+ All Categories
Home > Documents > NEOTERM - Rappresentanze Industriali€¦ · Boilers –directlyfiredand HRSG Powerstations...

NEOTERM - Rappresentanze Industriali€¦ · Boilers –directlyfiredand HRSG Powerstations...

Date post: 06-Sep-2018
Category:
Upload: vancong
View: 221 times
Download: 0 times
Share this document with a friend
40
NEOTERM
Transcript

NEOTERM

Viale BrodoliniZ.I. - 84091

Battipaglia (SA)

TERMOTECNICA INDUSTRIALE S.r.l.

EPC Contractor for Industrial & Power Plantssince 1980, abroad and in Italy

We operate with a turnkey approachdeliverying solutions to our Customers

We are committed to our Customersuccess guaranteeing plantperformances and timely execution of the projects

Our Team

Approx 50 people:

• Engineers;• Drafters;• SW developers;• Administration;• Sales force;• Qualified welders;• Piping;• Steel structure;• Electricians;• I&C field personnel.

Outside area

12000 m2

Offices1600 m2

Workshop1500 m2

Warehouse600 m2

Our facility14000 m2

Our Key Business Areas:

CHP – combined heat and power plants

Gas fired thermal stations

Industrial projects

We deliver Solutions to ourCustomers to accomplish their

specific needs

Company expertise:

Engineering

Boilers – directly fired and HRSG

Power stations

Complete Piping Systems

Plant DCS and Burner Management Systems

Gas Stations

ENGINEERING

Termotecnica Industriale has a consolidated expertise as Engineer.

We have a multidisciplinary, integrated approach, with competencies on Civil, Mechanical, Process, Electrical and I&C engineering.

ESApro

Complete suite for integrated plant engineering: P&ID, Piping, Data sheet, Sketch, Hook up,…

TecnoMETAL

Steel structures engineering

SPAC

Electrical schematics software

AutoCAD

Softwares utilized

CONSTRUCTION

Complete overview on project, from engineering to beneficial use, inclusingsite management and commissioning by skilled personnel.

PROCUREMENT

Equipment specification, suppliers qualification, negotiations and follow up.

SERVICE

To help our Customers to achieve their business targets, our specialists are always available for maintenance or emergency repairs.

NEOTERM

Via Renè Vanetti21100 - Varese

NEOTERM S.r.l.

Since 1950 engineers and manufacts of Conventional, biomass Boilers and HRSG abroad

and in Italy

Out team

Approx 23 people:

• Engineers;• Drafters;• Administration;• Sales force;• Welders;• Piping assemblers;• Steel structures

Our boilers have been operated for 30 years deliverying our Customers top performances with oustandingreliability.

Our Customer Services team provideslifecycle services to our boilers fleet.

Paper mills

O&G and chemical facilities

Textile facilities

Food industries

Sugar production facilities

CHP plant

Utility

Waste to Energy

Renewable energies / Biomass

Our Applications…..

NEOTERM si focused on engineering and construction of boilers.

We deliver:

SATURATED / SUPERHEATED STEAM BOILERS:ON NATURAL GAS / FUEL OILBIOMASSFIRED WITH INDUSTRIAL WASTES

HRSG: GAS TURBINES

RECIPROCATING ENGINES WASTE TO ENERGY FURNACES

HOT and SUPERHEATED WATER BOILERS

Key activities:

FIRE TUBE BOILERS

MARINE BOILERS (WaterTubes / Fire Tubes)

DIATHERMIC OILRECUPERATORS

HEAT RECOVERY SYSTEMS:EconomizersAir preheaters

BURNERS:For industrial fuelsFor natural gasFor HRSG

Principali attività:

H.R.S.G.

•Water tube – Natural circulation & Controlledcirculation

•Supplementary fired & Fresh Air System

W.H.R.B.

• Water tube – Natural circulation boiler & Controlled Circulation

• Hight fouling flue gas operated

• Cleaning system equipped

DUCT RADIANT BURNER

•Fuel Gas & Low LHV Gas

•Low Emissions system

•Water Cooled & Uncooled burners

NEOTERM ’s Activities:

Typical Project 1/6

P&ID e Hook-up

P&ID – Dettaglio rampa gasHook-up strumentali

Typical project 2/6

Civil & Structures

Vista in pianta e Vista 3D Rendering 3D

Typical project 3/6

Electrical drawings

Schema elettrico

Lay-out quadro elettrico

Typical project 4/6

Piping 3D e Sketch

3D Piping di distribuzione

Sketch isometrici

Typical project 5/6

Piping Stress Analysis

Complete stress analysis competencies.

• QCP

• Engineering Schedule

• Overall project schedule

• P&ID

• Piping 3D

• Isometric sketch

• Lay-out

• MTO

• Piping Stress Analysis

• IO list, alarm list, SD Matrix

• Hook up

• Electrical and control schematics

• Commissining and performance procedures

• Technical dossier as per CE requirements

• O&M manual

• Plant Declaration of Conformity

Un progetto 6/6

Standard documentation

We have strong competencies on thermal stations and existing boilers revamping and retrofits.

Thanks to our retrofits we are able to increase:

+ Efficiency

+ Production+ Enviromental sustainability

Revamping

We are able to Re – Certify complete systemsafter revamping is performed

Termotecnica Industriale has extended experience on

UNI/TS 11325-3

24 h

72 h

• Permanently manned boiler stations

• Unmanned operation up to 24 h

• Unmanned operation up to 72 h

We engineer, build and commission:

• BMS (Burner Management System) for safe operation of burners

• BCS (Boiler Control System) for boiler automatic control sequences

BMS

Centrale TermicaPiping 3D

Steam Boiler EPC Plant

- Thermal power= 15,5 MWt- steam flow = 25.000 kg/h- Rated pressure= 30 bar- Rated temperature = + 238 °C

Scope of supply: Basic and Detailed Engineering, Civil Works,Mechanical, Electrical, I&C works, Commissioning and test.

Reference 1

FCA Group S.p.A -Stabilimento Maserati

Grugliasco - TO

Centrale TermicaDettaglio caldaia

Centrale TermicaPiping 3D

EPC project fuel gas preheating system

- Heat input = 15 MWt x 2 = 30 MWt- Rated flow = 500 m3/h- Rated pressure= 6 bar

Scope of supply: basic and detailed engineering, civil,mechanical, electrical, I&C works, commissining and acceptancetests.

Reference 2

STO.G.IT. S.p.a.Bordolano - CR

Centrale TermicaVista in pianta

EPC boiler house

Heat Input= 19 MWt

• Diathermic oil system

- Rated Flow = 410 mc/h

- Rated Pressure = 12 bar

- Rated Temperature= + 350 °C

• Saturated steam system

- Rated Flow = 13 ton/h

- Rated Pressure = 10 bar

- Rated Temperature = + 184 °C

• Hot water system

- Rated flow = 470 mc/h

- Rated pressure = 5 bar

- rated Temperature = + 85 °C

Scopo of supply:EPC project with mechanical, electrical, civilengineering, construction, includingcommissioning and test.

Reference 3

Matrìca S.p.a.Porto Torres - SS

Centrale TermicaPiping 3D

Chilled water production plantPiping 3D

Chilled water tanksRendering 3D

EPC Chilled Water production and distribution plant:

- Thermal Power = 3,2 MWt- Rated Flow = 500 mc/h- Design Pressure= 6 bar- Design Temperature = - 10 °C

Scope of supply: Scopo di fornitura: Progettazione EPC project wthmechanical, process, electrical, I&C and civil, including commissining and tests.

Reference 3

Matrìca S.p.a.Porto Torres - SS

EPC Project Demi StationVista 3D

Impianto produzione aria compressa

Vista 3D

Reference 3

Matrìca S.p.a.Porto Torres - SS

Demi Plant:

- Design flow= 20 mc/h- Design pressure= 7 bar- Design temperature= + 60 °C

Compressed air EPC project:

- Rated flow= 5000 kg/h (su due linee)- Rated Pressure = 30 bar- Rated Temperature= + 110 °C

Centrale TermicaLayout e P&ID

CaminoProgetto e Realizzazione

EPC Boiler Station

- Boiler Thermal Power = 14,9 MWt x 2 = 29,8 MWt- Rated flow= 34 ton/h- Rated Pressure= 22 bar- Rated temperature = + 375 °C

Scope of supply: EPC project includign mechanical, electrical, civil engineering,construction and commissioning.

Reference 4

E.On S.p.a.Ostiglia - MN

Centrale TermicaPianta e Prospetto

Linee di distribuzioneDettaglio

Diathermic oil station

- Heat Input = 18,6 MW- Rated temeprature = +260°C

Scope of supply:Engineering installation and supply of:

Air compression stationTank systemHVAC

Process lines

Reference 5

Di Mauro S.p.a. Officine GraficheCava de’ Tirreni - SA

Mechanical installation works biomass power plants

- Rated Electrical Power = 9 MWe- Piping in A106 ed Aisi316 = kg 85.000- Steel Structures= kg 75.000- Coibentazioni = mq 4.000

Ferrero – Stabilimento di Balvano (PZ)Impianto di cogenerazione

Reference 6

Ferrero S.p.a.Balvano - PZ

Trenitalia – Foligno (PG)Vista 3D e dettagli realizzazione

Reference 7

Trenitalia S.p.a.Foligno - PG

EPC boiler and distribution station

- Rated Thermal Power = 10,5 MWt x 2 = 21 MWt- Rated Pressure= 8 bar- Rated Temperature= + 155 °C

Scope of supply: EPC Project for the new thermal power stationincluding distribution piping, rack, control system.

Centrale termica – Tavazzano (LO)Steam Generator

Reference 8

E.On S.p.a.Tavazzano - LO

EPC Project Thermal Power Station and Distribution System

- Heat Input = 14,9 MWt- Rated Flow = 17,4 t/h- Rated Pressure= 22 bar- Rated Temperature= + 425 °C

Scopo of suply: EPC Project including mechanical, electrical, civil works,commissining and tests.

Finale Emilia (MO)Vista

Reference 9

Neoterm S.r.L.VARESE

Biomass SH boiler plant

Steam Flow = 65,00 ton/h

- Rated pressure= 65 bar- Rated Temperature= + 470 °C

Scope of supply: EPC project for the complete system (mechanical,electrical, process, I&C)

ed elettrostrumentale

CHP with Turbogas 6,5MW

- Heat Input= 22,8MWt- Rated Flow = 35.000 kg/h- Rated Pressure= 20 bar- Rated Temperature = + 215 °C

Scope of supply: EPIngegneria EPC project with basic anddetailed engineering (mechanical, electrical I&C, piping)

Reference 10

Parmalat S.p.a.Collecchio - PR

CHP plantRendering

Boiler stationPiping 3D

EPC boiler station and distribution system

- Installed thermal power= 40 MWt- Rated Flow = 970 mc/h- Rated Pressure= 18 bar- Rated Temperature= + 170 °C

Scope of supply: mechanical, electrical, and processengineering; erection, commissioning and tests.

Reference 11

EDF Fenice S.p.A.FCA Group S.p.A

Cassino - FR

Centrale TermicaVista in pianta

Reference 12

Fedrigoni S.p.a.Pioraco - MC

Revamping boiler station

Engineering and Repowering up to 20 ton/h including burnerretrofits

Replacement burner fan with new Inverter / 90 kW

Replacement pumps and electrical motors

New recovery system

Complete new control system

Reference 13

TRELLEBORGTivoli - Roma

Revamping boiler and combustion management system

New Boiler Control System

New I&C system

- Replacement of remote instrumentation- Replacement of actuators

Customers 1/4

Customers 2/4

Customers 3/4

I nostri Clienti 4/4

Partners

Wide networks of business Partners to deliver optimized

technical and economicalsolutions.

Contact

I nostri recapiti principali

tel: +39.0828.6163

fax: +39.0828.307444

e-mail: [email protected]

[email protected]

[email protected]

[email protected]

Massimo Carucci

Sales Manager

tel. 0039.335.6382826

e-mail: [email protected]

Roberto Galleri

Sales Manager

tel. 0039.335.6381884

e-mail: [email protected]

Thanks for your attention.

NEOTERM


Recommended