2 Broadway VerO(W1L1C Hakim New York. NY 1000·1 President D New York CityTransit September 16,2016 INFORMATION BULLETIN # 2 Design and Construction of a New Substation at Harrison Place, Canarsie Line (BMT), in the Borough of Brooklyn Contract P-36699 (RFQ No. 0000139755) NOTICE TO PROPOSERS THE STEP-I QUALIFICATION PACKAGE DUE DATE HAS BEEN CHANGED FROM THURSDAY, SEPTEMBER 22, 2016 TO THURSDAY, SEPTEMBER 29,2016 AT NOON. Questions and Answers Below are questions raised by Prospective Proposers and the Authority's responses. Prospective Proposers' questions are restated for convenience only. Question I: We respectfuJJy ask for a (4) week extension for [RFQ] # P-36699 New Substation at Harrison Place. The Step-I Qualification Package due date has been extended to Wednesday, September 29, 2016 at 12pm, Noon (see also "Notice to Proposers" above). Answer 1: Question 2: We respect a copy of the Attendance Sheet and the PowerPoint presentation from this morning's Information Session. Please see Attachment 1 for a copy of the attendance sheet. The PowerPoint presentation is not available for distribution. Answer 2: Sincerely, v4;:lifford Slater Assistant Chief Procurement Officer Materiel Division MTA New York City Transit is all agency of the Metropolitan Transportation Authority, State 01 New York 11.'lS
Transcript
Page 1: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

2 Broadway VerO(W1L1C Hakim New York. NY 1000·1 President

DNew York City Transit

September 16,2016

INFORMATION BULLETIN # 2

Design and Construction of a New Substation at Harrison Place, Canarsie Line (BMT), in the Borough of Brooklyn

Contract P-36699 (RFQ No. 0000139755)

NOTICE TO PROPOSERS

THE STEP-I QUALIFICATION PACKAGE DUE DATE HAS BEEN CHANGED FROM THURSDAY, SEPTEMBER 22, 2016 TO THURSDAY, SEPTEMBER 29,2016 AT NOON.

Questions and Answers

Below are questions raised by Prospective Proposers and the Authority's responses. Prospective Proposers' questions are restated for convenience only.

Question I: We respectfuJJy ask for a (4) week extension for [RFQ] # P-36699 New Substation at Harrison Place.

The Step-I Qualification Package due date has been extended to Wednesday, September 29, 2016 at 12pm, Noon (see also "Notice to Proposers" above).

Answer 1:

Question 2: We respect a copy of the Attendance Sheet and the PowerPoint presentation from this morning's Information Session.

Please see Attachment 1 for a copy of the attendance sheet. The PowerPoint presentation is not available for distribution.

Answer 2:

Sincerely,

~~~ v4;:lifford Slater

Assistant Chief Procurement Officer Materiel Division

MTA New York City Transit is all agency of the Metropolitan Transportation Authority, State 01 New York

~B-(J]-61.!~ 11.'lS

Page 2: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

ATTACHMENT # 1

Page 3: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

11 New York City Transit

ATTENDANCE SHEET

Purpose: Step 1 - Information Session

Contract: P-36699 - Design and Construction of a New Substation at Harrison Place, Canarsie Line (BMT), in the Borough of Brooklyn

Date: Wednesday, September 14,2016

Place: 2 Broadway, New York, NY, 2nd Floor, Room 02.1'0

Time: 10:00 AM

NAME I REPRESENTING I TITLE I TELEPHONE EMAIL ADDRESS I NUMBER

1 6( iclV\ h;' V\ I P,Q~D~S

2r-~J0k ~ub,J 1?QY'5ox.J5 3

:ro 4.v S0 fI1 ;VJ f' "" I L (<-c- leAdh~~ -15/6 ~/~bO'O l:ss'V""", e-r-~ 12...", /"0~rft<;.(e. 4 e.. , C<J t'); $---J ~-...,....., , I~r B.... J D-.J I~t.- L7 2- 'i ~z. 'i I~; I) • ce 'Iii @<;:j""",...;) . <-0

5 ;tub<-.Au I -0-. H~~-A~ I ~l';!; S';"i ;NI~ I -;<:.I>IN'00 ;s..,b<...A,u. <.00('1~""f""''' d H ~-t~ I

6 ly-sr4-ZS-u I/I:.lJJ.tAr(AaI~.['J

7 ,x (

rc.~ '~7-i<.A.VI' I3Hl<Ti/C

801)["~tJu51i1t5 b~{ -351- ew./ IJaJ U511'1 5 p&;iJlft-",Ochlrttt.::J,Glff/l..l. i/:tJ) J1 au 5/(//5 v: M1v

I(JI'CI'.... ,.>1""'..,<d.; ZIe-

rr"qfj<lfVI i2. c. Iql$ -t/it..f6~b1U(t >!&.~ &415"&pt-1

Page lars

Page 4: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

.-_...__ •• __ •. _ .•• __ ""'_ ._••• ••• , ..........~ ~._ ~~~ ~_ _~~~, ~U~""''''''H'~'' ~_~

NAME

8, 0' J>E,l},J t7oR,"'!A

9 0E:/VPJv 1'\, () v , I

10 ' JOf-.lN LULK,I"-'

11 WJA'1 eic:.

12 JOr;:t-)irJCI/

13JDJ /'lfMJ~ 14

'F£RtJC£)if> NA-HIf~

15 . I3tlJ:f/fMW A8bfMaVL

16 UvAft. Tf NV 61l-J.!'

17 R:rO£\l..i N ,,*,-.5

18fYr:11v/ rto/! 19

-rlyCtu kho.'MiJJ 20

...

REPRESENTING TITLE TELEPHONE NUMBER

W.sP/I(& '17:$ cr~1 $£,77

'-J sf JFe:, 't,n ,CJVIL ~I'l '(,,~H'82>1

~O\-{N?'t1cClr1C V e. 5i023Cf 1&:10

Cd".<! /lur f.l C VI? [, J/·s61~/I(o

JYS-rRIf V? 97J r7J;7JJ

gy~7!LA /72-k:..77C¥:J 1tJW~CN:;.I1a f7@;~)W3"'~1a

-r:H012/fl£7Jc:f PH. 7/3 ~?J58-lj9'C1!.

W(.fr10~ZlletY ?5;LM/P17J!... ns-es-«oo

ere ..kso{",A7H (,io/j .. -".I/ .. ' -r.n <t '13!i'lOD2-i.(

S,""4-ISM, .s vI" '\5 3'1608'31

SfU --P-M .2.1:J]-Jac_ 21 Zr'

Aee.. 4~b J!)1... '-i1};'],

EMAIL ADDRESS l C?JO/"'''''''& ,f'J.,<-Jc./(P{' Ca..1'i

YV> 0 Y be I~ b"-f1lf \ d' l.G\v\

\v\A1/C ullclV\€\ Jl..Vl/lfceJ!'e,(O'L. -..J

I j'te.r c:> C. c+'" a\. TA, c"'~

r / ~/~ ch rfi) JYfTJU.0L. v

.t/ha.nak..@,f'yS"l1I./t e- C-<.f'I'

,'JI'rHIJSF:J TItCJ~IIte.7't, GD

es7IH /lij:.,Ut;.@7MO/2.i)f-#.;Y

.1)," , CJ7FfKEiAADU.Al? rt-,fr

rob<:.ri. (\ ;<:.k, Is ~ "" /A,,,, ~,-,I<". c;0'"

fb-f( JI'-~~.5;t ui <C 1) f-j,

-r:..(~ tl.l.\., k. ,,0.; M.011 € '3 {V\.o.; \.c.e ""

lit

~

Page 2 ors

Page 5: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

~ ......."'''' .. """'V..JL",U"'U. \~ oJ"',",.'/ ......... ~L"' ...V"'. I...,., ",,"V.V, UHV.......UVU U ....."""VIJ

NAME REPRESENTING TITLE TELEPHONE EMAIL ADDRESS NUMBER

~3J1BI_ ;,-J,4/-/';t-,. '":):M<: A.>~ u.s;;nh, cfm ' e-rJ

Ir.. SOt 11((/1 :J fl1t<5Y'lf, C. /V>r--Jot) 832 7060

21 RJ;J/;/ ~jd.4 ~~~~k, 1Nf

22g;, 4f!<Vlw-<­ I/~" fbfnc 1/(

23 /~~ CtNr 1M~7!J'-r s« '. r~ w-nr-

6-t(-"\-S").,· ). ~'t ., I~>'~N. t....Jy"tP fwI'-f to 7' .

I ,(,- , -i - - -

24 I

--o-c- ­25

26

27

28

29

30

31

32

33

/! I

- I

I

Page 3 of 5

1

Page 6: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

.. .u................ '-' ... .., ....~.... ~ ........ " ............... .;.; / ........ 1-'.................. -', ""-v ...... , ...................~..........."' ....., .......

NAME

34 /v) IctiftEL 6rJlOBr=Jy;

REPRESENTING TITLE TELEPHONE NUMBER

EMAIL ADDRESS

7UTbR PEAl}.!/ es: r=6T 7 3 'c/J/~'-og Jv1G(JLf)Bc~G-1()., f[;Rflv/- C(}~ 35 m~(k c., ,RO,

36 , ..... -­ . \. - -.. ­--r'"AsDN (l .Il aT4JD

PC" -",t 1\ ~U< ~G( ') ~J

/7IJ ol :l m~(\:. ,C .cc.. ~ ~c:,u:,\1,lt r-lt h11P£le.c:tn; 1+OrU4~

&],/ ­

sz7-)wV ~4/l)(.l1Y:J1JBeL i/;~ ,,..I LI 37 f<e6/:!!J1l:i{ J, PA', eKJJA I-~ Cc:1JSTJeue:t7t.J J BT'UA1A-rz$'

- ~.~ _. ,. -.,. ":' ,/" '63/-5819-860=> rpaferl?;J< ...~1-ec~t>, hiZ/'

38 R::bcil4Zw.'-OLI~i<.( /Jr~C&NI ~Iv'- ;;l., ~ - 1'11 .. }>r'f"l (h<-t.J-, z..""',<'Yw L e tl-~.Ul-j

39 M C(/lc., De"Bpr~ ~> r:n~oIr7{ .. iE~~t'l..~

ZOI -'77( -2- 12.$ ...,-.d~"l3> e"'1.~.el"c...~

40 ~-----t \~; 'SC. --:sy)~ ~ ~e,-\/. ~n 'P7 ::''6"2.. -::S'\;)c\''11\@ ~\'ll"I'9 C~

41 v

42

43

44 '

45

46

47

\.. a If\

~

Page 4 of 5

Page 7: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

Harrison Substation (P36699) September 14.2016. Information S"'"","'VI' NAME REPRESENTING TITLE TELEPHONE EMAIL ADDRESS J

NUMBER 48 1\ •

. ( ~ f!- . . I

49 . (") I I I/'l ,.., A

-' l f­ ;r~'~'.J ,50 I

I' n ,.....­

51 . I N$~SWJ

~ -­NMIN ~4~ I'll I 30; -C'!;z/() ~'f(;

I '1tU!,r).":''<o OJ' .,..~{., LY'l • UN")

52 IVf (L fi1(tf" tYe { AvP V t . 6t6264 2\/0 VI (A'I. p" (1 ~ P l't /,,, .c" ('1\

53 _, ~L. 'r'1 fffZ '~M'CI,Ffce.o Lb,.}",,... C<:::-,.J ¥fJrJtrrz-... 3'17-39-3- YiJSj Q.wE'7"'t'I'- e. h4LY"/f¥-lW12:l'!."'t>r c

54 +tp e. r; ~ p~hLr '\fo L. T~ l{~ . ~'.~. ")(RrtJ't-­ o. (pe 5 Ie @ I/o(fa lr'JP e./~(lti,v:)-5'0 0

55 4rt at/I 1k1f t?­ £b.4r~r 1/7 -;Dc??¥. . '.

l7Z_ q~y' t?pil(iii!.. -sAr-­56 / v

Lev Nucellb 5-'STI. e. eJJ Giir. Mq; 215/(1'3/ -'2)7<~ LfJu ccoo P {JUL. i

5SAN !/;J)Y!15¥;Ae.. J<1t&H {~lttJsD'rN' )3uf.};t/l. M4(2.. ~71~ ~33S-- 6&'12 SIlJl-l. v/J)YA5Ikjl/e@i::..Aq>sCH.

5~(:S S-,.',"'-. Lke:­ A~/ ~~\l 'fl>~-I \'(9 e .s;>,'c",Q ~<:.., \wo('-",S ,(, eE SJ\n......~\(\""i., 59 \ 1'-­ / - ,

~ . , - - J

6~ . lY1)b~ 86~v h!:><VJ,:Nr@ bIZ6 VI\) .c~:..."c.k.t- \ Gv<.h7,J! S~t [1l\i;fJ" r-e-:k\ ~~r~'C'\)"'0 \­6~ - . . " /'> .. - -.

, I - . . I

.

V .

" .1:J>..v.

-'I?{' • (cy>-/

C-QJ, L.C~

~"'. ~.?:'J Cite- GJrlc

COL AIET

"""'

'/ry

Page 5 of 5

Page 8: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

;2 Broadway verorucue Haknn New York, NV 10004 President

• New York City Transit September6,2016

Design and Construction of a New Substation at Harrison Place, Canarsie Line (BMT), in the Borough of Brooklyn

Contract P-36699 (RFQ No. 0000139755)

INFORMATION BULLETIN # 1

AN INFORMATION SESSION WILL BE HELD ON WEDNESDAY, SEPTEMBER 14, 2016 AT 10:00AM AT 2 BROADWAY, ROOM D2.10, NEW YORK, NY, 10004. PRE-REGISTRATION IS REQUIRED, PLEASE EMAIIL THE LIST OF ATTENDEES TO [email protected] BY MONDAY, SEPTEMBER 12, 2016 IN ORDER TO REGISTER.

NOTE: ATTENDANCE WILL BE LIMITED TO 2 REPRESENTATIVES PER FIRM.

Sincerely,

~~#U /......, Clifford Slater

CfV''Assistant Chief Procurement Officer Materiel Division

MTA New York City Transit is an agency ot the Metropolitan Transportation Authority, State of New York

~803-6'2b llil~

Page 9: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

8New York City Transit (NYCT)

~". ..T....' ... ' ....,.CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT

OVERVIEW

MTA-NYCT IS NOWADVERTISING FOR THE FOLLOWING:

RFq ID #: 0000139755 OPENING/DUE DATE: 9/22/2016

TYPE OF SOLICITATION: RFP IDOCUMENTAVAILABILITY DATE: N/A

SOLICITATION TITLE: P-36699- Design and Construction of a New SUbstation at Harrison Place, Canaraie Line (BMT), In the Borough of Brooklyn

New York City Transit (NYCT) is seeking to retain the services of a contractor/designer team to Design and Build a new below ground substation on the Canarsie Line at Harrison Place in the Borough of Brooklyn. NYCT will provide a conceptual design document that will serve as the basis for soliciting proposals to complete the Design and perform the constnuction. Selection will be accomplished with a two-step Request for Proposal (RFP) process, Proposers will be evaluated in accordance with Step 1 selection criteria for Technical Matters and Relevant Experience, General Responsibility, Financial Resources and Safety Record. In Step 2, the recommended Proposers from Step 1 shall be asked to submit a detailed technical response to the RFP, which shall be evaluated for Technical Proposal and Approach, Overall Project Cost as well as Other Relevant Matters. For Step 2, Proposals will be accepted only from firms selected in Step 1.

Note: It is the Intention of NYCT to offer a stipend to proposal teams that submit a detailed Technical Proposal In response to Step 2 of this RFP but are not otherwise selected for award. The Construction duration is forty-two (42) months,

Funding Capital: FTA: 100% Goals: DBE: 17% Estimated $ Range: $10M+

PLEASE SEE AITACHED FOR ADDITIONAL INFORMATION.

(X ) PRE·BID CONFERENCE LOCATION: TBD DATE: Week of September 12,2016 TIME:TBD

(X) SITE TOUR LOCATION: TBD

FORMORE INFORMATION, PLEASE CONTACT:

PROCUREMENT REPRESENTATIVE: Tiffany Fernandez PHONE: (6.6) 252-6085

REqUIREMENTS TO PARTICIPATE

DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER:ALL VENDORS MUST HAVE A DUN& BRADSTREET DUNS NUMBER IF THEY WISHTO PARTICIPATE IN THISPROCUREMENT. VENDORS WHODO NOT HAVEA DUNS NUMBER CAN REGISTER ONLINEAT WWW.DNB.COMtpROOUCT/EUPDATE/REQUESTOPTIONS,HTML TO OBTAIN ONE FREE OF CHARGE.YOU MUSTSTATE THAT THE NUMBERIS REQUIRED FOR SAM (SYSTEMFORAWARD MANAGEMENT)

SYSTEMFOR AWARD MANAGEMENT (SAM): VENDORS ARE ALSO REQUIRED TO REGISTER WITHSAM, A FEDERAL VENDOR DATABASE USEDTO VALIDATE VEDNDOR INFORMATION, BEFORE REQUESTING BID DOCUMENTS. YOU CAN VISIT THEIR WEBSITE AT www.Bam.qov TO REGISTER. A DUNS NUMBERIS REQUIRED FOR REGISTRATION.

I6..6:.-11.....37.IIW=A~F-;;:SIT=F------------------------_·_-----==--8/18/16

Page 10: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

NYCT Website Advertisement

MTA NEW YORK CITY TRANSIT

Request for Proposal P-36699

Design and Construction of a New Substation at Harrison Place, Canarsie Line (BMT), in the Borough of Brooklyn

The New York City Transit Authority (the "Authority") is seeking to retain the services of a contractor/designer team to Design and Build a new below ground substation on the Canarsie Line at Harrison Place in the Borough of Brooklyn. NYCT will provtde a conceptual design document that wi'l serve as the basis for soliciting proposals to complete the Design and perform the construction

The substation being provided under this project represents one of the three new power substations needed on the Canarsie Line. This Project encompasses providing the Design and Construction of a new below ground SUbstation on the Canarsie line between Harrison Place and Flushing Avenue near the Jefferson Subway Station, which meets or exceeds the requirements specified in the Contract documents.

The Design-Build team shall consist of the Construction Contractor and the design (firm)s (Design Professional), in a joint venture with the Construction Contractor, or as a subcontractor, to perform the design work.

The Design-Build team shall provide all architectural/engineering, as well as other necessary or appropriate professional or technical services for the proper design and construction of the project, and shall have responsibility for the full investigation of all existing conditions and the proper preparation of all Contract Drawings and Specifications for the project.

The Contract duration is forty-two (42) months from the Notice of Award date.

This project is federally funded and is estimated in excess of $10M.

The subcontracting goals are: DBE !L%

Note: It is the intention of NYCT to offer a stipend to proposal teams that submit a detailed technical proposal in response to Step 2 of this RFP but are not otherwise selected for award.

A Pre-Proposal Conference will be held the week of September 12, 2016. Please check our website for additional details. A Site Tour will be scheduled during Step-2 of the selection process.

Selection will be accomplished by a two-step Request for Proposal process. Step 1 involves the submission of one 111 original and seven 171 copies of a Qualification Package that consists of the following documents:

1) Letter of Interest; (to be signed by an officer or principal of the firm); 2) SF-330 Fomns (to be completed by Prime Contractors and/or Joint Venture Partners and any major

proposed Subcontractors. Customize, as appropriate, if the Prime Contractor is not an Architect/Engineer);

3) Schedule J. Responsibility Questionnaire - to be completed by Prime Contractor and/or JOint Venture (JV) Partners, lead design firm, and all known Subcontractors estimated to exceed $5M. Note: for JVs, you must submit a Schedule J for the JV in addition to a separate Schedule J for each member of the Joint Venture.

4) A customized Qualification Statement (to be submitted in the fomn of a brief executive summary with a maximum of 10 pages single-sided or 5 pages double-sided), which describes the Proposer's Technical approach, skills, abilities and experience that are most relevant to the project and demonstrates that they understand the project objectives and have adequate experience and

640769

Page 11: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

staffing resources to handle assignments (general responsibility as well as the firm(s) financial resources and safety records must also be included in the qualification statement)

5) Letter from a Surely indicating that proposer has adequate bonding capacity.

The submission shall be evaluated to assess the Proposer's responsibility, and project specific and general professional experience.

In Step 2, the Selection Committee will select the most technically qualified, experienced and financially stable Proposer(s) from Step 1 to submit a comprehensive/detailed response to the RFP which shall be evaluated in accordance with the specific evaluation criteria set forth in the RFP. Step 2 proposals shall only be accepted from firms selected in Step 1.

In evaluating a Contractor's response to this advertisement, NYCT shall primarily consider the information furnished in the Qualifications Package and information contained on NYCT and sister agencies prior performance evaluation forms, if any. Incomplete packages may be rejected without further consideration.

For the purpose of Step 1, the Schedule J, SF-330 Form and short Scope of Work may be obtained free of charge from the NYCT website. NYCT requires all Contractors to refrain from submitting anything other than what has been requested.

Qualification Packages must be submitted to: MTA NYC Transit, Bid Reception Desk, 3 Stone Street, New York, NY 10004, Attn: Tiffany Fernandez, Procurement Representative by 12:00 Noon on September 22, 2016, referencing RFQ # 00000139755: P-36699 Design and Construction of a New Substation at Harrison Place, Canarsie Line (BMT) in the Borough of Brooklyn.

The respondents selected as a result of Step 1 will be inVited to submit proposals (Step 2), and will be the only firms the Authority will consider eligible to be awarded a contract resulting from this RFP. The charge for the RFP document is $350.

ON·GOING RESPONSIBILITY

Proposers are reminded that establishing a Proposer's responsibility is an on-going requirement for award and that award of Authority contracts may only be made to "responsible" Proposers. Proposers should be aware that the following criteria are considered threshold criteria that must be met Proposers found unqualified based upon evaluation of the following criteria will be eliminated from further consideration:

• Record regarding integrity and business ethics; • Record regarding defaults, debarments, suspensions and non-responsibility

determinations; • Safety Record;

PROPOSAL EVALUATION

The proposals will be evaluated by a "Selection Committee" comprised of NYCT personnel, experienced in the disciplines necessary to evaluate the Proposal submissions. Committee members will base their evaluation on the criteria listed below.

Selection will be accomplished with a Two-Step Request for Proposal (RFP) process using the below listed criteria:

640769

Page 12: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

STEP 1 EVALUATION CRITERIA

1. Technical Matters and Relevant Experience: The Proposer must satisfactorily demonstrate a successful record in the fOllowing areas:

• The proposer must outline its general technical approach, (briefly) summarizing its overall plan to undertake a construction project of this size with a myriad of construction elements and to meet and accelerate the critical project construction schedule

• Relevant experience and qualifications of the member firms of the design-build team, including previous experience in designing, constructing and commissioning large construction projects, including underground substations. Experience with DC power systems and live tracks, excavation and water remediation and operation and maintenance of railroad/transit facilities is preferred.

• Relevant experience and qualifications of the member firms of the design-build team: Provide overall and previous history working together on simiiar design-build projects and ongoing project commitments that will run concurrently with this project. (Note: it is not a requirement for teams to have worked together).

• Record of timely performance with respect to budget and schedule on (i) design-bUild projects and (ii) other relevant construction projects.

• Qualifications and experience of the proposed Project Manager, Design Professionals and other key personnel.

• Proposed project organizational structure and the roles and responsibilities of key personnel.

• Experience commissioning industrial equipment facilities.

2. General Responsibility to Receive Contract Award and to successfully and Faithfully Perform Ihe Work: Included in this criterion is the degree to which the Proposer characteristically performs the contract work (inclUdingdesign and construction) using its own forces, types of work which it performs and satisfactory ratings on performance evaluations:

• General Business experience and stability, including organizational structure, management expertise and extent and length of time in business.

• Size, capacity' and capability in relation of the Work to be performed, as well as Proposer's other concurrent contractual commitments in bar chart form including remaining duration and cost of current and future work as it relates to the performance of this Contract (e.g. management, professional and technical expertise to perform the work, the availability of physical plant and equipment to perform the Work).

• Record of performance on other contracts of NYCT, MTA, other governmental and non­govemmental entities, including compliance with safety standards, DBElWBEIMBE requirements, claims loss history, and information on defaUlts,debarments and non-responsibility determinations:

3. Financial Resources: Proposer is required to be adequately financed to pay promptly for all labor and materials as such Obligations become due and to avoid the necessity for assignment of any monies payable. A firm must demonstrate:

• Requisite financial resources to timely execute the Work. • Adequate bonding capacity. • Ability to obtain required insurance

640769

Page 13: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

NOTE: A finn in arrears in the payment of amounts due to MTAlNYCT will be required to pay said amounts in full in order to be considered a responsible firm, unless and to the extent that NYCT, upon satisfactory explanation made by the firm, excuses the firm from the payment thereof or permits further deferment of payment.

4. Safety Record: The proposer must satisfactorily demonstrate that both it and its proposed Subcontractors have an acceptable safely record, including an experience rating for Worker's Compensation Insurance of not more than 1.2. Also each Proposer (on behalf of itself and its proposed SUbcontractors) must supply such information as to whether, within Ihe past five (5) years. ils Commercial General liability (or equivalent) and/or Builder's Risk, or all-risk (or equivalent) insurance policies have been canceled or otherwise discontinued by an insurance carrier, and if so, the background and reasons therefore.

NYCT intends to perform an evaluation of STEP 1 Proposers regarding all four of the above criteria, which are generally considered of equal importance.

Only those companies whose overall qualifications are considered acceptable based on the foregoing criteria in 1, 2, 3 and 4, will be deemed eligible to proceed to STEP 2, and propose on RFP # P-36699 (second step of the RFP process), which will include preliminary written specifications and design drawings.

STEP 2 EVALUATION CRITERIA

In Step 2, for the purpose of selecting Proposers to proceed to negotiations, Proposers will be evaluated by the Selection Committee utiliZingCriterion 1, Detailed Technical Proposal and Approach as well as Other Technical Matters, Criterion 2, Overall Project Cost and Criterion 3, Other Relevant Matters. Criteria are listed in their relevant order of importance. Those Proposers identified to be within the competitive range with respect to Criteria 1, 2 and 3, will then be invited to participate in negotiations, possibly resulting in a request for Best and Final Offers. To the extent that competing proposals are otherwise determined to be substantially equal with regard to Criterion 1 and Criterion 3, the importance of Criterion 2 shall increase. To ensure proper consideration, Proposers shall furnish proposals with supporting Documentation to be evaluated on the following criteria:

Criterion 1. Detailed Technical Proposal and Approach as well as Other Technical Matters

a) Technical and Qualification Considerations:

1. Detailed Design and Construction approach demonstrating the proposer's understanding of the project, including phasing and staging plans plan, and plan for replacing the RTU based SCADA system with the PLC based SCADA system at Gates-Ridgewood Substation (zone controlling substation) without any interruption to the operation of any other connected substations during the construction phase, identify key project concerns, risk and mitigation plan.

2. Detailed experience and qualifications of the Construction Contractor and key members of the Proposer's Construction Management team and organizational structure. This includes Relevant Experience as indicated in the STEP 1 Evaluation Criteria.

3. Detailed experience and qualifications of the Design Consultant and key members of the Proposer's Design Management team and organizational structure. This includes Relevant Experience as indicated in the STEP 1 Evaluation Criteria.

4. Proposed project innovations related to construction and opportunities to improve Or accelerate the proposed project schedule (including schedule monitoring) while still achievinq NYC Transit requirements.

640769

Page 14: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

5. Proposer's Safety and Quality Control/Quality Assurance plans for both design and construction.

6. Past performance on Authority contracts regarding administrative matters such as timely submittal ot contractually required certifications and reports and past performance regarding compliance with subcontracting provisions for DBEs and proposed plans and methods to ensure that the DBE goals are achieved under this Contract.

7. Qualifications and coordination of Subcontractors whose work scope value exceeds $5 Million (exclusive of suppliers of common materials) or are otherwise identified in section 15.e of the Overview and Proposal Procedures, Percentage and type of work to be performed by the Prime Construction Contractor and designated subcontractors as well as the Design Professional.

b) Other Technical Matters including, but not limited to:

1. Other relevant matters, including Evaluation Criteria 1, 2, 3 and 4 from Step 1 as well as pertinent items not expressly covered above and issues raised after the release of the RFP or during negotiations;

2, Quality and thoroughness of Technical Proposal and Oral Presentations including description of War!< Schedule.

Criterion 2 • Overall Project Cost including, but not limIted to:

a) Net cost savings and/or additions resulting from proposed changes to Terms and Conditions, as well as from innovations with respect to the Project Schedule and Phasing; and cost implications of proposed use of NYCT services, facilities and materials, In the case of alternate or Value Engineering Proposals deemed acceptable by the Selection Committee offering reductions to the time required for Substantial Completion, the cost Implications and value to the Authority of such schedule improvements will be taken into account under this criterion.

b) In evaluating Overall Project Cost, the Authority may consider whether and to what extent a Proposal, a system, or other matter being offered contains realistic pricing.

Criterion 3 • Other Relevant Matters inclUding but not limited to:

a) Willingness to agree to the Authority's Terms and Conditions or to negotiate same in timeframe consistent with the Authority's needs;

b) Overall adherence to the requirements of the RFP in terms of quality and completeness.

In making the determination as to Which proposal offers the best value to the Authority, the Authority will review all factors that contribute to the total cost of the proposal. Accordingly, the Authority may not necessarily make an award to the lowest priced proposal in the event that the Authority determines that the lowest priced proposal does not offer the best value to the Authority, In addition, the Authority may not necessarily make the award to the Proposer with the highest technical ranking. Even though price is not the most important evaluation criterion for this solicitation, price may be the controlling factor to the extent that competing proposals are otherwise determined to be substantialiy equal. The Authority reserves the right to (i) reject all Proposals submitted; (ii) accept any Proposal or allernate as submilled without oral presentations or negotiations; (iii) require revisions to, corrections of, or other changes to any Proposal submitted as a condition to its being given any further consideration; (iv) reject, without entertaining revisions or conducting negotiations, a proposal with

640769

Page 15: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

major substantive deficiencies; (v) at any time during the RFP process, should the Authority determine that a Proposer, including its proposed subcontractors, is found not acceptable in any area, the Authority may eliminate such Proposer from any further consideration or evaluation; (vi) select for negotiations only the overall best Proposal or alternate SUbmitted, as determined by the Authority; (vii) negotiate with those Proposers whose acceptable Proposals or alternates fall within a competitive range; (viii) negotiate with one or more Proposers in any manner it deems fit, (such negotiahons may be concurrent or sequential as the Authority determines); (ix) fOllowing the conclusion of all negotiations, issue a revised RFP or portion thereof and solicit "Best and Final Offers"; or solicit "Best and Final" offers uhlizing another appropriate procedure; (x) after receipt of "Best and Final" offers if it is in the interest of the Authority to do so, to thereafter reopen negotiations; and/or (xi) accept improvements to, enhancements of or other revisions to any Proposal or alternate at any time if it deems such to be in its best interest.

No Proposer shall have any rights against the Authority arising at any stage of the solicitation based upon any negotiations that take place, or because the Authority does not select a Proposer for negotiahons or if the Authority, for any reason, determines not to make an award of the Contract.

The Authority also reserves the right to (a) incorporate into the Contract Documents the successful Proposer's Proposal or portions thereof, as accepted by the Authority, (b) revise the solicitation documents in accordance with the completed negotiations with the successful Proposer and require such Proposer to execute the resultant Contract Documents or develop new Contract Documents reflecting the completed negotiations with the successful Proposer and require such Proposer to execute same, and (c) take such other achon as may be in the best interests of the Authority consistent with the law.

640769

Page 16: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

SHORT SCOPE OF WORK

Project P-36699: Design and Construction of a New Substation at Harrison Place,

Canarsie line (BMT), in the Borough of Brooklyn

Location: A new below ground structure will be built at Harrison Place between Flushing

Avenue & Stewart Ave. in Brooklyn near Jefferson subway station on Canarsie line.

Prior to the implementation of Communication Based Train Control (CBTC) on the Canarsie line, 12·15 trains per hour (TPH) were able to run along the line. Since 2006, when CBTC became fully operational along the full length of the Canarsie line, the number of TPH increased to 20 TPH. However, to further increase the number of TPH from 20 to 22, the traction power capacity must also be increased and in order to achieve this, three additional power substations are required.

NYC Transit will provide a conceptual design for this Substation along with an Owner's Project Requirements document (Detailed Description of Work), both of which will serve as the basis for soliciting proposals. This Project encompasses providlng the Design and Construction of a new below ground Substation, approximately 4,500 square feet. on the Canarsie line between Harrison Place and Flushing Avenue near the Jefferson Subway Station, which meets or exceeds the requirements specified in the Contract documents. The Project also includes outfitting the Substation with all new and required Electrical, Traction Power, Mechanical, Communication, SCADA and Instrumentation & Control Equipment. Additionally, Proposer(s) will be required to permanently relocate required utilities to facilitate construction and provide a Maintain and Protect Traffic (MPT) scheme that will allow for construction while permitting traffic.

Description of work:

• Provide new below grade (140'l X 33' W X 14' HI one story Substation. The Substation will be a steel framed and concrete building which will be designed for gravity and lateral loads as per New York State Building Code.

• Outfit Substation with new and required Electrical, Mechanical, Communication, and Instrumentation & Control EqUipment.

• Furnish and install new power equipment for two (2) 3000 kVA units consisting each of two (2) high tension AC switchgears with associated G&T device, two (2) 3000 KW silicon diode rectifiers with 150 KVA auxiliary transformer and negative disconnect switch, two (2) traction power dry type air cooled, circuit 25/26 transformers. DC switchgear line up consisting of two (2) machine breakers, one (1) bus tie breaker and four (4) feeder breakers with ceiling disconnect switches, ACbus and DCpositive and negative buses, and all other miscellaneous and incidental items.

• Furnish and install 200 Ahr batteries, battery charger and battery distribution panel.

• Furnish and install new CTBs, fuse test box, fire blanket and rubber insulated gloves, file and drawing cabinets, work bench with vise and storage locker.

• Furnish and install new Fire Alarm System.

640769

Page 17: New York CityTransit INFORMATION BULLETIN 2 Design and ...web.mta.info/nyct/procure/contracts/139755sol2.pdf · 6,2016 : Design and Construction of a New Substation at Harrison Place,

• Provide adequate illumination, emergency lighting, exit lighting, convenient receptacle, heater, etc.

• Provide a new property line manhole for the incoming Consolidated Edison service for high tension and low tension feeders.

• Furnish and install Two (2) stainless steel doors and door frames with required fire rating and necessary hardware.

• Furnish and install all interior plumbing work for water closets, sinks, drinking fountains, eye washer and all other plumbing as required.

• Permanently relocate all required utilities to facilitate construction.

• The new PLC-based SCADA system shall control and monitor fully all existing substations' functions in BMT Zone 15 including the two new 1" Avenue/Avenue A.

• Furnish and install redundant fiber optic network connections to carry control and indication data between the PCC Command Center at 333 West 53'd Street and Harrison Place Substation. This Substation shall be provided with a network infrastructure.

• Maintain and Protect Traffic (MPT) scheme that will allow construction while permitting traffic.