Industrial Property
• Industry leading coating manufacturer• Property footprint occupied an entire city block in East Vancouver
Industrial Property
• Original structure was over 100 year old • 5 different constructs with differing building techniques and materials
Industrial Property
• Property adjacent to live rail track and major traffic corridor
ScopeDecommissioning, Demolition & Remediation
• Permitting• Industrial waste
removal• Asset recovery• Hazardous material
abatement• Demolition• UST removal• Remediation
Tervita’s Integrated Approach
• Tervita’s Waste Services Group • Industrial waste collection and disposal
• Tervita’s Environmental Services Group• Equipment decommissioning• Asset recovery• Structural demolition• UST Removal and Remediation
• Sub Contracted Services• Hazardous materials abatement• Industrial moving
Waste IdentificationIdentify, inventory and classification of all industrial wastes
Tank & Pipe Decommissioning Tank and piping chemical removal involving:
• Draining• Compressed air purging • Inert gas blanketing • Rotary pressure washing • Chemical collection• Transport as per TDG
regulations and disposal at licensed facilities
Asset RecoveryAbove ground storage tanks
Asset Recovery
Various mixing tanks and mills
Asset Recovery
Packaging equipment
• Electric motors• Agitators• Filters• Pumps• Valves
Asset Recovery
Hazardous Materials Abatement
• Industrial doors• Windows• Floor tiles• Drywall compound• Vermiculite• Roof mounted bag filters
Demolition Equipment
• 45t Caterpillar excavator• 35t Caterpillar excavator• Genesis LPX 400 • Skid steer loader• Mister (MotoFog)
Demolition Sequence
Demolition Area 1
Demolition SequenceDemolition Area 1
Demolition SequenceDemolition Area 2 & 3
Demolition SequenceDemolition Area 4
Demolition Area 4
Demolition SequenceDemolition Area 5
UST Removal and Remediation
Removal of seven underground storage tanks
Demolition Waste Segregation
Project Challenges
• Undefined decommissioning quantities
• Asset recovery • Proximity to active rail & traffic
corridor• Site Security• Scope changes
Project ConclusionBefore
Project ConclusionAfter
Project ConclusionBefore
Project ConclusionAfter
ANY QUESTIONS?