INDIAN RAILWAYS NEW RAILWAYS A progressive journey since 2014 v Provision of FOB at Waraseoni. v Construction of new double story building at Balaghat station similar line to Chhindwara. v Proposed FOB with ramp, widening of PF No. 2 & 3 and improvement to goods shed platform at Balaghat. v Provision of FOB at Katangi. v Raising of High Level Platform at PF No.2 of Waraseoni station. v Extension of waiting hall at Waraseoni station. v Provision of Platform shelter at Katangi & Waraseoni. v Replacement of Train Indication Board, GPS Clock & Auto Announcement system PF No. 1,2&3 at Balaghat station. v Balance 60 km gauge conversion in connection with Gondia-Jabalpur gauge conversion Project. Renovated Balaghat Railway Station Inauguration of new train by Hon’ble MOSR Developmental Works - Some Glimpses Distribution of Railway Photo Identity Card to Divyang by Hon'ble MP Renovated Samnapur Railway Station
Transcript
Page 1: NEW RAILWAYS...INDIAN RAILWAYS NEW RAILWAYS A progressive journey since 2014 v Provision of FOB at Waraseoni. v Construction of new double story building at Balaghat station similar

INDIAN RAILWAYS

NEW RAILWAYS

A progressive journey since 2014

v Provision of FOB at Waraseoni.

v Construction of new double story building at Balaghat station similar line to Chhindwara.

v Proposed FOB with ramp, widening of PF No. 2 & 3 and improvement to goods shed

platform at Balaghat.

v Provision of FOB at Katangi.

v Raising of High Level Platform at PF No.2 of Waraseoni station.

v Extension of waiting hall at Waraseoni station.

v Provision of Platform shelter at Katangi & Waraseoni.

v Replacement of Train Indication Board, GPS Clock & Auto Announcement system PF

No. 1,2&3 at Balaghat station.v Balance 60 km gauge conversion in connection with Gondia-Jabalpur gauge

conversion Project.

Renovated Balaghat Railway Station Inauguration of new train by Hon’ble MOSR

Developmental Works - Some Glimpses

Distribution of Railway Photo Identity Card to Divyangby Hon'ble MP

Renovated Samnapur Railway Station

Page 2: NEW RAILWAYS...INDIAN RAILWAYS NEW RAILWAYS A progressive journey since 2014 v Provision of FOB at Waraseoni. v Construction of new double story building at Balaghat station similar

MADHYA PRADESH ON FAST TRACK DEVELOPMENT : 2014-PRESENT

INFRASTRUCTURE ENHANCEMENT :

v New line Projects : New line projects of 521 Kms for 8,642 crore `

sanctioned since 2014

v Doubling Projects : Doubling projects of 1,720 Kms for 18,395 crore `

sanctioned since 2014

v Electrification Projects : Electrification projects of 2,539 Kms for 2,222 `

crore sanctioned since 2014

v Rail Fly Over Projects : Rail flyover projects of 56 Kms for 1,046 crore `

sanctioned since 2014

MADHYA PRADESH CONNECT : PASSENGER FOCUS

v New Trains : 67 new trains introduced since 2014

v Trains Extended : 39 train extended since 2014

v Frequency Increased : for 12 trains since 2014

SAFETY : PRIME CONCERN

v Use of drone by WCR in Madhya Pradesh is first in India for disaster

management, crowd management and project monitoring etc.

v Use of GPS Tracker by WCR in Madhya Pradesh is first for India.

PASSENGER AMENITIES : PROVIDED AT ALL MAJOR STATIONS

v Lifts and Escalators

v Fast and free Wi-Fi facility :

v Automatic Ticket Vending machines

v Amrit Counters

v Mechanized Cleaning

v Water Vending machines

v LED Lights

INPUT BY RAILWAY IN KHANDWA PARLIAMENTARY CONSTITUENCY

KHANDWA PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS

Burhanpur, Bikhangaon, Pandhana, Barwaha, Mandhata, Khandwa, Bagali, Nepanagar

B. WORKS COMPLETED IN LAST FOUR YEARSB1. Infrastructural developments v New 33/11 KV substation constructed with 33 KV express feeder for continues and reliable Electrical supply.v Road Under Bridge is provided in lieu of LC No. 179 Bagmar-Bargaon Gujar (BSL-KNW) section.

B2. Improvement in passenger amenitiesv Computerised online booking of Retiring rooms and dormitories at Omkareshwar station on 04/11/2014. v Water Filtration System at 'D' & 'E' category Railway stations under CSR by M/s.YES Bank Ltd, Mumbai.v Additional Foot Over Bridge is provided at Itarsi End of Khandwa stationv Surface of Down & Up Platform has been renovated by Ashalting at Nepanagar stationv Existing Ramp of old Foot Over Bridge on Platform No. 1 & 2 has been flattened at Khandwa station for the

convenience of passengersv Small Cover over Sheds with seating arrangements at Chandni stationv Extension of UP Platform by 76 meter in Khandwa end and Down platform by 98 meter at Chandani Statiov Extension of platform No.1 by 120 meter and PF No. 2 by 40 meters at Asirgarh Statiov Extension of platform No. 1 & 2 by 165 meter at Wagoda stationv Three Water Vending machines has been provided at Khandwa Stationv Two Water Vending machines has been provided at Burhanpur stationsv Current Reservation – cum - Night Refund Counters commissioned at Burhanpur and Khandwa station for the

convenience of passengerv Air Conditioner provided in VIP lounge at Burhanpur statiov 1350 Nos. Of LED lights of various capacities have been provided at 11 stations viz, Burhanpur, Bargaongujar,

Bagmar, Kohadad, Dongargaon, Sagphata, Mandwa, Nepanagar, Chandni, Asirgarh and Burhanpur stationv Baby feeding corner provided at Khandwa & Burhanpur stationsv Water Cooler provided at Burhanpur station under NGO policyv Janani Seva: On the directives of Railway Board, Baby food, hot milk and hot water are being made available at

Burhanpur and Khandwa station.v Facade and Circulating area has been renovated at Burhanpur.

B3. New Train Introducedv On occasion of Mahashivratri Special train was run between Mhow – Khandwa from 16/02/15 to 18/02/15 and

between Ratlam – Ujjain on 17/02/15.C. ON GOING WORKS

v Gauge conversion of Khandwa – Sanawad Section. v Replacement of 2.44 m wide old Foot Over Bridge (FOB) by6.00 m wide FOB at BSL end at Khandwa stationv Extension of Cover over shed on platform no. 1&2 at Khandwa stationProvision of 02 Nos. Lifts on new FOB at

Platform No. 1/2 & 5 at Khandwa stationv Provision of 02 Nos. Escalators on new FOB at Platform No. 1/2 & 5 at Khandwa stationProvision of 04 Nos.

Escalators on FOB at Platform No. 1 & 2 at Burhanpur station.v Additional FOB 3.66 m wide in Bhusaval end at Burhanpur stationProvision of Cover Over Platform on down

platform (size- 144 x 8.5 M) at Burhanpur stationImprovement to Up and Dn platform surface with side wall at Burhanpur station.

v Provision of New station building with Retiring room 02 Nos. and VIP lounge with cafeteria at Burhanpur station.

v Provision of Entrance gate and separate parking with Drop and Go facility at Burhanpur station.Provision

INPUTS BY RAILWAY IN BALAGHAT PARLIAMENTARY CONSTITUENCY

BALAGHAT PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS

Lanji, Baihar, Paraswada, Katangi, Barghat, Balaghat, Seoni, Waraseoni.

B. WORKS COMPLETED IN LAST FOUR YEARSB1. Infrastructural developments

v After gauge conversion, new Broad gauge line Ex.Balaghat to Samnapur

commissioned on 01.04.2018 for passenger train operation with flagging off a train by

hon'ble MOSR.

v Raising of platform at Waraseoni.

v Renovation of Toilet on PF No-2 at Balaghat.

v Replacement of leaky corroded main pipeline at Balaghat.

v Provision of Post PRS at Baiher S.O

v Replacement of old existing water pipe line from pump house Bandar jhariya to over

head tank Balaghat.

v Provision of Coach watering facility for 24 coach length in between platform No.1&2 at

Balaghat station.

v Part Gauge conversion from Balaghat-Samnapur (16 Km) in connection with Gondia-

Jabalpur gauge conversion project.

v Part Gauge conversion Jabalpur to SukriMangela (42 Km) in connection with Gondia-

Jabalpur gauge conversion project.

v Part Gauge conversion Sukri Mangela to Ghansore (36 Km) & Ghansore to Nainpur

(35Km) in connection with Gondia-Jabalpur gauge conversion project.

v Construction of limited height subway in lieu of level crossings at LC No.BK-12,

13,18,31,33,41,49,51,55 & 56 between Balaghat –Katangi.

Note : Total cost of Gondia-Jabalpur gauge conversion project is R 1756 crore.

B2. Improvement In Train Services

New Train Introduced

v Train No.78809/78810 Gondia-Katangi-Gondia Passenger

v Train No.78821/78822 Gondia-Balaghat-Gondia Passenger

v Train No.78823 Balaghat-katangi Passenger

Train Extended/Frequency Increased

v Train No. 78803/78804 Gondia-Waraseoni upto Katangi station.

v Train No. 78821/78822 Gondia-Balaghat upto Katangi station.

v Train No. 78807/78808 Gondia-Balaghat upto Waraseoni station.

v Train No. 78809 Gondia-Balaghat upto Katangi station.C. ON GOING WORKS

v Samnapur-Nainpur gauge conversion project

v Katangi-Tirodi new line project.

v Nainpur- Balaghat Gauge conversion project.

v Development of Balaghat Station as “Adarsh Station”.

v Replacement of water storage tank at Balaghat, Birsola, Waraseoni & Katangi stations.

v Extension of Waiting hall and Provision of one bay platform shelter at Katangi station.

v Procurement of latest model chlorination plant with dosing Pump For Balaghat station.