+ All Categories
Home > Government & Nonprofit > New Solutions for Sustainable Mobility in Leipzig

New Solutions for Sustainable Mobility in Leipzig

Date post: 20-Jan-2017
Category:
Upload: rehne-gibb-larena
View: 150 times
Download: 3 times
Share this document with a friend
173
New Solutions for Sustainable Mobility in Leipzig Cebu City, 01.04.2016 Dipl.-Ing. Torben Heinemann City of Leipzig Office for Traffic Planning and Road Construction
Transcript

New Solutions for Sustainable

Mobility in Leipzig

Cebu City, 01.04.2016

Dipl.-Ing. Torben Heinemann

City of Leipzig

Office for Traffic Planning and Road Construction

Stadt Leipzig -

Leipzig – city of culture, trade and traffic

Office for Traffic Planning and Road Construction 2

Stadt Leipzig - 3Office for Traffic Planning and Road Construction

Leipzig - city of culture

working site of Johann Sebastian Bach

home of the world famous Thomanerchor

a place for modern art and architecture

Stadt Leipzig - 4Office for Traffic Planning and Road Construction

Leipzig trade fair international

investment: 800 Million €

start planning: 1992

opening: 1996

vistors per year: 1.4 Million

Stadt Leipzig - Office for Traffic Planning and Road Construction

inhabitants 568.000(in 2011 plus ca. 9.000 people

in 2012 plus ca. 10.000 p.

in 2013 plus ca. 11.000 p. plus 2,06 %

in 2014 plus ca. 13.000 p. plus 2,12 %

in 2015 plus ca. 16.000 p. plus 2,90 %)

area 29.760 ha

road network 1.765 km

tram network 148 km

tram lines 13

bicycle network 442 km

Leipzig – numbers and facts

Leipzig

Bundesrepublik

Deutschland

Berlin

Dresden

5

Stadt Leipzig - 6Office for Traffic Planning and Road Construction

Region Leipzig-Halle

Dresden

PragueChemnitzFrankfurt/

Munich

BerlinHannover

• Leipzig-Halle: region with

1.8 mio. inhabitants

• very good transport

infrastructure

• motorways in all directions

• rail service to Berlin 1 hour

Stadt Leipzig -

Leipzig: A growing City

new population more than

60,000 over the past 12

years

more than 95 % of

inhabitants enjoy living in

Leipzig

particularly attractive to

young people

registered employees in

2011: 216,189 Source: Statistisches Landesamt Sachsen

493.052 502.651 510.512 518.862 522.883 523.815

2001 2005 2007 2009 2010 2011

Office for Traffic Planning and Road Construction 7

Stadt Leipzig - 8

Leipzig city structure

North: New fields of employment

South: Leipziger Neuseenland

Office for Traffic Planning and Road Construction

Stadt Leipzig -

airport Leipzig/Halle

2 new runways (1996-2000 and 2005-2008)

New terminal + ICE-train station (2001-2003)

DHL (2005-2008)

Office for Traffic Planning and Road Construction 9

Stadt Leipzig -

airport Leipzig/Halle

Flights

(take-offs and landings)Passengers (Persons) Air freight (Tons)

2000 47,030 2,288,931 11,273

2001 42,408 2,185,130 9,252

2002 41,209 1,988,854 9,675

2003 40,303 1,995,070 9,342

2004 39,316 2,041,046 5,700

2005 37,905 2,127,895 12,054

2006 42,417 2,348,011 29,330

2007 50,972 2,723,748 101,283

2008 59,924 2,462,256 442,406

2009 60,150 2,421,382 524,083

2010 62,247 2,352,827 663,024

2011 64,097 2,266,742 760,345

2012 …

2013 887,000

2014 911,000

2015 > 1,000,000

Source: Leipzig City Council, Office for Statistics and Elections

Office for Traffic Planning and Road Construction 10

+ 1,600 %

Stadt Leipzig -

area around the new BMW factory

planning started: July 2001 - start of production: April 2005,

investment 1,5 billion €Office for Traffic Planning and Road Construction 11

Stadt Leipzig -

the new BMW factory

Office for Traffic Planning and Road Construction 12

electric cars - start of production: 2013

Stadt Leipzig -

the new BMW factory

electric cars - start of production: 2013

Office for Traffic Planning and Road Construction 13

Stadt Leipzig -

the new PORSCHE factory

planning started: 1998/1999, building: 2000-2002

Office for Traffic Planning and Road Construction 14

Stadt Leipzig -

the new PORSCHE factory

Porsche Cayenne

Office for Traffic Planning and Road Construction 15

Stadt Leipzig -

the new PORSCHE factory

Porsche Panamera

Office for Traffic Planning and Road Construction 16

Stadt Leipzig -

the new PORSCHE factory

Porsche Macan started in 2013

Office for Traffic Planning and Road Construction 17

Stadt Leipzig - Office for Traffic Planning and Road Construction

Expected Modal Split in Leipzig for 2020

39,5 38,231,5

26,3 27,3 25,0

5,8 5,813,2

12,414,4 18,0

23,2 27,5 27,334,1 28,6 25,0

8,78,4 8,7 9,9

11,09,0

22,8 20,1 19,3 17,3 18,823,0

36,0

5,2

17,8

5,9

35,1

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7

Per

cen

t

By publictransport

By car, gowith

By Car

By bicycle

By foot

1987 1991 1994 1998 2003 20202008

18

Stadt Leipzig -

New goals for the Modal Split 2025

19

44.0% 39.6% 32.0% 30.0%

17.3% 18.8%23.0% 23.0%

12.4% 14.4% 17.0% 20.0%

26.3% 27.3% 28.0% 27.0%

SrV 2003 SrV 2008 Ziel 2015 Ziel 2025

Modal Split

MIV ÖV Rad Fuß

• SrV = Survey of travel behaviour of TU Dresden for the City of

Leipzig every 5 years

• Ziel 2015 according to STEP 2003

• Ziel 2025 according to STEP 2015 (draft version)Office for Traffic Planning and Road Construction

by foot

by bike

by pt

by car

Stadt Leipzig -

Principles of sustainability

Leipzig won the national German price for sustainability

for the criteria:

- quality of life and

- structure of the city

2012

Office for Traffic Planning and Road Construction 20

Stadt Leipzig - 21

Public Space

Marktgalerie

Office for Traffic Planning and Road Construction

Stadt Leipzig - 22

Living at the water front

Office for Traffic Planning and Road Construction

Stadt Leipzig - 23

Living at the water front?

Office for Traffic Planning and Road Construction

Stadt Leipzig - 24

Living at the water front?

Office for Traffic Planning and Road Construction

Stadt Leipzig -

Leipzig – compact city center

Office for Traffic Planning and Road Construction 25

Leipzig - downtown

ca. 900 m

ca. 700 m

Stadt Leipzig - Office for Traffic Planning and Road Construction 26

Cebu City – Colon Street Quarter

Stadt Leipzig - Office for Traffic Planning and Road Construction 27

Stadt Leipzig -

City-centre – limited access for cars

Office for Traffic Planning and Road Construction 28

Passages in the city

There are more

than 30 covered

walkways

29Stadt Leipzig - Office for Traffic Planning and Road Construction

Stadt Leipzig - 30

City Centre – strenghening functional mix

Office for Traffic Planning and Road Construction

Stadt Leipzig -

Car reduced city center

Office for Traffic Planning and Road Construction 31

Parking in the city center

P

P

P

P

P

P

P

500 m

P

P

P

P

5.900 parking places

in public parking

garages underground

and above ground

Parking in the

City center:

10.400 parking places

totally in the inner city

32

Stadt Leipzig - 33

Parking in the city center

Raising the parking fee by 200 % in 2011, new: 2,- €/h

Reduction parking lots on street in thecity center from 870 to 250 in 10 years

Office for Traffic Planning and Road Construction

Stadt Leipzig -

Revitalizing public spaces: Richard-Wagner-Platz

a former parking lot for 120 cars

34Foto: punktum Bertram KoberOffice for Traffic Planning and Road Construction

Stadt Leipzig -

Cycling in Leipzig

Office for Traffic Planning and Road Construction 35

Stadt Leipzig -

Cycling in Cebu City

Office for Traffic Planning and Road Construction 36

Stadt Leipzig -

Cycling in Cebu City

Office for Traffic Planning and Road Construction 37

Stadt Leipzig -

Cycling in Cebu City

Office for Traffic Planning and Road Construction 38

Stadt Leipzig -

Cycling in Cebu City

Office for Traffic Planning and Road Construction 39

Stadt Leipzig - Office for Traffic Planning and Road Construction

Cycling in Leipzig

good conditions for

cycling:

plain landscape

compact city principle

as part of city

development

number of bicycles:

approx. 515,000

length of bicycle net

bicycle lanes: 99 km

bicycle advisory

lanes: 18 km

bicycle paths: 225 km

others: 93 km

overall: 436 km 40

Stadt Leipzig - 41

Cycling in Leipzig

1998

ca. 236,000 bicycles for 437,000 inhabitants

= ca. 540 bicycles per 1,000 inhabitants

2015

ca. 515,000 bicycles for 568,000 inhabitants= ca. 907 bicycles per 1,000 inhabitants

growth from 1998 to 2015

ca. 279,000 bicycles= ca. 367 bicycles per 1,000 inhabitants

or ca. 170 %

Office for Traffic Planning and Road Construction

Stadt Leipzig - 42

Cycling in Leipzig

Cycling share of Modal Split:

– SrV 1990: 5.2 %

– SrV 1994: 5.8 %

– SrV 1998: 13.2 %

– SrV 2003: 12.4 %

– SrV 2008: 14.4 %

– SrV 2013: 15.6 %

– SrV 2015: 17.3 %

SrV = Survey of representative transport behaviour in Leipzig since 1972

(German: System representativer Verkehrsbefragungen)

growth > 250 %

growth ca. 333 %

Office for Traffic Planning and Road Construction

Stadt Leipzig - 43

Cycling in Leipzig

trips in 1994 86,500 trips by bike per day

trips in 2015 353,750 trips by bike per day

km per day 1994 259,500 km per day

km per day 2015 1,415,000 km per day

number of bicycles 1994 215,000 bicycles

number of bicycles 2015 515,000 bicycles

growth ca. 400 %

growth ca. 240 %

growth ca. 540 %

Office for Traffic Planning and Road Construction

Stadt Leipzig - 44

bicycle parking downtown

bicycle racks for two bicycles each:

– 2008: ca. 630 bicycle racks

– 2009: ca. 730 “

– 2010: ca. 830 “

– 2011: ca. 880 “

– 2012: ca. 1,030 “

– 2013: ca. 1,200 “

( April 2013)

Additional bicycle parking at

private bicyle racks (some with

advertising), on privat grounds or

in garages.

Office for Traffic Planning and Road Construction

Stadt Leipzig - Office for Traffic Planning and Road Construction

bicycle parking

bicycle parking concept for

city center

use of parking rack

„Leipziger Anlehnbügel“

approx. 4.500 parking racks

placed in Leipzig

Best practice for bicycle infrastructure

4545

Stadt Leipzig - 46

bicycle garage in the university

opening of bicycle garages:

in 2009: ca. 600 parking lots

in 2012: ca. 1,100 additional parking lots

total: ca. 1,700 parking lots

Office for Traffic Planning and Road Construction

Stadt Leipzig - 47Office for Traffic Planning and Road Construction

bicycle underground parking at the university

Best practice for bicycle infrastructure

Stadt Leipzig - 48Office for Traffic Planning and Road Construction

Examples for bicycle infrastructure

Stadt Leipzig - 49Office for Traffic Planning and Road Construction

bicycle parking at the zoological garden

Examples for bicycle infrastructure

Stadt Leipzig - 50Office for Traffic Planning and Road Construction

bicycle parking at the German National Library

Examples for bicycle infrastructure

Stadt Leipzig - 51Office for Traffic Planning and Road Construction

bicycle parking at the main train station

Examples for bicycle infrastructure

Stadt Leipzig - 52Office for Traffic Planning and Road Construction

bicycle parking in the pedestrian zone

Examples for bicycle infrastructure

Stadt Leipzig - 53Office for Traffic Planning and Road Construction

bicycle parking next to mobility center

Examples for bicycle infrastructure

Stadt Leipzig - 54Office for Traffic Planning and Road Construction

bicycle parking in the city centre

Examples for bicycle infrastructure

Stadt Leipzig - 55

Bicycle parking in the city center near the university

approx. 300 bicycles on this picture

Stadt Leipzig - Office for Traffic Planning and Road Construction

Best practice for bicycle infrastructure

bicycle lanes

An der Tabaksmühle Dresdner Straße Karl-Liebknecht-Straße

width of bicycle lanes: mostly 1.85 m

length: 99 km of 436 km bicycle net

56

Stadt Leipzig - 57Office for Traffic Planning and Road Construction

Examples for bicycle infrastructure

bicycle lanes in intersections

Dresdner Straße K.-Liebknecht-Straße

for improved recognizability:

red colouring of bicycle lanes

Dresdner Straße

Karl-Liebknecht-Straße

Dresdner Straße

Stadt Leipzig - 58Office for Traffic Planning and Road Construction

bicycle marking in intersections (for indirect left turns)

Karl-Tauchnitz-StraßeDresdner StraßeRödelstraßeRödelstraße

RödelstraßeK.-Tauchnitz-Str.Example for a bicycle lane

between two car lanes

Examples for bicycle infrastructure

Karl-Tauchnitz-Straße

Stadt Leipzig - Office for Traffic Planning and Road Construction

bicycle lanes alongside to parking

Dresdner Straße K.-Liebknecht-Straße

An der Tabaksmühle Dresdner Straße

marking of the bicycle lanes on both sides

marking with 0.50 m next to parking, for protection

against car doors opening

Best practice for bicycle infrastructure

59

Stadt Leipzig - Office for Traffic Planning and Road Construction

bicycle advisory lane (alongside parking)

K.-Liebknecht-Straße

Dresdner Straße

width of the bicycle advisory lane: 1.5 m (minimum: 1.25 m)

interrupted white line, with 0.50 m distance to parking cars

William-Zipperer-StraßeWilliam-Zipperer-Straße

Best practice for bicycle infrastructure

60

Stadt Leipzig - Office for Traffic Planning and Road Construction

bicycle paths

Richard-Wagner-PlatzGeorgiring

Johannisplatz Waldstraße

Best practice for bicycle infrastructure

61

Stadt Leipzig - Office for Traffic Planning and Road Construction

Georgiring

Best practice for bicycle infrastructure

62

Stadt Leipzig - Office for Traffic Planning and Road Construction

Richard-Wagner-Platz

Best practice for bicycle infrastructure

63

Stadt Leipzig - Office for Traffic Planning and Road Construction

Johannisplatz

Best practice for bicycle infrastructure

64

Stadt Leipzig - Office for Traffic Planning and Road Construction

Waldstraße

Best practice for bicycle infrastructure

65

Stadt Leipzig - Office for Traffic Planning and Road Construction

bicycle path against the direction of one way roads (50 km/h)

Dresdner Straße K.-Liebknecht-Straße

Dresdner Straße

bicycles moving in direction of the one way road use the

car lane

Best practice for bicycle infrastructure

66

Stadt Leipzig - Office for Traffic Planning and Road Construction

bicycle path against the direction of one way roads (50 km/h)

Dresdner Straße K.-Liebknecht-Straße

Dresdner Straße seperate traffic light for

bicycles

Best practice for bicycle infrastructure

67

Stadt Leipzig - Office for Traffic Planning and Road Construction

bicycle marking in intersections

Richard-Wagner-Platz

Johannisallee

Karl-Tauchnitz-Straße

advanced stop line for bicycles

3 m – 5 m ahead of the car

stop line

for improved recognizability,

to avoid blind spot problems

widened stop area for bicycles

advanced stop line, 5 m

ahead of all car stop lines

to secure left turning bicycle

traffic

Best practice for bicycle infrastructure

6868

Stadt Leipzig - 6969

„Leipziger Kombispur“ – „combination lane“

cars turn right, bicycles are allowed to go straight as well

Georg-Schumann-Straße/Lindenthaler Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig - 7070

„Leipziger Kombispur“ – „combination lane“

K.-Tauchnitz-Str.Georg-Schumann-Straße/Lindenthaler Straße

cars turn right,

bicycles are

allowed to go

straight as well

Office for Traffic Planning and Road Construction

Leipziger Hauptbahnhof – main train station

Source: Freistaat Sachsen

Stadt Leipzig - Office for Traffic Planning and Road Construction 71

Jeepney

Stadt Leipzig - Office for Traffic Planning and Road Construction 72

Stadt Leipzig -

Rationalizing jeepney routesJeepneys will not be allowed along Colon Street. These will be rerouted so that they cross can cross Colon Street and thus provide access to jeep riders.

73Office for Traffic Planning and Road Construction

Stadt Leipzig -

Rationalizing jeepney stopsDesignated jeep stops along strategic points in streets perpendicular to

Colon Street to serve jeepney riders.

JEEP STOPS

LEGENDS:

74Office for Traffic Planning and Road Construction

BRT – Bus Rapid Transit in Bogotá

Stadt Leipzig - Office for Traffic Planning and Road Construction 75

BRT – Bus Rapid Transit in Bogotá

Stadt Leipzig - Office for Traffic Planning and Road Construction 76

BRT – Trolleybus instead of Diesel

Stadt Leipzig - Office for Traffic Planning and Road Construction 77

78

The electric bus

78Stadt Leipzig - Office for Traffic Planning and Road Construction

7979Stadt Leipzig - Office for Traffic Planning and Road Construction

The electric bus

Stadt Leipzig -

history - local and regional rail service

1. Line (1968)

Wurzen (1974)

Grünau (1977-84)

Halle (2004)

2002 stoped

Plagwitz- Gaschwitz

New City-Tunnel (2013)

Office for Traffic Planning and Road Construction 80

Stadt Leipzig -

The new local and regional rail service

Grünau – Stötteritz - Wurzen

Halle – Stötteritz - Wurzen

Borna - Eilenburg

Halle – Flughafen - Altenburg

Bitterfeld - Gaschwitz

Office for Traffic Planning and Road Construction 81

Stadt Leipzig -

City-Tunnel Leipzig

Office for Traffic Planning and Road Construction 82

Stadt Leipzig -

City-Tunnel Leipzig

project = 5279 m

tunnel = 1800 m

City centre

Office for Traffic Planning and Road Construction 83

Stadt Leipzig -

Main station

Office for Traffic Planning and Road Construction 86

Stadt Leipzig -

Market station

Office for Traffic Planning and Road Construction 88

Stadt Leipzig -

Wilhelm-Leuschner-Platz

Office for Traffic Planning and Road Construction 90

Stadt Leipzig -

Wilhelm-Leuschner-Platz

Office for Traffic Planning and Road Construction 91

Stadt Leipzig - 92

Quelle: Freistaat Sachsen

Bavarian Station: Moving the portikus

Office for Traffic Planning and Road Construction

Stadt Leipzig -

Bavarian Station

95Office for Traffic Planning and Road Construction

Stadt Leipzig - 96

Urban development area Bavarian Station

Office for Traffic Planning and Road Construction

Stadt Leipzig -

Tram line 15

Office for Traffic Planning and Road Construction 99

Stadt Leipzig -

The tram improvement program

line 11

(1999 – 2025)

line 16

(1994 – 2005)

line 7

(2010 – 2020)

line 15

(1998 – 2016)

Office for Traffic Planning and Road Construction 100

Stadt Leipzig -

Tram stop Goerdelerring

Office for Traffic Planning and Road Construction 101

Stadt Leipzig -

Tram stop Phillip-Rosenthal-Straße

Office for Traffic Planning and Road Construction 102

Stadt Leipzig -

Tram stop Coppiplatz

Office for Traffic Planning and Road Construction 103

Stadt Leipzig -

Tram stop Lindenau bus depot

Office for Traffic Planning and Road Construction 104

Stadt Leipzig -

Tram stop Main Station

Office for Traffic Planning and Road Construction 105

Stadt Leipzig -

Tram stop New fairground

Office for Traffic Planning and Road Construction 106

Stadt Leipzig -

Tram stop New Fairground

Office for Traffic Planning and Road Construction 107

Stadt Leipzig -

Bike & Ride

108Office for Traffic Planning and Road Construction

Stadt Leipzig -

Tram linie 16

109Office for Traffic Planning and Road Construction

110

Eisenbahnstraße

Stadt Leipzig - Office for Traffic Planning and Road Construction

Stadt Leipzig -

Eisenbahnstraße

111Office for Traffic Planning and Road Construction

Stadt Leipzig - 112112

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig -

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction 113

Stadt Leipzig - 114

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig - 115

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig - 116

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig - 117

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig - 118

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig - 119

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig - 120

Georg-Schumann-Straße

Office for Traffic Planning and Road Construction

Stadt Leipzig - Office for Traffic Planning and Road Construction

Public relations for cycling

overview:

activities for bicycle promotion:

ITF Active Transportation Tour

information material:

leaflets for bicycle parking

leaflets for car reduced

city-centre

homepage: „

www.Leipzig.de/Fahrrad“

bicycle maps for commuters and tourists

public participation during planning process:

bicycle traffic development concept

working group bicycle traffic promotion

133

Stadt Leipzig - Office for Traffic Planning and Road Construction

New Mobility-Stations in Leipzig in 2015

The Idea:

The public transport company

provides all modes of transport

out of one hand.

These are:

tram, bus, rail-service

carsharing

bike sharing

electric car charging

information to all modes

one bill for all

134

Stadt Leipzig - Office for Traffic Planning and Road Construction

Intermodality with “Leipzig mobil”

Easy use of different modes of transport for one trip

135

Information about the

ticket sale and trip to the

mobility station on your

smart phone

Get

information

for carsharing

or bike

sharing

Stadt Leipzig - Office for Traffic Planning and Road Construction

A network of mobility stations

Easy access to a dense net of mobility station

136

31

4

19

2216

12

9

15

42

46

24

30

6

18

11

8

13

17

20

47

25

5

39

7

Stadt Leipzig - 137Office for Traffic Planning and Road Construction

Public relations for cycling

International Transportforum (ITF) Active Transportation Tour

Stadt Leipzig - 138Office for Traffic Planning and Road Construction

International Transportforum (ITF) Active Transportation Tour

Public relations for cycling

Stadt Leipzig - 139Office for Traffic Planning and Road Construction

Citizen-consultation-hour of the Lord Mayor on bike

Public relations for cycling

Stadt Leipzig - 140Office for Traffic Planning and Road Construction

Public relations for cycling

Citizen-consultation-hour of the Lord Mayor on bike

Stadt Leipzig - 141Office for Traffic Planning and Road Construction

Public relations for cycling

Citizen-consultation-hour of the Lord Mayor on bike

Cebu City – Colon Street Quarter

Stadt Leipzig - Office for Traffic Planning and Road Construction 142

Stadt Leipzig -

Leipzig – compact city center

Office for Traffic Planning and Road Construction 143

Stadt Leipzig -

Pedestrian zone

144Office for Traffic Planning and Road Construction

Stadt Leipzig -

Sidewalk

145Office for Traffic Planning and Road Construction

Stadt Leipzig -

Pedestrian zone

146Office for Traffic Planning and Road Construction

Stadt Leipzig -

„Jahrhundertschritt“-monument in pedestrian zone

pic.: Andreas Schmitz

147Office for Traffic Planning and Road Construction

Stadt Leipzig -

Why support walking?

the desire to spend time in public

spaces is a sign of urban quality

– spaces without people are vast

and empty

the presence of people brings

social security

walking is healthy and leads to

well being

walking gives urban quality

Spaces for pedestrians are

attractive for tourists

Am Markt

Photo: Andreas SchmitzThomaskirche

Photo: Andreas Schmitz

148Office for Traffic Planning and Road Construction

Stadt Leipzig -

Walking = Thinking of Tourism

149Office for Traffic Planning and Road Construction

Stadt Leipzig -

Why support walking?

for an attractive public transport there is a need for an attractive net for walking

ecological mode of transport

walking does not cause any environmental

economical aspects

cost for infrastructure are much smaller than for any other form of transport

supporting walking increases the possibilities for handycapped people to be independently mobile

walking is not discriminating age or sex

attractive public spaces

attractive situation for local economies

Am Markt Photo: Andreas Schmitz

150Office for Traffic Planning and Road Construction

Stadt Leipzig -

Walking = Desing for all

151Office for Traffic Planning and Road Construction

Stadt Leipzig -

What is needed to attract pedestrians?

high level of safety

reducing spaces that might feel

unsafe for people

reducing barriers through other

uses on sidewalks Source: Beitrag zur Stadtentwicklung

40; S. 57Underpass Wilhelm-Leuschner-

Platz

EmilienstraßeKarl-Liebknecht-Straße Photo: Andreas SchmitzPhoto: Andreas Schmitz

152Office for Traffic Planning and Road Construction

Stadt Leipzig -

What is needed to attract pedestrians?

153Office for Traffic Planning and Road Construction

Stadt Leipzig -

What is needed to attract pedestrians?

direct connections

narrow network

easy walking with no

obsticles

Willmar-Schwabe-Straße

Passage am Neumarkt

Goerdelerring Photo: Andreas Schmitz

Photo

: A

ndre

as S

chm

itz

Photo: Andreas Schmitz

154Office for Traffic Planning and Road Construction

Stadt Leipzig -

What is needed to attract pedestrians

good orientation, easy to

understand

attractive design of

sidewalks, good quality

of material

Willy-Brandt-PlatzBrühl

Richard-Wagner-Platz Photo: Andreas Schmitz

Photo: Andreas SchmitzPhoto: Andreas Schmitz

155Office for Traffic Planning and Road Construction

Stadt Leipzig -

Bild

: w

ww

.ham

burg

.adfc

.de

conflicts between pedestrians and cyclists

157Office for Traffic Planning and Road Construction

Stadt Leipzig -

conflicts between pedestrians and cyclists

158Office for Traffic Planning and Road Construction

Stadt Leipzig -

pedestrian zone in Leipzig, 2011

162Office for Traffic Planning and Road Construction

Stadt Leipzig -

pedestrian zone in Leipzig, 2011

163Office for Traffic Planning and Road Construction

Stadt Leipzig -

new city cars in Leipzig, 2010

164Office for Traffic Planning and Road Construction

Stadt Leipzig -

urban street life in Leipzig, 2011

165Office for Traffic Planning and Road Construction

Stadt Leipzig -

urban street life in Leipzig, 2011

166Office for Traffic Planning and Road Construction

Stadt Leipzig -

urban street life in Leipzig, 2011

167Office for Traffic Planning and Road Construction

Stadt Leipzig -

urban street life in Leipzig, 2011

168Office for Traffic Planning and Road Construction

Cebu City – Colon Street Quarter – Step 1

Stadt Leipzig - Office for Traffic Planning and Road Construction 169

Cebu City – Colon Street Quarter – Step 2

Stadt Leipzig - Office for Traffic Planning and Road Construction 170

Cebu City – Colon Street Quarter – Step 3

Stadt Leipzig - Office for Traffic Planning and Road Construction 171

BRT stop

Stadt Leipzig - 172

Thank you for your attention

Office for Traffic Planning and Road Construction

Stadt Leipzig - 174

Department of City Development and Construction

Office for Transport Planning and Road Construction

04092 Leipzig

phone: +49 (341) 123 - 34 41

fax: +49 (341) 123 - 34 55

www.Leipzig.de

City of Leipzig

174

Stadt Leipzig - 175Verkehrs- und Tiefbauamt

Haltestelle mit angehobener Kfz-Fahrbahn

Prinzipskizze einer angehobenen Fahrbahn

(nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)

Stadt Leipzig - 176Verkehrs- und Tiefbauamt

Haltestelle mit angehobener Fahrbahn –

am Beispiel Leipzig

Pfaffendorfer Straße (Haltestelle Zoo - stadteinwärts)

Stadt Leipzig - 177Verkehrs- und Tiefbauamt

Haltestellenkap mit Fahrbahneinengung

am Beispiel Leipzig

Zschochersche Straße (Haltepunkt Elster Passage)

Stadt Leipzig - 178Verkehrs- und Tiefbauamt

Haltestellenkap mit Fahrbahneinengung

am Beispiel Leipzig

Pfaffendorfer Straße (Haltepunkt Zoo - stadtauswärts)

Stadt Leipzig - 179Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn

am Beispiel Leipzig

Könneritzstraße (Haltepunkt Holbeinstraße - stadteinwärts)

Stadt Leipzig - 180Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn

am Beispiel Leipzig

Könneritzstraße (Haltepunkt Holbeinstraße - stadteinwärts)

Stadt Leipzig - 181Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobenem Radweg

am Beispiel Leipzig

Könneritzstraße (Haltepunkt Holbeinstraße - stadteinwärts)

Stadt Leipzig - 182Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobenem Radweg

am Beispiel Leipzig

Könneritzstraße (Haltepunkt Holbeinstraße - stadteinwärts

Stadt Leipzig - 183Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn am Beispiel Leipzig

Könneritzstraße (Haltepunkt Rödelstraße - stadteinwärts)

Stadt Leipzig - 184Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn am Beispiel Leipzig

Könneritzstraße (Haltepunkt Rödelstraße - stadteinwärts)

Stadt Leipzig - 185Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn am Beispiel Leipzig

Könneritzstraße (Haltepunkt Rödelstraße - stadteinwärts)

Stadt Leipzig - 186Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn am Beispiel Leipzig

Könneritzstraße (Haltepunkt Rödelstraße - stadtauswärts)

Stadt Leipzig - 187Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn am Beispiel Leipzig

Könneritzstraße (Haltepunkt Rödelstraße - stadtauswärts)

Stadt Leipzig - 188Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn am Beispiel Leipzig

Könneritzstraße (Haltepunkt Rödelstraße - stadtauswärts)

Stadt Leipzig - 189Verkehrs- und Tiefbauamt

Haltestellenkap mit angehobener Radfahrbahn am Beispiel Leipzig

Könneritzstraße (Haltepunkt Rödelstraße - stadtauswärts)

Stadt Leipzig - 190Verkehrs- und Tiefbauamt

Haltestellenkap mit verschwenktem Radweg

am Beispiel Leipzig

Eisenbahnstraße (Haltepunkt Einertstraße - stadteinwärts)

Stadt Leipzig - 191Verkehrs- und Tiefbauamt

Haltestellenkap mit verschwenktem Radweg

am Beispiel Leipzig

Eisenbahnstraße (Haltepunkt Einertstraße - stadteinwärts)

Stadt Leipzig - 192Verkehrs- und Tiefbauamt

Haltepunkt S-Bahnhof Gohlis

Haltestellenkap mit verschwenkter Radverkehrsführung

am Beispiel Leipzig

Stadt Leipzig - 193Verkehrs- und Tiefbauamt

Haltepunkt S-Bahnhof Gohlis

Haltestellenkap mit verschwenkter Radverkehrsführung

am Beispiel Leipzig

Stadt Leipzig - 194Verkehrs- und Tiefbauamt

Haltepunkt S-Bahnhof Gohlis

Haltestellenkap mit verschwenkter Radverkehrsführung

am Beispiel Leipzig

Stadt Leipzig - 195Verkehrs- und Tiefbauamt

Radverkehrsführung an Haltestellenkaps

bei ausreichender Flächenverfügbarkeit

Lösungsvarianten für die Seitenräume analog Bushaltestellenkap

(analog Bushaltestellenkap, nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)

Stadt Leipzig - 196Verkehrs- und Tiefbauamt

Radverkehrsführung an Haltestellenkaps

bei hoher Flächenverfügbarkeit (≥ 7,00 m)

Lösungsvarianten für die Seitenräume analog Bushaltestellenkap

(analog Bushaltestellenkap, nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)

Stadt Leipzig - 197Verkehrs- und Tiefbauamt

bei geringer Flächenverfügbarkeit (≥ 4,50 m)

Radverkehrsführung an Haltestellenkaps

Lösungsvarianten für die Seitenräume analog Bushaltestellenkap

(analog Bushaltestellenkap, nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)

Stadt Leipzig - 198Verkehrs- und Tiefbauamt

Radverkehrsführung an Haltestellenkaps

bei sehr geringer Flächenverfügbarkeit (≥ 3,50 m) Führung als Rad-/Gehweg

Lösungsvarianten für die Seitenräume analog Bushaltestellenkap

(analog Bushaltestellenkap, nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)


Recommended