Viale BrodoliniZ.I. - 84091
Battipaglia (SA)
TERMOTECNICA INDUSTRIALE S.r.l.
EPC Contractor for Industrial & Power Plantssince 1980, abroad and in Italy
We operate with a turnkey approachdeliverying solutions to our Customers
We are committed to our Customersuccess guaranteeing plantperformances and timely execution of the projects
Our Team
Approx 50 people:
• Engineers;• Drafters;• SW developers;• Administration;• Sales force;• Qualified welders;• Piping;• Steel structure;• Electricians;• I&C field personnel.
Outside area
12000 m2
Offices1600 m2
Workshop1500 m2
Warehouse600 m2
Our facility14000 m2
Our Key Business Areas:
CHP – combined heat and power plants
Gas fired thermal stations
Industrial projects
We deliver Solutions to ourCustomers to accomplish their
specific needs
Company expertise:
Engineering
Boilers – directly fired and HRSG
Power stations
Complete Piping Systems
Plant DCS and Burner Management Systems
Gas Stations
ENGINEERING
Termotecnica Industriale has a consolidated expertise as Engineer.
We have a multidisciplinary, integrated approach, with competencies on Civil, Mechanical, Process, Electrical and I&C engineering.
ESApro
Complete suite for integrated plant engineering: P&ID, Piping, Data sheet, Sketch, Hook up,…
TecnoMETAL
Steel structures engineering
SPAC
Electrical schematics software
AutoCAD
Softwares utilized
CONSTRUCTION
Complete overview on project, from engineering to beneficial use, inclusingsite management and commissioning by skilled personnel.
PROCUREMENT
Equipment specification, suppliers qualification, negotiations and follow up.
SERVICE
To help our Customers to achieve their business targets, our specialists are always available for maintenance or emergency repairs.
Via Renè Vanetti21100 - Varese
NEOTERM S.r.l.
Since 1950 engineers and manufacts of Conventional, biomass Boilers and HRSG abroad
and in Italy
Out team
Approx 23 people:
• Engineers;• Drafters;• Administration;• Sales force;• Welders;• Piping assemblers;• Steel structures
Our boilers have been operated for 30 years deliverying our Customers top performances with oustandingreliability.
Our Customer Services team provideslifecycle services to our boilers fleet.
Paper mills
O&G and chemical facilities
Textile facilities
Food industries
Sugar production facilities
CHP plant
Utility
Waste to Energy
Renewable energies / Biomass
Our Applications…..
NEOTERM si focused on engineering and construction of boilers.
We deliver:
SATURATED / SUPERHEATED STEAM BOILERS:ON NATURAL GAS / FUEL OILBIOMASSFIRED WITH INDUSTRIAL WASTES
HRSG: GAS TURBINES
RECIPROCATING ENGINES WASTE TO ENERGY FURNACES
HOT and SUPERHEATED WATER BOILERS
Key activities:
FIRE TUBE BOILERS
MARINE BOILERS (WaterTubes / Fire Tubes)
DIATHERMIC OILRECUPERATORS
HEAT RECOVERY SYSTEMS:EconomizersAir preheaters
BURNERS:For industrial fuelsFor natural gasFor HRSG
Principali attività:
H.R.S.G.
•Water tube – Natural circulation & Controlledcirculation
•Supplementary fired & Fresh Air System
W.H.R.B.
• Water tube – Natural circulation boiler & Controlled Circulation
• Hight fouling flue gas operated
• Cleaning system equipped
DUCT RADIANT BURNER
•Fuel Gas & Low LHV Gas
•Low Emissions system
•Water Cooled & Uncooled burners
NEOTERM ’s Activities:
• QCP
• Engineering Schedule
• Overall project schedule
• P&ID
• Piping 3D
• Isometric sketch
• Lay-out
• MTO
• Piping Stress Analysis
• IO list, alarm list, SD Matrix
• Hook up
• Electrical and control schematics
• Commissining and performance procedures
• Technical dossier as per CE requirements
• O&M manual
• Plant Declaration of Conformity
Un progetto 6/6
Standard documentation
We have strong competencies on thermal stations and existing boilers revamping and retrofits.
Thanks to our retrofits we are able to increase:
+ Efficiency
+ Production+ Enviromental sustainability
Revamping
We are able to Re – Certify complete systemsafter revamping is performed
Termotecnica Industriale has extended experience on
UNI/TS 11325-3
24 h
72 h
• Permanently manned boiler stations
• Unmanned operation up to 24 h
• Unmanned operation up to 72 h
We engineer, build and commission:
• BMS (Burner Management System) for safe operation of burners
• BCS (Boiler Control System) for boiler automatic control sequences
BMS
Centrale TermicaPiping 3D
Steam Boiler EPC Plant
- Thermal power= 15,5 MWt- steam flow = 25.000 kg/h- Rated pressure= 30 bar- Rated temperature = + 238 °C
Scope of supply: Basic and Detailed Engineering, Civil Works,Mechanical, Electrical, I&C works, Commissioning and test.
Reference 1
FCA Group S.p.A -Stabilimento Maserati
Grugliasco - TO
Centrale TermicaDettaglio caldaia
Centrale TermicaPiping 3D
EPC project fuel gas preheating system
- Heat input = 15 MWt x 2 = 30 MWt- Rated flow = 500 m3/h- Rated pressure= 6 bar
Scope of supply: basic and detailed engineering, civil,mechanical, electrical, I&C works, commissining and acceptancetests.
Reference 2
STO.G.IT. S.p.a.Bordolano - CR
Centrale TermicaVista in pianta
EPC boiler house
Heat Input= 19 MWt
• Diathermic oil system
- Rated Flow = 410 mc/h
- Rated Pressure = 12 bar
- Rated Temperature= + 350 °C
• Saturated steam system
- Rated Flow = 13 ton/h
- Rated Pressure = 10 bar
- Rated Temperature = + 184 °C
• Hot water system
- Rated flow = 470 mc/h
- Rated pressure = 5 bar
- rated Temperature = + 85 °C
Scopo of supply:EPC project with mechanical, electrical, civilengineering, construction, includingcommissioning and test.
Reference 3
Matrìca S.p.a.Porto Torres - SS
Centrale TermicaPiping 3D
Chilled water production plantPiping 3D
Chilled water tanksRendering 3D
EPC Chilled Water production and distribution plant:
- Thermal Power = 3,2 MWt- Rated Flow = 500 mc/h- Design Pressure= 6 bar- Design Temperature = - 10 °C
Scope of supply: Scopo di fornitura: Progettazione EPC project wthmechanical, process, electrical, I&C and civil, including commissining and tests.
Reference 3
Matrìca S.p.a.Porto Torres - SS
EPC Project Demi StationVista 3D
Impianto produzione aria compressa
Vista 3D
Reference 3
Matrìca S.p.a.Porto Torres - SS
Demi Plant:
- Design flow= 20 mc/h- Design pressure= 7 bar- Design temperature= + 60 °C
Compressed air EPC project:
- Rated flow= 5000 kg/h (su due linee)- Rated Pressure = 30 bar- Rated Temperature= + 110 °C
Centrale TermicaLayout e P&ID
CaminoProgetto e Realizzazione
EPC Boiler Station
- Boiler Thermal Power = 14,9 MWt x 2 = 29,8 MWt- Rated flow= 34 ton/h- Rated Pressure= 22 bar- Rated temperature = + 375 °C
Scope of supply: EPC project includign mechanical, electrical, civil engineering,construction and commissioning.
Reference 4
E.On S.p.a.Ostiglia - MN
Centrale TermicaPianta e Prospetto
Linee di distribuzioneDettaglio
Diathermic oil station
- Heat Input = 18,6 MW- Rated temeprature = +260°C
Scope of supply:Engineering installation and supply of:
Air compression stationTank systemHVAC
Process lines
Reference 5
Di Mauro S.p.a. Officine GraficheCava de’ Tirreni - SA
Mechanical installation works biomass power plants
- Rated Electrical Power = 9 MWe- Piping in A106 ed Aisi316 = kg 85.000- Steel Structures= kg 75.000- Coibentazioni = mq 4.000
Ferrero – Stabilimento di Balvano (PZ)Impianto di cogenerazione
Reference 6
Ferrero S.p.a.Balvano - PZ
Trenitalia – Foligno (PG)Vista 3D e dettagli realizzazione
Reference 7
Trenitalia S.p.a.Foligno - PG
EPC boiler and distribution station
- Rated Thermal Power = 10,5 MWt x 2 = 21 MWt- Rated Pressure= 8 bar- Rated Temperature= + 155 °C
Scope of supply: EPC Project for the new thermal power stationincluding distribution piping, rack, control system.
Centrale termica – Tavazzano (LO)Steam Generator
Reference 8
E.On S.p.a.Tavazzano - LO
EPC Project Thermal Power Station and Distribution System
- Heat Input = 14,9 MWt- Rated Flow = 17,4 t/h- Rated Pressure= 22 bar- Rated Temperature= + 425 °C
Scopo of suply: EPC Project including mechanical, electrical, civil works,commissining and tests.
Finale Emilia (MO)Vista
Reference 9
Neoterm S.r.L.VARESE
Biomass SH boiler plant
Steam Flow = 65,00 ton/h
- Rated pressure= 65 bar- Rated Temperature= + 470 °C
Scope of supply: EPC project for the complete system (mechanical,electrical, process, I&C)
ed elettrostrumentale
CHP with Turbogas 6,5MW
- Heat Input= 22,8MWt- Rated Flow = 35.000 kg/h- Rated Pressure= 20 bar- Rated Temperature = + 215 °C
Scope of supply: EPIngegneria EPC project with basic anddetailed engineering (mechanical, electrical I&C, piping)
Reference 10
Parmalat S.p.a.Collecchio - PR
CHP plantRendering
Boiler stationPiping 3D
EPC boiler station and distribution system
- Installed thermal power= 40 MWt- Rated Flow = 970 mc/h- Rated Pressure= 18 bar- Rated Temperature= + 170 °C
Scope of supply: mechanical, electrical, and processengineering; erection, commissioning and tests.
Reference 11
EDF Fenice S.p.A.FCA Group S.p.A
Cassino - FR
Centrale TermicaVista in pianta
Reference 12
Fedrigoni S.p.a.Pioraco - MC
Revamping boiler station
Engineering and Repowering up to 20 ton/h including burnerretrofits
Replacement burner fan with new Inverter / 90 kW
Replacement pumps and electrical motors
New recovery system
Complete new control system
Reference 13
TRELLEBORGTivoli - Roma
Revamping boiler and combustion management system
New Boiler Control System
New I&C system
- Replacement of remote instrumentation- Replacement of actuators
Contact
I nostri recapiti principali
tel: +39.0828.6163
fax: +39.0828.307444
e-mail: [email protected]
Massimo Carucci
Sales Manager
tel. 0039.335.6382826
e-mail: [email protected]
Roberto Galleri
Sales Manager
tel. 0039.335.6381884
e-mail: [email protected]