New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012
Transcript
Page 1: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

New Bresnahan ModelElementary School Project

Neighborhood Meeting

January 11th 2012

Page 2: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

The Massachusetts School BuildingAuthority (MSBA)

Authority Established in 2006Funding from 1 cent of the 6.5 cent

MA sales taxResponsible for all School

Construction in the Commonwealth

Page 3: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

History of Submitting required information to MSBA

Required to submit Statement of Interest (SOI)

Statement of Interests Submitted for the Bresnahan School and the Nock/Molin School each year since 2007 indicating priority needs

Both SOI’s voted by School Committee and City Council each year

Page 4: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

How as Information Submitted to MSBA Generated?

Previous Feasibility Studies performed and reported existing conditions of SchoolsFacilities Study and Asset 1995Feasibility Study 1997Long-Term Elementary Building Needs Committee Report 2002Updated Long-Term Report 2006

Page 5: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Bresnahan Elementary SchoolPriority Overcrowding

33% Of the Classrooms At The Bresnahan School are in Modular Buildings

Page 6: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

The Corridor From The Lobby To The Principal’s And Nurse’s Office Is Also Used For Storage And Copying

Bresnahan Elementary SchoolPriority Overcrowding

Page 7: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Storage and Workspace in a Corridor

Bresnahan Elementary SchoolPriority Overcrowding

Page 8: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Occupational Therapy/Physical Therapy Room Cut Into Cafeteria

Bresnahan Elementary SchoolPriority Overcrowding

Page 9: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Bresnahan Elementary School Priority Health and Safety

Exterior Wall of 1995 Modular Building

Page 10: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Roof Leak in 2003 Modular Connector Corridor

Bresnahan Elementary SchoolPriority Health and Safety

Page 11: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

“Unwanted” Access Under Modular Building

Bresnahan Elementary SchoolPriority Health and Safety

Page 12: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Worn-out Door Hardware

Bresnahan Elementary SchoolPriority Health and Safety

Page 13: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Fire Doors Are Inadequate And Not Tied Into The Fire Alarm System

Bresnahan Elementary SchoolPriority Health and Safety

Page 14: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Smoke Detectors Exist But No Fire Sprinklers

Bresnahan Elementary SchoolPriority Health and Safety

Page 15: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Student and Staff Bathrooms Are Old And Worn

Bresnahan Elementary SchoolPriority Health and Safety

Page 16: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Single-Pane Metal-Framed Windows With No Thermal Block Are Very Drafty And Inefficient

Bresnahan Elementary SchoolPriority Building Systems

Page 17: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Wooden Frame Gymnasium Windows Are Dilapidated

Bresnahan Elementary SchoolPriority Building Systems

Page 18: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Classroom Unit Ventilators And Other Mechanical Equipment Are From The Original Construction in 1956

Bresnahan Elementary School Priority Building Systems

Page 19: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

“Ponding” And Other Problems Plague The Flat Roof Area Of the Building.

Bresnahan Elementary SchoolPriority Building Systems

Page 20: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Bresnahan Has A Partially Functional Antiquated Pneumatic Control

System And Needs A State Of The Art Computer Controlled System

Bresnahan Elementary SchoolPriority Building Systems

Page 21: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

With No Central Air Conditioning Window Air Conditioners Are Relied Upon For Cooling Requirements.

Bresnahan Elementary SchoolPriority Building Systems

Page 22: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

The Walk-In Refrigerator In The Kitchen Is No Longer Functional

Bresnahan Elementary SchoolPriority Building Systems

Page 23: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Electrical Panels Are Original To the Building And Filled To Capacity.

Providing Power Requirements For Newer Technology Is Difficult.

Bresnahan Elementary SchoolPriority Program Delivery

Page 24: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

What Was the Result of This Year’s SOI Submissions?

We Have Been Invited into MSBA’s

Capital Pipeline!

Page 25: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

East Fairhaven Elementary

Page 26: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Page 27: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Page 28: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Page 29: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Proposed Site Plan 1/11/12

Page 30: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.

Neighborhood MeetingJanuary 11th 2012

Questions?