+ All Categories
Home > Documents > NCP 31 Assgn

NCP 31 Assgn

Date post: 22-Feb-2018
Category:
Upload: surender
View: 225 times
Download: 1 times
Share this document with a friend

of 20

Transcript
  • 7/24/2019 NCP 31 Assgn

    1/20

    NICMAR (NCP-31)

    Assignment On

    PRODUCTIVITY & WORKSTUDY TECHNIQUES IN

    CONSTRUCTION PROJECTS

    N.SURENDER PGPCM- (M-13) (Page: 1)

    Assignment submitted by:-N. SURENDERReg No. 2!"!""#$$"22%

    PPC' ( )'"*+

    N,tion,- Institte o/Const01tion

    ',n,gement ,n

    Rese,0134 Pne.

  • 7/24/2019 NCP 31 Assgn

    2/20

    NICMAR (NCP-31)

    Co0se No. " NCP *

    Co0se Tit-e ( P0o1ti5it6 ,n Wo07 St6Te13ni8es in Const01tion P0o9e1ts

    ASSIN'ENT :RIE;USION B RECO''ENDATION


Recommended