New PW Coke Oven Batteries 2A & 2B for JFE Steel Corporation atKurashiki Plant
BY
A. Esposito, Head of Business Unit Coke, Paul Wurth Italia S.p.A. - ItalyM. Bisogno, Engineering Head Coke Oven Battery, Paul Wurth Italia S.p.A. - Italy
F. Strobino, Managing Director, Paul Wurth IHI Co. Ltd., - Japan
Keywords:coke oven, top charging technology, pad-up reconstruction
Presenter: F. Strobino, Paul Wurth IHI, Japan
1SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 2
Summary
Introduction1
Technological Improvements3
Project Highlights2
• Project Constraints• Project Time Schedule
• Heating and Combustion System• PW Design Tools – Combustion System• Bracing System• PW Design Tools – Bracing System• Refractory• PW Design Tools – Refractory
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017
Paul Wurth Group: Global Player
• About 1.630 highly-qualified staff
• 26 Group members in 17 countries, including20 operational entities
• Joint ventures: TMT, Paul Wurth-IHI,P&A Industrial Engineering, Paul Wurth Kovrov
• Other countries covered by Representations
• About 1.630 highly-qualified staff
• 26 Group members in 17 countries, including20 operational entities
• Joint ventures: TMT, Paul Wurth-IHI,P&A Industrial Engineering, Paul Wurth Kovrov
• Other countries covered by Representations
3SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 4
Summary
Introduction1
Technological Improvements3
Project Highlights2
• Project Constraints• Project Time Schedule
• Heating and Combustion System• PW Design Tools – Combustion System• Bracing System• PW Design Tools – Bracing System• Refractory• PW Design Tools – Refractory
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 5
Project Highlights
PW and PW-IHI have realized the New TopCharging Coke Ovens Batteries 2A and 2Bfor JFE Steel Corporation plant located inKurashiki, Japan
Project includes:• Engineering• Procurement• Erection Supervision• Heating-up• Commissioning
OVEN PARAMETERS
Oven Height 6,55 m
Oven Lenght 15,05 m
Oven Width 0,423 m
Useful Volume 39,79 m3
Oven pitch 1,375 m
COKE PLANT
Coke Production 0,976 Mt/y
Batteries 2A & 2B 86 ovens
STATE OF THE ARTCOKE OVEN BATTERIES 2A & 2B
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 6
Project Constraints
Pad-up of new Batteries 2A & 2B (43 + 43 ovens) in line with the existingbatteries
BATTERY 2A43 OVENS
BATTERY 2B43 OVENS
REUSED PART
New Batteries 2A & 2B built in the same place as the old-ones• Reuse of the existing stack and waste gas channel• Reuse of existing civil foundation, pinion wall and end-platforms
New Batteries in Line with the existing-ones• Constraints of existing old batteries• Same set of operating machines
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 7
Project Time Schedule
2015DEMOLITION
4th month
CIVIL WORKS
9th month
BUKSTAY & WPPERECTION12th month
REFRACTORYERECTION14th month
HEATING-UP
23rd month
FIRST COKE
26th month
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 8
Summary
Introduction1
Technological Improvements3
Project Highlights2
• Project Constraints• Project Time Schedule
• Heating and Combustion System• PW Design Tools – Combustion System• Bracing System• PW Design Tools – Bracing System• Refractory• PW Design Tools – Refractory
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 9
Technological Improvements
PW has introduced in the new COB 2A & 2B all the latest technologicalsolutions, with the final result of having in the same place two newState-of-The-Art Coke Oven batteries
• New Batteries Twin Flue design instead of Half Divided
• Optimized Combustion (emission and consumption reduction)
• Bracing System Taylor Made
• Heating-wall Stability Increased
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017
TARGETGas Consumption minimizationNOx minimizationConstant Coke quality
HEATING WALL CONFIGURATION• Twin-flueü Waste gas ricirculationü 1 Level for Air Staggering
SOLE CHANNEL CONFIGURATION• Symmetrical
HEATING GAS• Compound (COG & MG)
COG FEEDING• Under-jet
10
Heating and Combustion System
STATE OF THE ARTSTATE OF THE ART
RegulationBrick MG Port
COG Burner
RecirculationWindow
StaggeredChannel
Bottom Air
Air StaggeredOutlet
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 11
PW Design Tools – Combustion System
COKE
COMBUSTION MODELLING:Combustion diagnosis of Existing BatteriesCombustion optimization in Pad-up projectTurn over point optimisation based oncoke shrinkage
PW in house developed tool for heatingflue combustion based on fluent CFDmodelling:• 3D Temperature profile of complete
heating flues• Air, Gas and Waste gas mixing• NOx formation• Unburned Gas concentrations
FAN (Flame ANalysis)
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 12
PW Design Tools – Combustion System
REGENERTOR MODELLING:Waste gas thermal loss optimization in Pad-upand Hot-Repair/Re-checkering projects
PW in house developed tool for regenerator andchecker brick optimization:• Proper sizing of regenerator height• Definition of regenerator wall fireclay-silica
sliding joint position• Increased regenerator efficiency by improved
checker design
RAN (Regenerators ANalysis)
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 13
Bracing System
TARGETIncrease the battery life preserving refractorybrickwork:• No Tensile stress in refractory bricks• No Leakage between oven and heating wall
Bracing System ConfigurationOptimized solution taking into considerations plantconstraints:• Existing Oven and Heating wall width• Interface with existing Machines
PW Top Charging force distribution for mid-size ovenalong heating wall 45 kN/m
BRACING SYSTEM
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 14
PW Design Tools– Bracing System
BAN (Bracing system ANalysis)BRACING MODELLING:Bracing design optimization for Pad-up and hotrepair project introducing state of the artsolutionBracing force distribution defined according tobattery type and heating wall design
In house developed tool for bracing systembased on ANSYS modelling
FEM analysis on heating wall head, wallprotection plate and door frame under thermaland mechanical loads• Wall protection plate and door frame
deformation to ensure the correct forcetransmission to refractory brickwork
• Wall protection plate and door frame stress toensure equipment long life
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 15
Refractory
TARGET
Strongest Heating Wall Refractory Design:
• Liner/Binder fixed Joints with Internal Hammer Head
• Tongue and Groove bricks connection between liner &binder and between different layers
• Combination in odd & even layers of different internalhammer heads creating proper liner overlapping toincrease strength and gas tightness
• Thermal Shock Resistant bricks on oven contour
Even Layer
Odd Layer
STATE OF THE ART
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 16
PW Design Tools– Refractory
REFRACTORY DESIGN MODELLING:In house developed tool for coke oven batteryrefractory design based on 3D modellingsoftware:• Automatic brick interference check• Automatic bill of quantity generation• Complete battery assembly avoiding brick
assembly on workshop/site
VAP (Virtual Assembly refractory Program)
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
© Paul Wurth 2017 17
Thank you for the attention!
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki
PT Krakatau Posco, Battery No.1&2, Cilegon, Indonesia
© Paul Wurth 2017
Paul Wurth IHI Co., Ltd.Toyosu Center Building,
3-3, Toyosu 3-chome, Koto-ku,Tokyo 135-6009 Japan
Phone: [email protected]
Contacts
Dr. Ing. Fabrizio Strobino, Paul Wurth IHI Co., Ltd.Phone: +81-3-6630-4787Fax: +81-3-3536-4014
Mobile: +81-80-1280-7857e-mail: [email protected]
18
Paul Wurth International S.A.Taiwan Branch
Kaohsiung, TAIWANPhone: +886 7 33 93 309
Paul Wurth Italia S.p.A.Via di Francia 1, Genova
I-16149, ITALYPhone: +39 010 640 [email protected]
SEAISI 2017 – New PW Coke Oven Batteries 2A & 2B at JFE Kurashiki