FIRE ALARM NOTES: 1. THE SCOPE OF WORK INCLUDES FURNISHING MATERIALS AND LABOR FOR ALL INSTALLATION, PHASING, TESTING AND ACCEPTANCE OF THE FIRE ALARM SYSTEM AS SHOWN IN THE CONTRACT DOCUMENTS. THE PROJECT SCOPE INCLUDES: A. INSTALLATION OF FIRE ALARM PANEL. B. INSTALLATION OF REMOTE BOOSTER POWER SUPPLY PANELS, INCLUDING ALL NECESSARY CONDUIT, WIRING, ASSOCIATED HARDWARE AND MATERIAL REQUIRED TO PROPERLY MOUNT THE PANELS AS INDICATED IN THE CONTRACT DOCUMENTS. C. INSTALLATION OF FIRE ALARM INITIATION DEVICES IN ACCORDANCE WITH NFPA 72, AS INDICATED IN THE CONTRACT DOCUMENTS, INCLUDING ALL CONDUIT, WIRING AND ASSOCIATED HARDWARE. MANUAL PULL STATIONS ARE GENERALLY LOCATED IN THE PATH(S) OF EGRESS AND EXTERIOR EXITING DOORS. D. INSTALLATION OF FIRE ALARM NOTIFICATION DEVICES THROUGHOUT THE FACILITY AS INDICATED IN THE CONTRACT DOCUMENTS, INCLUDING ALL NECESSARY CONDUIT, WIRING AND ASSOCIATED HARDWARE. FIRE ALARM NOTIFICATION DEVICES SHALL BE INSTALLED PER NFPA 72. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR. DEPENDING ON NOTIFICATION DEVICE MANUFACTURER, THE HEIGHTS INDICATED ARE NOT THE MOUNTING HEIGHTS OF THE DEVICE ELECTRICAL BACKBOX. E. COORDINATION FOR NECESSARY 120 VAC DEDICATED CIRCUITS FOR POWER TO ALL ASSOCIATED FIRE ALARM SYSTEM PANELS AND SUPPORTING PANELS. F. INSTALLATION OF CIRCUITS FOR FIELD DEVICES AND SYSTEMS INTERFACES, PROGRAMMING, TESTING AND ACCEPTANCE FOR A COMPLETE AND OPERATIONAL FIRE ALARM SYSTEM. 2. THE PROJECT SHALL BE BASED ON THE REQUIREMENTS OF THE FOLLOWING CODES, STANDARDS, TESTING LABORATORIES AND UNDERWRITING AGENCIES: A. PHILADELPHIA UNIFORM CONSTRUCTION CODE (AMENDED INTERNATIONAL BUILDING CODE 2018 EDITION). B. 2018 CITY OF PHILADELPHIA BUILDING CODE (INTERNATIONAL BUILDING CODE 2018 AS AMENDED) C. 2018 CITY OF PHILADELPHIA FIRE CODE (INTERNATIONAL FIRE CODE 2018 AS AMENDED). D. 2015 CITY OF PHILADELPHIA MECHANICAL CODE. E. NFPA 70, NATIONAL ELECTRIC CODE 2017 EDITION. F. NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE 2018 EDITION. G. ADAAG, ADA ACCESSIBILITY GUIDELINES FOR BUILDNGS AND FACILITIES, 2012 EDITION. H. UL LISTED PRODUCTS FOR FIRE ALARM USE CONSIDERING ENVIRONMENTAL CONDITIONS. I. MANUFACTURER'S INSTALLATION INSTRUCTIONS. J. PROJECT SPECIFICATIONS 3. AREA SMOKE DETECTION PER NFPA 72 SHALL COVER EACH MECHANICAL EQUIPMENT ROOM, EACH TELEPHONE / COMMUNICATIONS / LAN CLOSET, EACH ROOM CONTAINING FIRE ALARM CONTROL CABINETS AND THE TOP OF EACH STAIRWAY. 4. DUCT SMOKE DETECTION SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72 IN ALL HVAC SUPPLY UNITS IN EXCESS OF 2,000 CFM CAPACITY, ALL HVAC RETURN UNITS IN EXCESS OF 2,000 CFM CAPACITY, AT ALL FLOOR RETURN DUCTS / ENTRY TO RETURN SHAFT (EACH SHAFT / EACH FLOOR), WITHIN 5 FEET OF FIRE / SMOKE DAPERS, WHERE DUCT PASSES THROUGH REQUIRED SMOKE BARRIER AND WHERE DUCT / HVAC SYSTEM SERVES MULTIPLE SMOKE ZONES. 5. ADDRESSABLE INPUT MODULES (AIM) SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72 AT EACH WATERFLOW & TAMPER DEVICE (PROVIDED BY FIRE PROTECTION), AT EACH DRY - PIPE SYSTEMS FOR WATERFLOW, TAMPER, PRESSURE SWITCH/STATUS, AT EACH CLEAN AGENT SYSTEM FOR ALARM, TROUBLE & SUPERVISORY/STATUS, AT FIRE PUMP FOR PUMP RUN, PUMP FAIL TO START, PUMP LOW FUEL STATUS, AT REQUIRED HVAC CONTROLLERS TO INITIATE DIRECT FAN SHUTDOWN, AT FIRE/SMOKE DOOR RELEASE SYSTEMS, AT FIRE/SMOKE DAMPERS, AT SECURITY FAIL - SAFE DOOR SYSTEMS & STAIRWAY RE - ENTRY SYSTEM, AT BUILDING MANAGEMENT SYSTEM FOR ADDITIONAL RELATED STATUS. 6. ADA COMPLIANT 75 CANDELA (MINIMUM) STROBES SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72 IN MECHANICAL ROOMS, WITHIN 10 FEET OF EACH EXIT ON EACH FLOOR, IN ALL TOILETS, CONFERENCE ROOMS, LOCKER ROOMS, WAITING AREAS, COPY/FILE ROOMS, PANTRIES, IN ALL COMMON AREAS IN EXCESS OF 1,000 SQFT, WITHIN 15 FEET OF THE END OF EVERY CORRIDOR (ADA/NFPA/ANSI) WITH 100 FEET MAXIMUM SPACING BETWEEN APPLIANCES (ADA/NFPA/ANSI), PROVIDE COMBINATION DEVICES AS SHOWN ON CONTRACT DRAWINGS. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT CIRCUIT TIE - IN LOCATIONS, IN THE EVENT THAT THE CIRCUIT IS TO BE EXTENDED. LOCATIONS AND POINTS SHOWN ON THE PLANS ARE DIAGRAMMATICAL AND FOR REFERENCE ONLY. THE CONTRACTOR SHALL SHOW THE FINAL INFORMATION ON THE SHOP DRAWINGS AND INSTALLATION SHALL NOT BEGIN UNTIL THESE PLANS ARE APPROVED. 8. THE FIRE ALARM CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL DEVICES WITH OTHER TRADES AND FIELD CONDITIONS AS PART OF THIS CONTRACT. 9. ALL WIRING SHALL COMPLY WITH PROJECT SPECIFICATIONS, AND ALL LOCAL AND NATIONAL ELECTRICAL CODES. 10. SUBSTITUTIONS OF TYPE FIRE POWER LIMITED PLENUM (FPLP) OR CERTIFIED FIRE ALARM CABLES SHALL NOT BE PERMITTED. 11. ALL WIRE AND CABLE SHALL HAVE A WIRE MARKER ON EACH END, BRADY OR EQUAL. ALL MARKERS SHALL BE TYPED. 12. SHIELDS ON ALL SHIELDED CABLE SHALL BE CONTINUOUS, GROUNDED AT THE FIRE ALARM CONTROL PANEL ONLY, AND ISOLATED FROM GROUND ELSEWHERE. NON - POWER LIMITED FIRE ALARM (NPLFA) CIRCUIT CONDUCTORS INSULATION SHALL BE SUITABLE FOR 600 VOLTS. MULTI - CONDUCTOR NPLFA CIRCUIT CABLES, TYPES NON - POWER LIMITED FIRE PLENUM (NPLFP), NON - POWER LIMITED FIRE RISER (NPLFR), AND NON - POWER LIMITED SIGNALING FIRE ALARM CABLINING (NPLF), SHALL NOT BE INSTALLED EXPOSED IN DUCTS, PLENUMS OR HOISTWAYS (SHAFTS). 13. NON - POWER LIMITED FIRE ALARM (NPLFA) CIRCUIT CONDUCTORS INSULATION SHALL BE SUITABLE FOR 600 VOLTS. MULTI - CONDUCTOR NPLFA CIRCUIT CABLES, TYPES NPLFP, NPLFR, AND NPLF, SHALL NOT BE INSTALLED EXPOSED IN DUCTS, PLENUMS OR HOISTWAYS (SHAFTS). 14. INSTALLATION OF FIRE ALARM SYSTEM RACEWAYS, BOXES, ENCLOSURES, CABINETS, AND WIRING SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: A. COVERS OF BOXES, ENCLOSURES AND CABINETS SHALL BE PAINTED RED AND PERMANENTLY IDENTIFIED AS TO USE. B. PENETRATIONS THROUGH RATED WALLS, CEILINGS AND FLOORS SHALL BE PROPERLY FIRE STOPPED. C. RACEWAYS OR WIRING SHALL NOT PENETRATE THE TOP OF ANY CONTROL EQUIPMENT CABINET OR ENCLOSURE. D. RACEWAYS INSTALLED UP TO 8 FT. IN STAIRWAYS SHALL NOT REDUCE OR OBSTRUCT REQUIRED STAIRWAY RADIUS OR EGRESS PATH. E. CABLES SHALL BE SECURED BY CABLE TIES, STRAPS OR SIMILAR FITTINGS DESIGNED AND INSTALLED SO AS NOT TO DAMAGE THE CABLES. SUCH FITTINGS SHALL BE SECURED IN PLACE AT INTERVALS NOT EXCEEDING 5 - FT ON CENTER AND WITHIN 1 - FT OF ASSOCIATED CABINET OR BOX. F. JUNCTION BOXES SHALL BE PROPERLY LABELED "FIRE ALARM JUNCTION BOX" PER SPECIFICATIONS. 15. ALL FIRE ALARM SYSTEM NOTIFICATION APPLIANCES SHALL BE SYNCHRONIZED PER NFPA 72. ALL HARDWARE, EQUIPMENT, PANEL MODIFICATIONS AND LABOR NECESSARY TO PERFORM SYNCHRONIZATION SHALL BE PART OF THIS CONTRACT. 17. FIRE ALARM SYSTEM VISUAL NOTIFICATION APPLIANCES SHALL BE SET TO THE CANDELA RATING ASSIGNED ON IN CONTRACT DOCUMENTS, AS A BASE SETTING. CANDELA SETTINGS MAY BE ADJUSTED IN THE FIELD AS PART OF ACCEPTANCE TESTING FOR COVERAGE. 18. MINIMUM DECIBEL AMBIENT RATING WITHIN OFFICE AND SHELTERD SPACES, OTHER THAN THE WAREHOUSE SHALL BE 55db. MINIMUM DECIBEL AMBIENT RATING WITHIN THE BODY OF THE WAREHOUSE SPACE(S) SHALL BE 70db. FIRE ALARM SYSTEM AUDIBLE NOTIFICATION DEVICES SHALL BE A MINIMUM OF 15db ABOVE AMBIENT LEVELS. 19. CIRCUIT MODIFICATIONS, TERMINATIONS AND SPLICES SHALL BE MADE WITH TERMINAL BLOCKS AND IN LISTED FITTINGS, BOXES, ENCLOSURES, FIRE ALARM DEVICES OR UTILIZATION EQIPMENT. SPLICES SHALL BE LIMITED TO LOCATIONS WHERE THE CONDITIONS OF INSTALLATION REQUIRE THE USE OF SPLICES. SPLICES AND TERMINATIONS IN RISER CABLES ARE PROHIBITED EXCEPT WHERE MADE IN FIRE ALARM EQUIPMENT TERMINAL CABINETS. MECHANICAL CONNECTIONS LISTED UNDER UNDERWRITERS LABORATORIES ("UL") 486 - 03, A & C SHALL BE USED FOR THE CONDUCTORS, OR IF SOLDERED, FIRST JOINED SO AS TO BE MECHANICALLY AND ELECTRICALLY SECURE PRIOR TO SOLDERING. TEMPERATURE RATING OF THE COMPLETED SPLICES SHALL EQUAL OR EXCEED THE TEMPERATURE RATING OF THE HIGHEST RATED CONDUCTOR. 20. FIRE ALARM CONDUITS SHALL BE LABELED AND IDENTIFIED PER THE PROJECT SPECIFICATIONS. ALL JUNCTION BOX COVERS SHALL BE PAINTED RED AND LABELED "FA". "EXPOSED" FIRE ALARM CONDUIT IN SPACES OTHER THAN WITHIN THE WAREHOUSE, SHALL BE PAINTED TO MATCH FINISHES. 21. INSTALLATION SHALL NOT BEGIN WITHOUT APPROVAL OF THE FIRE ALARM SHOP DRAWINGS BY THE ENGINEER. REFER TO THE SPECIFICATIONS FOR REQUIREMENTS. 22. IN THE EVENT THAT A DEVICE IS LOCATED ON A SURFACE THAT IS UNSUITABLE FOR PROPER MOUNTING, THE CONTRACTOR SHALL NOTIFY THE ENGINEER DURING THE SHOP DRAWINGS PHASE FOR APPROVAL OF AN ALTERNATE LOCATION. THIS NOTIFICATION SHALL OCCUR PRIOR TO INSTALLATION FOR CONDUIT AND JUNCTION BOX ROUGH - IN. 23. POWER - LIMITED FIRE ALARM CIRCUIT CABLES AND CONDUCTORS SHALL NOT BE PLACED IN ANY CABLE, CABLE TRAY, COMPARTMENT, ENCLOSURE, MANHOLE, OUTLET BOX, DEVICE BOX, RACEWAY, OR SIMILAR FITTING WITH CONDUCTORS OF ELECTRIC LIGHT, POWER, CLASS 1, NON - POWER - LIMITED FIRE ALARM CIRCUITS, AND MEDIUM - POWER NETWORK - POWERED BROADBAND COMMUNICATIONS CIRCUITS. 24. THE SYSTEM WILL REPORT THE DATE, TIME, DEVICE TYPE, DEVICE ID, LOCATION AND TYPE OF ALARM(S) THAT ARE RECEIVED. THE REMOTE ANNUNCIATOR PANEL WILL INCLUDE REMOTE STATUS ZONE ALARM INDICATION AND TROUBLE SIGNALS AND WILL INCLUDE A STRIP PRINTER. FIRE ALARM SYSTEM POWER SHALL BE DERIVED FROM A DEDICATED BRANCH CIRCUIT OF THE MAIN ELECTRICAL SERVICE. THE FIRE ALARM SYSTEM SHALL HAVE AS THE SECONDARY POWER, BATTERY BACKUP SIZED FOR 24 HOURS OF SUPERVISORY FOLLOWED BY 45 MINUTES OF FULL SYSTEM ALARM. FIRE ALARM NOTES - CONTINUED: DESCRIPTION SYMBOL MANUAL PULL STATION ADDRESSABLE SMOKE DETECTOR HEAT DETECTOR, WHERE 'X' = R/F COMBINATION RATE OF RISE/FIXED TEMPERATURE R/C RATE COMPENSATION F FIXED TEMPERATURE R RATE OF RISE ONLY WALL-MOUNTED FIRE ALARM HORN/STROBE 'X' DENOTES CANDELA RATING TAMPER SWITCH - FBO FLOW SWITCH - FBO CEILING-MOUNTED FIRE ALARM HORN/STROBE. 'X' DENOTES CANDELA RATING ADDRESSABLE DUCT SMOKE DETECTOR, WHERE 'X' = R RETURN-AIR DUCT S SUPPLY-AIR DUCT INTERPOSAL RELAY REMOTE ALARM LED INDICATOR FIRE ALARM CONTROL PANEL F TS FS RL FACP ADDRESSABLE INPUT MODULE (AIM) ADDRESSABLE OUTPUT MODULE (AOM) FIRE ALARM ANNUNCIATOR AAN FIRE ALARM BOOSTER POWER SUPPLY BPS WALL-MOUNTED FIRE ALARM STROBE 'X' DENOTES CANDELA RATING AIM IR AIM S X S X WALL-MOUNTED FIRE ALARM HORN X X X H FIRE ALARM ABBREVIATIONS : ADA AMERICANS WITH DISABILITIES ACT ADAAG AMERICANS WITH DISABILITIES ACT GUIDELINES AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE ALM ALARM AHJ AUTHORITY HAVING JURISDICTION AP ACCESS PANEL AR ADDRESSABLE RELAY AWG AMERICAN WIRE GAUGE BPS BOOSTER POWER SUPPLY CD CANDELA CKT CIRCUIT CM CONTACT MONITOR (C) CEILING MOUNTED DD DUCT SMOKE DETECTOR (R) EXISTING TO BE REMOVED / DEMOLISHED DIA DIAMETER DN DOWN DWG DRAWING EC ELECTRICAL CONTRACTOR EMT ELECTRICAL METALLIC TUBING EOL END-OF-LINE RESISTOR (E) EXISTING TO REMAIN (ER) EXISTING TO BE RELOCATED °F DEGREE(S) FAHRENHEIT FACP FIRE ALARM CONTROL PANEL FAH FIRE ALARM HORN FAHS FIRE ALARM HORN / STROBE FAS FIRE ALARM SYSTEM FM FACTORY MUTUAL FS FLOW SWITCH GC GENERAL CONTRACTOR HEAT HEAT DETECTOR IBC INTERNATIONAL BUILDING CODE IDC INITIATING DEVICE CIRCUIT IFC INTERNATIONAL FIRE CODE IN INCHES JB JUNCTION BOX (N) NEW NAC NOTIFICATION APPLIANCE CIRCUIT NEC NATIONAL ELECTRICAL CODE NFPA NATIONAL FIRE PROTECTION ASSOCIATION NIC NOT IN CONTRACT NICET NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES NIS NOT IN SCOPE NTS NOT TO SCALE POC POINT OF CONNECTION POD POINT OF DEMOLITION PS PRESSURE SWITCH (RE) RELOCATED SLC SIGNALING LINE CIRCUIT VIS VISIBLE CIRCUIT SQFT SQUARE FEET SUP SUPERVISORY TR TROUBLE TS TAMPER SWITCH VAC VOLTAGE - ALTERNATING CURRENT VDC VOLTAGE - DIRECT CURRENT FAAP FIRE ALARM ANNUNCIATOR PANEL FOIC FIBER OPTIC INTERFACE CABINET MPS MANUAL PULL STATION SD SMOKE DETECTOR ST STROBE WP WEATHER PROOF ADDRESSABLE INITIATING CIRCUITS 16 AWG/2 COND. TWISTED SHIELDED FACP NETWORK CIRCUIT HORN CIRCUITS 16 AWG/2 COND. TWISTED CONTROL CIRCUITS CIRCUIT TYPE MONITORING CIRCUITS DATA RISERS 14 AWG/2 COND. TWISTED STROBE CIRCUITS B WIRE TYPE CIRCUIT CLASS B B B B B B B 16 AWG/2 COND. TWISTED SHIELDED / SINGLE MODE FIBER 14 AWG/2 COND. TWISTED 14 AWG/2 COND. TWISTED 14 AWG/2 COND. TWISTED 16 AWG/2 COND. TWISTED ANNUNCIATOR DATA B 16 AWG/2 COND. TWISTED ANNUNCIATOR POWER B 14 AWG/2 COND. TWISTED FIRE ALARM WIRING CHART: COMBINATION HORN/STROBE CIRCUITS THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THEIR SCHEDULE WITH THE MASTER PROJECT AND COMMISSIONING SCHEDULE. THE SCHEDULE SHALL BE COORDINATED WITH ALL OTHER TRADES AND SUBMITTED TO THE GENRERAL CONTRACTOR OR DESIGNATED REPRESENTATIVE EVERY TWO WEEKS. ALL CONTRACTORS SHALL BEAR THE COST OF ANY SCOPE IMPACTS CAUSED BY CHANGES TO THE MASTER PROJECT SCHEDULE. PRIOR TO THE START OF INSTALLATION, A MASTER SCHEDULE AND COMMISSIONING SCHEDULE SHALL BE SUBMITTED FOR GENERAL CONTRACTOR OR DESIGNATED REPRESNTATIVE'S APPROVAL. ALL WORK SHALL BE COMPLETE (INCLUDING TESTING AND FINAL APPROVAL BY AHJ) IN ACCORDANCE WITH MASTER SCHEDULE. FIRE ALARM WORK SHALL COMMENCE IN THE FOLLOWING PHASES: 1. SHOP DRAWING SUBMITTAL: DEVELOP AND COORDINATE SHOP DRAWINGS FOR APPROVAL BY THE ENGINEER. 2. SYSTEM INSTALLATION: UPON APPROVAL OF SHOP DRAWINGS PERFORM INSTALLATION IN ACCORDANCE WITH MASTER SCHEDULE AND COORDINATE INSTALLATION WITH ALL OTHER TRADES. 3. FINAL INSPECTION: UPON COMPLETION OF ACCEPTANCE TESTING CONTRACTOR SHALL REQUEST, COORDINATE AND PERFORM ALL NECESSARY INSPECTIONS WITH ALL OTHER TRADES AND PHILAPORT NECESSARY FOR A SUCCESSFUL INSPECTION. ADDITIONAL INSPECTIONS DUE TO CONTRACTOR ERROR SHALL BE PERFORMED AT NO ADDITIONAL COST TO MASSPORT. 4. CLOSEOUT DOCUMENTS: SUBMIT ALL REQUIRED CLOSEOUT DOCUMENTATION TO THE ENGINEER FOR APPROVAL. FIRE ALARM PHASING NOTES: GENERAL NOTES: 1. CONTRACTOR SHALL COMPLY WITH ALL REGULATIONS & LAWS OF AUTHORITIES HAVING JURISDICTION. 2. ALL MATERIALS, MEANS AND METHODS SHALL COMPLY WITH APPLICABLE CODES, ORDINANCES, REGULATIONS AND STANDARDS. 3. CONTRACTOR SHALL PERFORM A SITE SURVEY TO VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE ENGINEER AT ONCE OF ANY DISCREPANCIES. 4. EACH CONTRACTOR SHALL REVIEW PROJECT DOCUMENTS OF ALL TRADES FOR A THOROUGH UNDERSTANDING OF PROJECT AND ANY CROSS REFERENCING OF WORK. REVIEW ALL PROJECT REQUIREMENTS PRIOR TO BIDDING. DISCREPANCIES BETWEEN DOCUMENTS SHALL BE REPORTED TO THE ENGINEER PRIOR TO BIDDING. IN THE CASE OF ANY DISCREPANCIES, THE MOST STRINGENT REQUIREMENT SHALL GOVERN. 5. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT AREA THROUGH DESIGNATED ACCESS POINTS AS DETERMINED BY THE OWNER OR THEIR DESIGNATED REPRESENTATIVE. 6. THE CONTRACTOR SHALL NOT BE ALLOWED ANY STORAGE AREA OTHER THAN THAT AVAILABLE WITHIN THE LIMITS OF THE STAGING AREA OR CONFINES OF THE WORK AREA. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL OF CONSTRUCTION DEBRIS AND REFUSE ON A DAILY BASIS. 8. A COPY OF THE CURRENT SET OF CONTRACT DOCUMENTS (WITH AS - BUILT INFORMATION) SHALL BE KEPT AT THE JOB SITE AT ALL TIMES BY THE CONTRACTOR. 9. ALL PENETRATIONS, THROUGH DESIGNATED FIRE RATED WALLS, CEILINGS AND FLOOR SLABS SHALL BE PROPERLY SEALED WITH AN APPROVED RATED FIRE STOPPING MATERIAL. ALL FIRE STOPPING MATERIAL SHALL BE SUPPLIED AND WORK PERFORMED AS PER PROJECT SPECIFICATIONS AND MANUFACTURERS INSTALLATION INSTRUCTIONS. 10. CONTRACTOR SHALL REPLACE IN - KIND ANY EQUIPMENT OR ARCHITECTURAL ELEMENTS DAMAGED BY WORK OF THIS PROJECT AT NO ADDITIONAL COSTS. 11. CONTRACTOR SHALL COMPLETE ALL CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE COMPLETED IN A NEAT AND WORKMANLIKE MANNER. PATCHING MATERIALS SHALL MATCH MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE TOUCH UP PAINT AS REQUIRED TO MATCH PAINT FINISH AND COLOR OF ADJACENT AREAS. CONTRACTOR SHALL SALVAGE MATERIALS FOR RE - USE IN AREAS WHERE SUBSTRATES / SURFACES ARE TO BE PATCHED/REPAIRED (I.E. TILES, WALLS, CEILING TILE). 12. THE CONTRACTOR SHALL GUARANTEE THE ENTIRE INSTALLATION FOR A MINIMUM PERIOD OF ONE YEAR (EXCEPT WHERE EXTENSIONS OF THIS ONE YEAR PERIOD ARE NOTED) FROM THE DATE OF BENEFICIAL USE AND ACCEPTANCE OF THE SYSTEM AS A WHOLE. ANY DEFECTS IN WORKMANSHIP, MATERIALS, MALFUNCTION OF EQUIPMENT OR UNSATISFACTORY PERFORMANCE, AND ALL OTHER WORK OR PARTS OF THE BUILDING DAMAGED THEREBY, AS A RESULT OF WORK OF THE PROJECT BY THE CONTRACTOR, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PAY ALL REPAIR COSTS ACCORDINGLY. 13. IN ADDITION TO SPECIFICATIONS, AS MAY BE DEFINED HEREAFTER, THE CONTRACTOR SHALL PROTECT THE WORK SITE AND ALL HIS OR HER WORK AGAINST ANY DAMAGE UNTIL FINAL COMPLETION AND ACCEPTANCE BY THE OWNER. 14. CONTRACTOR SHALL, UPON COMPLETION OF THE WORK, SUBMIT AS - BUILT RECORD DRAWINGS SHOWING ALL CHANGES FROM THE CONTRACT DRAWING MADE IN THE INSTALLATION, AND SHOWING DIMENSION LOCATIONS OF CONCEALED EQUIPMENT. 15. PRIOR TO DELIVERY OF ANY MATERIALS TO THE SITE, THE CONTRACTOR SHALL PROVIDE MATERIAL SAFETY DATA SHEETS FOR ALL ITEMS AND MATERIALS USED IN THE WORK TO THE GENERAL CONTRACTOR. 16. PERCUSSIVE FASTENING SYSTEMS, INCLUDING BUT NOT LIMITED TO POWDER, GAS AND PNEUMATIC ACTUATED ANCHORS, WILL NOT BE PERMITTED ANYWHERE ON THE PROJECT. CONTRACTORS ARE PERMITTED TO USE MECHANICAL TYPE UNISTRUT FASTENING DEVICES ONLY. 17. PRIOR TO ACCEPTANCE OF THE SPACE, ALL SYSTEMS SHALL BE INSPECTED, TESTED AND OPERATED TO DEMONSTRATE TO THE OWNER, OR HIS DESIGNATED REPRESENTATIVE, THAT THE INSTALLATION AND PERFORMANCE OF THESE SYSTEMS AND/OR PARTS THEREOF CONFORM TO THE DESIGN INTENT. 18. THE BUILDING IS A WORK OF A COMPLEX NATURE WHICH WILL REQUIRE ACCURATE PLANNING, CAREFUL PREPARATION AND EXECUTION. ATTENTION TO DETAIL AND CLOSE SUPERVISION BY THE CONTRACTOR WILL BE A REQUIREMENT. THE CONTRACTOR SHALL BE REQUIRED TO DO THIS WORK IN FULL COOPERATION WITH ALL CONSTRUCTION TRADES AND SUBJECT TO SCHEDULING ARRANGED TO MINIMIZE DISRUPTION OF NORMAL ACTIVITIES FOR CONSTRUCTION OF THE BUILDING. 19. JUNCTION BOXES, VALVES, DAMPERS, OR ANY CONCEALED EQUIPMENT REQUIRING ACCESS SHALL ONLY BE PERMITTED / LOCATED IN ACCESSIBLE TYPE AREAS (I.E. LAY - IN TYPE CEILING, ETC.) OR SHALL BE PROVIDED WITH ACCESS PANELS. 20. WHERE UTILITIES AND/OR SERVICES REQUIRE SHUTDOWN FOR THE WORK TO BE PERFORMED, NOTIFY THE PORT AUTHORITY PROJECT ENGINEER. REQUESTS FOR UTILITY AND/OR SERVICES SHUTDOWNS SHALL BE SUBMITTED TO THE PORT AUTHORITY PROJECT ENGINEER, IN WRITING, A MINIMUM OF ONE WEEK PRIOR TO THE SCHEDULED SHUTDOWN. 21. ALL PAINT SHALL MEET THE REQUIREMENTS OF THE NFPA FOR FLAME SPREAD AND SMOKE DENSITY. PAINT PROCESS SHALL MEET ENVIRONMENTAL STANDARDS FOR VENTILATION AS ESTABLISHED BY OSHA. ALL PAINTS, SOLVENTS, RAGS AND OTHER PAINTING REFUSE SHALL BE DISPOSED OF PROPERLY OFF SITE IN ACCORDING TO STATE AND FEDERAL ENVIRONMENTAL REGULATIONS. EVIDENCE OF SUCH COMPLIANCE SHALL BE FURNISHED TO THE OWNER PRIOR TO THE START OF PAINTING WORK. 22. REFER TO THE APPROPRIATE SPECIFICATION SECTION(S) AND MANUFACTURERS' INSTRUCTIONS REGARDING APPLICATION OF PAINT. EQUIPMENT NAMING LEGEND BR - LL - NAME - YY EQUIPMENT NUMBER EQUIPMENT TYPE OR NAME LEVEL OF BUILDING BUILDING REFRENCE ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OW NER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED W ILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK DATE NO. REVISIONS BY AS NOTED PROJECT DRAWN BY DRAWING SCALE SHEET DATE APPROVED BY ISSUED FOR CONSTRUCTION DATE: 01/03/2020 OF 3460 NORTH DELAWARE AVEUE PHILADELPIHA, PA 19134 2020-03-06 13:27:36 BIM 360://Philaport_Warehouse/17067600_PhilaPortWH_V18_E_central.rvt PHILADELPHIA REGIONAL PORT AUTHORITY 3309 S GALLOWAY AVENUE & 3401 SOUTH LAWRENCE STREET PHILADELPHIA, PA 19148 CONSTRUCTION OF PHILAPORT DISTRIBUTION CENTER NEW DRY WAREHOUSE GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS FA001 SMF AAS 01/03/2020 20-028.1
Transcript
Page 1: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

FIRE ALARM NOTES:

1. THE SCOPE OF WORK INCLUDES FURNISHING MATERIALS AND LABOR FOR ALL INSTALLATION, PHASING, TESTING AND ACCEPTANCE OF THE FIRE ALARM SYSTEM AS SHOWN IN THE CONTRACT DOCUMENTS. THE PROJECT SCOPE INCLUDES:A. INSTALLATION OF FIRE ALARM PANEL.B. INSTALLATION OF REMOTE BOOSTER POWER SUPPLY PANELS, INCLUDING ALL NECESSARY

CONDUIT, WIRING, ASSOCIATED HARDWARE AND MATERIAL REQUIRED TO PROPERLY MOUNT THE PANELS AS INDICATED IN THE CONTRACT DOCUMENTS.

C. INSTALLATION OF FIRE ALARM INITIATION DEVICES IN ACCORDANCE WITH NFPA 72, AS INDICATED IN THE CONTRACT DOCUMENTS, INCLUDING ALL CONDUIT, WIRING AND ASSOCIATED HARDWARE. MANUAL PULL STATIONS ARE GENERALLY LOCATED IN THE PATH(S) OF EGRESS AND EXTERIOR EXITING DOORS.

D. INSTALLATION OF FIRE ALARM NOTIFICATION DEVICES THROUGHOUT THE FACILITY AS INDICATED IN THE CONTRACT DOCUMENTS, INCLUDING ALL NECESSARY CONDUIT, WIRING AND ASSOCIATED HARDWARE. FIRE ALARM NOTIFICATION DEVICES SHALL BE INSTALLED PER NFPA 72. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR. DEPENDING ON NOTIFICATION DEVICE MANUFACTURER, THE HEIGHTS INDICATED ARE NOT THE MOUNTING HEIGHTS OF THE DEVICE ELECTRICAL BACKBOX.

E. COORDINATION FOR NECESSARY 120 VAC DEDICATED CIRCUITS FOR POWER TO ALL ASSOCIATED FIRE ALARM SYSTEM PANELS AND SUPPORTING PANELS.

F. INSTALLATION OF CIRCUITS FOR FIELD DEVICES AND SYSTEMS INTERFACES, PROGRAMMING, TESTING AND ACCEPTANCE FOR A COMPLETE AND OPERATIONAL FIRE ALARM SYSTEM.

2. THE PROJECT SHALL BE BASED ON THE REQUIREMENTS OF THE FOLLOWING CODES, STANDARDS, TESTING LABORATORIES AND UNDERWRITING AGENCIES:A. PHILADELPHIA UNIFORM CONSTRUCTION CODE (AMENDED INTERNATIONAL BUILDING CODE 2018

EDITION).B. 2018 CITY OF PHILADELPHIA BUILDING CODE (INTERNATIONAL BUILDING CODE 2018 AS AMENDED)C. 2018 CITY OF PHILADELPHIA FIRE CODE (INTERNATIONAL FIRE CODE 2018 AS AMENDED).D. 2015 CITY OF PHILADELPHIA MECHANICAL CODE.E. NFPA 70, NATIONAL ELECTRIC CODE 2017 EDITION.F. NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE 2018 EDITION.G. ADAAG, ADA ACCESSIBILITY GUIDELINES FOR BUILDNGS AND FACILITIES, 2012 EDITION.H. UL LISTED PRODUCTS FOR FIRE ALARM USE CONSIDERING ENVIRONMENTAL CONDITIONS.I. MANUFACTURER'S INSTALLATION INSTRUCTIONS.J. PROJECT SPECIFICATIONS

3. AREA SMOKE DETECTION PER NFPA 72 SHALL COVER EACH MECHANICAL EQUIPMENT ROOM, EACH TELEPHONE / COMMUNICATIONS / LAN CLOSET, EACH ROOM CONTAINING FIRE ALARM CONTROL CABINETS AND THE TOP OF EACH STAIRWAY.

4. DUCT SMOKE DETECTION SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72 IN ALL HVAC SUPPLY UNITS IN EXCESS OF 2,000 CFM CAPACITY, ALL HVAC RETURN UNITS IN EXCESS OF 2,000 CFM CAPACITY, AT ALL FLOOR RETURN DUCTS / ENTRY TO RETURN SHAFT (EACH SHAFT / EACH FLOOR), WITHIN 5 FEET OF FIRE / SMOKE DAPERS, WHERE DUCT PASSES THROUGH REQUIRED SMOKE BARRIER AND WHERE DUCT / HVAC SYSTEM SERVES MULTIPLE SMOKE ZONES.

5. ADDRESSABLE INPUT MODULES (AIM) SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72 AT EACH WATERFLOW & TAMPER DEVICE (PROVIDED BY FIRE PROTECTION), AT EACH DRY-PIPE SYSTEMS FOR WATERFLOW, TAMPER, PRESSURE SWITCH/STATUS, AT EACH CLEAN AGENT SYSTEM FOR ALARM, TROUBLE & SUPERVISORY/STATUS, AT FIRE PUMP FOR PUMP RUN, PUMP FAIL TO START, PUMP LOW FUEL STATUS, AT REQUIRED HVAC CONTROLLERS TO INITIATE DIRECT FAN SHUTDOWN, AT FIRE/SMOKE DOOR RELEASE SYSTEMS, AT FIRE/SMOKE DAMPERS, AT SECURITY FAIL-SAFE DOOR SYSTEMS & STAIRWAY RE-ENTRY SYSTEM, AT BUILDING MANAGEMENT SYSTEM FOR ADDITIONAL RELATED STATUS.

6. ADA COMPLIANT 75 CANDELA (MINIMUM) STROBES SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72 IN MECHANICAL ROOMS, WITHIN 10 FEET OF EACH EXIT ON EACH FLOOR, IN ALL TOILETS, CONFERENCE ROOMS, LOCKER ROOMS, WAITING AREAS, COPY/FILE ROOMS, PANTRIES, IN ALL COMMON AREAS IN EXCESS OF 1,000 SQFT, WITHIN 15 FEET OF THE END OF EVERY CORRIDOR (ADA/NFPA/ANSI) WITH 100 FEET MAXIMUM SPACING BETWEEN APPLIANCES (ADA/NFPA/ANSI), PROVIDE COMBINATION DEVICES AS SHOWN ON CONTRACT DRAWINGS.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT CIRCUIT TIE-IN LOCATIONS, IN THE EVENT THAT THE CIRCUIT IS TO BE EXTENDED. LOCATIONS AND POINTS SHOWN ON THE PLANS ARE DIAGRAMMATICAL AND FOR REFERENCE ONLY. THE CONTRACTOR SHALL SHOW THE FINAL INFORMATION ON THE SHOP DRAWINGS AND INSTALLATION SHALL NOT BEGIN UNTIL THESE PLANS ARE APPROVED.

8. THE FIRE ALARM CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL DEVICES WITH OTHER TRADES AND FIELD CONDITIONS AS PART OF THIS CONTRACT.

9. ALL WIRING SHALL COMPLY WITH PROJECT SPECIFICATIONS, AND ALL LOCAL AND NATIONAL ELECTRICAL CODES.

10. SUBSTITUTIONS OF TYPE FIRE POWER LIMITED PLENUM (FPLP) OR CERTIFIED FIRE ALARM CABLES SHALL NOT BE PERMITTED.

11. ALL WIRE AND CABLE SHALL HAVE A WIRE MARKER ON EACH END, BRADY OR EQUAL. ALL MARKERS SHALL BE TYPED.

12. SHIELDS ON ALL SHIELDED CABLE SHALL BE CONTINUOUS, GROUNDED AT THE FIRE ALARM CONTROL PANEL ONLY, AND ISOLATED FROM GROUND ELSEWHERE. NON-POWER LIMITED FIRE ALARM (NPLFA) CIRCUIT CONDUCTORS INSULATION SHALL BE SUITABLE FOR 600 VOLTS. MULTI-CONDUCTOR NPLFA CIRCUIT CABLES, TYPES NON-POWER LIMITED FIRE PLENUM (NPLFP), NON-POWER LIMITED FIRE RISER (NPLFR), AND NON-POWER LIMITED SIGNALING FIRE ALARM CABLINING (NPLF), SHALL NOT BE INSTALLED EXPOSED IN DUCTS, PLENUMS OR HOISTWAYS (SHAFTS).

13. NON-POWER LIMITED FIRE ALARM (NPLFA) CIRCUIT CONDUCTORS INSULATION SHALL BE SUITABLE FOR 600 VOLTS. MULTI-CONDUCTOR NPLFA CIRCUIT CABLES, TYPES NPLFP, NPLFR, AND NPLF, SHALL NOT BE INSTALLED EXPOSED IN DUCTS, PLENUMS OR HOISTWAYS (SHAFTS).

14. INSTALLATION OF FIRE ALARM SYSTEM RACEWAYS, BOXES, ENCLOSURES, CABINETS, AND WIRING SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:A. COVERS OF BOXES, ENCLOSURES AND CABINETS SHALL BE PAINTED RED AND PERMANENTLY

IDENTIFIED AS TO USE.B. PENETRATIONS THROUGH RATED WALLS, CEILINGS AND FLOORS SHALL BE PROPERLY FIRE

STOPPED.C. RACEWAYS OR WIRING SHALL NOT PENETRATE THE TOP OF ANY CONTROL EQUIPMENT CABINET

OR ENCLOSURE.D. RACEWAYS INSTALLED UP TO 8 FT. IN STAIRWAYS SHALL NOT REDUCE OR OBSTRUCT REQUIRED

STAIRWAY RADIUS OR EGRESS PATH.E. CABLES SHALL BE SECURED BY CABLE TIES, STRAPS OR SIMILAR FITTINGS DESIGNED AND

INSTALLED SO AS NOT TO DAMAGE THE CABLES. SUCH FITTINGS SHALL BE SECURED IN PLACE AT INTERVALS NOT EXCEEDING 5-FT ON CENTER AND WITHIN 1-FT OF ASSOCIATED CABINET OR BOX.

F. JUNCTION BOXES SHALL BE PROPERLY LABELED "FIRE ALARM JUNCTION BOX" PER SPECIFICATIONS.

15. ALL FIRE ALARM SYSTEM NOTIFICATION APPLIANCES SHALL BE SYNCHRONIZED PER NFPA 72. ALL

HARDWARE, EQUIPMENT, PANEL MODIFICATIONS AND LABOR NECESSARY TO PERFORM SYNCHRONIZATION SHALL BE PART OF THIS CONTRACT.

17. FIRE ALARM SYSTEM VISUAL NOTIFICATION APPLIANCES SHALL BE SET TO THE CANDELA RATING ASSIGNED ON IN CONTRACT DOCUMENTS, AS A BASE SETTING. CANDELA SETTINGS MAY BE ADJUSTED IN THE FIELD AS PART OF ACCEPTANCE TESTING FOR COVERAGE.

18. MINIMUM DECIBEL AMBIENT RATING WITHIN OFFICE AND SHELTERD SPACES, OTHER THAN THE WAREHOUSE SHALL BE 55db. MINIMUM DECIBEL AMBIENT RATING WITHIN THE BODY OF THE WAREHOUSE SPACE(S) SHALL BE 70db. FIRE ALARM SYSTEM AUDIBLE NOTIFICATION DEVICES SHALL BE A MINIMUM OF 15db ABOVE AMBIENT LEVELS.

19. CIRCUIT MODIFICATIONS, TERMINATIONS AND SPLICES SHALL BE MADE WITH TERMINAL BLOCKS AND IN LISTED FITTINGS, BOXES, ENCLOSURES, FIRE ALARM DEVICES OR UTILIZATION EQIPMENT. SPLICES SHALL BE LIMITED TO LOCATIONS WHERE THE CONDITIONS OF INSTALLATION REQUIRE THE USE OF SPLICES. SPLICES AND TERMINATIONS IN RISER CABLES ARE PROHIBITED EXCEPT WHERE MADE IN FIRE ALARM EQUIPMENT TERMINAL CABINETS. MECHANICAL CONNECTIONS LISTED UNDER UNDERWRITERS LABORATORIES ("UL") 486-03, A & C SHALL BE USED FOR THE CONDUCTORS, OR IF SOLDERED, FIRST JOINED SO AS TO BE MECHANICALLY AND ELECTRICALLY SECURE PRIOR TO SOLDERING. TEMPERATURE RATING OF THE COMPLETED SPLICES SHALL EQUAL OR EXCEED THE TEMPERATURE RATING OF THE HIGHEST RATED CONDUCTOR.

20. FIRE ALARM CONDUITS SHALL BE LABELED AND IDENTIFIED PER THE PROJECT SPECIFICATIONS. ALL JUNCTION BOX COVERS SHALL BE PAINTED RED AND LABELED "FA". "EXPOSED" FIRE ALARM CONDUIT IN SPACES OTHER THAN WITHIN THE WAREHOUSE, SHALL BE PAINTED TO MATCH FINISHES.

21. INSTALLATION SHALL NOT BEGIN WITHOUT APPROVAL OF THE FIRE ALARM SHOP DRAWINGS BY THEENGINEER. REFER TO THE SPECIFICATIONS FOR REQUIREMENTS.

22. IN THE EVENT THAT A DEVICE IS LOCATED ON A SURFACE THAT IS UNSUITABLE FOR PROPER MOUNTING, THE CONTRACTOR SHALL NOTIFY THE ENGINEER DURING THE SHOP DRAWINGS PHASE FOR APPROVAL OF AN ALTERNATE LOCATION. THIS NOTIFICATION SHALL OCCUR PRIOR TO INSTALLATION FOR CONDUIT AND JUNCTION BOX ROUGH-IN.

23. POWER-LIMITED FIRE ALARM CIRCUIT CABLES AND CONDUCTORS SHALL NOT BE PLACED IN ANY CABLE, CABLE TRAY, COMPARTMENT, ENCLOSURE, MANHOLE, OUTLET BOX, DEVICE BOX, RACEWAY, OR SIMILAR FITTING WITH CONDUCTORS OF ELECTRIC LIGHT, POWER, CLASS 1, NON-POWER-LIMITED FIRE ALARM CIRCUITS, AND MEDIUM-POWER NETWORK-POWERED BROADBAND COMMUNICATIONS CIRCUITS.

24. THE SYSTEM WILL REPORT THE DATE, TIME, DEVICE TYPE, DEVICE ID, LOCATION AND TYPE OF ALARM(S) THAT ARE RECEIVED. THE REMOTE ANNUNCIATOR PANEL WILL INCLUDE REMOTE STATUS ZONE ALARM INDICATION AND TROUBLE SIGNALS AND WILL INCLUDE A STRIP PRINTER. FIRE ALARM SYSTEM POWER SHALL BE DERIVED FROM A DEDICATED BRANCH CIRCUIT OF THE MAIN ELECTRICAL SERVICE. THE FIRE ALARM SYSTEM SHALL HAVE AS THE SECONDARY POWER, BATTERY BACKUP SIZED FOR 24 HOURS OF SUPERVISORY FOLLOWED BY 45 MINUTES OF FULL SYSTEM ALARM.

FIRE ALARM NOTES - CONTINUED:

DESCRIPTIONSYMBOL

MANUAL PULL STATION

ADDRESSABLE SMOKE DETECTOR

HEAT DETECTOR, WHERE 'X' =R/F COMBINATION RATE OF RISE/FIXED TEMPERATURE

R/C RATE COMPENSATION F FIXED TEMPERATURE R RATE OF RISE ONLY

WALL-MOUNTED FIRE ALARM HORN/STROBE 'X' DENOTES CANDELA RATING

TAMPER SWITCH - FBO

FLOW SWITCH - FBO

CEILING-MOUNTED FIRE ALARM HORN/STROBE. 'X' DENOTES CANDELA RATING

ADDRESSABLE DUCT SMOKE DETECTOR, WHERE 'X' =R RETURN-AIR DUCT

S SUPPLY-AIR DUCT

INTERPOSAL RELAY

REMOTE ALARM LED INDICATOR

FIRE ALARM CONTROL PANEL

F

TS

FS

RL

FACP

ADDRESSABLE INPUT MODULE (AIM)

ADDRESSABLE OUTPUT MODULE (AOM)

FIRE ALARM ANNUNCIATORAAN

FIRE ALARM BOOSTER POWER SUPPLYBPS

WALL-MOUNTED FIRE ALARM STROBE'X' DENOTES CANDELA RATING

AIM

IR

AIM

S

X

SX

WALL-MOUNTED FIRE ALARM HORN

X

X

X

H

FIRE ALARM ABBREVIATIONS:

ADA AMERICANS WITH DISABILITIES ACT

ADAAG AMERICANS WITH DISABILITIES ACT GUIDELINES

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ALM ALARM

AHJ AUTHORITY HAVING JURISDICTION

AP ACCESS PANEL

AR ADDRESSABLE RELAY

AWG AMERICAN WIRE GAUGE

BPS BOOSTER POWER SUPPLY

CD CANDELA

CKT CIRCUIT

CM CONTACT MONITOR

(C) CEILING MOUNTED

DD DUCT SMOKE DETECTOR

(R) EXISTING TO BE REMOVED / DEMOLISHED

DIA DIAMETER

DN DOWN

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EMT ELECTRICAL METALLIC TUBING

EOL END-OF-LINE RESISTOR

(E) EXISTING TO REMAIN

(ER) EXISTING TO BE RELOCATED

°F DEGREE(S) FAHRENHEIT

FACP FIRE ALARM CONTROL PANEL

FAH FIRE ALARM HORN

FAHS FIRE ALARM HORN / STROBE

FAS FIRE ALARM SYSTEM

FM FACTORY MUTUAL

FS FLOW SWITCH

GC GENERAL CONTRACTOR

HEAT HEAT DETECTOR

IBC INTERNATIONAL BUILDING CODE

IDC INITIATING DEVICE CIRCUIT

IFC INTERNATIONAL FIRE CODE

IN INCHES

JB JUNCTION BOX

(N) NEW

NAC NOTIFICATION APPLIANCE CIRCUIT

NEC NATIONAL ELECTRICAL CODE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NICET NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES

NIS NOT IN SCOPE

NTS NOT TO SCALE

POC POINT OF CONNECTION

POD POINT OF DEMOLITION

PS PRESSURE SWITCH

(RE) RELOCATED

SLC SIGNALING LINE CIRCUIT

VIS VISIBLE CIRCUIT

SQFT SQUARE FEET

SUP SUPERVISORY

TR TROUBLE

TS TAMPER SWITCH

VAC VOLTAGE - ALTERNATING CURRENT

VDC VOLTAGE - DIRECT CURRENT

FAAP FIRE ALARM ANNUNCIATOR PANEL

FOIC FIBER OPTIC INTERFACE CABINET

MPS MANUAL PULL STATION

SD SMOKE DETECTOR

ST STROBE

WP WEATHER PROOF

ADDRESSABLE INITIATING CIRCUITS 16 AWG/2 COND. TWISTED SHIELDED

FACP NETWORK CIRCUIT

HORN CIRCUITS

16 AWG/2 COND. TWISTEDCONTROL CIRCUITS

CIRCUIT TYPE

MONITORING CIRCUITS

DATA RISERS 14 AWG/2 COND. TWISTED

STROBE CIRCUITS

B

WIRE TYPE CIRCUIT CLASS

B

B

B

B

B

B

B

16 AWG/2 COND. TWISTED SHIELDED / SINGLE MODE FIBER

14 AWG/2 COND. TWISTED

14 AWG/2 COND. TWISTED

14 AWG/2 COND. TWISTED

16 AWG/2 COND. TWISTED

ANNUNCIATOR DATA B16 AWG/2 COND. TWISTED

ANNUNCIATOR POWER B14 AWG/2 COND. TWISTED

FIRE ALARM WIRING CHART:

COMBINATION HORN/STROBE CIRCUITS

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THEIR SCHEDULE WITH THE MASTER PROJECT AND COMMISSIONING SCHEDULE. THE SCHEDULE SHALL BE COORDINATED WITH ALL OTHER TRADES AND SUBMITTED TO THE GENRERAL CONTRACTOR OR DESIGNATED REPRESENTATIVE EVERY TWO WEEKS. ALL CONTRACTORS SHALL BEAR THE COST OF ANY SCOPE IMPACTS CAUSED BY CHANGES TO THE MASTER PROJECT SCHEDULE. PRIOR TO THE START OF INSTALLATION, A MASTER SCHEDULE AND COMMISSIONING SCHEDULE SHALL BE SUBMITTED FOR GENERAL CONTRACTOR OR DESIGNATED REPRESNTATIVE'S APPROVAL. ALL WORK SHALL BE COMPLETE (INCLUDING TESTING AND FINAL APPROVAL BY AHJ) IN ACCORDANCE WITH MASTER SCHEDULE.

FIRE ALARM WORK SHALL COMMENCE IN THE FOLLOWING PHASES:

1. SHOP DRAWING SUBMITTAL:DEVELOP AND COORDINATE SHOP DRAWINGS FOR APPROVAL BY THE ENGINEER.

2. SYSTEM INSTALLATION:UPON APPROVAL OF SHOP DRAWINGS PERFORM INSTALLATION IN ACCORDANCE WITH MASTER SCHEDULE AND COORDINATE INSTALLATION WITH ALL OTHER TRADES.

3. FINAL INSPECTION: UPON COMPLETION OF ACCEPTANCE TESTING CONTRACTOR SHALL REQUEST, COORDINATE AND PERFORM ALL NECESSARY INSPECTIONS WITH ALL OTHER TRADES AND PHILAPORT NECESSARY FOR A SUCCESSFUL INSPECTION. ADDITIONAL INSPECTIONS DUE TO CONTRACTOR ERROR SHALL BE PERFORMED AT NO ADDITIONAL COST TO MASSPORT.

4. CLOSEOUT DOCUMENTS:SUBMIT ALL REQUIRED CLOSEOUT DOCUMENTATION TO THE ENGINEER FOR APPROVAL.

FIRE ALARM PHASING NOTES:

GENERAL NOTES:

1. CONTRACTOR SHALL COMPLY WITH ALL REGULATIONS & LAWS OF AUTHORITIES HAVING JURISDICTION.

2. ALL MATERIALS, MEANS AND METHODS SHALL COMPLY WITH APPLICABLE CODES, ORDINANCES, REGULATIONS AND STANDARDS.

3. CONTRACTOR SHALL PERFORM A SITE SURVEY TO VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE ENGINEER AT ONCE OF ANY DISCREPANCIES.

4. EACH CONTRACTOR SHALL REVIEW PROJECT DOCUMENTS OF ALL TRADES FOR A THOROUGH UNDERSTANDING OF PROJECT AND ANY CROSS REFERENCING OF WORK. REVIEW ALL PROJECT REQUIREMENTS PRIOR TO BIDDING. DISCREPANCIES BETWEEN DOCUMENTS SHALL BE REPORTED TO THE ENGINEER PRIOR TO BIDDING. IN THE CASE OF ANY DISCREPANCIES, THE MOST STRINGENT REQUIREMENT SHALL GOVERN.

5. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT AREA THROUGH DESIGNATED ACCESS POINTS AS DETERMINED BY THE OWNER OR THEIR DESIGNATED REPRESENTATIVE.

6. THE CONTRACTOR SHALL NOT BE ALLOWED ANY STORAGE AREA OTHER THAN THAT AVAILABLE WITHIN THE LIMITS OF THE STAGING AREA OR CONFINES OF THE WORK AREA.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL OF CONSTRUCTION DEBRIS AND REFUSE ON A DAILY BASIS.

8. A COPY OF THE CURRENT SET OF CONTRACT DOCUMENTS (WITH AS-BUILT INFORMATION) SHALL BE KEPT AT THE JOB SITE AT ALL TIMES BY THE CONTRACTOR.

9. ALL PENETRATIONS, THROUGH DESIGNATED FIRE RATED WALLS, CEILINGS AND FLOOR SLABS SHALL BE PROPERLY SEALED WITH AN APPROVED RATED FIRE STOPPING MATERIAL. ALL FIRE STOPPING MATERIAL SHALL BE SUPPLIED AND WORK PERFORMED AS PER PROJECT SPECIFICATIONS AND MANUFACTURERS INSTALLATION INSTRUCTIONS.

10. CONTRACTOR SHALL REPLACE IN-KIND ANY EQUIPMENT OR ARCHITECTURAL ELEMENTS DAMAGED BY WORK OF THIS PROJECT AT NO ADDITIONAL COSTS.

11. CONTRACTOR SHALL COMPLETE ALL CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE COMPLETED IN A NEAT AND WORKMANLIKE MANNER. PATCHING MATERIALS SHALL MATCH MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE TOUCH UP PAINT AS REQUIRED TO MATCH PAINT FINISH AND COLOR OF ADJACENT AREAS. CONTRACTOR SHALL SALVAGE MATERIALS FOR RE-USE IN AREAS WHERE SUBSTRATES / SURFACES ARE TO BE PATCHED/REPAIRED (I.E. TILES, WALLS, CEILING TILE).

12. THE CONTRACTOR SHALL GUARANTEE THE ENTIRE INSTALLATION FOR A MINIMUM PERIOD OF ONE YEAR (EXCEPT WHERE EXTENSIONS OF THIS ONE YEAR PERIOD ARE NOTED) FROM THE DATE OF BENEFICIAL USE AND ACCEPTANCE OF THE SYSTEM AS A WHOLE. ANY DEFECTS IN WORKMANSHIP, MATERIALS, MALFUNCTION OF EQUIPMENT OR UNSATISFACTORY PERFORMANCE, AND ALL OTHER WORK OR PARTS OF THE BUILDING DAMAGED THEREBY, AS A RESULT OF WORK OF THE PROJECT BY THE CONTRACTOR, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PAY ALL REPAIR COSTS ACCORDINGLY.

13. IN ADDITION TO SPECIFICATIONS, AS MAY BE DEFINED HEREAFTER, THE CONTRACTOR SHALL PROTECT THE WORK SITE AND ALL HIS OR HER WORK AGAINST ANY DAMAGE UNTIL FINAL COMPLETION AND ACCEPTANCE BY THE OWNER.

14. CONTRACTOR SHALL, UPON COMPLETION OF THE WORK, SUBMIT AS-BUILT RECORD DRAWINGS SHOWING ALL CHANGES FROM THE CONTRACT DRAWING MADE IN THE INSTALLATION, AND SHOWING DIMENSION LOCATIONS OF CONCEALED EQUIPMENT.

15. PRIOR TO DELIVERY OF ANY MATERIALS TO THE SITE, THE CONTRACTOR SHALL PROVIDE MATERIAL SAFETY DATA SHEETS FOR ALL ITEMS AND MATERIALS USED IN THE WORK TO THE GENERAL CONTRACTOR.

16. PERCUSSIVE FASTENING SYSTEMS, INCLUDING BUT NOT LIMITED TO POWDER, GAS AND PNEUMATIC ACTUATED ANCHORS, WILL NOT BE PERMITTED ANYWHERE ON THE PROJECT. CONTRACTORS ARE PERMITTED TO USE MECHANICAL TYPE UNISTRUT FASTENING DEVICES ONLY.

17. PRIOR TO ACCEPTANCE OF THE SPACE, ALL SYSTEMS SHALL BE INSPECTED, TESTED AND OPERATED TO DEMONSTRATE TO THE OWNER, OR HIS DESIGNATED REPRESENTATIVE, THAT THE INSTALLATION AND PERFORMANCE OF THESE SYSTEMS AND/OR PARTS THEREOF CONFORM TO THE DESIGN INTENT.

18. THE BUILDING IS A WORK OF A COMPLEX NATURE WHICH WILL REQUIRE ACCURATE PLANNING, CAREFUL PREPARATION AND EXECUTION. ATTENTION TO DETAIL AND CLOSE SUPERVISION BY THE CONTRACTOR WILL BE A REQUIREMENT. THE CONTRACTOR SHALL BE REQUIRED TO DO THIS WORK IN FULL COOPERATION WITH ALL CONSTRUCTION TRADES AND SUBJECT TO SCHEDULING ARRANGED TO MINIMIZE DISRUPTION OF NORMAL ACTIVITIES FOR CONSTRUCTION OF THE BUILDING.

19. JUNCTION BOXES, VALVES, DAMPERS, OR ANY CONCEALED EQUIPMENT REQUIRING ACCESS SHALL ONLY BE PERMITTED / LOCATED IN ACCESSIBLE TYPE AREAS (I.E. LAY-IN TYPE CEILING, ETC.) OR SHALL BE PROVIDED WITH ACCESS PANELS.

20. WHERE UTILITIES AND/OR SERVICES REQUIRE SHUTDOWN FOR THE WORK TO BE PERFORMED, NOTIFY THE PORT AUTHORITY PROJECT ENGINEER. REQUESTS FOR UTILITY AND/OR SERVICES SHUTDOWNS SHALL BE SUBMITTED TO THE PORT AUTHORITY PROJECT ENGINEER, IN WRITING, A MINIMUM OF ONE WEEK PRIOR TO THE SCHEDULED SHUTDOWN.

21. ALL PAINT SHALL MEET THE REQUIREMENTS OF THE NFPA FOR FLAME SPREAD AND SMOKE DENSITY. PAINT PROCESS SHALL MEET ENVIRONMENTAL STANDARDS FOR VENTILATION AS ESTABLISHED BY OSHA. ALL PAINTS, SOLVENTS, RAGS AND OTHER PAINTING REFUSE SHALL BE DISPOSED OF PROPERLY OFF SITE IN ACCORDING TO STATE AND FEDERAL ENVIRONMENTAL REGULATIONS. EVIDENCE OF SUCH COMPLIANCE SHALL BE FURNISHED TO THE OWNER PRIOR TO THE START OF PAINTING WORK.

22. REFER TO THE APPROPRIATE SPECIFICATION SECTION(S) AND MANUFACTURERS' INSTRUCTIONS REGARDING APPLICATION OF PAINT.

EQUIPMENT NAMING LEGEND

BR - LL - NAME - YY

EQUIPMENT NUMBER

EQUIPMENT TYPE OR NAME

LEVEL OF BUILDING

BUILDING REFRENCE

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL

DIM

EN

SIO

NS

MU

ST

BE

VE

RIF

IED

BY

CO

NT

RA

CT

OR

A

ND

OW

NE

R M

US

T B

E N

OT

IFIE

D O

F A

NY

DIS

CR

EP

AN

CIE

S B

EF

OR

E P

RO

CE

ED

ING

WIT

H W

OR

K

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

2020-0

3-0

6 1

3:2

7:3

6B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

GE

NE

RA

L N

OT

ES

, S

YM

BO

LS

, A

ND

AB

BR

EV

IAT

ION

S

FA001

SMF

AAS

01/03/2020

20-028.1

Page 2: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

N

N

1

2

3

4

5

6

7

8

9

10

M

M

L

L

K

K

J

J

I

I

H

H

G

G

F

F

E

E

D

D

C

C

B

B

A

A

9.5

8.5

7.5

6.5

5.5

4.5

3.5

2.5

1.5

A.3 A.6

A.5 B.5 C.5 D.5 E.5 F.5 G.5 H.5 I.5 J.5 K.5 L.5 M.5

B.3 B.6 C.3 D.3 D.6 E.3 E.6 F.3 F.6 G.3 G.6 H.3 H.6 I.3 I.6 J.3 J.6 K.3 K.6 L.3 L.6 M.3 M.6

FA501

1

FA502

1

FA502

2

FA211

1

FA212

1

FA213

1

FA214

1FA215

1FA216

1

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

A B C

D E F

PROJECT NORTHP

2020-0

3-0

6 1

3:2

7:4

5B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

MA

IN L

EV

EL

OV

ER

AL

L S

PA

CE

FA210

SMF

AAS

01/03/2020

20-028.1

3/64" = 1'-0"1MAIN LEVEL OVERALL SPACE

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

GENERAL NOTES:

KEYED NOTES:

1 REFER TO DRAWING SHEET FA501 VIEWS 1 AND 2 FOR THE ENLARGED PLANS OF THE FIRST AND SECOND LEVELS.

1

Page 3: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

110 110

WP

110

F

110

WP+48"

BP

SB

PS

BP

SB

PS

BP

SB

PS

110

BP

SB

PS

BP

SB

PS

J J J J J J J J J J J J J

BPS BPSBPS BPS

WPWP

110

110

F

110

BP

SB

PS

BP

SB

PS

WP+48"

110110

J

J

J J J

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

110

S

P

S

P

S

P

110

WP

FF

1

2

3

4

5

EDCBA

5.5

4.5

3.5

2.5

1.5

A.3 A.6 B.3 B.6 C.3 D.3 D.6 E.3

1

2

3

ADMIN.WAREHOUSE

119

LOCKERROOM

115

BREAKROOM

114

WOMEN

116

TRUCKERLOUNGE

121

TOILET

122

MEN

117

JAN.

118

IT

123

2

FA211

4

FA211

3

FA211

(1) (1)(1)

(1) (2) (2)

(3)

(5)

(5) (5) (5) (5)

(5)(5)(5)

(5) (5) (5) (5)

(4) (4)

(6)

(6)

(6) (6)

(6)

(6) (6)

(6)

(6) (6)

(6)

(6)

(4)

(5)

(2)

(2) (2)

FA502

1

5

4

4

(5)

(1)WPWP

11

WP

WP

1

BPS-03 BPS-02 BPS-01

BPS-04BPS-05BPS-06

4

BPS-08 BPS-07

BPS-09BPS-10

5

BPS-13 BPS-12 BPS-11

BPS-14BPS-15BPS-16

4

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

A

PROJECT NORTHP

2020-0

3-0

6 1

3:2

8:0

3B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

FL

OO

R P

LA

N -

FIR

ST

FL

OO

R -

SE

CT

OR

A

FA211

SMF

AAS

01/03/2020

20-028.1

1/8" = 1'-0"1FIRE ALARM FLOOR PLAN - FIRST FLOOR - SECTOR A

GENERAL NOTES:

KEYED NOTES:

1

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

3. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR.

4. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

5. NUMBERS CONTAINED IN PARENTHESES () ARE INDICATED AS A GUIDE TO FIRE ALARM NOTIFICATION DEVICE CIRCUITING FROM THE FIRE ALARM BOOSTER POWER SUPPLY PANELS. SHOP DRAWINGS SHALL SHOW ACTUAL CIRCUITING AND DEVICE GROUPING.

FIRE ALARM BOOSTER POWER SUPPLY PANELS INSTALLED STACKED, 2 ROWS HIGH, AT 7 FT AFF AND 10 FT AFF. MEASURED TO TOPS OF THE CABINETS. REFER TO SECTION VIEWS.

FIRE ALARM BOOSTER POWER SUPPLY PANELS INSTALLED STACKED, 2 ROWS HIGH, AT 6 FT 6 INCHES AFF AND 8 FT 6 INCHES AFF. MEASURED TO TOPS OF THE CABINETS. REFER TO SECTION VIEWS.

FIRE ALARM BOOSTER POWER SUPPLY PANELS INSTALLED STACKED, 2 ROWS HIGH, AT 7 FT AFF AND 10 FT AFF. MEASURED TO TOPS OF THE CABINETS. REFER TO DRAWING SHEET FA214 SECTION VIEW 1.

WALL-MOUNTED ADDRESSABLE SMOKE DETECTOR INSTALLED 5 FEET ABOVE FIRE ALARM BOOSTER POWER SUPPLY PANELS.

WALL-MOUNTED ADDRESSABLE SMOKE DETECTOR INSTALLED 4 FEET 6 INCHES ABOVE FIRE ALARM BOOSTER POWER SUPPLY PANELS.

1/4" = 1'-0"2FA BPS ELEVATION VIEW A1

1/4" = 1'-0"3FA BPS ELEVATION VIEW

1/4" = 1'-0"4FA BPS ELEVATION VIEW A3

2

3

4

5

20

20

.03

.06

1R

EV

ISE

D F

OR

PE

RM

IT/B

ID

Page 4: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

F

110 110 110

WP WP

F

WP

WP+48"

WP+48"

J J J J J J J J J J J J JJ

110

110

110110

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

J J J J

1

2

3

4

5

IHGF

5.5

4.5

3.5

2.5

1.5

E.3 E.6 F.3 F.6 G.3 G.6 H.3 H.6 I.3 I.6

STAGING

124

(1) (1) (1)

(2) (2)

(6)

(6)

(6)

(4) (4) (4)

(7)

(7)

(7)

(7)

(7)

(7)

(7)

(7)

(7)

(7)

(7)

(7)

(8)

(8)

(8)

(8)

(8)

(8)

(8)

(8)

(8)

(8)

(8)

(8)

(2) (2)

WPWP

11

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

B

PROJECT NORTHP

2020-0

3-0

6 1

3:2

8:0

9B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

FL

OO

R P

LA

N -

FIR

ST

FL

OO

R -

SE

CT

OR

B

FA212

SMF

AAS

01/03/2020

20-028.1

1/8" = 1'-0"1FIRE ALARM FLOOR PLAN - FIRST FLOOR - SECTOR B

GENERAL NOTES:

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

3. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR.

4. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

5. NUMBERS CONTAINED IN PARENTHESES () ARE INDICATED AS A GUIDE TO FIRE ALARM NOTIFICATION DEVICE CIRCUITING FROM THE FIRE ALARM BOOSTER POWER SUPPLY PANELS. SHOP DRAWINGS SHALL SHOW ACTUAL CIRCUITING AND DEVICE GROUPING.

20

20

.03

.06

1R

EV

ISE

D F

OR

PE

RM

IT/B

ID

Page 5: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

110

110 110

WP WP WP

F F

WP+48"

WP+48"

BPSBPSBPSBPS BPS BPS

110

110

J J J J J J J J J J J

110

110

110

110

110 110

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

J J J J J

J

J

J

AIM

AO

MIR

IR

COMPACTOR

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

BATTERY

CH

ARG

ERBATTER

YC

HAR

GER

SP

F

N

1

2

3

4

5

MLKJ

5.5

4.5

3.5

2.5

1.5

I.6 J.3 J.6 K.3 K.6 L.3 L.6 M.3 M.6

1

STAIR #1

113

IT

103

OFFICE

105

PANTRY

107

TRUCKERLOUNGE

109

TOILET

110

CORRIDOR

106

WAREHOUSEADMIN

108

TOILET

111WAITING

112

OFFICE

104

CHARGING

124

2

FA213

(1) (1) (1)

(2)

(10)

(4) (4)

(8)

(8)

(8)

(9)

(9)

(9)

(9)

(4)

(4) (4) (4) (10)

(9) (9)

(4) (4)

(10)

(10) (10)

(10) (10)

(10)

(10)

(10)

(10)

(10)

(2)(2)

4

2

3

FA501

1

5

WPWP

WP1

1 1

BPS-17

BPS-20

BPS-18

BPS-21

BPS-19

BPS-22

5

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

C

PROJECT NORTHP

2020-0

3-0

6 1

3:2

8:2

6B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

FL

OO

R P

LA

N -

FIR

ST

FL

OO

R -

SE

CT

OR

C

FA213

SMF

AAS

01/03/2020

20-028.1

1/8" = 1'-0"1FIRE ALARM FLOOR PLAN - FIRST FLOOR - SECTOR C

GENERAL NOTES:

KEYED NOTES:

1 FIRE ALARM BOOSTER POWER SUPPLY PANELS INSTALLED STACKED, 2 ROWS HIGH, AT 7 FT AFF AND 10 FT AFF. MEASURED TO TOPS OF THE CABINETS. REFER TO DRAWING SHEET FA213 ELEVATION VIEW 2.

COORDINATE WITH ELECTRICAL CONTRACTOR FOR FIRE ALARM SUPERVISION OF AC POWER FOR SHUNT TRIP BREAKER. COORDINATE FINAL INSTALLATION LOCATION AND FIELD WIRING INTERCONNECTIONS.

COORDINATE WITH THE ELECTRICAL CONTRACTOR FOR ELECTRICAL WIRING INTERFACE AND INTERCONNECTIONS FOR FIRE ALARM SYSTEM SHUNT TRIP ACTIVATION TO DISCONNECT CHARGING STATIONS FROM POWER SOURCE. COORDINATE FINAL ADDRESSABLE INPUT AND OUTPUT MODULE INSTALLATION, LOCATION AND FIELD WIRING.

CHARGING STATION POWER SOURCE SHUNT TRIP SHALL OCCUR UPON SPRINKLER SYSTEM ACTIVATION IN THE AREA ABOVE THE CHARGING STATIONS. COORDINATE WITH THE FIRE PROTECTION CONTRACTOR FOR DEVICE IDENTIFICATION NECESSARY FOR FIRE ALARM SYSTEM PROGRAMMING.

WALL-MOUNTED ADDRESSABLE SMOKE DETECTOR INSTALLED 4 FEET 6 INCHES ABOVE FIRE ALARM BOOSTER POWER SUPPLY PANELS.

2

1/4" = 1'-0"2FA BPS ELEVATION VIEW C1

3

4

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

3. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR.

4. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

5. NUMBERS CONTAINED IN PARENTHESES () ARE INDICATED AS A GUIDE TO FIRE ALARM NOTIFICATION DEVICE CIRCUITING FROM THE FIRE ALARM BOOSTER POWER SUPPLY PANELS. SHOP DRAWINGS SHALL SHOW ACTUAL CIRCUITING AND DEVICE GROUPING.

5

20

20

.03

.06

1R

EV

ISE

D F

OR

PE

RM

IT/B

ID

Page 6: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

110110110

110 110 110

110 110 110

BP

SB

PS

BP

SB

PS

BP

SB

PS

110

110

110

BP

SB

PS

BP

SB

PS

BP

SB

PS

BP

SB

PS

BP

SB

PS

BP

SB

PS

F

J

J

J

J

J

J

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

J J J

S

P

S

P

S

P

110

110

F

FF

6

7

8

9

10

EDCBA

9.5

8.5

7.5

6.5

5.5

A.5 B.5 C.5 D.5

2

1

1

2

FA214

3

FA214

4

FA214

(5) (5) (5) (5)

(5)(5)

(6) (6) (6) (6)

(6)

(12)

(12)

(12)

(12)

(12)

(12)

(12)

(12)

(12)

(12)

(12)

(12)

(13)

(13)

(13)

(13)

(13)

(13)

(13)

(13)

(13)

(13)

(13)

(13)

(14)

(14)

(14)

(14)

(14)

(14)

(14)

(14)

(12) (13) (14)

(13)(13)(12)

(12)

(5)

1

2

2

(12)

(12)

(14)

WP WP

11

WP

1

1WP

BPS-29

BPS-32

BPS-30

BPS-33

BPS-31

BPS-34

2

BPS-23

BPS-26

BPS-24

BPS-27

BPS-25

BPS-28

2

BPS-35

BPS-38

BPS-36

BPS-39

BPS-37

BPS-40

2

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

D

PROJECT NORTHP

2020-0

3-0

6 1

3:2

8:4

7B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

FL

OO

R P

LA

N -

FIR

ST

FL

OO

R -

SE

CT

OR

D

FA214

SMF

AAS

01/03/2020

20-028.1

1/8" = 1'-0"1FIRE ALARM FLOOR PLAN - FIRST FLOOR - SECTOR D

GENERAL NOTES:

KEYED NOTES:

1 FIRE ALARM BOOSTER POWER SUPPLY PANELS INSTALLED STACKED, 2 ROWS HIGH, AT 7 FT AFF AND 10 FT AFF. MEASURED TO TOPS OF THE CABINETS. REFER TO SECTION VIEWS.

WALL-MOUNTED ADDRESSABLE SMOKE DETECTOR INSTALLED 5 FEET ABOVE FIRE ALARM BOOSTER POWER SUPPLY PANELS.

1/4" = 1'-0"3FA BPS ELEVATION VIEW D2

1/4" = 1'-0"2FA BPS ELEVATION VIEW D1

1/4" = 1'-0"4FA BPS ELEVATION VIEW D3

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

3. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR.

4. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

5. NUMBERS CONTAINED IN PARENTHESES () ARE INDICATED AS A GUIDE TO FIRE ALARM NOTIFICATION DEVICE CIRCUITING FROM THE FIRE ALARM BOOSTER POWER SUPPLY PANELS. SHOP DRAWINGS SHALL SHOW ACTUAL CIRCUITING AND DEVICE GROUPING.

2

20

20

.03

.06

1R

EV

ISE

D F

OR

PE

RM

IT/B

ID

Page 7: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

F

110110110

110 110 110

110 110 110

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

J J

110

F

6

7

8

9

10

IHGF

9.5

8.5

7.5

6.5

5.5

E.5 F.5 G.5 H.5 I.5

WAREHOUSE

120

(6)

(7) (7) (8)

(7) (7) (7) (7) (8) (8) (8) (8)

(14)

(14)

(14)

(14)

(15)

(15)

(15)

(15)

(15)

(15)

(15)

(15)

(15)

(15)

(15)

(15)

(15) (16) (17)

(16)

(16)

(16)

(16)

(16)

(16)

(16)

(16)

(16)

(16)

(16)

(16)

(17)

(17)

(17)

(17)

(17)

(17)

(17)

(17)

(17)(15)(15) (16)

WP WP

11

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

E

PROJECT NORTHP

2020-0

3-0

6 1

3:2

8:5

3B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

FL

OO

R P

LA

N -

FIR

ST

FL

OO

R -

SE

CT

OR

E

FA215

SMF

AAS

01/03/2020

20-028.1

1/8" = 1'-0"1FIRE ALARM FLOOR PLAN - FIRST FLOOR - SECTOR E

GENERAL NOTES:

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

3. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR.

4. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

5. NUMBERS CONTAINED IN PARENTHESES () ARE INDICATED AS A GUIDE TO FIRE ALARM NOTIFICATION DEVICE CIRCUITING FROM THE FIRE ALARM BOOSTER POWER SUPPLY PANELS. SHOP DRAWINGS SHALL SHOW ACTUAL CIRCUITING AND DEVICE GROUPING.

20

20

.03

.06

1R

EV

ISE

D F

OR

PE

RM

IT/B

ID

Page 8: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

F

110110

110 110 110

110

110 110

F

SP

WP

+48"

110

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

75

J

J

JJJ

AIM

AIM

AIM

J

110

110

F

F

N

6

7

8

9

10

MLKJ

9.5

8.5

7.5

6.5

5.5

J.5 K.5 L.5 M.5

2

FIRE PUMPROOM

102

IT

103

UTILITY

101

(9) (9)

(9) (9) (9) (9) (10) (10)

(9)

(9)

(19)

(18) (19)

(17)

(17)

(17)

(17)

(18)

(18)

(18)

(18)

(18)

(18)

(18)

(18)

(18)

(18)

(18)

(18)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)

(19)(18)(17)

1

FA501

2

(17)

WP WP

WP

11

1

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

F

PROJECT NORTHP

2020-0

3-0

6 1

3:2

8:5

9B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

FL

OO

R P

LA

N -

FIR

ST

FL

OO

R -

SE

CT

OR

F

FA216

SMF

AAS

01/03/2020

20-028.1

1/8" = 1'-0"1FIRE ALARM FLOOR PLAN - FIRST FLOOR - SECTOR F

KEYED NOTES:

1 ADDRESSABLE INPUT MODULES SHALL BE COORDINATED WITH FIRE PROTECTION CONTRACTOR FOR FINAL LOCATIONS AND DEVICE INTERCONNECTIONS. POINTS TO BE MONITORED:

• PUMP RUN - SUPERVISORY• PUMP LOW FUEL - SUPERVISORY• PUMP FAIL TO START - SUPERVISORY

REFER TO DRAWING SHEET FA502 FOR DIESEL PUMP BUILDING ENLARGED DRAWING.

2

GENERAL NOTES:

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

3. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR.

4. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

5. NUMBERS CONTAINED IN PARENTHESES () ARE INDICATED AS A GUIDE TO FIRE ALARM NOTIFICATION DEVICE CIRCUITING FROM THE FIRE ALARM BOOSTER POWER SUPPLY PANELS. SHOP DRAWINGS SHALL SHOW ACTUAL CIRCUITING AND DEVICE GROUPING.

20

20

.03

.06

1R

EV

ISE

D F

OR

PE

RM

IT/B

ID

Page 9: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

110

15

15

15

15

15

15

15

15

BPSBPS BPSBPS

15

15

15

15

15

SP

AIMAIMAIM

FH

ANN

BPSBPS

75

AIMAIMAIM AIMAIMAIMAIMAIMAIM

F

75

F

75

75

FA

CP

15

15

15

30

15

15

15

30

SP

SP

SS

K K

R

N

5

6

M

5.5

4.5

UTILITY

101

IT

103

OFFICE

104

PANTRY

107

CORRIDOR

106

OFFICE

105

WAREHOUSEADMIN

108

TOILET

111

TOILET

110

WAITING

112

STAIR #1

113

TRUCKERLOUNGE

109

4

FA501

3

FA501

2

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

(11)

3

1

(11)

N

5

6

M

5.5

4.5

STAIR #1

113

TOILET

209

COPY

208

OPEN AREA

207

OFFICE

205

MEDIUMCONF. RM

206

OFFICE

204

IT

202

OFFICE

201

LARGECONF RM

203

OPEN AREA

207

SR

(20)

(20)(20)

(20)

(20)

(20)

(20)

(20)

(20)

(20)

4

4

TYPICAL ADDRESSABLE INPUT MODULE

1 4 7 10

2 5 8 11

3 6 9 12

5

BPS-41

BPS-44

BPS-42

BPS-45

BPS-43

BPS-46

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

PROJECT NORTHP

2020-0

3-0

6 1

3:2

9:2

3B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

AD

MIN

. O

FF

ICE

EN

LA

RG

ED

PL

AN

S

FA501

SMF

AAS

01/03/2020

20-028.1

1/4" = 1'-0"1FIRE ALARM FLOOR PLAN - ADMIN. OFFICE - FIRST FLOOR

1/4" = 1'-0"2FIRE ALARM FLOOR PLAN - ADMIN. OFFICE - SECOND FLOOR

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

3. ENLARGED DRAWINGS PROVIDED FOR INCREASED LEGIBILITY. COUNT FIRE ALARM DEVICE AND EQUIPMENT FOR QUANTITIES.

4. REFER TO FLOOR PLAN DRAWING SHEETS FOR KEYED NOTES AND ELEVATION VIEWS FOR FIRE ALARM BOOSTER POWER SUPPLY PANELS INSTALLATION HEIGHTS.

5. ADDRESSABLE INPUT MODULES SHALL BE COORDINATED AS REFERENCED ON FLOOR PLAN DRAWING SHEETS BY KEYED NOTES FOR COORDINATION OF FINAL LOCATIONS AND DEVICE INTERCONNECTIONS.

6. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

7. NUMBERS CONTAINED IN PARENTHESES () ARE INDICATED AS A GUIDE TO FIRE ALARM NOTIFICATION DEVICE CIRCUITING FROM THE FIRE ALARM BOOSTER POWER SUPPLY PANELS. SHOP DRAWINGS SHALL SHOW ACTUAL CIRCUITING AND DEVICE GROUPING.

GENERAL NOTES:

1/4" = 1'-0"3SPRINKLER RISER SUPERVISION MODULES

1/4" = 1'-0"4FA BPS WALL PLACEMENT ELEVATION

KEYED NOTES:

1 FIRE ALARM BOOSTER POWER SUPPLY PANELS INSTALLED STACKED, 2 ROWS HIGH, AT 7 FT AFF AND 10 FT AFF. MEASURED TO TOPS OF THE CABINETS. REFER TO ELEVATON VIEW 4 FOR REFERENCE.

FIRE ALARM SYSTEM REMOTE ANNUNCIATOR, SURFACE MOUNTED. COORDINATE FINAL LOCATION WITH ARCHITECTURAL DRAWINGS.

FIRE ALARM SYSTEM ADDRESSABLE INPUT MODULES STACKED 4 COLUMNS WIDE AND 3 ROWS HIGH. REFER TO ELEVATION VIEW 3 FOR REFERENCE. SPRINKLER SYSTEM RISERS SHALL REQUIRE ADDRESSABLE (DUAL) INPUT MODULES FOR MONITORING ALARM AND SUPERVISORY POINTS. COORDINATE WITH THE FIRE PROTECTION CONTRACTOR FOR FINAL LOCATIONS AND DEVICE INTERCONNECTIONS.

PHYSICAL LOCATION OF FIRE ALARM SYSTEM DUCT SMOKE DETECTORS AND INTERPOSAL SHUTDOWN RELAY ARE LOCATED IN THE SPACE ABOVE THE SECOND FLOOR. COORDINATE INSTALLATION WITH THE MECHANICAL HVAC CONTRACTOR. FIELD LOCATE FINAL ACCESSIBLE LOCATIONS FOR DUCT SMOKE DETECTOR TEST/RESET KEYSWITCHES AND REMOTE ALARM LED INDICATORS.

ADDRESSABLE INPUT MODULES NUMBERED 1 TO 9 SHALL BE DESIGNATED FOR WATER FLOW AND VALVE TAMPER MONITORING OF THE BUILDING SPRINKLER SYSTEM. ADDRESSABLE INPUT MODULES NUMBERED 10 TO 12 SHALL BE DESIGNATED FOR WATER FLOW AND VALVE TAMPER MONITORING FOR THE FIRE PUMP.

2

3

4

5

Page 10: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

F

SP

75

75

11

01

10

75

30

30

15

15

75

110

75

75

SP

6

FIRE PUMPROOM

102

FIRE PUMP FOOTPRINT

1 2 3

WP

1

2

A

2.5

1.5

A.3 A.6

TRUCKERLOUNGE

121

ADMIN.WAREHOUSE

119

MEN

117

TOILET

122

WOMEN

116

BREAKROOM

114

LOCKERROOM

115

JAN.

118

IT

123

(1)

(1)

(1)

(3)

(3)

(3)

(3)

(3)

(3)

(3)

(3)

(3)

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

KEY PLAN

PROJECT NORTHP

2020-0

3-0

6 1

3:2

9:2

9B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

WA

RE

HO

US

E O

FF

ICE

/ D

IES

EL

PU

MP

BU

ILD

ING

FA502

SMF

AAS

01/03/2020

20-028.1

GENERAL NOTES:

1. REFER TO SHEETS FA001 FOR GENERAL NOTES, FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHOWN SHALL BE PROVIDED BY THE CONTRACTOR.

3. ENLARGED DRAWINGS PROVIDED FOR INCREASED LEGIBILITY. COUNT THE FIRE ALARM DEVICES AND EQUIPMENT FOR QUANTITIES.

4. REFER TO FLOOR PLAN DRAWING SHEETS FOR KEYED NOTES AND ELEVATION VIEWS INDICATING FIRE ALARM BOOSTER POWER SUPPLY PANELS INSTALLATION HEIGHTS.

5. REFER TO DRAWING SHEET FA502 FOR BUILDING SUBSTATION DEVICE QUANTITIES AND LOCATIONS.

6. FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

7. NUMBERS CONTAINED IN PARENTHESES () ARE INDICATED AS A GUIDE TO FIRE ALARM NOTIFICATION DEVICE CIRCUITING FROM THE FIRE ALARM BOOSTER POWER SUPPLY PANELS. SHOP DRAWINGS SHALL SHOW ACTUAL CIRCUITING AND DEVICE GROUPING.

1/4" = 1'-0"2DEISEL PUMP BUILDING

1/4" = 1'-0"1FIRE ALARM FLOOR PLAN - WAREHOUSE OFFICE - FIRST FLOOR

KEYED NOTES:

1 REFER TO DRAWING SHEET FA216 FOR COORDINATION OF DESIGNATED SUPERVISORY POINTS OF THE FIRE PUMP CONSISTING OF:

• PUMP RUN - SUPERVISORY• PUMP LOW FUEL - SUPERVISORY• PUMP FAIL TO START - SUPERVISORY

REFER TO DRAWING SHEET FA501 FOR COORDINATION OF DESIGNATED SUPERVISORY POINTS FOR THE WATER FLOW AND VALVE TAMPER SWITCHES FOR THE FIRE PUMP.

FIRE ALARM SYSTEM ADDRESSABLE INPUT MODULES SHALL BE COORDINATED WITH FIRE PROTECTION CONTRACTOR FOR FINAL LOCATIONS AND DEVICE INTERCONNECTIONS.

2

3

20

20

.03

.06

1R

EV

ISE

D F

OR

PE

RM

IT/B

ID

Page 11: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS

BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

BPS BPS BPS

UTILITY ROOM 101

CHARGER AREA ON WALL ADJACENT TO OFFICE STAIR

SOUTH WALL TO EAST SIDE OF WAREHOUSE

SOUTH WALL TO EAST SIDE OF WAREHOUSE ADJACENT TO EAST SIDE OF EXIT DOOR

SOUTH WALL TO EAST SIDE OF WAREHOUSE ADJACENT TO WEST SIDE OF EXIT DOOR

SOUTH WALL TO WEST SIDE OF WAREHOUSE ADJACENT TO EAST SIDE OF WAREHOUSE OFFICE

SOUTH WALL - WEST SIDE WAREHOUSE OFFICE

EAST EXTERIOR WALL OF WAREHOUSE OFFICE

FACP

• LOCATED IN SECOND FLOOR ADMIN OFFICE IT RM 202• COORDINATE WITH ELECTRICAL CONTRACTOR FOR DEDICATED 120 VAC

POWER BRANCH CIRCUIT• COORDINATE WITH COMMUNICATIONS / SECURITY CONTRACTOR FOR

METHODS OF COMMUNICATIONS FOR OFFSITE MONITORING

(1) 16/2 TW/SH (SLC)

F S AIM AOM

TO ADDITIONAL INITIATION DEVICES

(1) 16/2 TW/SH (DATA)(1) 16/2 TW/SH (SLC)(1) 14/2 (NAC)

(1) 16/2 TW/SH (DATA)(1) 16/2 TW/SH (SLC)(1) 14/2 (NAC)

(1) 14/2 (NAC - HORN)(1) 14/2 (NAC - STROBE)

TO ADDITIONAL NOTIFICATION DEVICES OR TO EOL RESISTOR PER CIRCUIT

BPS-01 BPS-02 BPS-03

BPS-06BPS-05BPS-04

BPS-07 BPS-08

BPS-10BPS-09

BPS-11 BPS-12 BPS-13

BPS-16BPS-15BPS-14

BPS-17 BPS-18 BPS-19

BPS-22BPS-21BPS-20

BPS-23 BPS-24 BPS-25

BPS-28BPS-27BPS-26

BPS-29 BPS-30 BPS-31

BPS-34BPS-33BPS-32

BPS-35 BPS-36 BPS-37

BPS-40BPS-39BPS-3

8

BPS-41 BPS-42 BPS-43

BPS-46BPS-45BPS-44

ANN

FIRST FLOOR STAIR #1

DEVICES SHOWN ARE TYPICAL FOR ANY BPS NOTIFICATION CIRCUIT

H

DEVICE ACTIVATION

FIRE ALARM SEQUENCE OF OPERATION MATRIX

SYSTEM RESPONSE

RE

CO

RD

IN

SY

ST

EM

HIS

TO

RY

: O

CC

UR

EN

CE

,DA

TE

,T

IME

, &

ZO

NE

S(S

) IN

ITIA

TIN

G E

VE

NT

AC

TU

AT

E F

IRE

ALA

RM

NO

TIF

ICA

TIO

N T

HR

OU

GH

TH

E S

UP

ER

VIS

ING

S

TA

TIO

N C

ON

NE

CT

ION

(S).

AC

TU

AT

E F

IRE

SU

PE

RV

ISO

RY

NO

TIF

ICA

TIO

N T

HR

OU

GH

TH

E

SU

PE

RV

ISIN

G S

TA

TIO

N C

ON

NE

CT

ION

(S)

AC

TU

AT

E F

IRE

TR

OU

BLE

NO

TIF

ICA

TIO

N T

HR

OU

GH

T

HE

SU

PE

RV

ISIN

G S

TA

TIO

N C

ON

NE

CT

ION

(S)

AC

TU

AT

E F

IRE

ALA

RM

CO

NT

RO

L P

AN

EL A

ND

FIR

E

ALA

RM

AN

NU

NC

IAT

OR

CO

NT

RO

L P

AN

EL T

RO

UB

LE

LE

D

AC

TU

AT

E F

IRE

ALA

RM

CO

NT

RO

L A

ND

FIR

E A

LA

RM

AN

NU

NC

IAT

OR

C

ON

TR

OL P

AN

EL A

UD

IBLE

TR

OU

BLE

SIG

NA

L

AC

TU

AT

E F

IRE

ALA

RM

CO

NT

RO

L A

ND

FIR

E A

LA

RM

A

NN

UN

CIA

TO

R C

ON

TR

OL P

AN

EL S

UP

ER

VIS

OR

Y L

ED

AC

TU

AT

E F

IRE

ALA

RM

CO

NT

RO

L A

ND

FIR

E A

LA

RM

AN

NU

NC

IAT

OR

C

ON

TR

OL P

AN

EL A

UD

IBLE

ALA

RM

SIG

NA

L

AC

TU

AT

E F

IRE

ALA

RM

SIG

NA

L T

HR

OU

GH

OU

T T

HE

FA

CIL

ITY

AC

TU

AT

E F

IRE

ALA

RM

CO

NT

RO

L A

ND

FIR

E A

LA

RM

AN

NU

NC

IAT

OR

C

ON

TR

OL P

AN

EL A

UD

IBLE

SU

PE

RV

ISO

RY

SIG

NA

L

AC

TU

AT

E F

IRE

ALA

RM

CO

NT

RO

L A

ND

FIR

E A

LA

RM

AN

NU

NC

IAT

OR

C

ON

TR

OL P

AN

EL A

LA

RM

LE

D

DIS

PLA

Y T

RO

UB

LE

IN

FO

RM

AT

ION

ON

FA

CP

AN

D

FIR

E A

LA

RM

AN

NU

NC

IAT

OR

CO

NT

RO

L

DIS

PLA

Y S

UP

ER

VIS

OR

Y I

NF

O O

N F

AC

P A

ND

FIR

E A

LA

RM

A

NN

UN

CIA

TO

R C

ON

TR

OL

DIS

PLA

Y A

LA

RM

IN

FO

RM

AT

ION

AT

FA

CP

AN

D F

IRE

ALA

RM

A

NN

UN

CIA

TO

R C

ON

TR

OL

AC

TU

AT

E D

OO

R R

ELE

AS

E C

ON

TR

OL R

ELA

Y(S

) A

S N

EC

ES

SA

RY

ALL V

ISU

AL S

IGN

ALS

RE

MA

IN A

CT

IVE

UP

ON

SIL

EN

CIN

G O

F T

HE

S

YS

TE

M,

UN

TIL

RE

SE

T

REMOVAL OF A DEVICE OR RELATED DEVICE COMMUNICATIONS TROUBLE

SHORT CIRCUIT (ON ANY TYPE OF CIRCUIT)

ANY SYSTEM TROUBLE SIGNAL NOT MENTIONED IN DETAIL

ACTIVATION OF ANY SYSTEM HEAT DETECTOR

FIRE ALARM AC POWER FAILURE OR OTHER RELATED TROUBLE

FIRE ALARM SYSTEM LOW BATTERY OR ASSOCIATED BATTERY TROUBLE

GROUND FAULT (ON ANY TYPE OF CIRCUIT)

OPEN CIRCUIT (ON ANY TYPE OF CIRCUIT)

ACTIVATION OF ANY SYSTEM SMOKE DETECTOR

ACTIVATION OF ANY SYSTEM MANUAL PULL STATION OR MASTER BOX PULL STATION

DEVICE ACTIVATION

ACTIVATION OF ANY FIRE PROTECTION VALVE TAMPER OR LOW AIR SUPERVISORY DEVICE

ACTIVATION OF ANY FIRE PROTECTION WATER FLOW DEVICE

ANY DESIGNATED FIRE PUMP OPERATIONS SUPERVISORY DEVICE

ANY SYSTEM SUPERVISORY SIGNAL NOT MENTIONED IN DETAIL

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

PROJECT NORTHP

2020-0

3-0

6 1

3:2

9:3

2B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

RIS

ER

DIA

GR

AM

FA601

SMF

AAS

01/03/2020

20-028.1

2FA RISER DIAGRAM

GENERAL NOTES:

1. RISER DIAGRAM IS SHOWN AS DIAGRAMATICAL.

2. CONTRACTOR SHALL PROVIDE ACTUAL RISER DIAGRAM AS PART OF THE DOCUMENT CLOSE OUT PORTION OF THIS PROJECT.

3. FIRE ALARM CONTROL PANEL (FACP) SHALL BE POWERED BY A DEDICATED 120 VAC CIRCUIT.

4. FIRE ALARM BOOSTER POWER SUPPLIES (BPS) SHALL BE POWERED BY DEDICATED 120 VAC CIRCUITS.

5. COORDINATE WITH ELECTRICAL CONTRACTOR AND DRAWINGS FOR DEDICATED CIRCUIT IDENTIFICATION FOR THE FIRE ALARM CONTROL PANEL AND EACH OF THE BOOSTER POWER SUPPLY PANELS.

6. FIRE ALARM INITIATION AND NOTIFICATION FIELD DEVICES ARE SHOWN AS REPRESENTATIVE.

7. EACH FIRE ALARM BOOSTER POWER SUPPLY CONTAINS 4 CLASS 'B' NOTIFICATION OR AUXILIARY POWER CIRCUITS, FOR FIELD CONFIGURATION AS NECESSARY.

8. FIRE ALARM NOTIFICATION FIELD DEVICES ARE SHOWN AS REPRESENTATIVE.

NO SCALE1FIRE ALARM SEQUENCE OF OPERATION (INPUT/OUTPUT MATRIX)

Page 12: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

SHIELDSHIELD

-

+ +

-

21

3 4

1

3

2

4

FIRE ALARM

PULL DOWN

WALLEX

ISTING

011

57

03

51

REMOVABLE COVER(TOOL REQUIRED)

-

+

-

+

SHIELD SHIELD SHIELD

R B BR

S S

6' -

0"

6' -

8"

4' -

0"

FINISHED FLOOR

TYPICAL FIRE

ALARM PANEL

MANUAL PULL STATION

FINISHED CEILING

CEILING-MOUNTED

SMOKE DETECTOR

CEILING-MOUNTED

HEAT DETECTOR

WALL-MOUNTED

HORN/STROBE

3FT MIN HVAC DIFFUSER

H

F

S3FT MIN

TYPICAL FIRE

ALARM BPS

PANEL

TYPICAL FIRE

ALARM BPS

PANEL

10' - 0"

6' - 0"WALL-MOUNTED

STROBEWALL-MOUNTED

HORN

TO OPERATING PART OF HANDLE

84 INCHES TO BOTTOM OF STROBE LENS

7' - 0"

90 INCHES TO TOP OF STROBE LENS

FIRE ALARM SYSTEM NOTIFICATION MOUNTING HEIGHTS

• FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN OFFICE OR SHELTERED SPACES ON EACH LEVEL, SHALL BE INSTALLED WITH THE BOTTOM OF THE STROBE LENS LOCATED AT 84 INCHES ABOVE THE FINISHED FLOOR.

• FIRE ALARM NOTIFICATION DEVICES LOCATED WITHIN THE WAREHOUSE SPACE, SHALL BE INSTALLED WITH THE TOP OF THE STROBE LENS LOCATED AT 90 INCHES ABOVE THE FINISHED FLOOR.

• DEPENDING ON NOTIFICATION DEVICE MANUFACTURER, THE HEIGHTS INDICATED ARE NOT THE MOUNTING HEIGHTS OF THE DEVICE ELECTRICAL BACKBOX.

4 11/16" SQUARE x 2 1/8" DEEP BOX SUPPLIED BY CONTRACTOR

FLUSH ADAPTOR AVAILABLE FROM MANUFACTURER

MOUNTING INSTRUCTIONS: 1. COVER & BACKPLATE COME

ASSEMBLED.

2. UNLOCK STATION, DROP COVER FORWARD TO EXPOSE MOUNTING SCREWS.

FLUSH MOUNTING

NOTE: BOX MUST BE RECESSED INTO WALL 1" TO 1 1/8".

CUTOUT MUST BE A MINIMUM 6" HIGH BY 5" WIDE.

TO ADDITIONAL DEVICESFROM FIRE ALARM CONTROL PANEL OR OTHER DEVICES ON CIRCUIT

NEW WALL O

R

WALL BACKING

PLATE USED FOR UNEVEN SURFACES

STANDARD ELECTRICAL BOX MOUNTING 4" SQUARE BOX, 1-1/2" DEEP, WITH A 4" SQUARE BOX EXTENSION, 1-1/2" DEEP, SUPPLIED BY OTHERS.

WIRING INPUT TERMINALS AND SPEAKER TAP SELECTION ARE ACCESSIBLE FROM REAR

HORN ASSEMBLY

STROBE ASSEMBLY

INTENSITY SELECTION PLUG, ACCESSIBLE ONLY FROM REAR OF HOUSING; FACTORY SETTING IS 15cd.

STROBE INTENSITY VIEWING SLOT

TRANSPARENT HOUSING AND LENS ASSEMBLY

BACK BOX

ADAPTER PLATE

MOUNTING NOTES:

1. THE SPEAKER STROBE UNIT ATTACHES DIRECTLY TO A STANDARD 4" SQ., ELECTRICAL BOX (NOT SUPPLIED), SEMI-FLUSH OR SURFACE MOUNTED.

2. THERE ARE TWO (2) HOLES FOR ELECTRICAL BOX MOUNTING. SECURE THE HOUSING TO SINGLE-GANG BOX USING 2 MOUNTING SCREWS (#6/32-INCH x 1 1/8-INCH LONG SUPPLIED) LINE THE MOUNTING TABS OF THE STROBE UNIT TO THE HOUSING SLOTS AND SNAP INTO PLACE.

3. IT IS RECOMMENDED THAT THE STROBE ADDRESS BE SET BEFORE THE APPLIANCE IS SNAPPED TO THE HOUSING.

4. ADDRESS SWITCH IS ACCESSIBLE WITH THE UNIT STROBE REMOVED.

HORN -

HORN +

HORN +

HORN -

NAC -

NAC +

STROBE +

STROBE -

HORN +

HORN -

EOL

RESISTOR

WIRING NOTES:

NOTIFICATION APPLIANCES ARE RATED PER INDIVIDUAL NAMEPLATE LABEL. MAINTAIN CORRECT POLARITY ON TERMINAL CONNECTIONS. DO NOT LOOP WIRES UNDER TERMINALS. ALL NAC WIRING CONNECTIONS ARE SUPERVISED AND POWER-LIMITED. SEE INSTALLATION INSTRUCTIONS FOR ADDITIONAL INFORMATION.

STROBE:

1. RATED VOLTAGE RANGE: UL LISTED: 16VDC TO 33 VDC PER UL 1971.

2. FLASH RATE: 1Hz

3. SYNCHRONIZED MODE NAC LOADING: MAXIMUM OF 35 SYNCHRONIZED STROBES PER NAC CIRCUIT.

FROM AUDIO NAC

CHANNEL 4100U

FROM STANDARD

SMARTSYNC NAC

HORN +

HORN -

NAC -

NAC +

EOL

RESISTOR

STROBE +

STROBE -

4"x1-1/2" DEEP OCTAGONAL OR 4" SQUAREX 1-1/2" DEEP, WHICH REUQIRES AN ADAPTERPLATE (6-3/8" X 1/4") BOX SUPPLIED BY CONTRACTOR

ADDRESS DIP SWITCHES SEE BASEINSTALLATION INTRUCTIONS FORSETTINGS

PHOTO-ELECTRIC SMOKE SENSOR

HEAT SENSOR

FLUSH MOUNTING(BOX TO BE FLUSH OR RECESSED 1/4" MAXIMUM)

TO ADDITIONAL DEVICESFROM PREVIOUS DEVICE OR FIRE ALARM CONTROL PANEL

OR

4" SQUARE X 2 1/8" DEEP BOX SUPPLIED BY CONTRACTOR

RELAY MODULE

2 - GANG BACK BOX COVERSUPPLIED BY CONTRACTOR

NORMALLY CLOSED (N.C.)

COMMON

NORMALLY OPEN (N.O.)

NOT USED

NORMALLY CLOSED (N.C.)

COMMON

NORMALLY OPEN (N.O.)

NOT USED

OPTIONAL SHIELD

+ -+ -

ADDRESS SETTING UNDER RE - SEALABLE LABEL

IDNET (SLC) TO FACPFROM PREVIOUS DEVICE OR FACP

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

PROJECT NORTHP

2020-0

3-0

6 1

3:2

9:3

5B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

DE

TA

ILS

FA801

SMF

AAS

01/03/2020

20-028.1

NOT TO SCALE1TYPICAL MOUNTING HEIGHTS

NOT TO SCALE5MANUAL PULL STATION MOUNTING AND WIRING - TYPICAL

NOT TO SCALE6MANUAL PULL STATION BUBBLE COVER

NOT TO SCALE2HORN / STROBE - TYPICAL

NOT TO SCALE3HORN / STROBE WIRING - TYPICAL

NOT TO SCALE4ADDRESSABLE DETECTOR MOUNTING - TYPICAL

NOT TO SCALE7ADDRESSABLE OUTPUT MODULE (AOM) - TYPICAL

Page 13: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

MONITOR VOLUME

READY TO PAGE

PREANNOUNCE TONE

10:36:02 05-17-18

SYSTEM STATUS: NORMAL

UNSILENCE

AUDIBLES

SILENCED

ACKNOWLEDGE

SILENCEACK

LOCAL

SUPERVISORY

ON

ALARM TROUBLESECURITY

BUTTON ENABLE

ON

OFF

TO OTHER DEVICES

SHIELDSHIELD

ALARM

TEST

NORMAL

REMOTE ALARM INDICATOR/KEYSWITCHRESET/TEST STATION

TUBE SUPPORT HOLE SHALL BE USED FOR DUCTS MORE THAN 3 FEET WIDE

INSERT RUBBER PLUG

EXHAUST TUBE CUT TO 1/2 OF DUCT WHEN < 24" DO NO INSERT RUBBER PLUG

FOR DUCT WIDTHS 8" TO 3'

FOR DUCT WIDTHS 3' TO 95"

WIRING NOTES:

1. DUCT SENSOR WIRING IS 12 TO 18 AWG. 2. THE TEST KEY MODULE IS POLARIZED, OBSERVE COLOR-CODED WIRING. 3. MAXIMUM WIRE LENGTH TO TEST TERMINALS AND REMOTE LED IS 250 FEET.

SEE NOTES 2,3

TEST

UL LISTED CONTROL PANEL

SLC

POWER CIRCUIT 24 VDC

SHIELD(OPTIONAL)

+-

+

-

REMOTE ALARM INDICATOR/ KEYSWITCH

RED ALARM LED

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16TB1

REDBLK

EOL

+ ALM -+ -LED+ - TEST MAP+ MAP- +24V 24C

ADDRESS SWITCH

SW2

4-WIRE DUCT SMOKE DETECTOR

8

2

567

43

1 ON

INTERIOR, WITH DOOR OPENEXTERIOR, WITH DOOR CLOSED SHOWING WINDOW AND LOCK

90"

FINISHED FLOOR

90"

TYPICAL INSTALLATION METHOD FOR "STAND-ALONE"

NON-STORAGE RACK SUPPORTED

TYPICAL INSTALLATION METHOD FOR STORAGE

RACK SUPPORTED

SECURELY FASTEN DIRECTLY TO STORAGE RACK

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

PROJECT NORTHP

2020-0

3-0

6 1

3:2

9:3

7B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

DE

TA

ILS

FA802

SMF

AAS

01/03/2020

20-028.1

NOT TO SCALE1DUCT SMOKE DETECTOR

NOT TO SCALE2FIRE ALARM ANNUNCIATOR ENCLOSURE

NOT TO SCALE3UNISTRUT-MOUNTED - FA HORN/STROBE

Page 14: New GENERAL NOTES: FIRE ALARM NOTES: FIRE ALARM NOTES - … · 2020. 3. 9. · fire alarm notes: 1. the scope of work includes furnishing materials and labor for all installation,

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATESARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTEDTO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ONTHE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTENVERIFICATION OR ADAPTATION BY PENNONI

ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDEDWILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY

OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; ANDOWNER SHALL INDEMNIFY AND HOLD HARMLESS

PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES,LOSSES AND EXPENSES ARISING OUT OF OR

RESULTING THEREFROM.

ALL D

IME

NS

ION

S M

US

T B

E V

ER

IFIE

D B

Y C

ON

TR

AC

TO

R

AN

D O

WN

ER

MU

ST

BE

NO

TIF

IED

OF

AN

YD

ISC

RE

PA

NC

IES

BE

FO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

DA

TE

NO

.R

EV

ISIO

NS

BY

AS NOTED

PROJECT

DRAWN BY

DRAWING SCALE

SHEET

DATE

APPROVED BY

ISSUED FOR CONSTRUCTIONDATE: 01/03/2020 OF

3460 N

OR

TH

DE

LA

WA

RE

AV

EU

E

PH

ILA

DE

LP

IHA

, P

A 1

9134

PROJECT NORTHP

2020-0

3-0

6 1

3:2

9:5

4B

IM 3

60:/

/Phila

port

_W

are

house/1

7067600_P

hila

Port

WH

_V

18_E

_centr

al.rv

t

PH

ILA

DE

LP

HIA

RE

GIO

NA

L P

OR

T A

UT

HO

RIT

Y

3309 S

GA

LLO

WA

Y A

VE

NU

E &

3401 S

OU

TH

LA

WR

EN

CE

ST

RE

ET

PH

ILA

DE

LP

HIA

, P

A 1

9148

CO

NS

TR

UC

TIO

N O

F P

HIL

AP

OR

T D

IST

RIB

UT

ION

CE

NT

ER

NE

W D

RY

WA

RE

HO

US

E

FIR

E A

LA

RM

SC

HE

DU

LE

S

FA901

SMF

AAS

01/03/2020

20-028.1

FIRE ALARM SYSTEM NOTIFICATION DEVICE SCHEDULE

NOTIFICATION DEVICE TYPENOTIFICATION ACTION

TYPEBPS NOTIFICATION

AREA

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - VIS NAC VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-15

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-16

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - VIS NAC VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-17

NOTIFICATION - VIS NAC VIS NAC-17

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-18

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - VIS NAC VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-19

NOTIFICATION - H/S NAC AUD/VIS NAC-20

NOTIFICATION - H/S NAC AUD/VIS NAC-20

NOTIFICATION - VIS NAC VIS NAC-20

NOTIFICATION - VIS NAC VIS NAC-20

NOTIFICATION - VIS NAC VIS NAC-20

NOTIFICATION - VIS NAC VIS NAC-20

NOTIFICATION - VIS NAC VIS NAC-20

NOTIFICATION - VIS NAC VIS NAC-20

NOTIFICATION - VIS NAC VIS NAC-20

NOTIFICATION - VIS NAC VIS NAC-20

FIRE ALARM SYSTEM NOTIFICATION DEVICE SCHEDULE

NOTIFICATION DEVICE TYPENOTIFICATION ACTION

TYPEBPS NOTIFICATION

AREA

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - VIS NAC VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - H/S NAC AUD/VIS NAC-8

NOTIFICATION - VIS NAC VIS NAC-9

NOTIFICATION - VIS NAC VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-9

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - VIS NAC VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-10

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-11

NOTIFICATION - VIS NAC VIS NAC-11

NOTIFICATION - VIS NAC VIS NAC-11

NOTIFICATION - VIS NAC VIS NAC-11

NOTIFICATION - VIS NAC VIS NAC-11

NOTIFICATION - VIS NAC VIS NAC-11

NOTIFICATION - AUD NAC AUD NAC-11

NOTIFICATION - VIS NAC VIS NAC-11

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-12

NOTIFICATION - VIS NAC VIS NAC-12

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - VIS NAC VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-13

NOTIFICATION - VIS NAC VIS NAC-13

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

NOTIFICATION - H/S NAC AUD/VIS NAC-14

FIRE ALARM SYSTEM NOTIFICATION DEVICE SCHEDULE

NOTIFICATION DEVICE TYPENOTIFICATION ACTION

TYPEBPS NOTIFICATION

AREA

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S NAC AUD/VIS NAC-1

NOTIFICATION - H/S NAC AUD/VIS NAC-1

NOTIFICATION - H/S NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S NAC AUD/VIS NAC-1

NOTIFICATION - H/S - WP NAC AUD/VIS NAC-1

NOTIFICATION - H/S NAC AUD/VIS NAC-2

NOTIFICATION - H/S NAC AUD/VIS NAC-2

NOTIFICATION - H/S NAC AUD/VIS NAC-2

NOTIFICATION - H/S NAC AUD/VIS NAC-2

NOTIFICATION - H/S NAC AUD/VIS NAC-2

NOTIFICATION - H/S NAC AUD/VIS NAC-2

NOTIFICATION - VIS NAC VIS NAC-2

NOTIFICATION - VIS NAC VIS NAC-2

NOTIFICATION - VIS NAC VIS NAC-2

NOTIFICATION - H/S NAC AUD/VIS NAC-2

NOTIFICATION - VIS NAC VIS NAC-2

NOTIFICATION - H/S NAC AUD/VIS NAC-2

NOTIFICATION - H/S NAC AUD/VIS NAC-3

NOTIFICATION - H/S NAC AUD/VIS NAC-3

NOTIFICATION - H/S NAC AUD/VIS NAC-3

NOTIFICATION - VIS NAC VIS NAC-3

NOTIFICATION - VIS NAC VIS NAC-3

NOTIFICATION - VIS NAC VIS NAC-3

NOTIFICATION - H/S NAC AUD/VIS NAC-3

NOTIFICATION - H/S NAC AUD/VIS NAC-3

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - H/S NAC AUD/VIS NAC-4

NOTIFICATION - VIS NAC VIS NAC-5

NOTIFICATION - VIS NAC VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - H/S NAC AUD/VIS NAC-5

NOTIFICATION - VIS NAC VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - H/S NAC AUD/VIS NAC-6

NOTIFICATION - VIS NAC VIS NAC-7

NOTIFICATION - VIS NAC VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

NOTIFICATION - H/S NAC AUD/VIS NAC-7

FIRE ALARM SYSTEM INITIATION DEVICE SCHEDULE

DEVICE TYPECIRCUIT

TYPE DEVICE ID

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - AUTOMATIC SLC ADDRESSABLE SMOKE DETECTOR

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

INITIATION - MANUAL SLC ADDRESSABLE MANUAL PULL STATION

FIRE ALARM SYSTEM PANEL SCHEDULEELECTRICAL INPUT

INFO DEVICE TYPE

120 VAC 20A MAIN CONTROL PANEL

120 VAC 20A PANEL BPS-01

120 VAC 20A PANEL BPS-02

120 VAC 20A PANEL BPS-03

120 VAC 20A PANEL BPS-04

120 VAC 20A PANEL BPS-05

120 VAC 20A PANEL BPS-06

120 VAC 20A PANEL BPS-07

120 VAC 20A PANEL BPS-08

120 VAC 20A PANEL BPS-09

120 VAC 20A PANEL BPS-10

120 VAC 20A PANEL BPS-11

120 VAC 20A PANEL BPS-12

120 VAC 20A PANEL BPS-13

120 VAC 20A PANEL BPS-14

120 VAC 20A PANEL BPS-15

120 VAC 20A PANEL BPS-16

120 VAC 20A PANEL BPS-17

120 VAC 20A PANEL BPS-18

120 VAC 20A PANEL BPS-19

120 VAC 20A PANEL BPS-20

120 VAC 20A PANEL BPS-21

120 VAC 20A PANEL BPS-22

120 VAC 20A PANEL BPS-23

120 VAC 20A PANEL BPS-24

120 VAC 20A PANEL BPS-25

120 VAC 20A PANEL BPS-26

120 VAC 20A PANEL BPS-27

120 VAC 20A PANEL BPS-28

120 VAC 20A PANEL BPS-29

120 VAC 20A PANEL BPS-30

120 VAC 20A PANEL BPS-31

120 VAC 20A PANEL BPS-32

120 VAC 20A PANEL BPS-33

120 VAC 20A PANEL BPS-34

120 VAC 20A PANEL BPS-35

120 VAC 20A PANEL BPS-36

120 VAC 20A PANEL BPS-37

120 VAC 20A PANEL BPS-38

120 VAC 20A PANEL BPS-39

120 VAC 20A PANEL BPS-40

120 VAC 20A PANEL BPS-41

120 VAC 20A PANEL BPS-42

120 VAC 20A PANEL BPS-43

120 VAC 20A PANEL BPS-44

120 VAC 20A PANEL BPS-45

120 VAC 20A PANEL BPS-46

FIRE ALARM SYSTEM MODULE DEVICE SCHEDULE

DEVICE TYPE DEVICE ACTION TYPEDEVICE CKT

TYPE

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE INPUT MODULE (AIM) MODULE - INPUT - SUPV SLC

ADDRESSABLE OUTPUT MODULE (AOM) MODULE SLC