Transcript
Page 1: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Navigational Lighting Update

Staci Timol, PENovember 29, 2012

Page 2: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Districts with Navigable Bridges

Page 3: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Locations Per District

*There is a total of 55 navigable bridges in 45 locations

Page 4: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Bodies of Water

• OHIO RIVER• TENNESSEE RIVER• CUMBERLAND RIVER• GREEN RIVER• KENTUCKY RIVER• LICKING RIVER• BIG SANDY RIVER• CRAIGS CREEK

Page 5: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Example - Natcher Bridge DS

Page 6: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Downstream Side Pier B Gauge

Page 7: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Downstream Side Lights and Signs

Pier B 180° Red Light2’ x 2’ Red Panel

Channel 1 360 ° Green Light2’ x 2’ Green Panel

Pier A 180° Red Light2’ x 2’ Red Panel

Page 8: Navigational Lighting Update Staci Timol, PE November 29, 2012.

USCG Requirements• Lights• Signs• Gauge Markings

Page 9: Navigational Lighting Update Staci Timol, PE November 29, 2012.

USCG District Contact

Eric WashburnCommander, Eight Coast Guard District1222 Spruce StreetSt. Louis, MO 63103-2398314-269-2300 [email protected]

Page 10: Navigational Lighting Update Staci Timol, PE November 29, 2012.

When to Get New Lighting Plan

• Moving existing lights• Moving existing signs• Existing lights or signs are not in exact location

specified by existing lighting plan• Extra lights or signs in place• Changing from incandescent to LEDs

Page 11: Navigational Lighting Update Staci Timol, PE November 29, 2012.

New Lighting Plans

• There are options• USCG wants to cooperate with you• Takes only a few weeks to issue

Page 12: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Inspections

• Monthly Inspections– Make sure all of the lights are burning

• In-depth Inspections– At least 2 – 4 times annually

Page 13: Navigational Lighting Update Staci Timol, PE November 29, 2012.
Page 14: Navigational Lighting Update Staci Timol, PE November 29, 2012.
Page 15: Navigational Lighting Update Staci Timol, PE November 29, 2012.
Page 16: Navigational Lighting Update Staci Timol, PE November 29, 2012.
Page 17: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Notify USCG of Problems

• Notify USCG 1-800 Number• USCG Broadcasts Info To Mariners• Fix Problem As Soon As Safely Possible– Traffic Control– Weather

• Notify USCG When Problem Is Fixed• USCG Ends Broadcast

Page 18: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Lighting

• Emergency Repairs• Major Repairs• Minor Repairs

Page 19: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Signs• Replace Signs Statewide on Navigable Bridges• Solid Signs With No Borders• Signs Will Be At Least 2’x2’• Some Lighting Plans Specify Larger Signs• Signs Should Be Within 5’ of Lights

Page 20: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Orientation of Sign

Page 21: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Gauges

• Responsibility of Maintenance• Redoing All Gauges on Ohio River• Other Rivers As Funds Become Available

Page 22: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Risk Assessment

• Assign Score– 100 Max– Higher Number = More Risk

• Condition of Navigational Lighting – 25%• Bridge Geometry – 22%• Boat Activity – 22%• Bypass Inconvenience – 22%• Cost – 9%

Page 23: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Condition of Navigational Lighting

• 25% of Total Score• District Priority Based on Condition• Compliance With Current Lighting Plan– Lights– Signs– Markings

Page 24: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Bridge Geometry

• 22% of Total Score• Data From Pontis• Piers in Water• Scour Critical• Structure Type• Clearances– Horizontal Clearance– Vertical Clearance

Page 25: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Boat Activity

• 22% of Total Score• River Crossed• Allision History

Page 26: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Bypass Inconvenience

• 22% of Total Score• Twin Bridges• Bypass Length• ADT• % Trucks

• Truck Network• NHS• STRAHNET

Page 27: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Cost

• 9% of Total Score• Estimated Cost• Border Bridges

Page 28: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Statewide RankingDISTRICT BRIDGE NAME RISK ASSESSMENT RANK

2 TWIN BRIDGES 70 11 US 68 HENRY LAWRENCE MEMORIAL 68 21 US 45 BROOKPORT /IRVIN COBB 61 36 I 275 COMBS HEIL BRIDGE 60 46 TAYLOR SOUTHGATE BRIDGE 58 51 CAIRO BRIDGE 58 66 I 71 DUAL BRIDGES 57 75 MILTON-MADISON BRIDGE 55 85 KENNEDY BRIDGE 54 92 WESTERN KY PARKWAY BRIDGE 53 109 CARL PERKINS BRIDGE 51 116 I 275 CARROLL CROPPER BRIDGE 51 121 US 60 LUCY JEFFERSON MEMORIAL 50 131 EGGNERS FERRY BRIDGE 49 146 I 471 DANIEL CARTER BEARD BRIDGE 49 156 BRENT SPENCE BRIDGE 49 169 SIMEON WILLIS, 12TH STREET BRIDGE 48 179 MAYSVILLE - ABERDEEN/ SIMON KENTON 48 185 US 31 CLARK MEMORIAL (2ND STREET) 47 191 I-24 HIGHWAY BRIDGE 45 202 ROCKPORT BRIDGE ON US 62 45 211 US 62 EUREKA BRIDGE 44 222 WILLIAM NATCHER BRIDGE 44 231 I-24 CUMBERLAND BRIDGE 43 246 CLAY WADE BAILEY BRIDGE 43 25

Page 29: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Statewide Ranking ContinuedDISTRICT BRIDGE NAME RISK ASSESSMENT RANK

9 WILLIAM HARSHA 41 266 KY 8 4TH STREET BRIDGE 41 276 I 275 DUAL BRIDGE 41 289 CATTLETSBURG - KENOVA 39 291 KY 453 CANAL BRIDGE 39 306 US 42 BRIDGE 39 315 US 127 BRIDGE 38 321 US 60 GEORGE ROGERS CLARK 37 336 US 42 CITY STREET 36 342 SEBREE BRIDGE 35 356 ROEBLING SUSPENSION BRIDGE 35 362 SHAWNEETOWN BRIDGE 34 372 AUDUBON PARKWAY BRIDGE 34 382 CALHOUN BRIDGE 34 395 KY 22 GRATZ BRIDGE 33 402 LIVERMORE BRIDGE 32 412 OWENSBORO BRIDGE (GLOVER CARY) 31 426 KY 1120 GIRL SCOUT BRIDGE 31 432 ISLAND BRIDGE 30 442 SPOTTSVILLE BRIDGE 27 45

Page 30: Navigational Lighting Update Staci Timol, PE November 29, 2012.

District 1 RankingsDISTRICT 1 RISK ASSESSMENT STW RANKUS 68 HENRY LAWRENCE MEMORIAL 68 2US 45 BROOKPORT /IRVIN COBB 61 3CAIRO BRIDGE 58 6US 60 LUCY JEFFERSON MEMORIAL 50 13EGGNERS FERRY BRIDGE 49 14I-24 HIGHWAY BRIDGE 45 20US 62 EUREKA BRIDGE 44 22I-24 CUMBERLAND BRIDGE 43 24KY 453 CANAL BRIDGE 39 30US 60 GEORGE ROGERS CLARK 37 33

Page 31: Navigational Lighting Update Staci Timol, PE November 29, 2012.

District 2 RankingsDISTRICT 2 RISK ASSESSMENT STW RANKTWIN BRIDGES 70 1WESTERN KY PARKWAY BRIDGE 53 10ROCKPORT BRIDGE ON US 62 45 21WILLIAM NATCHER BRIDGE 44 23SEBREE BRIDGE 35 35SHAWNEETOWN BRIDGE 34 37AUDUBON PARKWAY BRIDGE 34 38CALHOUN BRIDGE 34 39LIVERMORE BRIDGE 32 41OWENSBORO BRIDGE (GLOVER CARY) 31 42ISLAND BRIDGE 30 44SPOTTSVILLE BRIDGE 27 45

Page 32: Navigational Lighting Update Staci Timol, PE November 29, 2012.

District 5 Rankings

DISTRICT 5 RISK ASSESSMENT STW RANKMILTON-MADISON BRIDGE 55 8KENNEDY BRIDGE 54 9US 31 CLARK MEMORIAL (2ND STREET) 47 19US 127 BRIDGE 38 32KY 22 GRATZ BRIDGE 33 40

Page 33: Navigational Lighting Update Staci Timol, PE November 29, 2012.

District 6 Rankings

DISTRICT 6 RISK ASSESSMENT STW RANKI 275 COMBS HEIL BRIDGE 60 4TAYLOR SOUTHGATE BRIDGE 58 5I 71 DUAL BRIDGES 57 7I 275 CARROLL CROPPER BRIDGE 51 12I 471 DANIEL CARTER BEARD BRIDGE 49 15BRENT SPENCE BRIDGE 49 16CLAY WADE BAILEY BRIDGE 43 25KY 8 4TH STREET BRIDGE 41 27I 275 DUAL BRIDGE 41 28US 42 BRIDGE 39 31US 42 CITY STREET 36 34ROEBLING SUSPENSION BRIDGE 35 36KY 1120 GIRL SCOUT BRIDGE 31 43

Page 34: Navigational Lighting Update Staci Timol, PE November 29, 2012.

District 9 Rankings

DISTRICT 9 RISK ASSESSMENT STW RANKCARL PERKINS BRIDGE 51 11SIMEON WILLIS, 12TH STREET BRIDGE 48 17MAYSVILLE - ABERDEEN/ SIMON KENTON 48 18WILLIAM HARSHA 41 26CATTLETSBURG - KENOVA 39 29

Page 35: Navigational Lighting Update Staci Timol, PE November 29, 2012.
Page 36: Navigational Lighting Update Staci Timol, PE November 29, 2012.
Page 37: Navigational Lighting Update Staci Timol, PE November 29, 2012.
Page 38: Navigational Lighting Update Staci Timol, PE November 29, 2012.
Page 39: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Changes To KEPT

• Other – Navigable Bridge• New Category• Customized to Our Data Needs• Automatically Populate Data– PONTIS– HIS– Calculate Risk Assessment

• Input From Districts

Page 40: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Training

• Spring 2012• Regular Schedule• Materials Available for

New Hires

Page 41: Navigational Lighting Update Staci Timol, PE November 29, 2012.

Questions?


Recommended