPLO
AM 2 DESERTPRODUCTION
COORDINATOR
AM 2/3/4COMMUNITY
MANAGEMENT
AM 4 REAL
PROPERTY OFFICER
AM 4GRC SME
AM 2 MARINE CORPSPRODUCTION
COORDINATOR
GIS PLANNING PLANNING
ADA SME ADA SME
GS-15 Management
GS-14 Supervisory
GS-13 Supervisory
GS-12/13
CO
LOR
KEY
Supported functionsNotes:1. No changes to AM1 Real Estate or AM5 PPV, both resident in AM Core. Details of AM1 and AM5 are not shown.2. Marine Corps planning personnel will remain with current structure to maintain dedicated Marine Corps Team.
AM1/5REAL ESTATE/PPV
PRODUCT LINE LDR
OPCON/ADCON
Direct Support
AOPS/ DAOPSAOPS/ DAOPS
AOPS/DAOPS
OPS/DOPS
10
Southwest AcquisitionOrganizational Chart
ACQ SLL
ACQ4
Environmental
ACQ3
Capital Improvements
ACQ2
Public Works
ACQ1
People &
Processes
OPS/DOPS
AOPS/DAOPS
USMC & JSF
Notes:
1. No changes to ACQ1, People & Processes. Community Management for all ACQ remains in ACQ1
2. No changes to ACQ2, Public Works. Previously no PW ACQ work or funding on IPTs
3. ACQ3, CI Core reorganized to incorporate IPT assets. Field Support and Claims align under GS14 Director (no change). Regional team and CIBL/AM funded ACQ assets from IPTs integrated to form two teams. Span of control per supervisor expected to be 15 FTEs or less depending on whether assets are moved to the field to support work up to $5M. Each team provides support for full range of contract support (incl MACs) for major clients and internal stakeholders
4. ACQ4, Environmental reorganized to incorporate IPT assets. No change to BRAC team. Regional team and ENV funded ACQ assets from IPTs integrated to form two teams. Span of control per supervisor expected to be 10 FTEs. Each team provides support for full range of contract support (incl MACs) for major clients and internal stakeholders
5. Team supervisor serves as Production Controller
Navy & Air
ForceFMFS UEM Field
Support
Claims
El Centro
Monterey
San Diego
Point Loma
Ventura
Seal Beach
29 Palms & Bridgeport
CPEN & MCAS CPEN
Coronado & Coastal C
China Lake
Barstow
Miramar & MCRD
Yuma
Travis
Lemoore
Fallon
EV 3
(Restoration)
EV 1,2, & 4
(Compliance &
Conservation)
BRAC
Team Supervisors serve
as Production Controllers
GS-15 Management
GS-14 Supervisory
GS-13 Supervisory
GS-12/13
CO
LOR
KEY
Supported functions
OPCON/ADCON
Direct Support
FOCAS
11
PM
Sample Project Team
GS-15 Management
GS-14 Supervisory
GS-13 Supervisory
GS-12/13
CO
LOR
KEY
Supported functions
OPCON/ADCON
Direct Support
CI41 Arch
CI42 Struct
CI43 Mech
CI44 Elec
CI45 Civil
CI46 Fire Prot
CI47 Cost
Landscape Design
Interior Design
EV34 USMC
EV35 Desert
EV36 Coastal
EV3 Restoration PC
Planning
ADA SME
AM2 Coastal PC
AM2 Desert PC
AM2 USMC PC
AM 2/3 Facility Planning
PLL
PM Supv.(CI)
PM (CI)
EV1 Compliance PC
EV2 NEPA/NR/CR PC
EV24 USMC
CI3
CI 4
Design Prod Director
PM TDC / Program Mgr
EV25 Desert
EV26 Coastal
OPS/DOPS
CI BLL EV BLL AM BLL ACQ 4Environmental
ACQ 3Capital Improvements
Navy & Air Force
USMC & JSF
PW/FEAD CS
PW/FEAD CS
EV 1,2,&4 (Compliance & Conservation)
EV 3 (Restoration)
ACQ SLL
AOPS/DAOPS
PM
PMPM
PMPM
PMPM
PMPM
PMPM
Planning
ADA SME
Planning
ADA SME
12
HQ CI BLL / MILCON
FEC CIBL, CI3, OPS
AOPS / DAOPS
CI PMDesign
Production Director
Lead Branch Head
Design Manager
Discipline Branch Heads
Virtual Teams
Established
MILCON – Work Flow
13
PWD WIB AOPS / DAOPS
CI PM (if required)
Design Production
DirectorLead Branch
HeadDesign
Manager
Discipline Branch Heads
Virtual Team Established
Non-MILCON SRM – Work Flow
14
Plan Summary
Plan consolidates AM, CI, EV, ACQ, BD & Safety
• Coastal IPT– Bldg 291, NBSD– Spaces going to CI
• Marine Corps IPT– 3rd Flr, Bldg 1, Broadway– Spaces going to EV
• Desert IPT– Bldgs 129, 130 and 131, 1220 Pacific Highway– Spaces going to CI and AM
Initial Operating Capability (IOC)
01APR18
Final Operating Capability (FOC)
30APR18
15
NBSD B291: CI Design
• Opportunity exists using current NAVFAC Southwest space– 32nd Street, Bldg. 291:
• CI Architectural, Civil, Structural, Mechanical, Electrical, Landscape Architectural
• CI4 Product Line Coordinator, CI4 Design Production Director
All of CI engineering except fire protection, cost & interior design in one building
95
16
Broadway B1: EV & CI Design Remainder
– Broadway Complex, Bldg. 1:• Environmental
– EV from IPTs on FL 3– EV ACQ stays with EV Tech
• CI Interior Design on FL 1 & Mezzanine• CI Fire Protection, CI5 (Construction) on FL 1 & 3• PWD Reserves Team
Consolidates EV in one building
CI Interior Design (existing, add 2 stations)
PWD Reserves TeamCI Fire Protection, CI5 (Construction)
EV2, EV3, ACQ EV (coming from IPT’s)
Interior Design (existing)
Environmental, ACQ EV (existing, no change)
FL 1
Mezzanine
FL 3
FL 5VariousExisting
123
7622
3
87
17
1220 B127: AM, ACQ, other CI
– 1220 Complex, Bldg. 127:• AM1, AM4 (real estate, asset utilization) on FL 1 middle wing & FL 2 north wing
• ACQ1, ACQ3 on FL 1 north wing• CI BLL, CI3 PLC, CI5 PLC on FL 2 (existing)
AM and most of ACQ consolidated in 1220 Compound
ACQ1, ACQ3
FL 2
FL 1
AM1 (real estate) AM4 (asset utilization)
CI BLL, CI3 & CI5 PLCs
24
40
46
3
18
1220 Complex: Functional Consolidation
20
34
30
29
18
– 1220 Complex, Bldgs. 128, 129, 130, 131 & 132:• Bldg. 132: ACQ2 (Public Works FMFS & UEM), IG
• Bldg. 131: CI3 (PgM Mgmt), CI Cost, CI4 Community & QA, CI4 AQ Readiness
• Bldg. 130: AM2 (facility planning)
• Bldg. 129: AOPS, DAOPS, CI PMs
• Bldg. 128: BD Staff (BD, Deputy, HRO remain in Bldg. 127), AM5 (PPV), Safety
AOPS, DAOPS & CI projects managers consolidated into one building
19
LANT Plan of Action & Milestones
CRITICAL PATH ACTIONS COMPLETION
Final Report with POAM May 2017
Coordinated w/ HQ BL/SL & CMO June 2017Community Detailed Organizational Designs August 2017
Provision of FEC Co-location Plans/ROM Costs October 2017
Community PD Changes October 2017LANT Review/Approval of Co-Location Plans October 2017
FEC PMB Approval of Org Changes November 2017
Ech III PMB Approval of Org Changes December 2017Union Notifications November 2017
Union Negotiations (I&I) December 2017
MAXIMO/ieFACMAN CCB Modifications January 2018FEC FM Creation of New Work Centers February 2018
DoD Review of Union Agreement February 2018
OCHR Mass Update Data Elements & OF-8s March 2018
Process RPAs for Reassignments (IOC) March 2018TWMS Routing Updates (PRM, IPMS, RPA Tracker) April 2018
Supervisory Assignment Updates (TWMS, DCPDS) April 2018
SLDCADA Org Updates April 2018MAXIMO Update WI / ieFACMAN Data Migration April 2018
FEC Collocation of Personnel (FOC) Date is FEC specific
19
Updates to LANT Commander every 60-days - first update week of 04DEC
20
SW Detailed POA&MFEC PROGRESS
ID Task Task Name Duration Start Finish BL/SL WASHINGTON MIDLANT SOUTHEAST SOUTHWEST1 Deliverables 3/4 Drafted and Submitted 20 days 3/20/17 4/14/17 x x x x2 Review by Stakeholders 7 days 4/17/17 4/25/17 x x x x3 Final Report of Recommended Actions 14 days 4/26/17 5/15/17 x x x x4 Decision by NAVFAC Leadership 21 days 5/16/17 6/13/17 x x x x5 Prepare OF-8 Updates for OPS positions 14 days 6/14/17 7/3/17 BD Waiting on HQ/ LANT 11/22/2017 TBD6 FECs finalize Table 30 changes for Operations 21 days 6/14/17 7/12/17 BD Waiting on HQ/ LANT x 11/17/177 FECs identify work/cost center changes for Operations 14 days 7/13/17 8/1/17 OPS Waiting on HQ/ LANT 11/29/2017 11/1/178 BL/SL Finalize Organizational Plans 45 days 6/14/17 8/15/17 BL/SL 10/21/2017 x x x9 OPS PD Changes (DAOPS) 45 days 6/14/17 8/15/17 OPS Waiting on HQ/ LANT 11/22/2017 TBD
10 FEC FM builds any New OPS Workcenters 14 days 8/2/17 8/21/17 FM Waiting on HQ/ LANT 2/21/2018 11/24/1711 FECs finalize Table 30 changes for BL/SLs 21 days 8/16/17 9/13/17 BD Waiting on HQ/ LANT x 11/17/1712 Develop Communication Plan 75 days 6/14/17 9/26/17 PAO x x x x13 Prepare OF-8 Updates for BL/SL Positions 30 days 8/16/17 9/26/17 BD Waiting on HQ/ LANT 11/22/2017 11/15/1714 FECs identify work/cost center changes for BL/SLs 14 days 9/14/17 10/3/17 BL/SL Waiting on HQ/ LANT 11/29/2017 11/1/1715 BL/SL PD Changes 45 days 8/16/17 10/17/17 BL/SL Waiting on HQ/ LANT 11/22/2017 11/30/1716 FECs Provide Co-Location Plans as Required 45 days 8/16/17 10/17/17 OPS x x x x17 Develop Revised Org Charts 45 days 8/16/17 10/17/17 BD x x 9/29/2017 x18 FEC FM builds any new BL/SL workcenters 14 days 10/4/17 10/23/17 FM 2/21/2018 11/24/1719 FEC Union Notification(s) Changes 16 days 10/18/17 11/3/17 BD 11/15/201720 Launch Communication Plan - Phase 1 - Intent, Pre-Decisional on final details 30 days 9/27/17 11/7/17 PAO x x x x21 Develop NAVFAC Portal Updates by FEC 60 days 8/16/17 11/7/17 CIO22 FEC PMB Approval of BL/SL Org Changes 30 days 10/18/17 11/28/17 VICE 10/24/201723 Provide specs for Team (Maximo and eProjects) changes 90 days 8/16/17 12/19/17 PW & CI 11/22/201724 ieFACMAN - Develop and test modifications 30 days 8/16/17 12/19/17 CIO 11/22/201725 Draft FM eSystem Updates (WC, Routing, etc.) 90 days 8/16/17 12/19/17 FM26 Union I&I FEC Instructions 57 days 11/4/17 12/31/17 BD 1/17/201827 Prepare Mass Update for HR Data Elements 30 days 11/29/17 1/9/18 BD28 Prepare RPAs for reassignments 30 days 11/29/17 1/9/18 BD29 ECH III PMB Approval of Changes 30 days 11/29/17 1/9/18 VICE30 Develop Updates for FEC Instruction and Policy 120 days 8/16/17 1/30/18 VICE31 Provide specs for Office (eContracts) changes 30 days 12/20/17 1/30/18 AQ32 DoD Review of Union Agreement 30 days 1/1/18 2/1/18 BD33 ieFACMAN - Production Env Changes 1 day 2/21/18 2/27/18 CIO34 Issue Revised Org Charts (FEC portal, etc.) 5 days 2/21/18 2/27/18 BD35 ieFACMAN Data Migration 5 days 2/28/18 3/6/18 CIO36 Maximo - Develop and test modifications 30 days 2/21/18 3/12/18 PW & CI37 Deploy Portal Updates 14 days 2/21/18 3/12/18 CIO38 Launch Communication Plan - Phase 2 - Details of Implementation 15 days 2/21/18 3/13/18 PAO39 BMS Updates - Draft 150 days 8/16/17 3/13/18 BL/SL40 Process RPAs for reassignments 21 days 2/21/18 3/21/18 BD41 OCHR Process Mass Update of Data Elements and OF-8 Updates 7 days 3/14/18 3/22/18 BD42 BMS Updates Launch 7 days 3/14/18 3/22/18 BL/SL43 FM deletes old OPS or BL/SL Workcenters 14 days 3/22/18 4/10/18 FM44 FEC Email Distribution Lists Updates 14 days 3/22/18 4/10/18 CIO45 DTS Routing Updates 14 days 3/22/18 4/10/18 BD46 SLDCADA Org Updates 14 days 3/22/18 4/10/18 FM47 Supervisory Assignment Updates - TWMS, IPMS 14 days 3/22/18 4/10/18 BD48 TWMS Routing Updates (PRM/IPMS/RPA Tracker) 14 days 3/22/18 4/10/18 BD49 DCPDS Routing Updates 14 days 3/22/18 4/10/18 BD50 Issue FEC Instruction Updates 5 days 4/4/18 4/10/18 VICE51 Maximo - Production Env Changes 1 day 12/20/17 4/24/18 PW & CI52 FM System Updates - Production 45 days 2/21/18 4/24/18 FM53 FEC Share Drive Updates 14 days 4/11/18 4/30/18 CIO54 TBD - IPMS Plan Closeout / New 30 days 3/22/18 5/2/18 BD55 Misc. Updates - Telework, ESAMS, OGE450 30 days 3/22/18 5/2/18 OPS56 FEC Completes Moves for Co-Location of Personnel 180 days 2/21/18 10/30/18 OPS
21
Transition Team
• First priority is administrative tasks to meet POA&M• Second priority will be development of work flow processes• Team members:
o OPS: Martin Smith, Leado IPTs: Chris Parry, Coastal
Earl Estrella, Marine CorpsEileen Dsouza, Desert
o CI: Jennifer Llamaso EV: Kathie Beverlyo AM: Amy Chevaliero ACQ: Carlos Donadoo BD: Cindy Ludwigo FM: Joleen Robinsono HR: Elise Magsarilio CIO: Marc Santos
22
Moving Forward
• Positive and productive energy to implement
• Change management
• Workflow processes and Coordination
• Seamless transition from Supported Command
viewpoint
•Cooperative and collaborative approach
– Transition team
– FEC NW Lessons Learned
– Leverage what others are doing (High Velocity Learning)
• Open and frequent Communications
• A lot of work, but it is manageable
23
Questions ?
• What's broken that needs such cost and effort to fix? We just did a realignment several years ago.
• Is it true that NAVFAC SW has been highly successful as IPT's, while other NAVFAC FEC's have not embraced the model?
• Is there any existing and empirical data to show that this will be beneficial?
•Why move people now when we have to move for the new bldg. someday anyway? Cost savings seem to favor one move, versus two.
•How much will this cost as planned?
•What is NAVFAC SW doing to minimize/avoid impacts to the employees, specifically?
24
Questions ?
• Will existing pre/post award project teams (i.e. Design Manager) stay with the projects to the end?
• Would the planning team reconsider the idea of having the Project Manager and DM/design team at different locations? PMs will end up spending a significant amount of time visiting the DMs for project coordination.
• When visiting DM/design team, will PMs have access to cubicles or temporary work areas?
• There is talk about some employees moving to NBSD and the impact it will have on the daily commute especially for some who use public transportation such as the Coaster Train. If this move does happen this will add 1/2hr. + to an already 1-1/2 hr. commute.
• Will there be options such as additional days for Telework, workstations at Camp Pendleton FEAD or flexibility in work schedule for those who live in North County?
25
CO’s Final Thoughts