Energy Efficiency and Sustainability (buildings) New Easy to Install and Manufacture PRE-Fabricated Modules Supported by a BIM based Integrated Design ProceSS This project has received funding from the European Union’s Horizon 2020 research and Innovation programme under grant agreement nº 636717 The contents of this publication do not necessarily reflect the Commission’s own posi- tion. The document reflects only the IMPRESS Consortium views and the European Com- mission is not liable for any use that may be made of the information contained therein. Consortium www.project-impress.eu Technology Demonstration and Validation DEMONSTRATION BUILDING ALICE VOINESCU SCHOOL IN DROBETA-TURNU SEVERIN (ROMANIA) THERMAL IMAGE BEFORE REFURBISHMENT REFURBISHMENT PROCESS AFTER REFURBISHMENT FINAL APPEARANCE CONCLUSIONS As it can be seen in the thermal images taken after refurbishment, the IMPRESS over-cladding solution outperforms the commercial option. Specifically, the deeper embedment of the bearing structure and better insulating properties of HYPUCEM ® minimize thermal bridges. An intensive monitoring campaign is currently being carried out, so as to determine the energy saving achieved. NEW LABORATORY BUILDING AT TECHRETE PLANT IN BALBBRIGAN (IRELAND) IMPRESS-HYPUCEM ® COMMERCIAL SOLUTION ON-GOING The new laboratory pavilion at Techrete plant in Ireland is the real scale testing ground for the lightweight over-cladding panels (shown in the image detail), as well as the Phase Change Material panels for re- cladding. Real scale panel’s manufacture Laboratory pavilion Over-cladding panels
Transcript
Page 1: New Easy to Install and Manufacture PRE …New Easy to Install and Manufacture PRE-Fabricated Modules Supported by a BIM based Integrated Design ProceSS This project has received funding

Energy Efficiency and Sustainability (buildings)New Easy to Install and Manufacture PRE-Fabricated Modules Supported by a BIM based Integrated Design ProceSS

This project has received funding from the European Union’s Horizon 2020 research and Innovation programme under grant agreement nº 636717

The contents of this publication do not necessarily reflect the Commission’s own posi-tion. The document reflects only the IMPRESS Consortium views and the European Com-mission is not liable for any use that may be made of the information contained therein.

Consortium www.project-impress.eu

Technology Demonstration and Validation

DEMONSTRATION BUILDING ALICE VOINESCU SCHOOL IN DROBETA-TURNU SEVERIN (ROMANIA)

THERMAL IMAGE BEFORE REFURBISHMENT

REFURBISHMENT PROCESS

AFTER REFURBISHMENT FINAL APPEARANCE

CONCLUSIONSAs it can be seen in the thermal images taken after refurbishment, the IMPRESS over-cladding solution outperforms the commercial option. Specifically, the deeper embedment of the bearing structure and better insulating properties of HYPUCEM® minimize thermal bridges.An intensive monitoring campaign is currently being carried out, so as to determine the energy saving achieved.

NEW LABORATORY BUILDING AT TECHRETE PLANT IN BALBBRIGAN (IRELAND)

IMPRESS-HYPUCEM®

COMMERCIAL SOLUTION

ON-GOINGThe new laboratory pavilion at Techrete plant in Ireland is the real scale testing ground for the lightweight over-cladding panels (shown in the image detail), as well as the Phase Change Material panels for re-cladding.

Real scale panel’s manufacture Laboratory pavilion Over-cladding panels