© Paul Wurth 2017 New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation at Kurashiki Plant BY A. Esposito, Head of Business Unit Coke, Paul Wurth Italia S.p.A. - Italy M. Bisogno, Engineering Head Coke Oven Battery, Paul Wurth Italia S.p.A. - Italy F. Strobino, Managing Director, Paul Wurth IHI Co. Ltd., - Japan Keywords: coke oven, top charging technology, pad-up reconstruction Presenter: F. Strobino, Paul Wurth IHI, Japan 1 SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
Transcript
Page 1: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017

New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation atKurashiki Plant

BY

A. Esposito, Head of Business Unit Coke, Paul Wurth Italia S.p.A. - ItalyM. Bisogno, Engineering Head Coke Oven Battery, Paul Wurth Italia S.p.A. - Italy

F. Strobino, Managing Director, Paul Wurth IHI Co. Ltd., - Japan

Keywords:coke oven, top charging technology, pad-up reconstruction

Presenter: F. Strobino, Paul Wurth IHI, Japan

1SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 2: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 2

Summary

Introduction1

Technological Improvements3

Project Highlights2

• Project Constraints• Project Time Schedule

• Heating and Combustion System• PW Design Tools – Combustion System• Bracing System• PW Design Tools – Bracing System• Refractory• PW Design Tools – Refractory

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 3: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017

Paul Wurth Group: Global Player

• About 1.630 highly-qualified staff

• 26 Group members in 17 countries, including20 operational entities

• Joint ventures: TMT, Paul Wurth-IHI,P&A Industrial Engineering, Paul Wurth Kovrov

• Other countries covered by Representations

• About 1.630 highly-qualified staff

• 26 Group members in 17 countries, including20 operational entities

• Joint ventures: TMT, Paul Wurth-IHI,P&A Industrial Engineering, Paul Wurth Kovrov

• Other countries covered by Representations

3SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 4: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 4

Summary

Introduction1

Technological Improvements3

Project Highlights2

• Project Constraints• Project Time Schedule

• Heating and Combustion System• PW Design Tools – Combustion System• Bracing System• PW Design Tools – Bracing System• Refractory• PW Design Tools – Refractory

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 5: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 5

Project Highlights

PW and PW-IHI have realized the New TopCharging Coke Ovens Batteries 2A and 2Bfor JFE Steel Corporation plant located inKurashiki, Japan

Project includes:• Engineering• Procurement• Erection Supervision• Heating-up• Commissioning

OVEN PARAMETERS

Oven Height 6,55 m

Oven Lenght 15,05 m

Oven Width 0,423 m

Useful Volume 39,79 m3

Oven pitch 1,375 m

COKE PLANT

Coke Production 0,976 Mt/y

Batteries 2A & 2B 86 ovens

STATE OF THE ARTCOKE OVEN BATTERIES 2A & 2B

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 6: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 6

Project Constraints

Pad-up of new Batteries 2A & 2B (43 + 43 ovens) in line with the existingbatteries

BATTERY 2A43 OVENS

BATTERY 2B43 OVENS

REUSED PART

New Batteries 2A & 2B built in the same place as the old-ones• Reuse of the existing stack and waste gas channel• Reuse of existing civil foundation, pinion wall and end-platforms

New Batteries in Line with the existing-ones• Constraints of existing old batteries• Same set of operating machines

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 7: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 7

Project Time Schedule

2015DEMOLITION

4th month

CIVIL WORKS

9th month

BUKSTAY & WPPERECTION12th month

REFRACTORYERECTION14th month

HEATING-UP

23rd month

FIRST COKE

26th month

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 8: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 8

Summary

Introduction1

Technological Improvements3

Project Highlights2

• Project Constraints• Project Time Schedule

• Heating and Combustion System• PW Design Tools – Combustion System• Bracing System• PW Design Tools – Bracing System• Refractory• PW Design Tools – Refractory

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 9: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 9

Technological Improvements

PW has introduced in the new COB 2A & 2B all the latest technologicalsolutions, with the final result of having in the same place two newState-of-The-Art Coke Oven batteries

• New Batteries Twin Flue design instead of Half Divided

• Optimized Combustion (emission and consumption reduction)

• Bracing System Taylor Made

• Heating-wall Stability Increased

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 10: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017

TARGETGas Consumption minimizationNOx minimizationConstant Coke quality

HEATING WALL CONFIGURATION• Twin-flueü Waste gas ricirculationü 1 Level for Air Staggering

SOLE CHANNEL CONFIGURATION• Symmetrical

HEATING GAS• Compound (COG & MG)

COG FEEDING• Under-jet

10

Heating and Combustion System

STATE OF THE ARTSTATE OF THE ART

RegulationBrick MG Port

COG Burner

RecirculationWindow

StaggeredChannel

Bottom Air

Air StaggeredOutlet

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 11: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 11

PW Design Tools – Combustion System

COKE

COMBUSTION MODELLING:Combustion diagnosis of Existing BatteriesCombustion optimization in Pad-up projectTurn over point optimisation based oncoke shrinkage

PW in house developed tool for heatingflue combustion based on fluent CFDmodelling:• 3D Temperature profile of complete

heating flues• Air, Gas and Waste gas mixing• NOx formation• Unburned Gas concentrations

FAN (Flame ANalysis)

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 12: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 12

PW Design Tools – Combustion System

REGENERTOR MODELLING:Waste gas thermal loss optimization in Pad-upand Hot-Repair/Re-checkering projects

PW in house developed tool for regenerator andchecker brick optimization:• Proper sizing of regenerator height• Definition of regenerator wall fireclay-silica

sliding joint position• Increased regenerator efficiency by improved

checker design

RAN (Regenerators ANalysis)

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 13: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 13

Bracing System

TARGETIncrease the battery life preserving refractorybrickwork:• No Tensile stress in refractory bricks• No Leakage between oven and heating wall

Bracing System ConfigurationOptimized solution taking into considerations plantconstraints:• Existing Oven and Heating wall width• Interface with existing Machines

PW Top Charging force distribution for mid-size ovenalong heating wall 45 kN/m

BRACING SYSTEM

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 14: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 14

PW Design Tools– Bracing System

BAN (Bracing system ANalysis)BRACING MODELLING:Bracing design optimization for Pad-up and hotrepair project introducing state of the artsolutionBracing force distribution defined according tobattery type and heating wall design

In house developed tool for bracing systembased on ANSYS modelling

FEM analysis on heating wall head, wallprotection plate and door frame under thermaland mechanical loads• Wall protection plate and door frame

deformation to ensure the correct forcetransmission to refractory brickwork

• Wall protection plate and door frame stress toensure equipment long life

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 15: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 15

Refractory

TARGET

Strongest Heating Wall Refractory Design:

• Liner/Binder fixed Joints with Internal Hammer Head

• Tongue and Groove bricks connection between liner &binder and between different layers

• Combination in odd & even layers of different internalhammer heads creating proper liner overlapping toincrease strength and gas tightness

• Thermal Shock Resistant bricks on oven contour

Even Layer

Odd Layer

STATE OF THE ART

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 16: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 16

PW Design Tools– Refractory

REFRACTORY DESIGN MODELLING:In house developed tool for coke oven batteryrefractory design based on 3D modellingsoftware:• Automatic brick interference check• Automatic bill of quantity generation• Complete battery assembly avoiding brick

assembly on workshop/site

VAP (Virtual Assembly refractory Program)

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

Page 17: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017 17

Thank you for the attention!

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki

PT Krakatau Posco, Battery No.1&2, Cilegon, Indonesia

Page 18: New PW Coke Oven Batteries 2A & 2B for JFE Steel ...seaisi.org/seaisi2017/file/file/full-paper/8B-4 New PW Coke Oven...New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation

© Paul Wurth 2017

Paul Wurth IHI Co., Ltd.Toyosu Center Building,

3-3, Toyosu 3-chome, Koto-ku,Tokyo 135-6009 Japan

Phone: [email protected]

Contacts

Dr. Ing. Fabrizio Strobino, Paul Wurth IHI Co., Ltd.Phone: +81-3-6630-4787Fax: +81-3-3536-4014

Mobile: +81-80-1280-7857e-mail: [email protected]

18

Paul Wurth International S.A.Taiwan Branch

Kaohsiung, TAIWANPhone: +886 7 33 93 309

[email protected]

Paul Wurth Italia S.p.A.Via di Francia 1, Genova

I-16149, ITALYPhone: +39 010 640 [email protected]

SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki


Recommended