+ All Categories
Home > Documents > Network Rationalization APWU Article 12.4.B Meeting

Network Rationalization APWU Article 12.4.B Meeting

Date post: 22-Jan-2016
Category:
Upload: ajaxe
View: 27 times
Download: 0 times
Share this document with a friend
Description:
Network Rationalization APWU Article 12.4.B Meeting. February 13, 2012. Volume. Universal Service Obligation. Declining steadily. Fixed Cost Base. Transactional volume declining due to e-diversion - PowerPoint PPT Presentation
15
® 1 Network Rationalization APWU Article 12.4.B Meeting February 13, 2012
Transcript
Page 1: Network Rationalization APWU Article 12.4.B Meeting

®

1

Network RationalizationAPWU

Article 12.4.B Meeting

February 13, 2012

Page 2: Network Rationalization APWU Article 12.4.B Meeting

2

VolumeVolume

PricePrice Labor CostsLabor Costs

Universal Service Universal Service ObligationObligation

Capped by inflation Price elasticities are in flux

due to growing alternatives

Postal network driven by: Delivery points Retail locations Sortation facilities Six-day delivery

~80% of total costs COLA increases Benefits: pensions, retiree

health, health insurance Limited flexibility Retiree prefunding

obligation, rising workman's compensation costs

These trends will These trends will continue to put continue to put

pressure on USPS’s pressure on USPS’s ability to provide ability to provide

affordable universal affordable universal serviceservice

DecliningDecliningsteadilysteadily Transactional volume

declining due to e-diversion Advertising mail is subject

to more substitution options

Mail volume highly sensitive to economic changes Mail mix changes –

lost profit contributions

Fixed Cost Fixed Cost BaseBase

Rising butRising but cappedcapped

Rising Cost Rising Cost per hourper hour

Situation Assessment: Mail

Page 3: Network Rationalization APWU Article 12.4.B Meeting

3

Mail Volume Shifting to Less Profitable Mix

Volume in Billions of Pieces

Page 4: Network Rationalization APWU Article 12.4.B Meeting

4

RealigningOur Network

Reducing annual operating costs by $2.6 billion

Page 5: Network Rationalization APWU Article 12.4.B Meeting

5

Mail Processing Facility Footprint

461 Facilities Today

Current Mail Processing Sites

Page 6: Network Rationalization APWU Article 12.4.B Meeting

6

Mail Processing Facility Footprint

Potential Network

Page 7: Network Rationalization APWU Article 12.4.B Meeting

7

Our Employees

559,000

151,000

35,000

Total Career Employees

Total Mail Processing Employees

Fewer Mail Processing Positions

Page 8: Network Rationalization APWU Article 12.4.B Meeting

8

Deactivation Site Complement - APWU

Potentially Impacted Employees

1 3B

CL

ER

K

CL

ER

K

PV

S

MA

INT

EN

AN

CE

CAPITAL METRO 924 1 72 342 1,339EASTERN 3,315 16 275 1,522 5,128GREAT LAKES 1,413 4 41 710 2,168NORTHEAST 2,527 8 336 1,385 4,256PACIFIC 1,161 0 33 502 1,696SOUTHWEST 2,711 3 330 1,545 4,589WESTERN 1,736 7 27 942 2,712NATION 13,787 39 1,114 6,948 21,888

Function

Gra

nd

To

tal

AREA NAME

3A

Page 9: Network Rationalization APWU Article 12.4.B Meeting

9

Service Standards for:-Priority Mail-Express Mail-Standard Mail-Packages

BMEU locations, in the near term

What is not Changing?

Page 10: Network Rationalization APWU Article 12.4.B Meeting

1010

1 Day1 Day 2 Day2 Day 3 Day3 Day

Today’s Delivery DistributionToday’s Delivery Distribution

1 Day1 Day

First-Class Mail Standards First-Class Mail Standards

*Dependent upon market adaptation

2 Day2 Day 3 Day3 Day

Likely Future Distribution*Likely Future Distribution*

What is Changing?

Page 11: Network Rationalization APWU Article 12.4.B Meeting

11

24:00

06:00

12:00

18:00

04:00

08:00

OutgoingOutgoingOperationsOperations

(5:00PM – 12:30 AM)(5:00PM – 12:30 AM)

ContinuousContinuousDPS/Secondary DPS/Secondary

OperationsOperations(12:00PM-0400AM)(12:00PM-0400AM)

IncomingIncomingPrimary Primary

OperationsOperations(0800-1200)(0800-1200)

BMEUBMEU(8:00AM –7:00PM)(8:00AM –7:00PM)

11

Proposed 24-Hour Plant Operations

Page 12: Network Rationalization APWU Article 12.4.B Meeting

12

HubHub

Processing Processing PlantPlant

For Illustrative Purposes Only

12

HubHub

HubHub

HubHub

HubHub

Proposed Area Hubs

Page 13: Network Rationalization APWU Article 12.4.B Meeting

13

Service Standard Change- Final Rule Mid-April- Implementation After May 15

Network Realignment- AMP Decisions End of February- Overall Realignment begins after May 15- No major changes during Fall mailing/peak season

Timeline

Page 14: Network Rationalization APWU Article 12.4.B Meeting

14

Our Commitment

Robust site-specific project plans

Deliberate timing of operational moves

Critical activities include:

- Employee moves

- Equipment moves

- Transportation contracts

- Facility modifications

Ongoing communications

Planning for Implementation

Page 15: Network Rationalization APWU Article 12.4.B Meeting

15

Maintain the long-term affordability of mail and high level of service

Network changes imperceptible to 150 million residential customers and seamless for business customers

Create giant efficiency improvements throughout our network

Concluding Thoughts


Recommended