September 2011 Eastside Transit Corridor Phase 2 Project Update
Transcript
Page 1: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 1

September 2011

Eastside Transit Corridor Phase 2 Project Update

Page 2: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 2

Agenda September 2011

6:00 – 6:30pm: Open House

6:30 – 7:00pm: Presentation

7:00 – 8:00pm: Open House

Page 3: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 3

Purpose of Today’s Meeting September 2011

Project Background

Update: Environmental Status

Engineering Status

Urban Design & Station Planning

Outreach

Page 4: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 4

west hollywood

chatsworth

santa monica

culver city

torrance

santa ana

azusa

SR-60 Alternative

Washington Blvd.

Alternative

Metro’s Current & Future Regional Network

Page 5: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 5

Project Need September 2011

Highly congested highways & arterials during peak periods

Population and employment growth

Growth in travel demand and land use changes

Transit-dependent population

Environmental issues

Page 6: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 6

September 2011 Project Goal and Purpose Improve the region’s public transit service and

mobility by providing a connection to the Metro Gold Line Eastside Extension

Improve mobility, accessibility and connectivity to the Metro regional transit system Support local land use objectives

Provide a cost effective and financially feasible project

Plan for projected growth in a sustainable manner

Meet the needs of the transit dependent

Page 7: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 7 Study Area/Alternatives

September 2011

Page 8: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 8

Project Development Process September 2011

Public Involvement

Alternatives Analysis

Final Design

Construction

Start-up/ Revenue Operations

Final EIS/EIR Preliminary Engineering

Draft Environmental Impact Statement/ Environmental Impact Report

(Draft EIS/EIR)

Completed 2007 - 09

Draft EIS/EIR •Identify and

focus on possible

significant environmental

impacts of a proposed

project

Page 9: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 9

What have we been doing? September 2011

Development of environmental technical documents

•Transportation •Water Resources •Land Use & Economic Development

•Visual & Aesthetics •Ecosystems/Biological Resources

•Displacement/ Relocation of Uses

•Air Quality •Noise & Vibration •Community & Neighborhood

•Cultural/Historic Resources •Energy Use •Economic & Fiscal Impacts

•Safety & Security •Parks & Other Community Facilities

•Section 4f Resources

•Climate Change

•Cumulative Impacts

•Environmental Justice

•Geotechnical, Seismic, Hazardous Materials

•Growth Inducing Impacts

•Construction

Page 10: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 10

September 2011

Coordination with Federal Transit Administration (FTA) Metro – Lead Agency (CEQA)

FTA – Co-Lead (NEPA)

Coordination with Cooperating Agencies US Environmental Protection Agency

US Army Corps of Engineers

Caltrans

What have we been doing?

Page 11: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 11

September 2011

Continue Public Outreach

Project Webinar Social Media Updates (Facebook and Twitter)

City Briefings and Community Updates

• Approximately 273 project briefings

What have we been doing?

Page 12: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 12

Update: Environmental & Engineering September 2011

Potential Maintenance Yard 3 different locations within Study Area

• Mission Junction, Los Angeles

• SCE Transmission Line ROW, Commerce

• East of Allport Ave, Santa Fe Springs

One location identified in Monrovia (separate effort)

Mission Junction – Los Angeles SCE Transmission Line ROW - Commerce East of Allport Ave – Santa Fe Springs

Page 13: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 13

Update: Environmental & Engineering September 2011

Issues • Geotechnical, noise, vibration – OII Superfund Site

Page 14: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 14

Update: Environmental & Engineering September 2011

Issues • Traffic Issues – Along Garfield Ave and Washington Blvd

Page 15: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 15 Update: Environmental & Engineering September 2011

Issues • Visual and Aesthetic Issues – Both alignments

Conceptual

Existing

SR 60 Alt. Shops at Montebello

Conceptual

Washington Blvd Alt. Greenwood Ave Station

Page 16: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 16

Update: Environmental & Engineering September 2011

Issues • Ecological and Biological Issues – Park and two rivers

Legg Lake within Whittier Narrows Recreation Area

Rio Hondo River under SR 60 San Gabriel River

Page 17: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 17

Updated Technical Analysis Results September 2011

SR-60 LRT Washington

LRT

Length (miles) 6.9 9.5

Total Capital Cost (billions) $1.51

(in 2008$)

$1.65

(in 2008$)

Cost per mile (millions) $218.8 $173.7

Travel Time (minutes) 12.5 19.5-22.5

Ridership (average weekday daily) 18,300 20,800

Page 18: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 18

Estimated Project Cost (Year 2008 Dollars) SR-60: $1.51 Billion

Washington Boulevard: $1.65 Billion

Measure R (Estimated $40 Billion over 30 years) $1.27 Billion for Eastside Transit Corridor Phase 2 (funding

available 2028)

Other potential sources Federal reauthorization

State funding

Local funding

Public/Private partnerships

September 2011 Funding Considerations

Page 19: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 19

September 2011

Urban Design and Station Planning Update

City and Community Input Safety, visual, better access

Environmental Opportunities and Constraints Historic resources, protected lands, pedestrian access

Engineering Opportunities and Constraints Utility lines, bridge or structural needs

Page 20: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 20 SR 60 LRT Alternative Peck Road Station – Conceptual Plan

September 2011

Page 21: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 21 Washington Blvd LRT Alternative Rosemead Station – Conceptual Plan

September 2011

Page 22: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 22

Schedule for Draft EIS/EIR

Public Participation Opportunities Project Tasks Milestone

Month 2XXX 2010 2011

Jan - Apr May - Aug

Sept - Dec

Jan - Apr May - Aug

Sept - Dec

NOI/NOP to Initiate Scoping

Public Scoping Meetings

Environmental Analyses & Review

Public Review of DEIS/DEIR

Selection of Locally Preferred Alternative (LPA)

2010 2011

Jan - Apr May - Aug

Sept - Dec

Jan - Apr May - Aug

Jan- May Sept - Dec

NOI/NOP to Initiate Scoping

Public Scoping Meetings

Environmental Analyses & Review

Public Review of DEIS/DEIR

Metro Board Action

September 2011

2012

Ongoing Public Updates

Page 23: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 23

Outreach: Next Steps September 2011

City Council Briefings – August/September 2011

Public Meetings

• September 21 – Montebello

• September 22 – Whittier

Social Media – link to Metro website

• LRT Webinar session

• Facebook & Twitter

• Interactive Map

Page 24: New Project Updatemedia.metro.net/projects_studies/eastside_phase2/images/... · 2011. 9. 2. · Project Background Update: Environmental Status Engineering Status Urban Design &

Page 24

Stay Involved!

Contact Number: 213.922.2606

E-mail: [email protected]

Project Website: metro.net/eastsidephase2

Facebook: facebook.com/metroeastsidephase2

Twitter: @Eastsidephase2