    NAVIGATOR WATCH

    The NAVIGATOR WATCH will be boon to those who wants to live life on the edge. It willspecifically complement those who are in adventure and travelling. The specification on

    which the watch is designed is as follows:

    The LCD display- The age of liquid crystal display has given tremendous opportunity tomanipulate a lot of information that can be displayed at a time. It will enable us to display

    real-time display of Temperature, Altitude, Pressure, GPS data with latitude andlongitude of a particular place. It is water resistant having a synthetic coating.

    The Strap of the watch will give it the complete design and will make it look fashionableand sporty.

    On-Board electronic sensors will display the time, altitude, temperature, GPS information,Pressure at a go. This will be an indispensible gadget for military usages also. GPS devicewill be customizable as there will be service providers who will be dealing with the GPS

    information upload in the watch.

  • 8/8/2019 Navigator Watch

    2/21

    WATCH SPECIFICATION

    BATTERY

    Mass 76 g

    Casing Composite

    Color options Black + Silver

    Battery type Li-Ion

    Display type LED

    Alarm/clock YesTimer Yes

    EXTRAS

    Altitude alarm Yes

    Altimeter/barometer lock Yes

    Infra temp controller Yes

    Chronograph, stopwatch Yes

    Built-in compass Yes

    GPS chipset Built-in

    GPS resolution 1 meter

    GPS-based recording functions Distance, 50 routes, Speed, 25 Tracks, 500 Waypoints

    Backlight Yes

  • 8/8/2019 Navigator Watch

    3/21

    NEW PRODUCT DEVELOPMENT

    IDEA GENERATION- CREATING OUT OF BOX PRODUCTS

    SCREENING

    PRELIMINARYDESIGN

    EVALUATION & FINAL

    DESIGN

    PROTOTYPE

    MARKET TESTING &

    RAMP UP

  • 8/8/2019 Navigator Watch

    4/21

    USE OF THE WATCHThe growing enthusiasm ofadventure sports has left open a wide area

    of sport gadgets that help to engage the enthusiasts more frequentlyinto challenges. To help them carry on with the sport frequent data

    updation regarding the environmental changes is important.

    We have found that this watch can also fulfill the needs ofmilitary

    covert operations that can lead to better operations during night and

    jungle warfare.This watch can find wide application in :

    AIR PRESSURE Mountain tracking

    WATER PRESSURE Scuba Diving and deep-sea diving

    TEMPERATURE Mountain tracking

    ALTITUDE Mountain tracking

    ON BOARD GLOBAL POSITIONING SYSTEM Globe trotting, Jungle expedition

  • 8/8/2019 Navigator Watch

    5/21

    MARKET SEGMENTATION

    We are planning to target low and medium cost segment

    Low cost $50 - $299

    Medium cost- $300-$999)

    High cost $1000 and above

  • 8/8/2019 Navigator Watch

    6/21

    THE PROJECT

  • 8/8/2019 Navigator Watch

    7/21

    LOCATION

    The location for the plant should be adjacent to the sea port or air-port , sothat logistics cost will be minimized to a great extent. The logistics includes-

    raw material purchase, carriage inwards to the factory, warehousing,delivery of finished goods.

    We have selected 3 locations for the plant setup- Kolkata, Mumbai, vizag.

    LOCATION INVESTMENT

    (In crore Rs.)

    FIXED COST

    (In crore Rs.)

    VARIABLE COST

    (in Rs.)

    Kolkata 100 5 3 lakhs

    Mumbai 150 6 6 lakhs

    Vizag 120 5.5 5 lakhs

  • 8/8/2019 Navigator Watch

    8/21

    The main factors leading to proper selection of location are:

    The methodologies that can be implemented for appropriate locationdecisions are:

    Here we use the Break-even-point method because it is a start upfirm.

    1.Cost-profit-volume

    2.Point rating method

    3.The transportation method of linear programming

    4.Center of gravity method

    1.Availability of skills and labour2.Site cost, amenities available

    3.Regional regulations

    4.Political, cultural and economic situation

  • 8/8/2019 Navigator Watch

    9/21

    BREAK EVEN POINT

    The Break-Even Point (BEP) is the point at which cost or expenses and revenue are

    equal: there is no net loss or gain, and one has "broken even. The break-even point

    is a special case oftarget income sales, where target income is 0 (breaking even).

    Selling price of each watch Rs. 8000Interest on investment - 12%

    Solution: Let NA be the number of BREAK EVEN units.

    PARTICULARS KOLKATA MUMBAI VIZAG

    SELLING PRICE NA* 8500 NA * 8500 NA * 8500

    Less : VARIABLE COST NA* 3000000 NA * 6000000 NA * 5000000

    CONTRIBUTION(per unit) NA* 1500 NA * 1450 NA * 1550

    FIXED COST 100 crore 150 crore 120 crore

  • 8/8/2019 Navigator Watch

    10/21

    For KOLKATA :-

    NA* 8500 = 12% of 5 crore + 3000000

    Therefore NA = 1052 units

    For MUMBAI :-

    NA* 8500 = 12% of 6 crore + 6000000

    Therefore NA = 1552 units

    For VIZAG :-

    NA* 8500 = 12% of 5.5 crore + 5000000

    Therefore NA = 1364 units

  • 8/8/2019 Navigator Watch

    11/21

    Purchasing departmentAs most of the electronic enhancement is outsourced to be assembled in the watch, hence,

    development of proper purchase plans from vendors and on time supply of materials is essential.

    The objectives of purchasing department are:-

    We have selected a number of vendors for the purchase purpose and

    have shortlisted the following vendors on the following criterias and also

    the list vendors to supply digital component

    1. To ensure availability of proper quantities of raw materials

    for smoothing function of production department.

    2. To procure materials at reasonably low cost

    3. To ensure supply of quality materials.

    4. Proper value analysis for the electronic components.

    a. To deliver on time as per order

    b. To deliver as per quality specification

    c. To supply material at as low a price as possible

    d. Capability to meet emergency orders

    COMPONENT VENDOR

    Digital altimeter Sunroad technology

    ltd. (China)

    Digital barometer Chihuahua Clock

    &Watch Co., Ltd

    GPS tracking device Shenzhen V-sun

    Electronics Co. Ltd

    Infra red temperature

    detector

    Innomax

    systems(Taiwan)

  • 8/8/2019 Navigator Watch

    12/21

    PRODUCTION PLANNING

    Working Hours 9:00 AM to 6:00 PM ( 10 hrs)

    THE process flow of production of the Navigator Watch

    A B C

    D EE FF GG HH II J K

  • 8/8/2019 Navigator Watch

    13/21

    Work

    Element

    Description Immediate

    Predecessor

    Time (hour)

    A Distribution of Raw Material None 6

    B Body Molding A 1

    C Strap fitting B 1

    D Painting of body A 1

    E Fitting in Time

    synchronization module

    D 0.5

    F Fitting GPS module E 1

    G Fitting electronic Altimeter F 2

    H Fitting infrared temp. device G 1.5

    I Install of Digital Barometer H 2

    J Connecting all componentsto LCD display

    I 3

    K Quality check and display

    check

    J,I,H,G,F,E 4

  • 8/8/2019 Navigator Watch

    14/21

    MANUFACTURING CAPACITY

    PLANNING1. Mapping the demand projection of all the styles to

    the available production capacity2. As some of the components are bought from vendors,

    the company will maintain what it calls its 'supplier

    network planning' (SNP). Through a portal for its

    vendors, orders can be placed keeping lead-times in

    mind. Vendors will upload information daily on this

    portal, helping the company keep track of theproduction in real time.

    3. He demand for each watch variant will be matched

    with the capacity within each of the company's

    manufacturing shops, as well as those of its vendors. In

    case the two do not fit advantageously, the forecast will

    get modified till a concrete production plan emerges.4. Reduce the idle time of machines and doing parallel

    projects in the machine that will reduce the idle time

    and more utilization of capacity.

    CAPACITY PLANNING-BASI S

    MASSPRODUCT

    ION TYPE

    BATCHTYPE

    JOB-SHOP

    OUTPUT/PRODUCT VARIETY

    CONTINUOUSFLOWTYPE

    In case of the DATA WATCH as the operations volume is relatively high and the output variety is relatively low, continuous flow

    type of production can be employed.

  • 8/8/2019 Navigator Watch

    15/21

    DOVETAILING OF PLANS

    Dovetailing of plans is thus necessary for attaining operational efficiency. From the table, it is evidentthat plan III is most economical. However the production plan has to be in sync with the market

    forecasts. It is to be noted that if delay in delivery is a very important factor and might result in loss

    of business then the company has to follow Plan I. This is where the trade-off lies.

    PLAN III

    PLAN

    II

    TIME

  • 8/8/2019 Navigator Watch

    16/21

    AGGREGATE PLANNINGProduction planning in intermediate range less than a year for the company is as

    follows:

    Aggregate Planning is very vital for a company. It defines a companys production rates,workforce levels and inventory position with respect to market demand and available

    capacity. It balances the market demand and the production rate of the organization.

    Optimal combination of production rate

    example: no ofwatchnavigators produced per unit of time

    Work force level

    example: workforce needed for the strap manufacturing facility or for assembling and packaging

    Inventory in hand

    example: no of electronics that the watch needs

    Relevant costs in aggregate planning

    Basic production costs

    fixed costs

    variable costs

    direct and indirect labour costs

    Cost associated with change in production rate

    hiring and laying off, working in single or multiple shiftstraining cost

    over time and under time cost

    inventory holding cost

    back-ordering costs

  • 8/8/2019 Navigator Watch

    17/21

    FACILITY LAYOUT

    The facility layout designed for the watch manufacturing plant has

    been done to keep in mind the best utilization of space and

    resources. As it is watch manufacturing so, we have decided to give

    it a Product-layout design. Because in product layout machines are

    arranged according to the progressive steps by which a product ismade.

    The advantages derived from it are:

    1. it will reduce our cost of materials handling2. it requires less floor space per unit of production

    3. It helps to avoid better production control and production

    bottlenecks can be avoided

  • 8/8/2019 Navigator Watch

    18/21

    Layout of Plant

  • 8/8/2019 Navigator Watch

    19/21

    QUALITY CONTROLZERO DEFECTS PROGRAMME

    The principles of the methodology are four-fold:

    Quality is conformance to requirements

    Every product or service has a requirement : a description of what

    the customer needs. When a particular product meets that

    requirement, it has achieved quality, provided that the

    requirement accurately describes what the enterprise and the

    customer actually need.

    Defect prevention is preferable to

    quality inspection and correction

    The second principle is based on the observation that it is

    nearly always less troublesome, more certain and less

    expensive to prevent defects than to discover and correctthem.

    Zero Defects is the quality standard The third is based on the normative nature ofrequirements: if a requirement expresses what is

    genuinely needed, then any unit that does not meet

    requirements will not satisfy the need and is no good.

    . Quality is measured in monetaryterms the Price of

    Nonconformance (PONC)

    Phil Crosby believes that every defect represents a cost,which is often hidden. These costs include inspection

    time, rework, wasted material and labor, lost revenue and

    the cost of customer dissatisfaction. When properly

    identified and accounted for, the magnitude of these

    costs can be made apparent, which has three advantages:1.cost-justification

    2.measure progress

    3.Decisions analysis

  • 8/8/2019 Navigator Watch

    20/21

    OPERATION CONTROLHere we have two parts firstly the proposed design and secondly the

    acceptable design which will be approved after undergoing all the stepsThe proposed design:

    The first step would include estimating the manufacturing

    cost. this includes estimating the cost of all the components

    for the original product as well as the equipments needed

    to produce it(include prices)

    The manufacturing cost can be segregated into three parts

    a) Reduce cost of components-the aim of the manufacturer

    should be to produce a quality product at a minimum cost

    b) Reduce cost of assembly- the assembling of the product

    includes attaching the groove in strap and the dial

    Standard product design is to be done in watch manufacturing

    For the watch to be manufactured we wil use:-Product focused system

    Standard product design

    Product to stock policy

  • 8/8/2019 Navigator Watch

    21/21

    START

    RAW MATERIAL SORTING FOR MANUFACTURING PROCESS

    ARRANGING

    THE

    ELECTRONICCOMPONENTS

    MAKING THE WATCH CASING AND

    PAINTING THE BODY OF THE WATCH

    CHECKING THE

    COMPONENTS FOR

    QUALITY

    SPECIFICATIONASSEMBLING THE COMPONENTS IN THE WATCH

    AND FIXING THE COMPONENTS TO THE LCD

    DISPLAY PANEL

    QUALITY CHECK AND QUALITY ASSUARANCEPACKAGING AND

    LABELLING THE WATCHES

    MARKETING AND

    SHIPPING THE

    WATCHES AS PER

    ORDER

    IF NO


Recommended