+ All Categories
Home > Documents > NEW BLOCK 9 EXTENSION - King's College London · NEW BLOCK 9 EXTENSION ... Rooflights above the...

NEW BLOCK 9 EXTENSION - King's College London · NEW BLOCK 9 EXTENSION ... Rooflights above the...

Date post: 16-May-2018
Category:
Upload: nguyenthuan
View: 215 times
Download: 3 times
Share this document with a friend
1
NEW BLOCK 9 EXTENSION St omas’ Campus Development The New Block 9 Extension 1. New Basement (B1) utilises the excavation levels as part of the demolition work. 2. Hospital tunnel / former morgue space used to connect into new basement level for services distribution. 3. B1 level with B9 Basement 4. Void along the west provides spatial connection and light from above. 5. Ground Floor Plan - level / through access from Block 9. 6. Dissection Amphitheatre - positively included into the sequence of new spaces 7. Cadaver Liſt - positively included into the sequence of new spaces, top lit dramatically revealing the space and prividing daylight to the Basement. 8. Stepped section- level to Lambeth Palace Road, and raised to enable floor height to basement and views over the river frontage. 9. Rooflights above the deep plan areas, follows the notional circulation routes. 10. Secondary entrance, utilsing the stable arch, providing servings access. 11. Use of the stable arches for entrance, ventilation of Substation, Refuse 12. Terrace at the prow, vantage point with minimal visual impact to the Embankment and Lambeth Palace. Contributing to the curving lines and Portland stone treatment. 13. New apertures with Lambeth Palace Road Wall. New internal wall construction for structure, insulation, vapour control, and allow for differential structural movement. 14. Utilising the interstitial space above Wc cores to reduce AHU visual impact above Proposed view towards Block 9 Extension prow from the Albert Embankment Proposed roof garden plan Proposed heritage assets Proposed new openings in Lambeth Palace Road wall Proposed new Block 9 circulation cores Proposed section showing retained Kadaver liſt
Transcript

NEW BLOCK 9 EXTENSIONSt Thomas’ Campus Development

Prideaux Building and Block 9 Landscape Masterplan

5m 10m 20m 50m

S T . T H O M A S H O S P I T A L | M a s t e r p l a nTOWN615(03)0002 R00

The New Block 9 Extension1. New Basement (B1) utilises the excavation levels as part of the

demolition work.

2. Hospital tunnel / former morgue space used to connect into new

basement level for services distribution.

3. B1 level with B9 Basement

4. Void along the west provides spatial connection and light from

above.

5. Ground Floor Plan - level / through access from Block 9.

6. Dissection Amphitheatre - positively included into the sequence

of new spaces

7. Cadaver Lift - positively included into the sequence of new spaces,

top lit dramatically revealing the space and prividing daylight to

the Basement.

8. Stepped section- level to Lambeth Palace Road, and raised to

enable floor height to basement and views over the river frontage.

9. Rooflights above the deep plan areas, follows the notional

circulation routes.

10. Secondary entrance, utilsing the stable arch, providing servings

access.

11. Use of the stable arches for entrance, ventilation of Substation,

Refuse

12. Terrace at the prow, vantage point with minimal visual impact

to the Embankment and Lambeth Palace. Contributing to the

curving lines and Portland stone treatment.

13. New apertures with Lambeth Palace Road Wall. New internal wall

construction for structure, insulation, vapour control, and allow

for differential structural movement.

14. Utilising the interstitial space above Wc cores to reduce AHU

visual impact above

Proposed view towards Block 9 Extension prow from the Albert Embankment

Proposed roof garden plan

Proposed heritage assets

Proposed new openings in Lambeth Palace Road wall Proposed new Block 9 circulation cores

Proposed section showing retained Kadaver lift

Recommended