+ All Categories
Home > Documents > New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07)...

New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07)...

Date post: 15-Oct-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
33
GMA Certification Group Pty Ltd BUILDING SURVEYORS BUILDING APPROVALS & INSPECTIONS BUILDING CERTIFICATION FIRE SAFETY AUDITS Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669 1166 Atherton (07) 4091 4196 Childers (07) 4126 3069 Queensland’s leaders in Building Certification Services PORT DOUGLAS OFFICE PHONE: (07) 4098 5150 FAX: (07) 4098 5180 Lot 9 Unit 5 Craiglie Business Park Owen Street CRAIGLIE QLD 4877 POSTAL: P.O. Box 831, PORT DOUGLAS QLD 4877 E-Mail: [email protected] Web: www.gmacert.com.au 10 August 2018 The Chief Executive Officer Douglas Shire Council PO Box 723 MOSSMA Q 4877 Attention: Development Assessment Dear Sir, Re: Material Change of Use Application Proposed Dwelling – 12 Ives Avenue, Wonga Beach Lot 5 SP892256 GMA Certification Group have been engaged to assess an application for the construction of a dwelling on the abovementioned property. The property is within the Flood and Storm Tide Inundation overlay (Storm Tide Medium Hazard & Floodplain Assessment Overlay). Accordingly, the application for Material Change of Use is enclosed for Council’s assessment, which includes: 1. DA forms 1; 2. Assessment against the applicable Acceptable Solutions & Outcomes of the overlay Code; 3. Waste Water Report 4. 1 x copy of plans 5. Owners consent; Assessment – Flood & storm tide hazard overlay code The following table provides an assessment of the proposed development with regards to Performance Outcomes of the flood & storm tide hazard overlay code.
Transcript
Page 1: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

GMA Certification Group Pty LtdBUILDING SURVEYORS

BUILDING APPROVALS & INSPECTIONS BUILDING CERTIFICATION FIRE SAFETY AUDITS

Gold Coast

(07) 5578 1622

Sunshine Coast

(07) 5449 0383

Cloncurry

(07) 4742 2022

Chinchilla

(07) 4669 1166

Atherton

(07) 4091 4196

Childers

(07) 4126 3069

Queensland’s leaders in Building Certification ServicesPORT DOUGLAS OFFICE

PHONE: (07) 4098 5150FAX: (07) 4098 5180

Lot 9 Unit 5Craiglie Business ParkOwen StreetCRAIGLIE QLD 4877

POSTAL:P.O. Box 831,PORT DOUGLAS QLD 4877

E-Mail: [email protected]: www.gmacert.com.au

10 August 2018

The Chief Executive OfficerDouglas Shire CouncilPO Box 723MOSSMA Q 4877

Attention: Development Assessment

Dear Sir,

Re: Material Change of Use ApplicationProposed Dwelling – 12 Ives Avenue, Wonga BeachLot 5 SP892256

GMA Certification Group have been engaged to assess an application for the construction of a dwelling on the abovementioned property. The property is within the Flood and Storm Tide Inundation overlay (Storm Tide Medium Hazard & Floodplain Assessment Overlay).

Accordingly, the application for Material Change of Use is enclosed for Council’s assessment, which includes:

1. DA forms 1;2. Assessment against the applicable Acceptable Solutions & Outcomes of the overlay Code;3. Waste Water Report4. 1 x copy of plans5. Owners consent;

Assessment – Flood & storm tide hazard overlay code

The following table provides an assessment of the proposed development with regards to Performance Outcomes of the flood & storm tide hazard overlay code.

Page 2: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

2 of 4

Flood and storm tide hazards overlay code Performance Outcomes Acceptable Outcomes CommentFor assessable and self assessable developmentPO1Development is located and designed to:ensure the safety of all persons;minimise damage to the development andcontents of buildings;provide suitable amenity;minimise disruption to residents, recovery time,and rebuilding or restoration costs afterinundation events

For dwelling houses,AO1.2Development within the Flood and Storm Tidehazards overlay maps (excluding the Flood plainassessment sub-category) is designed to provideimmunity to the Defined Inundation Event asoutlined withinTable 8.2.4.3.b plus a freeboard of 300mm.AO1.3New buildings are:(a) not located within the overlay area;(b) located on the highest part of the site tominimise entrance of flood waters;(c) provided with clear and direct pedestrian andvehicle evacuation routes off the site.

AO1.4In non urban areas, buildings and infrastructureare set back 50 metres from natural ripariancorridors to maintain their natural function ofreducing velocity of floodwaters.

The dwelling is to be constructed within a developed area of Wonga Beach and will therefore have a similar floor level to existing dwellings in the vicinity.

The current ground level where the dwelling is to be constructed is approximately 2.8m AHD. The building platform will be raised to 3.30m AHD and the finished floor level of the dwelling will be approximately 3.685m AHD.

It is considered the proposed finished floor level of 3.685m AHD will provide an acceptable level of flood immunity consistent with other dwellings in the vicinity.

NA

PO3Development siting and layout responds toflooding potential and maintains personal safety

For Material change of useAO3.1New buildings are:(d) not located within the overlay area;(e) located on the highest part of the site tominimise entrance of flood waters;

The proposed dwelling will be located on the highest part of the site so as to minimize the entrance of flood waters.

To the owner’s knowledge the property has not been inundated previously. Therefore, the proposed floor level is above any perceived flooding potential other than that projected out to 80 years.

Page 3: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

3 of 4

(f) provided with clear and direct pedestrian andvehicle evacuation routes off the site.OrAO3.2The development incorporates an area on sitethat is at least 300mm above the highest knownflood inundation level with sufficient space toaccommodate the likely population of thedevelopment safely for a relatively short time untilflash flooding subsides or people can beevacuated.orAO3.3Where involving an extension to an existingdwelling house that is situated below DFE /Stormtide, the maximum size of the extension does notexceed 70m2 gross floor area.AO3.1The design and layout of buildings used forresidential purposes minimise risk from floodingby providing:(a) parking and other low intensive, non-habitableuses at ground level;

Should flooding be envisaged from a cyclonic event, there are early mandatory evacuation periods for which residents can evacuate the site, should this be necessary.

NA

NA

PO6Development avoids the release of hazardousmaterials into floodwaters.

AO6.1Materials manufactured or stored on site are nothazardous or noxious, or comprise materials thatmay cause a detrimental effect on theenvironment if discharged in a flood event;orAO6.2If a DFE level is adopted, structures used for themanufacture or storage of hazardous materials

No manufacture or storage of hazardous or noxious materials is proposed.

Page 4: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

4 of 4

are:(a) located above the DFE level;or(b) designed to prevent the intrusion offloodwaters.AO6.3Infrastructure is designed and constructed toresist hydrostatic and hydrodynamic forces as aresult of inundation by the DFE.AO6.4If a flood level is not adopted, hazardousmaterials and their manufacturing equipment arelocated on the highest part of the site to enhanceflood immunity and designed to prevent theintrusion of floodwaters.

PO7The development supports, and does not undulyburden, disaster management response orrecovery capacity and capabilities.

AO7Development does not:(a) increase the number of people calculated tobe at risk of flooding;(b) increase the number of people likely to needevacuation;(c) shorten flood warning times; and(d) impact on the ability of traffic to useevacuation routes, or unreasonably increasetraffic volumes on evacuation routes.

The proposal is for one dwelling. Therefore, the proposal does not affect envisaged disaster management response or recovery capabilities.

Evacuation is self-managed at times of a cyclonic event with long lead times for mandatory evacuation.

Wonga Beach is a small community therefore, evacuation routes will not be blocked by excessive traffic.

Should you require any further information or wish to discuss the application, please contact me on 4098 5150 or by email [email protected]

Kind Regards,

GMA Certification Group

Page 5: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 6: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 7: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 8: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 9: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 10: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 11: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 12: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 13: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 14: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 15: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 16: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 17: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

820 820

820

21-20SD

20-0

6GLV

20-0

6GLV

10-11SW820

720

720

820

820

20-20SW20-20SW 20-20SW12-16SW09-07SW

20-08SW 20-28SD

820

720

720

720

720

06-20FG

23

41

04A-A

04A-A

HWS

REF.

M.H.R/SHR

W.M.

D.P

D.P

12

D.P

S.D.

METERBOX

D.P

D.P

S.D.

S.D.

S.D. S.D.

S.D.

D.P

D.P

18,390200

18,590

600

4,80

06,

390

11,7

90

600

1,20

019

021

029

0

210

190

2,51

020

029

05,

410

290

200

2,090 6,510 6,190200

3,400200

600

3,00

08,

190

1901,610

903,210

706,930

706,030

190 200

600

190

1,66

070

1,38

070

1,55

070

6,01

019

0

190

600

7,07

070

3,67

019

0

190

600

1,20

060

030

04,

970

7053

070

3,07

019

0

190900

710 903,210

703,620 4,210

901,510

190 2003,400

200

3,60

019

04,

070

701,

000

702,

600

190

190

600

3,00

04,

070

7053

070

3,07

019

0

600

190

2,81

019

04,

070

701,

000

701,

000

701,

530

190

600

190

2,81

019

01,

580

7090

070

1,45

070

530

703,

070

190

1,900190

6,510 3,390 2,800200

3,400

8,600190

1,000 2,010 1,20090

1,510190 200

3,400

1902,300

70 530 703,000

701,000

701,830

701,830

701,000

706,030

190

1902,900

70930

702,000

702,900

702,900

706,030

1902

ELEVATION KEY

ENERGY EFFICIENCY NOTES:: ALL TAPWARE & SHOWERS TO BE 3 STAR min. : ALL TOILETS TO BE 4 STAR min.: SOLAR HOT WATER SYSTEM TO BE INSTALLED.

GENERAL NOTES :: Solar block 2 to all alum. framed glass windows and doors.: Dishwasher prov. with SPP and cold water plumb.: Lift off hinges to wc.: Mechanical exhaust to wc with no external opening.: Niches - 900H base with a 2100H head U.N.O.: Hampers and Openings - 2100H head U.N.O.: Bulkheads - 2100H U.N.O.NOTE : ADDITIONAL BRACING WILL BE REQUIRE TO VANITY WALLS. (FLOATING VANTIES)

Client:

N.B. ALL WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES - THIS DESIGN ISTHE EXCLUSIVE PROPERTY OF NQ HOMES Pty. Ltd. Of 10

Design:

Facade:

Inclusions:

PREMIUMScale:

Date:

Drawn By:

1 : 100

Job Number:

Sheet Number:

Amendments:

WONGA 175

TRADITIONAL

S.C.

T.R

AIL

FLOOR PLAN2

SOLAR

TAP

NIC

HE

BED 1

BED 3BED 2 BED 4

LOUNGE

FLOOR AREASLIVING - 125.62GARAGE - 39.36AL FRESCO - 20.10TOTAL - 185.09m19.92 SQUARES

DWPROV.

LIN

ENROBE

W.I.R.

ROBE ROBE

NICHE

26-33STACKER

26-3

0STA

CK

ER

DINING

I.G.

U/B OVEN

W.I.P.

1200

GARAGE100mm STEP DOWN

2300

H x

501

0W P

AN

ELIF

T D

OO

R

100mm STEP DOWNAL FRESCO

KIT. ELEV.REFER TO

SHEET 8 of 10

900w FLAT TOP

ABN: 73614916086QBCC: 15031495Address: P.O. BOX 863,Pt. DOUGLAS Qld. 4877Phone: (07)40985518Fax: (07)40985512

DALLAS FAYE WALKERLOT 5, IVES AVENUE

WONGA BEACH366TL

TAP

I.G.T.R

AIL

M/SLIDERS M/SLIDERS M/SLIDERS

A/C

HEAD

HAMPER990

WIND-'C2'

2 x S

TACK

EDA/

C MO

TORS

A/C HEADA/C HEAD

3 x STACKEDA/C MOTORS

A/C

HEAD

A/C

HEAD

29/07/2018

Page 18: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

Client:

N.B. ALL WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES - THIS DESIGN ISTHE EXCLUSIVE PROPERTY OF NQ HOMES Pty. Ltd. Of 10

Design:

Facade:

Inclusions:

PREMIUMScale:

Date:

Drawn By:

Job Number:

Sheet Number:

Amendments:

WONGA 175

TRADITIONAL

S.C.CONTOUR PLAN11 : 200

ABN: 73614916086QBCC: 15031495Address: P.O. BOX 863,Pt. DOUGLAS Qld. 4877Phone: (07)40985518Fax: (07)40985512

DALLAS FAYE WALKERLOT 5, IVES AVENUE

WONGA BEACH366TL

WIND-'C2'

NOTES -- ANY RETAINING REQUIRED. BY CLIENT- ANY TREE REMOVAL REQUIRED. BY CLIENT- POOLS MUST BE 2000mm MIN. FROM ANY SLAB EDGE OR PATIO COLUMNS. IF LESS THAN 2000mm, ENGINEER TO BE CONSULTED.- REFER TO SHEET 9 of 10 FOR SETOUT PLAN.- REFER TO SHEET 10 of 10 FOR PLUMB. PLAN.

* FILL BATTER @ 1:3 MAX* CUT BATTER @ 1:1.5 MAX

INTDICATES 400mm WIDE x 75mmDEEP GRADED TABLE DRAIN

PLATFORM LEVEL APPROX - R.L. 3.30 (+/-0.05)* IMPORT FILL - 550mm APPROX at worse point after scrape* STORMWATER TO STREET* DISCHARGE WASTE TO SEPTIC.

# DRIVEWAY GRADIANT 1:9 @ 5m APPROX

29/07/2018

MSB

# PROPOSEDRESIDENCE

F.F.L. 3.685

2.6

37

P.L. 3.30

4,96

9 TO

FASC

IA

1°51

'10"

8.1

69

6

Block Wall

358°

01'1

5"

Timber Fence

Single Story Timber House 0.12 Diam Coppers Log Posts

PalmD 0.25H 8S 4

PalmD 0.25H 8S 4

PalmD 0.25H 8S 4

TreeD 1.3H 15S 15

2.91

2.92

2.90

2.91

2.93

2.95

2.79 2.92

2.79 2.91

2.772.90

2.76 2.88

2.76 2.88

2.76 2.89

2.75 2.87

2.87

2.95

2.91

2.92

2.943.02

2.83 2.76

2.97

2.77

2.74

2.81

2.98

2.78 2.78

2.72

2.762.66

2.90

3.01

2.83

2.74

2.67

2.72

2.68

2.69

2.33

2.572.58

2.632.762.782.84

2.86

2.93

2.912.84

2.74

2.69

2.62

2.67

3.08

3.24

2.672.76

2.882.91

3.29

3.15

2.98 3.04

3.013.08

3.11

2.66

NOTESLevel Datum: AHDOrigin of Levels: PM73135RL: 2.505Origin of Coordinates: Stn 9500 Nail in KerbE 10010.835N 9937.899Meridian: RP892256

U'ground Telstra (plotted from records)

U'ground Water (plotted from records)U'ground Electricity (plotted from records)

TreeD 0.25H 10S 6

TreeD 0.25H 10S 6

6,000 TOFASCIA

7.1

35

154

IL of Mountable Kerb

IVE

S A

VE

NU

E

TBM 9500Nail in KerbRL 2.861

Back of Mountable KerbTop of BankToe of BankTimber Paling Fence

Road CrownFire HydrantTelstra PitElectricity Pillar

LEGEND

0 102 4 6 8

metresSCALE 1:200 IS APPLICABLE ONLYTO THE ORIGINAL SHEET SIZE (A3).

APPROX POSITION OFCLIENT'S FUTURE POOL.KEEP SERVICES CLEAR

(2000mm MINIMUM CLEARFROM HOUSE SLAB EDGE)

273°52'40" 40.828

88°01'30" 39.806

3°06

'15"

Block Wall

1,500 TOFASCIA

Garden

178°01'30" 22.070

APPROX POSITION OF SEPTIC TANK. REFER PLANS FOR EXACT LAYOUT &

POSITION OF SYSTEM

RP851593

5RP892256

RP887365

RP892256

Page 19: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

Client:

N.B. ALL WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES - THIS DESIGN ISTHE EXCLUSIVE PROPERTY OF NQ HOMES Pty. Ltd. Of 10

Design:

Facade:

Inclusions:

PREMIUMScale:

Date:

Drawn By:

Job Number:

Sheet Number:

Amendments:

WONGA 175

TRADITIONAL

S.C.ELEVATIONS31 : 100

ABN: 73614916086QBCC: 15031495Address: P.O. BOX 863,Pt. DOUGLAS Qld. 4877Phone: (07)40985518Fax: (07)40985512

DALLAS FAYE WALKERLOT 5, IVES AVENUE

WONGA BEACH366TL

WIND-'C2'29/07/2018

600600

2,10

0

2,30

0

2,00

0

60021* ROOF PITCH

Elevation 1

2,00

0

2,10

0

Elevation 2

Elevation 3

2,00

0

1,50

0

2,10

0

Elevation 4

250

2,63

5 TO

U/S

600

COLORBOND CUSTOM ORB METAL SHEET ROOF

ENGINEERED ROOFTRUSSES @ 1200cts.'R3.5' CEILING BATTS TO

ROOF AREA. (excludingeaves)

GYPROCK LININGSINTERNAL WALLSWITH VILLABOARDTO WET AREAS.

OF

TRU

SS

ES

METAL CEILING BATTENS@ 450 CTS

Section A-AN.T.S.

ALL STRUCTURAL TIMBER HASBEEN TREATED IN ACCORDANCEWITH THE AS3600.1 FOR TERMITEPROTECTION.

21* ROOF

PITCH

BLOCK DETAILS, FOOTING & SLAB DETAILS TO BE DESIGNED,CERTIFIED AND INSPECTED BY A RPEQ ENGINEER PRIOR TO WORK BEING CARRIED OUT FOR A 'P' CLASS SITE AND WIND-'C2' WIND RATING.

Page 20: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

Client:

N.B. ALL WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES - THIS DESIGN ISTHE EXCLUSIVE PROPERTY OF NQ HOMES Pty. Ltd. Of 10

Design:

Facade:

Inclusions:

PREMIUMScale:

Date:

Drawn By:

Job Number:

Sheet Number:

Amendments:

WONGA 175

TRADITIONAL

S.C.

1 : 200 9

SETOUT PLANABN: 73614916086QBCC: 15031495Address: P.O. BOX 863,Pt. DOUGLAS Qld. 4877Phone: (07)40985518Fax: (07)40985512

DALLAS FAYE WALKERLOT 5, IVES AVENUE

WONGA BEACH366TL

WIND-'C2'29/07/2018

D.P

D.PD.P

D.P

D.PD

.P

D.P MSB

4,96

9

1,50

0

6,000

TO F

AS

CIA

LOT 5 ON RP892256IVES AVENUE

WONGA BEACH

1°51

'10"

APPROX POSITIONOF SOLAR VENT

PROPOSEDRESIDENCE

WEST

Prevall

ing

Winds

Prevalling

Winds

SunsetMay - July

Sunset

Nov - JanSunriseNov - Jan

EAST

Sunrise

May - July

SOU

THN

OR

TH

- 35mm DEEP SAWCUT WITHIN 8 HOURS OF CONCRETE POUR- CUTOUT EVERY 2nd MESH BAR ACROSS JOINT

SC

273°52'40" 40.828

2.6

37

TreeD 0.25H 10S 6

22.

070

3°06

'15"

7.1

35

TreeD 1.3H 15S 15

178°

01'3

0"

PalmD 0.25

H 8S 4

TreeD 0.25H 10S 6

PalmD 0.25

H 8S 4

PalmD 0.25

H 8S 4

39.806

IVE

S

AV

EN

UE

88°01'30"

358°

01'1

5" 8

.169

TO F

ASC

IA

TO FASCIA

APPROX POSITION OFCLIENT'S FUTURE POOL.KEEP SERVICES CLEAR

(2000mm MINIMUM CLEARFROM HOUSE SLAB EDGE)

Page 21: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

20 Owen St, Craiglie

MOWBRAY, PORT DOUGLAS QLD 4877

PH: 0418 187 376

ON SITE SEWERAGE FACILITIES

SITE ASSESSMENT & DESIGN

NQ Homes Tropical Living

Site Evaluator: Brian Petrus

Signature:

Date: 25th July 2018

Address Lot 5 Ives Ave Wonga Beach

Page 22: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

Site & Soil Assessment

BP Plumbing Contractors Pty Ltd ABN: 49 097 270 472 BSA: 896522

20 Owen St, Craiglie

Port Douglas

QLD 4877

Telephone: 0418 187 376

Email: [email protected]

25th July 2018

Chief Executive Officer Douglas Shire Council 64-66 front St Mossman QLD 4873 Dear Sirs, Re: On-site Wastewater Disposal – Lot 5 Ives Ave Wonga Beach QLD 4873 This is to certify that Brian Petrus of BP plumbing Contractors Pty Ltd has designed the on-site wastewater disposal system for the above mentioned site in accordance with the following Australian Standards and specifications

AS/NZS1547 - On-site Domestic Wastewater Management - Plumbing & Drainage Act 2012 - Standard Plumbing & Drainage Regulation 2003 - Qld Plumbing & Wastewater Code - Plumbing Code of Australia] AS/NZS3500 - Plumbing & Drainage

Location Details:

Suburb/Town: - Wonga Beach Survey Plan Details: - Lot 5 RP892256 Total Area: - 800m2 Local Government Authority: - Douglas Shire Council

Owner Details:

Owner: - C/- NQ Homes Tropical Living Address: N/a

Page 23: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

Site & Soil evaluation for an onsite sewerage system Description - 4 bedroom residence Water Supply Source - Town water Site Details

Existing vegetation - Short grass

Slope - <1% Drainage Pattern - Linear planer Soil Drainage - Good Water Course - >10m Flooding Potential - Nil Existing Buildings - Nil Water Table - >1.6m Water Bore/Well - - Predominant wind direction - South Easterly

Site Stability

Is expert Evaluation necessary - No Climate - Port Douglas Area

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Total

Mean Rainfall (mm)

394 424 425 204 72 49 26 25 32 49 108 205 2013

Evapotransporation (ET, mm)

112 98 99 89 88 90 93 93 97 104 108 112 1183

Source: Australian Bureau of Meteorology

Page 24: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

Separation Distances The following separation distances should be adapted as per on-site sewerage code Feature Recommended Horizontal Distance Measured Distance

Footings of

Buildings

Boundaries of land application areas should be positioned at least 2.0

metres downslope, 4.0metres upslope from the footing or where the

site is flat, 2.0 metres from any point of the building

Property boundaries,

pedestrian paths &

walkways,

recreation areas

Boundaries of land application areas should be positioned at least 2.0

metres downslope, 4.0 metres upslope from the footing or where the

site is flat, 2.0 metres from any point of the feature.

Retaining wall

footings

Boundaries of land application areas should be positioned at least 2.0

metres downslope, 4.0 metres upslope from the footing or where the

site is flat, 6.0 metres from any point of the retaining wall footing.

In ground swimming

pool 6.0 metres from any point of the swimming pool.

In ground portable

water tank

Primary Effluent – 15 metres from the boundary of the land

application area.

Secondary Effluent – 6 metres from the boundary of the land

application area.

Note:

The separation distances are recommended only. The local government may upon considering the public health and

environmental risks reduce or increase the distances given in the table

Feature Recommended Horizontal Distance Measured Distance Top of bank of permanent

water course;

Top of bank of intermittent

water course;

Top of bank of lake:

Top water level of a

surface used for

agriculture, aquiculture or

stock purposes;

Easement boundary of

unlined open stormwater

drainage or channel or

drain.

Primary effluent: 50 metres (horizontal)

Secondary effluent: 30 metres (horizontal)

Advanced Secondary effluent: 10 metres (horizontal)

Bore or dam used or likely

to be used for human and

or domestic consumption.

Primary effluent: 50 metres (horizontal)

Secondary effluent: 30 metres (horizontal)

Advanced Secondary effluent: 10 metres (horizontal)

Unsaturated soil depth to a

permanent water table.

Primary effluent: 50 metres (horizontal)

Secondary effluent: 30 metres (horizontal)

Advanced Secondary effluent: 10 metres (horizontal)

Note:

The separation distances are recommended only. The local government may upon considering the public health and

environmental risks reduce or increase the distances given in the table

Page 25: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

Soil Properties - CAT 2 DLR 50

Design Criteria

Proposed development - 4 bedroom residence No of persons using facilities - 6 persons Design flow rate with standard water reduction fixtures - 150L / per day Total Flow Rate - 900L / per day DLR - 50

Reserve/Secondary Area AS 1547-2000 requires a reserve area of 100% of the design area to be available for future replacement of the land application facility. Reserve/Secondary area available

Page 26: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

Disposal System Required

Provide an onsite disposal system to secondary stage treatment

Disposal Area required with the use of standard water reduction fixtures inc 6/3L water closets, shower flow restrictors, aerator outlets & water conserving automatic washing machines

Disposal area = volume of effluent in litres / day design loading rate in mm / day = 900 /day 50mm /day = 18m2 disposal area

PROPOSED SYSTEM To comprise of a 3000L septic tank with 18m2 of AES disposal bed as per attached drawings

Page 27: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 28: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 29: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 30: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 31: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669
Page 32: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

SUITABLE VEGETATION FOR WET SOILS

TYPES OF VEGETATION

CLIMBERS

Bougainvillea Kennedia

Hardenbergia Loniceria Japonica

Hibbertia Scandens Pandorea Jasminoides

GRASSES

Buffalo Kykuku

GROUND COVER

Acanthus Mollis Liriope Muscari

Coprosma X Kirki Ophiopogon

Grevillea Poorinda Royal Mantle

PERENNIALS

Agapanthus Preaecox Gazania X Hybrida

Astor Novi-Belgii Salvia X Superba

Canna X Generalis Stokesia Laevis

Chrysanthemum Maximum Viola Hederacea

SHRUBS

Abelia X Grandiflora Euhorbia Pulcherrima

Acacia Longifolia Hebe Speciosa

Callistemon Citrinus Jasminum Mesnyi

Cassia Bicapsularis Jasminum Officinale

Ceratostigma Jasminum Polyanthum

Chaenomeles Lagenaria Lantana Camara

Correa Alba Lantana Montevidensis

Cotoneaster Glaucophyllus Leptospermum Flavescens

Cotoneaster Lacteus Narium Oleander

Caphea Ignea Pyracantha Fortuneana

Euonymus Japonicus Thunbergia Alata

Euphorbia Millii Weastringia Fruticosa

TREES

Angophora Costa Leptospermum Laevigatum

Banksia Integrifolia Leptospermum Petersonii

Callistemon Salinus Melaleuca Armillaris – Sandy Soil

Callistemon Viminalis Melaleuca Linariifolia – Clay Soils

Casuarina Glauca Melalueca Quinquenervia – Sandy Soil

Casuarina Stricta Melaleuca Styphelioides – Clay Soils

Eucalyptus Botryoides Nyssa Sylavatica

Eucalyptus Robusta Photinea X Frasieri “Robusta”

Hakea Salicifolia Tristaniopsis Laurina

Hakea Saligna

All vegetation should be checked with Local Authorities & Nurseries prior to installation for

suitability to each region

Page 33: New GMA Certification Group Pty Ltd - Douglas Shire Council · 2020. 10. 7. · Gold Coast (07) 5578 1622 Sunshine Coast (07) 5449 0383 Cloncurry (07) 4742 2022 Chinchilla (07) 4669

NOTICE TO LAND OWNER

Your sanitary drainage installation consists of a septic tank and an application system. To ensure the operational effectiveness of this

installation the following advice should be adhered to.

OPERATION AND MAINTENANCE:

GENERALLY

On-site sewerage treatment plants and the associated land application facilities are complex systems that are prone to failure if operated and

maintained incorrectly. All on-site sewerage facilities require a high degree of user dedication in terms of operation and maintenance to

ensure that the design performance of the facility is achieved for the expected life of the facility.

All on-site sewerage facilities or components of the facility have a finite life. For instance, septic tanks may have an expected life of 25

years, whilst the associated land application facility may have an expected life of 5 to 15 years depending on the nature of the specific site.

OPERATION AND MAINTENANCE PROCEDURES

Operation and maintenance procedures are undertaken to a regular schedule appropriate to the nature and type of treatment and land

application facility and in accordance with any manufacturers instructions; and Continuity of operation and maintenance is achieved

throughout changes of ownership and/or changes in use or development of the site.

OPERATION

Practice water conservation, and avoid exceeding the hydraulic capacity of the facility. DO NOT USE OR INSTALL A GARBAGE

GRINDER.

Minimise the input of cleaning agents, detergents, disinfectants, bleaches, alkalis, oil, petrol, acids, degreasers, photography chemicals,

cosmetics, lotions, pesticides and herbicides into the facility.

Not place materials such as disposal nappies, female napkins, paper towels, cigarette butts, bones and coffee grounds into the facility.

Be observant regarding signs of unsatisfactory performance, including unusual odours, leaks form the facility or choking.

Contact the service agent following observation of unsatisfactory performance or breakdown.

Protect facility components from structural damage, such as from vehicles.

Be familiar with safety procedures.

Establish a time pattern of desludging.

Keep the area in the vicinity of the on-site sewerage facility tidy to facilitate ease of operation and maintenance.

Where appropriate, or required by a condition of approval, enter into an annual service contact with a service agent, and

Retain copies of all service reports.

SEPTIC TANKS

It is recommended that septic tanks be inspected at two yearly intervals. The inspection should include an assessment of the sludge and

scum levels and checking of the outlet and inlet square junctions for blockages.

Septic Tanks should be desludged when:

• The scum layer is within 100mm of the bottom of the inlet square junction or the sludge layer is within 200mm

from the bottom of the inlet.

• The sludge occupies the basic allowances of the septic tank: on

• The sludge scum occupy two-thirds the volume of the tank (or fist stage of a two stage system).

The desludging procedure should ensure that 400-500mm of liquid is retained in the tank, and that the tank is immediately refilled with water

to the outlet level.

LAND APPLICATION SYSTEMS

Regular visual checking of correct system operation by households, and an annual inspection by service contractors should be

undertaken. Signs of system failure incude:

• Surface ponding and run-off or treated effluent;

• Degrading of soil structure (Sheet or Rill erosion, surface crusts, hard surface);

• Poor vegetation growth; and

• Unusual odours


Recommended