CITY OF VIRGINIA BEACH NEW CITY HALL
DESIGN DEVELOPMENT UPDATE
August 7, 2018
1
Agenda
• Site plan.
• Exterior design.
• Overall building floor plans.
• Council Chambers, Mayor’s Office, City Manager’s Office.
• Schedule overview.
2
City Hall – Site Plan
3
STAFF ENTRY
PUBLIC ENTRY
City Hall – Site Plan – Accessible Site Access
4
ACCESSIBLE RAMPS 153 SPACES
303 SPACES (8 ACCESSIBLE)
21 SPACES (2 ACCESSIBLE)
City Hall – Exterior Design
• Front Façade from drop off approach
5
City Hall – Exterior Design
• West Façade from parking lot
6
City Hall – Exterior Design
• Overhead view
7
City Hall – Exterior Design
• Street view
8
City Hall – Exterior Design
• Street view
9
City Hall – First Floor
10
COMMISSIONER OF THE REVENUE TREASURER
City Hall – Second Floor
11
CITY CLERK
ATTORNEY
MAYOR/CITY COUNCIL/ CITY
MANAGER
City Hall – Third Floor
12
FINANCE
BUDG
ET A
ND
MAN
AGEM
ENT
VOLUNTEER OFFICES
CITY AUDITOR
COM
MU
NIC
ATIO
NS
City Hall – Second Floor – Mayor/CM/City Council
13
City Hall – Second Floor – Council Circulation
14
MEDIA
ATTY MGR
CLERK
STAFF PR
3’-0
” W
PR 3
’-0”
W
5’-0
” M
IN
5’-0
” M
IN 5’-0
” M
IN
5’-0
” M
IN
AVERAGE SEAT WIDTH = 23”
City Hall – Mayor/City Council Suite
15
CONF
BREAK ROOM
ASSISTANT TO THE CITY MANAGER
ASSISTANT TO THE CITY MANAGER
EXECUTIVE ASSISTANT TO THE CITY MANAGER
FILES/SUPPLIES/WORKROOM
KITCHEN
ASST TO CITY COUNCIL
AV
TO CHAMBERS
COUNCIL OFFICE
COUNCIL OFFICE
CONFERENCE ROOM
234 CONFERENCE
ROOM
EXECUTIVE RECEPTIONIST
VISITOR WAITING
MAYOR
VICE MAYOR
CONF
CONF
MEDIA
MEDIA WAITING
ASST TO CITY COUNCIL
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
COFFEE
City Hall – City Manager Suite
16
CITY MANAGER
DEPUTY CITY
MANAGER
CONFERENCE ROOM
DEPUTY CITY
MANAGER
DEPUTY CITY
MANAGER
DEPUTY CITY
MANAGER
BREAK ROOM
ASSISTANT TO THE CITY MANAGER
ASSISTANT TO THE CITY MANAGER
EXECUTIVE ASSISTANT TO THE CITY MANAGER
FILES/SUPPLIES/WORKROOM
DCM EX ASST
CONFERENCE
KITCHEN
AV/ BROADCASTING
TO CHAMBERS
TO 234
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
DCM EX ASST DCM EX ASST DCM EX ASST
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
COUNCIL OFFICE
CONFERENCE ROOM
VOLUNTEER SHARED WKSTN
Schedule Update
• Moseley Architects completed Design Development of the new City Hall. The design process includes the following key milestones:
February Confirm occupant space needs February Confirm City Council space needs February Conduct workshop to develop site and building concepts March Meet with staff to select conceptual design plan and massing April Review conceptual design of City Council Space April Meet with staff to review 50% SD drawings April Meet with staff to review 95% SD drawings May Complete Schematic Design, submit for review and approval May Update City Council August Complete Design Development Phase October Review 50% CD drawings January Complete 100% CD drawings February Advertise for Bids
17