Module 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course NDDOT Erosion & Sediment Control – Construction Course Module 4: Stormwater Pollution Prevention Plan (SWPPP) 1 What’s covered in this module? 1. What is a SWPPP 2. Important initial considerations that affect the SWPPP 3. The main parts of the SWPPP 4. Permit requirements 2 Page 1
Transcript
Page 1: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

NDDOT Erosion & Sediment Control – Construction CourseModule 4: Stormwater Pollution Prevention Plan (SWPPP)

1

What’s covered in this module?

1. What is a SWPPP

2. Important initial considerations that affect the SWPPP

3. The main parts of the SWPPP

4. Permit requirements

2

Page 1

Page 2: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

What are the module’s learning objectives?

1. Identify initial considerations

2. Develop the SWPPP from the plans and Contractor operations and phasing

3

What is a SWPPP?

Definition:

A document, a plan that describes who and what will control erosion and keep sediment from leaving the project site, and when, where and how this will be done. The plan is the common link between the owner, designer, contractor, and inspector.

4

Page 2

Page 3: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

What is a SWPPP?

A SWPPP is a site-specific, written document.

− Identifies potential pollution

− Describes practices

− Identifies procedures

5

Why is a SWPPP important?

1. Required by the permits

2. Powerful tool to assist erosion and sediment control

6

Page 3

Page 4: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Who is responsible for developing it?

Prime Contractor

Plan Designer

SWPPP

Design Plans

Project Implementation

7

Overview of SWPPP Development Process

Inspection, Maintain, and Record

Select Good Housekeeping ESC measures

Select ESC measures

Assess Site & Proposed Project

8

Page 4

Page 5: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Initial Considerations

1. Existing conditions

2. Outfalls

3. Waterbodies

4. Project boundaries

9

Initial Considerations

5. Environmentally sensitive areas

6. Permanent stormwater controls

a. Ponds

b. Infiltration

7. Project phasing

10

Page 5

Page 6: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Existing Conditions

Soils

Hydrology

Topography

11

Outfalls and Waterbodies

Considerations:

− Where does it drain to?

− How close will the disturbance be?

− What protections are required?

− Is it impaired? What for? Total Maximum Daily Load (TMDL)?

12

Page 6

Page 7: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Project Boundaries

Considerations:

− Slopes

− Proximity to right of way lines

− What is coming into the project?

− Points of egress – trackout, etc.

− Impacts from or to outside

13

Environmentally Sensitive Areas

Rivers, Lakes, Streams:− Spawning times

Threatened and Endangered Species

Wetlands:− Impacts− Mitigation

Cultural sites and other avoidance areas

14

Page 7

Page 8: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Permanent Stormwater Controls

What permanent structures are required?

− MS4

− City

− Are there any existing?

15

Permanent Stormwater Controls

Placement

Sizing

Maintenance

16

Page 8

Page 9: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Project Phasing

What will be done first?

What should be done first?

Environmental commitments

Should things be required due to the nature of the work?

17

What are the components of a SWPPP?1. Illustrative:

a. Map/site planb. Detailsc. Drawings

2. Narrative:a. Contractors means and methods b. Plan notesc. Environmental commitments

3. Calculations and other supporting documents

18

Page 9

Page 10: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

What are the parts of the illustrative section in the SWPPP?1. Site map

2. Erosion and Sediment Control Measure (ESCM) installation drawingsa. Standard drawingsb. Plan detailsc. Manufacturer’s drawings/details

3. Other visual aids

19

What are the parts of a map/site plan in the SWPPP?

1. Vicinity map

2. North arrow

3. Existing contours

4. Preliminary and final design contours

5. Existing vegetation

6. Soils

20

Page 10

Page 11: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

What are the parts of a map/site plan in the SWPPP?

7. Critical areas

8. Existing and final drainage patterns

9. Limits of clearing and grading

10. Outfalls

11. Surface waters (including wetlands)

21

What are the parts of a map/site plan in the SWPPP?

12. Temporary ESCMs

13. Permanent ESCMs

14. Permanent stormwater management practices

15. Off site areas (if applicable)

16. Legend

22

Page 11

Page 12: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Plan Sections

Section 75 – Wetlands

Section 76 – Temporary ESCMs

Section 77 – Permanent ESCMs

23

Page 12

Page 13: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Site Map Example

24

Page 13

Page 14: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

ESCM Installation Drawings

25

Page 14

Page 15: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

ESCM Installation Drawings

26

Page 15

Page 16: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

ESCM Installation Drawings

27

Page 16

Page 17: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

ESCM Installation Drawings

28

Page 17

Page 18: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

What are the parts of the narrative section in a SWPPP?

1. Site description

2. Operational controls

3. Erosion and sediment control measures

4. Stormwater management

5. Maintenance

29

What are the parts of the narrative section in a SWPPP?

6. Inspections

7. Plan review and revisions

8. Signatory requirements

9. Local requirements

10. Final stabilization

30

Page 18

Page 19: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Site Description

1. Project description

2. Existing site conditions

3. Adjacent areas

4. Estimates of areas

5. Proposed timetable

6. Soils

7. Critical areas

8. Surface waters

9. 303(d) list information

31

Project Description, Existing Site Conditions, Adjacent & Estimated Areas

Who

What

Existing issues

Land uses

32

Page 19

Page 20: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

A proposed timetable of activities that disturb soils for major portions of the site

33

Page 20

Page 21: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

34

Page 21

Page 22: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Soils

What types of soil?

Soil properties

Specific ESCMs due to soils

35

Critical Areas

Environmentally sensitive

Highly erosive

High flow

Time sensitive

36

Page 22

Page 23: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Surface Waters and 303(d) list

Where does the site drain?

Multiple receiving waters

Impaired waters and the 303(d) list

Integrated Report

TMDLs

37

Operational Controls

1. Chain of responsibility

2. Good housekeeping practices

3. Preventative measure practices

4. Spill prevention and response procedures

38

Page 23

Page 24: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Operational Controls

5. Training

6. Concrete waste control

7. Dewatering

39

Chain of Responsibility

Identify who will oversee:− SWPPP

− ESCM installation, inspection, maintenance and removal

Develop a Chain of Responsibility: − NOT JUST DOT and PRIME CONTRACTOR

40

Page 24

Page 25: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Good Housekeeping Practices

Litter

Construction debris

Chemicals

Human waste

Vehicle fueling/maintenance

Vehicle washing

41

Trackout and Dust Control

Soils

Particular ESCMs

Practices

Locations

Plan for cleaning

42

Page 25

Page 26: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Preventative Measure Practices

Stormwater control devices

− Operation

− Inspection

− Maintenance

43

Preventative Measure Practices

Equipment and vehicles

− Operation

− Inspection

− Maintenance

44

Page 26

Page 27: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Spill Prevention and Response Procedures

Specific handling procedures

Storage requirements

Spill containment

Cleanup procedures

Use Spill Prevention, Control and Countermeasure (SPCC) Plans

45

Training

Annual training

As new employees are hired

Erosion and sediment control practices

Spill response

Good housekeeping

The SWPPP

46

Page 27

Page 28: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Training Subcontractors

Include specific contract language requiring subcontractors to implement appropriate stormwater controls.

47

Concrete Waste Control

Concrete wash water

Grindings

Slurries

48

Page 28

Page 29: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Dewatering

Only stormwater or groundwater

Cannot discharge sediment

Inspected daily

Includes stream diversions

49

Erosion and Sediment Control Measures

50

Page 29

Page 30: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Erosion Control (keeping the dirt in place)

1. Minimize disturbed area and protect natural features and soil

2. Phase construction activity

3. Control stormwater flowing onto and through the project

4. Stabilize soils promptly

5. Protect slopes

51

Sediment Controls (the second line of defense)

6. Protect storm drain inlets

7. Establish perimeter controls

8. Retain sediment on-site and control dewatering practices

9. Establish stabilized construction exits

10. Inspect and maintain controls

52

Page 30

Page 31: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Erosion and Sediment Control MeasuresPerimeter control

Temporary or permanent cover

Required maintenance

Off-site accumulations removed

Withstand a 2yr, 24 hour rain event

TMDL requirements

Appendix 1

53

PerimeterControl

All down slope boundaries

Side slope boundaries

54

Page 31

Page 32: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Temporary or Permanent Cover

55

Where activities have been completed or temporarily ceased

Include graded slopes, pond embankments, ditches, berms and soil stockpiles

56

Page 32

Page 33: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Required Maintenance

All control measures must be properly selected, installed, and maintained

Required maintenance must be outlined for each device

Justification required if against guidelines

57

58

Page 33

Page 34: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Off-site Accumulations

Must be removed

Minimize off-site impacts

Plan must be modified

Have a plan in place for this

59

60

Page 34

Page 35: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

2 Year, 24 Hour Rain Event

Controls are expected to withstand and function properly

Visible erosion should be minimal

Ranges from about 1.9 inches in the west to 2.3 inches in the east

Rain Gauge

61

62

Page 35

Page 36: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Must Comply with TMDL Requirements

Patterson Lake

WLA = 0 Tons/year

63

Appendix 1Specific Requirements for ESCMs

64

Page 36

Page 37: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Permanent Stormwater Management

SWPPP must identify:

− Ponds

− Flow reduction devices

− Infiltration areas

− Energy dissipation at discharge locations

− Erosion protection for outfalls and ditches

65

66

Page 37

Page 38: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

What are the environmental considerations?

Wetland impacts

Mitigation

404 Permit

Temporary/permanent impacts

Executive Order 11990

67

What are the environmental considerations?

Wildlife

Threatened and Endangered

Fish passage

Spawning seasons

68

Page 38

Page 39: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

What are the environmental considerations?

Environmental documents

Environmental commitments

69

70

SWPPP must indicate the maintenance intervals for all ESCMs

Page 39

Page 40: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Inspections

Must provide for site inspections

Including a copy of the inspection report being used

May have to revise SWPPP based upon findings of the inspections

71

Plan Review and Revisions

Signatory Requirements

SWPPP must be made available upon request

72

Page 40

Page 41: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Plan Review and Revisions

Must amend the SWPPP when there is a change in Design, Construction, Operation, Maintenance, or if found to be ineffective

73

Signatory Requirements

SWPPP must be signed

Signed by a responsible corporate officer, a general partner, or a principal executive officer

Can be someone authorized by the above

Permit contains certification language

74

Page 41

Page 42: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Local Requirements

Some Cities and Counties have their own requirements

Must comply with the most stringent requirement

75

Final Stabilization

SWPPP must show how the site will be stabilized.

Three methods:

1. 70% Vegetation

2. Farmland

3. Arid exemption (3 year rule)

76

Page 42

Page 43: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

What are the components of the calculation section in the SWPPP?

Calculations – > data

77

Common SWPPP Mistakes and Violations

Not developing a SWPPP

Missing required sections

Inadequate maps/illustrations

ESCMS not designed to 2 year 24 hour storm

78

Page 43

Page 44: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Common SWPPP Mistakes and Violations

Weak chain of responsibility section

No signature/certification

No Inspection Report

Cookie cutter SWPPP

79

Art of Writing A SWPPP

Clear and concise

Avoid “as needed” or “when required”

Be specific, but not too specific

80

Page 44

Page 45: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Timetable of Soil Disturbance

When will soils be disturbed and stabilized?

When will infrastructure be installed?

What ESCMs will be used during a particular phase?

81

Timetable of Soil Disturbance

When will ESCMs be installed or removed?

What phase are you currently in, are ESCMs installed according to the plan?

82

Page 45

Page 46: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Soils

What types of soils do you have (NRCS)?

How erosive are they to water and wind?

−Do soils have a low, medium or high erosivity to water? Do your ESCMs address this?

− Do soils have a low, medium or high erosivity to wind? What type of ESCMs are you using?

83

Soils

What type of permeability do soils have (low, medium, high)?

− Will water soak in or runoff?

Do soils stick to tires?

− Tracking

84

Page 46

Page 47: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Chain of Responsibility

Who is responsible for what and when?

If the responsible party is unable to complete their task, who then has authority to make sure that task is completed?

85

Chain of Responsibility

“The owner shall develop a chain of responsibility with all operators on the site to ensure that the SWPPP will be implemented and stay in effect until the construction project is complete, the entire site has undergone final stabilization, and a NOT [notice of termination] has been submitted to the Department.”

86

Page 47

Page 48: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Trackout

Are you even considering it, because it will happen?

What type of soils do you have?

Will they stick to tires?

87

Trackout

Does your plan call for a trackout pad?

− Is it installed?

− Is it installed in the right spot?

− Have you moved it and did you update your map?

− Are people using it?

88

Page 48

Page 49: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Trackout

Do you have a plan to clean streets by the end of the day?

89

Dust

Like trackout, are you even considering it, because it will happen

What type of soils do you have?

− Will they blow away?

− Will it effect an individual?

− Will it effect a surface water?

90

Page 49

Page 50: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Dust

What do you plan on using to control dust?

− Will it be enough?

What other dust control options do you have?

91

Concrete Wash Water

Will trucks be washed on site or back at the plant?

92

Page 50

Page 51: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Concrete Wash Water

Will there be a wash pit on site?

− Is it shown on the plans?

− Is it in the same location as shown on the plans?

− Will it move around the site?

93

Concrete Wash Water

How will drivers know where it is at?

How was it sized?

How will it being maintained?

94

Page 51

Page 52: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Erosion and Sediment Control Measures

Do you have an installation guide for selected ESCMs?

How do you know they are installed correctly?

Do you know where you are going to install ESCMs?

95

Erosion and Sediment Control Measures

Is placement/location of ESCMs in accordance with the permit?

Is placement/location of ESCMs in accordance with standard practices?

96

Page 52

Page 53: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Group Activity

Each group must write a section of the SWPPP

Basic project: 20 mile widening job, last part in town, concrete paving

97

What are the module’s takeaway points?

Design affects SWPPP

SWPPP must convey Design

Two main parts: Illustrative and Narrative

Site Specific

Art of SWPPP Writing

98

Page 53

Page 54: NDDOT Erosion & Sediment Control – Construction … 4: Stormwater Pollution Prevention Plan (SWPPP) – NDDOT Erosion & Sediment Control – Construction Course What are the module’s

Module 4: Stormwater Pollution Prevention Plan (SWPPP) –NDDOT Erosion & Sediment Control – Construction Course

Questions?

99

What’s next?

Exam