Neponset WatershedCIC Grant
Task 7: Regional O&M Database
Framework for a cloud-based tool for stormwater management operations & maintenance
plan development, reporting, enforcement, and public records access
User Types
• Local permitting authority– View reporting history– Issue enforcement orders
• Owner / Operator– Create O & M plan based on template– Report O & M activity
• Public Users– View O & M plans– View reporting history
Owner/Operator: Create O&M Plan Record
• Specify local permitting authority• Project name• Parcel numbers (pre- & post
subdivision) • Watershed / subwatershed (auto
generated) • Legally responsible party• Reporting point of contact• Spill prevention / emergency contact• Registry of Deeds book & page
File Uploads – O & M Plan
• PDF site plan of stormwater system (as-built)
• CAD, shapefile, or KMZ of system (as-built)
• PDF of final permit documents: – Order of Conditions– Stormwater permit– Special Permit– Subdivision Approval
O & M Plan Template: BMP list
• Select BMP type (bioretention, hydro separator, retention basin, etc)
• Indicate number of BMPs on-site• Text field describing location /
function• Boilerplate inspection requirements
(editable) • Boilerplate maintenance
requirements (editable)• Confirm schedule of BMP tasks• Specify start date and milestone
dates
Plan Template: BMP Task Matrix
BMP Type Frequency Task Task Type
Sweeping Quarterly Sweeping Maintenance
Hydro Separator Annual Clean-out Maintenance
General Weekly Inspect Parking Lot
Inspection
Bioretention Biannual Mulch Maintenance
Plan Template: Pollution Prevention
• Select materials covered–Multiple choice (& “other, specify”)
• Boilerplate materials management plan (editable)
Plan Template: Export & Finalize
• Export O &M Plan as MS Word document
• Local authority review• Edit plan template online• Export final O & M plan as PDF and
upload to site • Municipal user “locks” O & M
activities template once plan is approved
Owner/Operator: Reporting Module
Swear by pains of perjury that this is an accurate record of inspection and maintenance
SUBMIT
BMP Type
Task Due Date Description
Corrective Action
Status
Hydro Separator Clean-out 1/1/15 Cleaned None Delaye
d
GeneralInspect Parking Lot
12/15/14 Inspected Picked up trash
Not Complete
Sweeping Sweeping 11/1/14 Swept NoneNot Complete
Bioretention Mulch 1/1/15
Maintained
Replanted & mulched
Complete
Municipal User: OverviewPlan #
Address
Owner
View Report
Grade View Enforcement
View Plan
Owner/ Operator Details
500 3 Main St
3M LLC
95%
501 2 Oak Dr
Jones 60%
502 51 Elm St
Wendy’s
100%
503 2 1st Ave
Frank 89%
“Grade” is percent of maintenance & inspection requirements completed and reported on-time within past 21 months
Municipal User: Plan Report
Plan # 500; 3 Main Street; 3M LLC
“Issue Enforcement” generates boilerplate letter/email to Owner/Operator point of contact
BMP Type
Task Due Date
Description
Corrective Action
Status Issue Enforcement
Hydro Separator
Clean-out
1/1/15 Cleaned None Delayed
GeneralInspect Parking Lot
12/15/14 Inspected Picked up trash
Not Complete
Sweeping
Sweeping
11/1/14 Swept NoneNot Complete
Bio-retention
Mulch 1/1/15Maintained
Replanted & mulched
Complete
Alerts
• Owner / Operator: Due date approaching– 1 week in advance, 1X
• Owner / Operator: Due date passed–Weekly digest
• Municipal Staff: New report submitted– As submitted
• Municipal Staff: Reports overdue –Weekly digest
Public Users: Overview & Plan Report
Plan #
Address
Owner
View Report
Grade View Enforcement
View Plan
Owner/ Operator Details
500 3 Main St
3M LLC
95%
501 2 Oak Dr
Jones 60%
502 51 Elm St
Wendy’s
100%
503 2 1st Ave
Frank 89% Plan # 500; 3 Main Street; 3M LLC
“Issue Enforcement” generates boilerplate letter/email to Owner/Operator point of contact
BMP Type
Task Due Date
Description
Corrective Action
Status Issue Enforcement
Hydro Separator
Clean-out
1/1/15 Cleaned None Delayed
GeneralInspect Parking Lot
12/15/14 Inspected Picked up trash
Not Complete
Sweeping
Sweeping
11/1/14 Swept NoneNot Complete
Bio-retention
Mulch 1/1/15Maintained
Replanted & mulched
Complete
All Users: Interactive Map
Report “Grade”Good (>90%)Fair (70% - 90%)Poor (<70%)
18 Unquity RoadReporting Rate: 65%Owner: Milltown LLCView Plan Report
Next Steps
• Refine desired functionality• Develop website specifications• Prepare RFP