Nehru Place-Place making Project January, 2015
Transcript
Page 1: Nehru place  placemaking project uttipec-sdmc_shakti

Nehru Place-Place making ProjectJanuary, 2015

Page 2: Nehru place  placemaking project uttipec-sdmc_shakti

3- slidePROJECT SUMMARY:

Page 3: Nehru place  placemaking project uttipec-sdmc_shakti

PROPOSED MASTER PLAN

MLCP + OFFICE + RETAIL ON GROUND

MLCP + RETAIL ON GROUND

MLCP + RETAIL ON GROUND

CONVENTION CENTRE

HOTEL MLCP + RETAILRETAIL + OFFICE + SERVICE APARTMENTS

RETAIL + OFFICE + SERVICE APARTMENTS

HOTEL BUS TERMINAL + DEPOT + RETAIL

PLANNING – DESIGN PROPOSAL

Page 4: Nehru place  placemaking project uttipec-sdmc_shakti

d

OPERATION & MAINTENANCE MODEL - PPPBus Terminal

98 Crores

Multi Level Car Parking

NMT & pedestrain Infrastructure

Public spaces and Social Ammenities

New Commercial Development

Project Cost 485 Crores

Project IRR146% 35%

Breakeven Period4 yrs(119 Crores)

Equity IRR

FinancialViability

347% 75%

611 Crores

19%

28%

10 Yrs(617 Crores)

Project Viable

NA

Project Viable Project Viable

Parking & Public Space Management

?

Page 5: Nehru place  placemaking project uttipec-sdmc_shakti

Proposed Way Forward

• Creation of a multi stakeholder platform under the leadership of DDA/ SDMC• Constitution of a high level committee comprising of key stakeholders in the Nehru Place project

•UTTIPEC•SDMC•CPWD•DTC•DMRC

• To review and approve recommendations for the area• Facilitate implementation of the recommended interventions

Page 6: Nehru place  placemaking project uttipec-sdmc_shakti

PROJECT DETAILS:

Page 7: Nehru place  placemaking project uttipec-sdmc_shakti

7

Access & Connectivity

Vehicle & Parking

Management

Multi-Modal Integration

Pedestrian & Public Spaces

Cleanliness & Safety

Parameters of a vibrant commercial district

Page 8: Nehru place  placemaking project uttipec-sdmc_shakti

New Friends Colony

East of Kailash

Sant Nagar

Kailash Colony

Chitranjan Park

Pamposh EnclaveG K 1

G K 2

• Planned in 1969, operational in early 1980s as a commercial business district surrounded by residential areas

• 38 Hectares of prime real estate in the heart of South Delhi

• Currently a regional commercial centre served by two major roads, 2 Metro lines and 24 bus routes

• Less than 2/3rd developed portion has 5.8 lakh sq.m. built commercial development

• Attracts 1,30,000 visitors and 32,000 vehicles daily

OUTER RING ROAD

LALA LAJPAT RAI MARG

NEHRU PLACE DISTRICT CENTRE

Page 9: Nehru place  placemaking project uttipec-sdmc_shakti

Parking consumes public space

Page 10: Nehru place  placemaking project uttipec-sdmc_shakti

Unwelcoming & hostile access

Page 11: Nehru place  placemaking project uttipec-sdmc_shakti

Desolate & unsafe at night

Page 12: Nehru place  placemaking project uttipec-sdmc_shakti

Lacks maintenance, amenities

Page 13: Nehru place  placemaking project uttipec-sdmc_shakti

New Friends Colony

East of Kailash

Sant Nagar

Kailash Colony

Chitranjan Park

Pamposh EnclaveG K 1

G K 2

OUTER RING ROAD

LALA LAJPAT RAI MARG

NEHRU PLACE – DISTRICT CENTRE

An underperforming and underutilized, 38 hectares of prime public asset

Page 14: Nehru place  placemaking project uttipec-sdmc_shakti

Renewal - Regeneration Project: Nehru Place District Centre

May’13 Project conceptualised by UTTIPEC

June’13 Project initiated: Shakti commissioned technical partners at the request of UTTIPEC

Nov’13 Draft designs developed in consultation with UTTIPEC and the local stakeholders

Dec’13 Designs approved by UTTIPEC

Jan’14 Project discussed with Engineering Member, DDA

May’14 Project discussed with Commissioner, SDMC

Today Project discussion with VC, DDA for guidance on next steps

Page 15: Nehru place  placemaking project uttipec-sdmc_shakti

New Friends Colony

East of Kailash

Sant Nagar

Kailash Colony

Chitranjan Park

Pamposh EnclaveG K 1

G K 2

OUTER RING ROAD

LALA LAJPAT RAI MARG

NEHRU PLACE – DISTRICT CENTRE

An underperforming and underutilized, 38 hectares of prime public asset

Parking Planning Management

Key Interventions identified

Page 16: Nehru place  placemaking project uttipec-sdmc_shakti

d

16

Traffic and pedestrian counts: 6 locations

Parking survey: 25 Sites

Boarding and alighting survey: 4, Bus and Metro Stations

User survey: 2000 commuters and visitors

Establishment survey: 500 commercial establishments

Topographic survey: 38 hectares, 10km

Activity Survey: Day, night, weekday and weekend

Photo documentation

Data Collection

Page 17: Nehru place  placemaking project uttipec-sdmc_shakti

• 9500 ECS (Phase 1 & 2)• 1000 in 1 MLCP –

5000sqm – 4 floors• 8500 at grade – 68000

sqm (Stacked)• 20% of precinct area

Demand in BAU Scenario (2021)

• 5500 ECS• 3500 in 4 MLCP –

15000sqm• 2000 ECS at grade –

48000 sq.m.• 18% of precinct area

Planned Capacity (2021) • 12000 ECS

• 10000 in 5 MLCP – 18000sqm

• 2000 at grade – 48000 sqm

• 20% of precinct area

As per Master Plan Norms (2021)

• 6600 ECS (Phase 1)• 1000 in 1 MLCP – 5000

sqm – 4 floors• 5600 at grade – 46000

sq.m.• 14% of precinct area

PARKING DEMAND vs CAPACITY SCENARIOS

Best Case Supply Scenario MLCP Vs At-grade to be balanced

Base year Demand (2013)

Page 18: Nehru place  placemaking project uttipec-sdmc_shakti

Current Price

Short Term (<2 hrs)

At Grade MLCP

20 30

Long Term (>2 hrs)

40 60

Demand Capacity

87% of capacity

5000 MLCP, 500 Surface

No. of Visitors Parking space consumed

8% of precinct area

*-As per Transport Department notification

At grade parking encroaching street space Only 30% of MLCP used

Current Scenario Proposed Scenario

Proposed Price

Short Term

At Grade MLCP

125* 45

Long Term

475* 180

What is driving parking demand?

Page 19: Nehru place  placemaking project uttipec-sdmc_shakti

PLANNING

Ideally, the area should have access from all directions

Astha Kunj, restricting access from North

Currently majority of access is from the South and the west

Page 20: Nehru place  placemaking project uttipec-sdmc_shakti

PLANNING

Within precinct, public transport is at the periphery while personal vehicles have close access while

Page 21: Nehru place  placemaking project uttipec-sdmc_shakti

PLANNING

Improved circulation of public transport within the commercial area is recommended

Page 22: Nehru place  placemaking project uttipec-sdmc_shakti

PLANNING

Circulation of private vehicles needs to be managed better

Page 23: Nehru place  placemaking project uttipec-sdmc_shakti

1833

861

1000

783

646

PLANNING

Parking needs to be concentrated in a few Multi-level car parks

Page 24: Nehru place  placemaking project uttipec-sdmc_shakti

1833

861

1000

783

646

270150

25 25

30

PLANNING

Few off-street parking spaces proposed for short term parking

Page 25: Nehru place  placemaking project uttipec-sdmc_shakti

PLANNING

Vehicular circulation plan for various streets is changed accordingly

Page 26: Nehru place  placemaking project uttipec-sdmc_shakti

PLANNING

Pedestrian connectivity and circulation increased to the entire area

Page 27: Nehru place  placemaking project uttipec-sdmc_shakti

PLANNING

Proposed designs incorporate the upcoming DDA establishments

Page 28: Nehru place  placemaking project uttipec-sdmc_shakti

PLANNING

Additional links providing non-motorised transport access are proposed

Page 29: Nehru place  placemaking project uttipec-sdmc_shakti

PROPOSED MASTER PLAN

MLCP + OFFICE + RETAIL ON GROUND

MLCP + RETAIL ON GROUND

MLCP + RETAIL ON GROUND

CONVENTION CENTRE

HOTEL MLCP + RETAILRETAIL + OFFICE + SERVICE APARTMENTS

RETAIL + OFFICE + SERVICE APARTMENTS

HOTEL BUS TERMINAL + DEPOT + RETAIL

PLANNING – DESIGN PROPOSAL

Page 30: Nehru place  placemaking project uttipec-sdmc_shakti

PROBLEMS

EXISTING NEHRU PLACE INTERNAL PLAZA

Page 31: Nehru place  placemaking project uttipec-sdmc_shakti

SOLUTIONS

PROPOSED RETROFITTING: INTERNAL PLAZA

Page 32: Nehru place  placemaking project uttipec-sdmc_shakti

PROBLEMS

EXISTING NEHRU PLACE INTERNAL PLAZA

Page 33: Nehru place  placemaking project uttipec-sdmc_shakti

SOLUTIONS

PROPOSED PLAZA WITH LIGHTING, SIGNAGE, etc.

Page 34: Nehru place  placemaking project uttipec-sdmc_shakti

PROBLEMS

EXISTING PARKING ON GROUND

Page 35: Nehru place  placemaking project uttipec-sdmc_shakti

SOLUTIONS

PROPOSED PUBLIC SPACE ON RECLAIMED SPACE

Page 36: Nehru place  placemaking project uttipec-sdmc_shakti

PROBLEMS

EXISTING BUS TRMINAL

Page 37: Nehru place  placemaking project uttipec-sdmc_shakti

SOLUTIONS

PROPOSED REDESIGN OF BUS TRMINAL

Page 38: Nehru place  placemaking project uttipec-sdmc_shakti

Multi Level Car Parking

NMT & pedestrain Infrastructure

Public spaces and Social Ammenities

New Commercial Development

Bus Terminal

474 Crores 30.34 Crores 103 Crores 485 Crores

21% -VE 146% 35%

Breakeven Period

8 yrs(473.65)4 yrs(119 Crores)

30%

FinancialViability Project Viable Unviable

347% 75%

98 Crores

-VE

NA

-VE

Unviable

-VE

NA NA

Project Viable Project Viable

Project Cost

Project IRR

Equity IRR

Terminal Development

& Management

Real Estate Development

& Management

DTCDDA

MANAGEMENT MODEL BY PPP

Page 39: Nehru place  placemaking project uttipec-sdmc_shakti

d

OPERATION & MAINTENANCEBus Terminal

98 Crores

Multi Level Car Parking

NMT & pedestrain Infrastructure

Public spaces and Social Ammenities

New Commercial Development

Project Cost 485 Crores

Project IRR146% 35%

Breakeven Period 4 yrs(119

Crores)

Equity IRR

FinancialViability

347% 75%

611 Crores

19%

28%

10 Yrs(617 Crores)

Project Viable

NA

Project Viable Project Viable

Parking & Public Space Management

?

Page 40: Nehru place  placemaking project uttipec-sdmc_shakti

Proposed Way Forward

• Creation of a multi stakeholder platform under the leadership of DDA• Constitution of a high level committee comprising of key stakeholders in the Nehru Place

project •UTTIPEC•SDMC•CPWD•DTC•DMRC

• To review and approve recommendations for the area• Facilitate implementation of the recommended interventions


Recommended