Railway Research Institute JSC “VNIIZhT”. Railway Research Institute JSC “VNIIZhT”. New switch design as the tool to increase train traffic speeds Doctor of Engineering, Prof. Boris Gluzberg Chief of Laboratory « Switch designs and technologies ». New switch design as the tool to increase - PowerPoint PPT Presentation
Popular Tags:
15
New switch design as the tool to increase train traffic speeds Doctor of Engineering, Prof. Boris Gluzberg Chief of Laboratory «Switch designs and technologies» Railway Research Institute JSC “VNIIZhT” Railway Research Institute JSC “VNIIZhT” New switch design as the tool to increase train traffic speeds Doctor of Engineering, Prof. Boris Gluzberg Chief of Laboratory «Switch designs and technologies»
Transcript
Page 1: New switch design as the tool to increase train traffic speeds

New switch design as the tool to increase train traffic speeds

Doctor of Engineering, Prof. Boris Gluzberg Chief of Laboratory «Switch designs and technologies»

Railway Research Institute JSC “VNIIZhT”

Railway Research Institute JSC “VNIIZhT”

New switch design as the tool to increase train traffic speeds

Doctor of Engineering, Prof. Boris Gluzberg Chief of Laboratory «Switch designs and technologies»

Page 2: New switch design as the tool to increase train traffic speeds

Development objectives

1. Providing speeds on lines being reconstructed for speed and high-speed traffic

2. Speed increase at station entries

Page 3: New switch design as the tool to increase train traffic speeds

1. Providing speed on the lines being reconstructed for speed and high-speed traffic

Page 4: New switch design as the tool to increase train traffic speeds

Switch of R 65 type, 1/11, ( under the project 2956)and exchange track on its basis (project 2968) Design speed:on straight main line of the switch - 250 km/h; on side line – 50 km/h

7 | Switches| 10.2012| VNIIZHT

Page 5: New switch design as the tool to increase train traffic speeds

Speed increase of train traffic through switches (under the project 2726)

2 | Switches| 03.2012| VNIIZhT

Design speed trough the switch – 200 km/hSpeed through the upgraded switch – 220 km/h

Page 6: New switch design as the tool to increase train traffic speeds

Vibration of switch at speed of 220 km/h

Before modernization

After modernization

Page 7: New switch design as the tool to increase train traffic speeds

Speed increase of train traffic through switches (under the project 2750)

3 | Switches| 03.2012| VNIIZhT

Design speed through switch – 140 km/hSpeed after upgrade of the switch – 160 km/h

Page 8: New switch design as the tool to increase train traffic speeds

2. Increase in traffic speed at station entries

Page 9: New switch design as the tool to increase train traffic speeds

Dynamic-kinematical characteristics of typical projects of switches in Russian railways

4 | Switches| 03.2012| VNIIZhT

Rail type Switch grade Radii, m speed, km/h acceleration, m/s2 Parameter of loss of

kinenatic energy , m/s

switch Turnout curve Suddenly emerged

unredeemed

R65

1/9 300,000 200,060

25 0,160 0,241 0,120

40 0,412 0,617 0,191

50 0,643 0,964 0.239

R65

1/11 300,000 300,000

25 0,160 0,160 0,120

40 0,412 0,412 0,191

50 0,643 0,643 0,239

60 0,925 0,925 0,287

Page 10: New switch design as the tool to increase train traffic speeds

The rate of acceleration change when entering the turnout curve and in the body of passenger car

while passing turnout

5 | Switches| 03.2012| VNIIZhT

Rail type Switch grade Speed, km/h Rate of acceleration change (maximum), m/s3

Maximum acceleration in the body of car, m/s3

Passenger car ЦМВ

Freight car

R65

1/9

25 0,10 0,26 0,9

40 0,40 1,03 2,2

50 0,79 2,01 2,5

R65

1/11

25 0,07 0,18 0,9

40 0,27 0,69 1,9

50 0,53 1,34 2,2

60 0,91 2,32 2,6

Page 11: New switch design as the tool to increase train traffic speeds

Dynamic-kinematical characteristics of suggested turnouts

6 | Switches| 03.2012| VNIIZhT

Variant № Rail type

Switch grade

Minimal radii, m Speed, km/h

Unredeemed acceleration,

m/s2

Rate of acceleration change (maximum), m/s3

Maximum acceleration in the body

of passenger car, m/s;*

Passenger car

Freight car

1 Р65 1/9 275,000 40 0,448 0,29 0,75 1,9 2 Р65 1/11 400,000 50 0,482 0,39 0,90 2,0

60 0,693 0,68 1,73 2,23 Р65 1/14 600,000 50 0,322 0,26 0,67 1,6

60 0,463 0,45 1,16 2,170 0,630 0,72 1,84 2,1

4 Р65 1/15 620,000 60 0,450 0,44 1,12 2,070 0,610 0,70 1.78 2,1

5 Р65 1/15 690,000 60 0,40 0,39 0,95 1,870 0,55 0,63 1,60 2.0

Page 12: New switch design as the tool to increase train traffic speeds

Switch of Р65 mark 1/22Speed of movement on a straight main line - 250 km/h

Speed of movement on side line - 120 km/h

Page 13: New switch design as the tool to increase train traffic speeds

Offers to a cooperation

Team work in development of switches of flat marks for high speed traffic1

2 Industrial engineering in Russia of switch parts base on European producers

3Using VNIIZHT methods in research work, their aim is to improve design

speed of turnouts

Page 14: New switch design as the tool to increase train traffic speeds

CONCLUSIONS:

Effective use of switches for transportation can be increased due to increasing traffic speeds in the yard neck

It is possible to increase traffic speed on switches and its combinations at the branch, without yard neck reconstruction, with minimum costs through the use of new geometry of switch curves

It is possible to minimize the costs to increase train speeds on straight track of switch through its modernization directly on

tracks.

7 | Switches| 03.2012| VNIIZhT

Development of new and modernization turnouts in current operation is the effective tool to increase speed of trains

Page 15: New switch design as the tool to increase train traffic speeds

Thank you for your kind attention

9 | Стрелочные переводы| 03.2012| ВНИИЖТ

D.o.E., Prof. Boris Glusberg Chief of the «Switches» laboratory

Thank you for your kind attention!

D.o.E., Prof. Boris Glusberg Head of the «Switches» Laboratory