NBCUniversal
NBCU & EIDR Integration Prepared for Hollywood IT Society Summit, 2012
NBCUniversal P2
Agenda
• NBCU EIDR Integration Roadmap – POC to Operational Registration
• Phase 1 – Title Matching
• Phase 2 – Technical & UX Integration
• Next Steps
• Phase 3 – Operationalizing EIDR Registry for UV Support
NBCUniversal P3
POC to Operational Registration
Phase 1: Title Matching
Phase 2: Technical Integration
Phase 3: Operationalize for UV Support
NBCUniversal P4
POC to Operational Registration
Phase 1: Title Matching
• Goal
• Manual Title Matching to compare NBCU Title Metadata with seeded EIDR Data
• Scope
• Initially - 200 Feature Titles
• Feature films at title level produced within the last 10 yrs.
• Expanded - ~3400 titles
• Feature films at title level going back to 1916
92%
8%
80%
20%
200 feature titles in TM • 184 titles matched on studio, title
name, release year • 16 titles not in EIDR, required manual
registry
3390 feature titles in TM • 2722 titles matched on studio, title
name, release year • 669 titles not in EIDR, requires
manual registry
NBCUniversal P5
POC to Operational Registration
Phase 2: Technical Integration
Invoke new EIDR registration call with appropriate title data from TM
Is title a duplicate
?
Wait for result of manual resolution process.
Obtain EIDR ID of the new title or match
found in manual process
Register with EIDR and get EIDR ID for title
Get EIDR ID
Store EIDR ID obtained in the new TM table
Registration Scenarios
• Goal
• Enable the ability to register Feature Titles with EIDR from within the Title Management application.
• Scope
• Automated duplicate title checking and registration of 200 Feature Titles using Java API
• Integrated EIDR Registration with TM User Experience
No Yes Yes (manual)
NBCUniversal P6
POC to Operational Registration
Phase 3: Operationalize for UV Support
• Goal
• Enable the ability to register Title and Version with EIDR from within the Title Management application in order to support NBCU Ultra Violet operations.
• Scope
• Expand Technical Integration POC to include the version level registration capability
• Secured project funding to operationalize the architecture and UI designs for automated EIDR registry at version level
• UAT and deploy to Prod in Q2
NBCUniversal P7
Questions?