2007
The pad was poured in late 2006 and in 2007 the lower section was raised by PSS crew
2008
In 2008 museum visitors and local wildlife enjoyed the new structure at the rear of the site.
2008
2009
In 2009 we learned that the roof would need snow stops
2010
By 2010 the windows and snow stops were installed
2011
2011 saw much activity in behind the cedars. The new porch was added….
2011
and water/electricity were roughed in.
2012
The Building in the spring of 2012….it’s been a long project but we’re almost finished!