10 - 12 Nov 200410 - 12 Nov 2004 APEC 23rd EGNRET MeetingAPEC 23rd EGNRET Meeting 11
New & Renewable Energy Technologies New & Renewable Energy Technologies Development in Development in
Hong Kong Special Administrative RegionHong Kong Special Administrative Region
Dr. Y F KWOKDr. Y F KWOKElectrical and Mechanical Services Dept.Electrical and Mechanical Services Dept.
10 - 12 Nov 200410 - 12 Nov 2004 APEC 23rd EGNRET MeetingAPEC 23rd EGNRET Meeting 22
Consultancy Study – Last Consultancy Study – Last Update (1)Update (1)
Consultancy study on Potential Consultancy study on Potential Application of Renewable Application of Renewable Energy in Hong KongEnergy in Hong Kong
Commissioned in late 2000Commissioned in late 2000 Divided into 2 StagesDivided into 2 Stages Stage 1 completed in early 2003Stage 1 completed in early 2003
10 - 12 Nov 200410 - 12 Nov 2004 APEC 23rd EGNRET MeetingAPEC 23rd EGNRET Meeting 33
Consultancy Study – Last Consultancy Study – Last UpdateUpdate Stage 2 is a Stage 2 is a
BIPV BIPV demonstration demonstration projectproject
10 - 12 Nov 200410 - 12 Nov 2004 APEC 23rd EGNRET MeetingAPEC 23rd EGNRET Meeting 44
HKSARG – Current Update HKSARG – Current Update (1)(1) Evaluation of BIPV Evaluation of BIPV
demonstration demonstration project completed project completed and report will and report will soon be issued.soon be issued.
EMSD has built a EMSD has built a new 350 kW grid-new 350 kW grid-connected BIPV in connected BIPV in its new its new Headquarters Headquarters Building.Building.
10 - 12 Nov 200410 - 12 Nov 2004 APEC 23rd EGNRET MeetingAPEC 23rd EGNRET Meeting 55
HKSARG – Current Update HKSARG – Current Update (2)(2) Launched a Wind Measurement Launched a Wind Measurement
Program in mid 2004 to monitor the Program in mid 2004 to monitor the wind resources at 5 potential siteswind resources at 5 potential sites
10 - 12 Nov 200410 - 12 Nov 2004 APEC 23rd EGNRET MeetingAPEC 23rd EGNRET Meeting 66
HKSARG – Current Update HKSARG – Current Update (3)(3)
The 2 Power Utilities in HK have The 2 Power Utilities in HK have agreed each to build a agreed each to build a commercial-scale wind turbine commercial-scale wind turbine for demonstration purposefor demonstration purpose
One already fixed the site, One already fixed the site, completed EIA and is tendering. completed EIA and is tendering. Expected to start generation in Expected to start generation in 20062006
10 - 12 Nov 200410 - 12 Nov 2004 APEC 23rd EGNRET MeetingAPEC 23rd EGNRET Meeting 77
HKSARG – Current Update HKSARG – Current Update (4)(4)
The Sustainable Development CThe Sustainable Development Council of HKSARG recently issuouncil of HKSARG recently issued an “Invitation and Response ed an “Invitation and Response Document” to seek the general Document” to seek the general public’s view on three areas for public’s view on three areas for SD, including use of RE.SD, including use of RE.
10 - 12 Nov 200410 - 12 Nov 2004 APEC 23rd EGNRET MeetingAPEC 23rd EGNRET Meeting 88
HKSARG – Current Update HKSARG – Current Update (5)(5)
EMSD has set up a Working EMSD has set up a Working Group to formulate a set of Group to formulate a set of technical guidelines on Grid technical guidelines on Grid Connection for small-scale RE Connection for small-scale RE power systems.power systems.