NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction Expert Task Group Ames, IA May 1, 2017 Y. Richard Kim, Cassie Castorena, Farhad Yousefi Rad, Michael Elwardany NC State University
Transcript
Page 1: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

NCHRP Project 9-54 Long-Term Aging of Asphalt

Mixtures for Performance Testing and Prediction

Asphalt Mixture & Construction Expert Task Group Ames, IA

May 1, 2017

Y. Richard Kim, Cassie Castorena, Farhad Yousefi Rad, Michael Elwardany

NC State University

Page 2: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Outline NCHRP 09-54 objectives Proposed Long-Term Aging Method Kinetics Modeling Aging Durations Based on Climatic Data

Page 3: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

NCHRP 09-54 Objectives Develop a calibrated and validated procedure to

simulate long-term aging of asphalt mixtures for performance testing and prediction.

Develop an aging model that is more accurate than GAS model and less cumbersome than the Transport model (developed by Texas A&M).

Develop calibration functions by investigating the differences in mechanical properties as functions of traffic, climate, and moisture.

Page 4: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Aging Factors Investigated

Pressure vs. Oven Compacted specimen vs. Loose mix 95°C vs. 135°C

Page 5: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Oven aging of loose mix at 95°C was found to be the most promising method for long-term aging of asphalt mixture based on the following criteria:

• Specimen integrity (Compactability)

• Uniformity of oxidation

• Efficiency

• Practicality and versatility

• Simulation of physicochemical changes in field aging

Proposed Long-Term Aging Method

95°C

Page 6: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Kinetics Modeling

Verification of Existing Kinetics Models Using Rheological AIP (log G*) and Laboratory Aged Loose Mix Data

Page 7: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

𝑃 = 𝑀 1 − exp −𝑘𝑓𝑡 + 𝑘𝑐𝑡

CA= 𝐶𝐶𝑡𝑡𝑡𝑡 + 𝑀 1 − exp −𝑘𝑓𝑡 + 𝑘𝑐𝑡

Herrington _ New Zealand

Charles Glover _ Texas A&M

Petersen and Glaser _ WRI

Kinetics Modeling

log 𝐺∗ = log𝐺0∗ + 𝑀(1 −𝑘𝑐𝑘𝑓

) 1 − exp −𝑘𝑓𝑡 + 𝑘𝑐𝑀𝑡

𝑘𝑓 = 𝐶𝑓 exp (−𝐸𝑡𝑓 𝑅𝑅� ) 𝑘𝑐 = 𝐶𝑐 exp (−𝐸𝑡𝑐 𝑅𝑅� ) 𝑤ℎ𝑒𝑒𝑒

NCHRP 09-54

𝐶 + 𝑆 = (𝐶 + 𝑆)0+𝑀(1 −𝑘𝑐𝑘𝑓

) 1 − exp −𝑘𝑓𝑡 + 𝑘𝑐𝑀𝑡

Page 8: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64°

C, 1

0 ra

d/s

(kP

a)

Aging Duration (Days)

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40lo

g G

*, 6

4°C

, 10

rad

/s (

kPa)

Aging Duration (Days)

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64°

C, 1

0 ra

d/s

(kP

a)

Aging Duration (Days)

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40lo

g G

*, 6

4°C

, 10

rad

/s (

kPa)

Aging Duration (Days)

ALF-Control ALF-SBS

WesTrack-Coarse WesTrack-Fine SHRP-AAD-1

Kinetics Modeling

85°C Predicted 70°C Predicted STA

95°C Predicted

85°C Measured 70°C Measured

95°C Measured Single Binder

Dependent Variable

(M)

M = 1.104 M = 0.871

M = 0.743 M = 0.524

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64°

C, 1

0 ra

d/s

(kP

a)

Aging Duration (Days)

M = 0.725

Page 9: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64°

C, 1

0 ra

d/s

(kP

a)

Aging Duration (Days)

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40lo

g G

*, 6

4°C

, 10

rad

/s (

kPa)

Aging Duration (Days)

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64°

C, 1

0 ra

d/s

(kP

a)

Aging Duration (Days)

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64°

C, 1

0 ra

d/s

(kP

a)

Aging Duration (Days)

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40lo

g G

*, 6

4°C

, 10

rad

/s (

kPa)

Aging Duration (Days)

LTPP-TX LTPP-SD Kinetics Model Verification

85°C Predicted 70°C Predicted STA

95°C Predicted

85°C Measured 70°C Measured

95°C Measured Single Binder

Dependent Variable

(M)

M = 0.88 M = 0.747

NCS9.5B

M = 0.937

LTPP-WI

M = 1.016

LTPP-NM

M = 0.546

Page 10: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Verification Using Non-Isothermal History

0

5

10

15

20

25

30

35

40

16D 33D 43D

G*,

64°C

, 10

rad/

s (k

Pa)

Aging Duration

PredictedMeasured

13% Error

13% Error14% Error

30

40

50

60

70

80

0 5 10 15 20 25 30 35 40 45

Tem

pe

ratu

re (

°C)

Aging Time (Days)

Loose Mix Sampling

2 D

6 D

6 D

13 D

5 D

10 D

1 D15% G* ≈ 10% E*

WesTrack Fine 1995

Page 11: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Kinetics Modeling to Find Required Duration to Match Field Aging

Field (EICM) Lab Oven Aging

95°C

Aging Duration?

log 𝐺𝐹𝐹𝑒𝐹𝐹∗ = log 𝐺𝑜∗ + 𝑀[(1 − 𝑡𝑐𝑡𝑓� ) 1 − exp −𝑘𝑓𝑡 + 𝑘𝑐𝑡]𝐹𝐹𝐹𝐹𝐹

log 𝐺𝐿𝐿𝐿∗ = log 𝐺𝑜∗ + 𝑀[(1 − 𝑡𝑐𝑡𝑓� ) 1 − exp −𝑘𝑓𝑡 + 𝑘𝑐𝑡]𝐿𝑡𝐿

[(1 − 𝑘𝑐𝑘𝑓� ) 1 − exp −𝑘𝑓𝑡 + 𝑘𝑐𝑡]𝐹𝐹𝐹𝐹𝐹 = [(1 − 𝑘𝑐

𝑘𝑓� ) 1 − exp −𝑘𝑓𝑡 + 𝑘𝑐𝑡]𝐿𝑡𝐿

Required Aging Duration to Match Field Aging is Independent of

Binder Source/Type (i.e., STA G* and M value)

Page 12: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64°

C, 1

0 ra

d/s

(kP

a)

Aging Duration (Days)

Non-Isothermal Laboratory Aging Trial • FHWA ALF Control • WesTrack Fine 1995

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64 °

C,

10 r

ad/s

(kP

a)

Aging Duration (Days)

Non-Isothermal Aging Verification

M = 0.871

M = 0.743

ALF-Control

WesTrack-Fine

30

40

50

60

70

80

0 5 10 15 20 25 30 35 40 45

Tem

pe

ratu

re (

°C)

Aging Time (Days)

Loose Mix Sampling

2 D

6 D

6 D

13 D

5 D

10 D

1 D

Page 13: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Non-Isothermal Aging Verification

30

40

50

60

70

80

0 5 10 15 20 25 30 35 40 45

Tem

pe

ratu

re (

°C)

Aging Time (Days)

Loose Mix Sampling

2 D

6 D

6 D

13 D

5 D

10 D

1 D

Non-Isothermal Laboratory Aging Trial • FHWA ALF Control • WesTrack Fine 1995

0

0.5

1

1.5

2

2.5

3

0 10 20 30 40 50

Mea

sure

d D

urat

ion

Non-Isothermal Oven Aging Duration

ALF - ControlWesTrack - Fine 1995

y = 0.8665x + 0.2657R² = 0.96

0

0.5

1

1.5

2

2.5

3

0 0.5 1 1.5 2 2.5 3

ALF

-C

ontr

ol

Mea

sure

d D

urat

ion

WesTrack - Fine Measured Duration

Page 14: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40lo

g G

*, 6

4°C

, 10

rad

/s (

kPa)

Aging Duration (Days)

Field Cores from: • FHWA ALF Control • FHWA ALF SBS-LG Modified

0

0.5

1

1.5

2

2.5

3

3.5

4

0 5 10 15 20 25 30 35 40

log

G*,

64°

C,

10 r

ad/s

(kP

a)

Aging Duration (Days)

Verification from Field Cores

M = 0.743

ALF-Control

ALF-SBS

M = 0.524

Field (19 mm depth) Required Durations

ALF-Control 7.7 days

ALF-SBS 8 days

Page 15: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Verification from WMA vs. HMA Manitoba Sections – 4 Years Old

Matching field aging levels in the laboratory

85°C

Field Section Depth Required Durations at 85°C

MIT-Control HMA 19 mm 16.5 days

MIT-WMA Evotherm 19 mm 16.1 days

y = 0.0249x + 0.1151R² = 0.9825

y = 0.0181x + 0.1442R² = 0.9995

y = 0.0217x + 0.0935R² = 0.9935

0

0.2

0.4

0.6

0.8

0 5 10 15 20 25 30

log

G*,

64°C

, 10

rad/

s (k

Pa)

Duration (Days)

MIT-HMA

MIT-Evotherm

MIT-Foam

Page 16: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Verification from WMA vs. HMA NACT Sections – 4 Years Old

Matching field aging levels in the laboratory

85°C

Field Section Depth Required Durations at 85°C

NCAT-Control HMA 19 mm 35.6 days

NCAT-WMA Foam 19 mm 31.3 days

y = 0.021x + 0.88R² = 0.9451

y = 0.0188x + 0.8397R² = 0.9525

0.5

0.7

0.9

1.1

1.3

1.5

0 5 10 15 20 25 30

log

G*,

64°C

, 10

rad/

s (k

Pa)

Duration (Days)

NCAT-HMA

NCAT-Foam

Page 17: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Aging Durations Based on Climatic Data

Matching 4, 8, and 16 Years of

Field Aging

Page 18: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Climatic Aging Index

Climatic Aging Index (CAI)

CAI= ∑ (A × exp −𝐸𝑎𝑅𝑅� /24)

where 𝐶, 𝐸𝑡 = Fitting Parameters R= Universal Gas Constant T= Air Temperature in Kelvin

Page 19: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction

Aging Durations Based on Climatic Data

y = 1xR² = 0.56

0

5

10

15

20

25

0 5 10 15 20 25

Agin

g Du

ratio

n at

95°

C (D

ays)

Climatic Aging Index, CAI

ALF-CTRL ALF-SBSWesTrack-Fine WesTrack-CoarseLTPP-TX LTPP-NMLTPP-SD LTPP-WI

t3

t2

t1

CAI4Y CAI8Y CAI16Y

Page 20: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction
Page 21: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction
Page 22: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction
Page 23: NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for ......NCHRP Project 9-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction Asphalt Mixture & Construction