.' - - NELSAP Pipeline Investment Projects- Power Development & Trade SINo. Countries Project name Project Area Status Next Action Pre-investment, US$ min Investment US$ min 1 uganda, DRe Semuliki Hydropower Project DRC Northern Identification done Feasibility study and (72MW! East ESIA RAP - detailed 6 c l! & .. CP Design 6 3 2 DRC Mugomba Hydropower Project ( 100MW) DRC Northern East Identification done Feasibility study and ESIA RAP - detailed Design 3 Rwanda and Burundi Akanyaru river Small hyd ropower Projects (SHP) (2SMW) (6+13+6) Akanyaru River Pre-Feasibility Study done Feasibility study and ESIA RAP - deta lied Design Tanzania Kakono Hydropower Project (87MW! Kagera River FS and ESIA RAP comoleted Resource mobilization 96.00 S Tanzania Malagarasi Hydropower Malagarasi River, FS and ESIA RAP Resource mobilization 0 Project (41 MWl Kigoma Region completed 153 a. e 'lI:l >- :z: S 6 South Sudan Bedden HPP (South SHS96MW) Bahr EI Jebel/Nile River (FS,ESIA RAP compl. in 2010 I Update FeaSibility study/Project Imolementation 1,392 7 South Sudan lakki S24 HPP (South Bahr EI (FS,ESIA RAP compl. Update Feasibility Jebel/Nile River in 2010) study/Project 5 780 Implementation Pre-i nvestment, US$ mIn 8 South Sudan Shukoli HPP (South S) 235 MW Bahr EI Jebel/Nile River (FS,ESIA RAP compl. in 2010) Update Feasibility study/Project Implementation 632 SINo. Countries Project na me Project Area Status Next Action Investment US$ min 9 Tanzania Innga-Mbeya transmission line FS and ESIA RAP Resource mobilization 400 kV of 292Km completed & Implementation 191 10 Uganda, DRC Uganda-DRC (Nkenda - Beni - Butembo - Bunia) transmission line, 220KV of 396 km FS and ESIA RAP completed Resource mobilization & Implementation 165 11 Tanzania, Zambia Tanzania-Zambia (Mbeya- Kasama-Kabwe) power transmission line, of 1,260km EAPP & SAPP interconnector. FeaSibility, detailed design, ESIA RAP ongoing FeaSibility, detailed design, ESIA RAP continue up to Dec 2016 ( est} 3 2 500 12 uganda, South Sudan Uganda (Olwiyo)-South Sudan (Jubaj Power Transmission Interconnection, of 254 Km Identification done Feasibility study and ESIA RAP - detailed DeSign 170 13 Burundi, Tanzania Burundi (Jiji - Mulembwe)- Tanzania (Kigoma) Power Transmission Line, 220KV of 180km Identification done Resource mobilizatIOn 80 South Sudan Renk - Malakal TL in South Sudan in 220 kV of 320 km + 3 3 154 substations 15 South Sudan South S(Juba)- South S(Bor} Power TL -400 kV of 151 km· 2 86 Segment of Juba - Malakal 16 South Sudan South Sudan(Bor) - South Sudan(Malakali Power TL-400 3 108 kVof 366 km 3 17 South Sudan Malakal- Bentiu Tl in South Sudan in 220 kV of 222 km 52 18 South Sudan Bedden HPP-Juba Power Transmission Line in South 2 III 5 iii J!l E III C .. GI 0 0- Sudan, 220 kV of 37 km 2 3 19 South Sudan Lakkl HPP - Juba Power TransmiSSion Line in South Sudan, 220 kVof 100 km 30 20 South Sudan Shukoll HPP - Collector substation TL, 220 kV of 80 km 40 21 Ethiopia, South Sudan Ethiopia (Gambella) - South Sudan (Malakalj Power TL (Phase 1), 230kV of 357 km 3 3 102 22 Ethiopia, South Sudan Ethiopia (Dedesa-Tepi) - South Sudan (Bor-Juba) Power Tl, 400 kV AC/500HVDC of 700 km 102 NELSAP Power Dev. Trade Projects Page 1 4/27/2016
Transcript
Page 1: NELSAP Pipeline Investment Projects- Power Development …nelsap.nilebasin.org/attachments/article/147/6a...lakki S24 HPP (South : Bahr EI (FS,ESIA RAP compl. Update Feasibility :

.' - -NELSAP Pipeline Investment Projects- Power Development &Trade

SINo. Countries Project name Project Area Status Next Action Pre-investment,

US$ min

Investment

US$ min

1 uganda, DRe Semuliki Hydropower Project DRC Northern Identification done Feasibility study and

(72MW! East ESIA RAP ­ detailed 6

c ~ l! ~ &.. CP

Design

6

3

2 DRC Mugomba Hydropower Project

( 100MW)

DRC Northern

East

Identification done Feasibility study and

ESIA RAP ­ detailed

Design

3 Rwanda and

Burundi

Akanyaru river Small

hyd ropower Projects (SHP)

(2SMW) (6+13+6)

Akanyaru River Pre-Feasibility

Study done

Feasibility study and

ESIA RAP ­ deta lied

Design

~ Tanzania Kakono Hydropower Project

(87MW!

Kagera River FS and ESIA RAP

comoleted

Resource mobilization 96.00

S Tanzania Malagarasi Hydropower Malagarasi River, FS and ESIA RAP Resource mobilization ~ 0 Project (41 MWl Kigoma Region completed 153 a. e 'lI:l >­:z: S

6 South Sudan Bedden ~96 HPP (South

SHS96MW)

Bahr EI

Jebel/Nile River

(FS,ESIA RAP compl.

in 2010 I Update FeaSibility

study/Project

Imolementation

1,392

7 South Sudan lakki S24 HPP (South Bahr EI (FS,ESIA RAP compl. Update Feasibility

S)(~10MW) Jebel/Nile River in 2010) study/Project 5 780

Implementation

~

Pre-i nvestment,

US$ mIn

8 South Sudan Shukoli HPP (South S) 235 MW Bahr EI

Jebel/Nile River

(FS,ESIA RAP compl.

in 2010)

Update Feasibility

study/Project

Implementation

632

SINo. Countries Project na me Project Area Status Next Action Investment

US$ min

9 Tanzania Innga-Mbeya transmission line FS and ESIA RAP Resource mobilization

400 kV of 292Km completed & Implementation 191

10 Uganda, DRC Uganda-DRC (Nkenda - Beni -

Butembo - Bunia)

transmission line, 220KV of

396 km

FS and ESIA RAP

completed

Resource mobilization

& Implementation 165

11 Tanzania,

Zambia

Tanzania-Zambia (Mbeya­

Kasama-Kabwe) power

transmission line, ~OOKV of

1,260km

EAPP & SAPP

interconnector.

FeaSibility, detailed

design, ESIA RAP

ongoing

FeaSibility, detailed

design, ESIA RAP

continue up to Dec

2016 ( est}

3

2

500

12 uganda, South

Sudan

Uganda (Olwiyo)-South Sudan

(Jubaj Power Transmission

Interconnection, ~OOKV of 254

Km

Identification done Feasibility study and

ESIA RAP ­ detailed

DeSign 170

13 Burundi,

Tanzania

Burundi (Jiji - Mulembwe)­

Tanzania (Kigoma) Power

Transmission Line, 220KV of

180km

Identification done Resource mobilizatIOn

80

1~ South Sudan Renk - Malakal TL in South

Sudan in 220 kV of 320 km + 3 3 154

substations

15 South Sudan South S(Juba)- South S(Bor}

Power TL -400 kV of 151 km· 2 86

Segment of Juba - Malakal

16 South Sudan South Sudan(Bor) - South

Sudan(Malakali Power TL-400 3 108

kVof 366 km

3 17 South Sudan Malakal- Bentiu Tl in South

Sudan in 220 kV of 222 km 52

18 South Sudan Bedden HPP-Juba Power

Transmission Line in South 2

III

~ 5 iii J!l E III C

~ .. GI ~ 0 0­

Sudan, 220 kV of 37 km

2

3

19 South Sudan Lakkl HPP ­ Juba Power

TransmiSSion Line in South

Sudan, 220 kVof 100 km

30

20 South Sudan Shukoll HPP - Collector

substation TL, 220 kV of 80 km 40

21 Ethiopia,

South Sudan

Ethiopia (Gambella) - South

Sudan (Malakalj Power TL

(Phase 1), 230kV of 357 km

3

3

102

22 Ethiopia,

South Sudan

Ethiopia (Dedesa-Tepi) - South

Sudan (Bor-Juba) Power Tl,

400 kV AC/500HVDC of 700 km 102

NELSAP Power Dev. Trade Projects Page 1 4/27/2016

Page 2: NELSAP Pipeline Investment Projects- Power Development …nelsap.nilebasin.org/attachments/article/147/6a...lakki S24 HPP (South : Bahr EI (FS,ESIA RAP compl. Update Feasibility :

Anli SINO. II Countries Il'roject name Project Area Status Next Action Pre-investment, Investment

US$ min US$ min

23 ISouth Suda n, ISOuth 5 IJuba-Torit-Kapoeta)­Kenya Kenya(Lokichogio) in220kV of 3 86

4Bffi:m ~~ . -..J;·I'7 Lt-:...~·~~· ..,.....;.: r.A..~_~ l .. IlA __ ....... __._.. __ .......... ~

Note'.-"""~ .... 1. Power PrOjects selected from SSEA 2005 and reconsidered by EAC Master Plan: Semulikl, Mugomba, Kakono HPP, Malagarast HPP, Kenya (Isinya)- TanzanIa (Song!da),

Iringa - Mbeya in Tanzania, Uganda (Masaka)- Tanzania (Mwanza).Gitega-Burun (Burundi) - Kigoma (Tanzania) Tanzania-Zambia, Kenya IKisumu) - (Kenya) - Tanzania

(Mwanza),

2. Power Projects selected from CBWS 2011: Tanzania - Kenya !ntere., Tanzania - Uganda Intere., Uganda - Southern Sudan, Ethiopia - Sudan;

3. Power Projects for ontegration of South Sudan into Regional Electricity Grid are from the South Sudan Master Plan (Hydropower Expansion Plan and Regional

Integration Plan of South Sudan into Regional Grid)

4. SHPs with capacity less than 50 MW like the ones of Akanyaru river were not ranked