Halden, June 25 th 2013 Nexans Investor Day
Transcript
Page 1: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

1

Halden, June 25th 2013

Nexans Investor Day

Page 2: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day

Introduction to High Voltage Submarine

Managing a growing complexity

2

Dirk Steinbrink Executive VP High Voltage and Underwater Cables

Page 3: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Where does complexity come from ?

Customers are looking for increasingly higher transmission capacity

Customers are building longer and deeper interconnections

Project scope of work has expanded in order to offer comprehensive interconnection

solutions

Nexans Investor Day 3

Page 4: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Skagerrak 1 Skagerrak 2 Skagerrak 3 Skagerrak 4

Completion date (*) 1976 1976 1993 2014

Distance 130 km 130 km 130 km 140 km

Voltage 250 kV DC 250 kV DC 350 kV DC 525 kV DC

Power 250 MW 250 MW 500 MW 700 MW

(*) Expected completion date for Skagerrak 4

Customers are looking for increasingly higher transmission capacity

Nexans Investor Day 4

Page 5: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

The Italy-Montenegro interconnector

415 km of 500 kV HVDC cable (1 pole)

Down to 1200m

Growing demand for HVDC

Longer and deeper interconnections

Nexans Investor Day 5

Page 6: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

HVDC: industry leading track record with above 3,000 km of cable experience

Fenno Skan 2 (2011) 500kV DC, 200km

Estlink 2 (2013) 450kV DC IRC, 150km

Fenno Skan 1 (1989) 400kV DC, 200km

Korea Cheju (1993) 180kV DC, 102km

Cook Strait (1991) 350kV DC, 3x40km

Skagerrak 1&2 (1976) 250kV DC, 2x127km

Skagerrak 3 (1993) 350kV DC, 127km

Skagerrak 4 (2014) 525kV DC, 150km

Norned (2008) 450kV DC, 2x158km

Hainan Guangdong (2009)

525kV AC/DC, 3x30km

Kontek (2010) 400kV DC, 50km

Valhall (2010) 150kV DC IRC, 300km

Sardinia Italy (2010) 500kV DC IRC, 330km

Scotland Ireland (2001) 250kV DC, 2x65km

Gulf of Aqaba (1997) 400kV AC/DC, 4x13km

Cross Channel (1985) 270kV DC, 4x47km

Vancouver Pole 1 (1969) 300kV DC, 3x33km

Spain Mallorca (2011) 250kV DC, 242km

Spain Morocco (2005) 400kV AC/DC, 2x27km

In progress

6

Nexans Investor Day

Page 7: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Purpose is to build a 200 MW interconnector between Malta and Sicily to ensure environmental friendly and reliable power supply in Malta Approx 200 M€ turnkey contract awarded to Nexans in 2010 Comprehensive scope of work including: submarine cable supply, laying and protection land cables supply and installation supply and commissioning of a power substation (Malta)

Completion expected in 2014

Scope of work includes a growing portion of “non cable” activities

The Malta-Sicily interconnector

7

Nexans Investor Day

Page 8: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Cable trenching by Nexans Capjet

101 km of 3x245 kV submarine cable

manufactured in Halden

Cable laying by C/S Nexans

Skagerrak in two campaigns

Construction and supply of substation in Malta (subcontracted)

Land cable installation

Protection by rock-dumping in areas where trenching

protection does not give the necessary protection

The Malta-Sicily interconnector

Near shore protection by horizontal directional drilling and cast iron

shells

Nexans Investor Day 8

Page 9: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans is ideally positioned to handle this growing complexity

Industry leading track record in HVDC MI and HVAC

Longstanding experience in complex cable laying and protection marine operations

Strong reputation in turnkey projects

9

Nexans Investor Day

Page 10: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day

Submarine High Voltage

An organization built for success

10

Kjetil Hovland Vice President Submarine High Voltage Business Line

Vincent Dessale Chief Operating Officer Submarine High Voltage Business Line

Page 11: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Combination of short-term containment measures and more structural long-term actions

11

Nexans Investor Day

Lessons learnt from 2012

Feeding in more machines and manpower to match market demand is not sufficient Coping with growing complexity and increasing timeline uncertainty requires highly structured organization, robust processes and right mindset

Page 12: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

12

Nexans Investor Day

The organization is being reinforced all along the project value chain

Tendering

Engineering

Manufacturing

Installation

Commissioning

Page 13: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

13

Nexans Investor Day

Tendering and engineering: preparing the ground for a smooth project execution

Selective bidding strategy Scaled up risk analysis at tendering stage Develop and implement risk mitigation actions before production starts Reinforce interfaces between engineering and production before, during and after production

Page 14: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

14

Nexans Investor Day

Manufacturing: implementing an organization focused on excellence (1/2)

Simplification of plant organization: rationalization and focus to secure the basics Process engineering: improve process control to maximize the utilization of the assets Supply chain: reinforce planning management to better anticipate planning adjustments and gain slack

Page 15: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

15

Nexans Investor Day

Quality: split of quality and HSE functions to ensure stronger focus on manufacturing quality management Cost control: reinforced costing tools to ensure proactive tracking of costs

Manufacturing: implementing an organization focused on excellence (2/2)

Page 16: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

16

Nexans Investor Day

Conclusion: an organization built for success

We have leveraged on the Group to attract the required talents to build a stronger Submarine organization Manufacturing has stabilized Project execution is gradually improving, supporting our objectives

Page 17: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Submarine High Voltage: Our ambitions

17

Frédéric Michelland Senior Executive VP High Voltage and Underwater Cables, North & South America

Nexans Investor Day

Page 18: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

A buoyant market…

18

Nexans Investor Day

Page 19: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Strong market drivers…

Grid interconnection: above average growth in Europe driven by need for better balancing supply and offer in the European power market and attractive return for TSOs Offshore Wind: growing offshore wind capacity in Europe together with longer distances to shore O&G: growing demand worldwide for HV connections of offshore platforms

19

Nexans Investor Day

Page 20: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

NOR.LINK 1,400 MW, +/- 500 kV Two HVDC cables, turnkey Delivery expected in 2018

Cable Landing in Vollesfjord, NO 514 km submarine cable route Cable Landing at Büsum, Schl.-Holstein , DE 55 km underground cable route in DE

HVDC: NOR.LINK project

20

Nexans Investor Day

Page 21: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Offshore wind: Northwind project

Northwind Windfarm 216 MW

72 turbines, 3MW each (Vestas)

Belwind 2 Windfarm 165 MW

53 turbines, 3MW each (Vestas)

21

Supply of 245kV 3 core XLPE subsea cables: -Cable 1: Belwind 2 to Northwind: 14km -Cable 2: Northwind to shore 42km With 2 FO elements 48 fibers in each cable

Scope of works includes design, type-test, supply, and jointing termination works, cable witnessing and testing

Completion scheduled in 2013

Largest cable ever manufactured in the world

Nexans Investor Day

Page 22: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Sales CAGR

+7/8% (*)

Double digit

OM %

Our ambition for submarine activities

Sales ~600 M€

Low single digit

OM %

Legacy contracts completion

Stronger organization Execution

issue H1’12

Stronger risk management

Cost optimization

Nexans Investor Day 22

Plant output stabilization phase Secured improvement phase

(*) including Hybrid Underwater Cables

Page 23: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Bill Walsh Halden Plant Manager

Nexans Investor Day

Halden plant, processes & products

23

Page 24: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day

The Halden plant was built in 1974 to produce the first Skagerrak cable between Norway and Denmark

Halden plant, 1974

Early days

24

Page 25: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day

Nexans’ competence center for subsea cables, a turnkey supplier for customized solutions Engineering/design Type testing Manufacturing Land operations Marine operations

Subsea power cables (paper

insulated and XLPE), umbilicals and cables for Direct Electrical Heating

High voltage laboratory Factory area: 100,000m², running 365 d/y

The Halden plant today

25

Page 26: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 26

1. Engineering/Design 2. Type Testing

Turn-key supplier

5. Marine installation 4. Land installation 6. Protection

3. Production

Page 27: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 27

Vancouver cable

High Voltage submarine Interconnections, mainly used between countries and continents

High Voltage Paper Technology

Drawing Conductor stranding Impregnation Paper lapping

Page 28: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 28

HVAC Interconnections mainly used between windmill farms and connection point onshore

XLPE extrusion Armouring Vertical lay-up

XLPE cables

Page 29: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 29

Used for control and operation of subsea installations

Vertical lay-up Steel tube welding Storage

Umbilicals and power umbilicals

Page 30: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 30

High Voltage Test Laboratory for R&D, type testing, routine testing and final testing, several different labs

Mechanical testing High Voltage Test Laboratory

Control room

Complete Test Facilities

Page 31: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 31

Turntables are used as a part of the production line, intermediate storages and final storages - a key element in the Halden plant

Producing cables up to 7,000 tons demands solid cable ways demanding a complex rigging activity or solid fixed cableways

Complex Manufacturing

Page 32: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 32

General HSE requirements

Please be aware of the nearest emergency exit In case of fire alarm, follow your Nexans contact to

the nearest meeting point Hard hats, protective shoes and safety glasses

are mandatory in the factory Visitor must wear red reflective shirts Visitors with pace maker not allowed inside the plant

due to the magnetic fields No picture allowed Do not stray from the assigned area

Page 33: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day

Submarine installation

33

Anders Røren Marine Installation Manager

Page 34: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 34

Installing cables around the globe

Different climates

Different conditions

Page 35: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 35

Turn-key projects: more than manufacturing • Seabed mapping

• Feasibility study

• Route design

Additional services

• Cable Repair

• Cable & Umbilical transport

• Factory support

• Engineering

• Risk management

• Planning

• Load-out

• Transport

• Laying

• Shore landing

Cable protection (against fishing activities, currents, etc.)

• Jetting

• Trenching

• Rock Dumping

• Near Shore

• Onshore civil works

• Onshore cable pulling

• Cable end terminations

• Jointing

Page 36: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Load-out at factory

Nexans Investor Day 36

Installing the cable

Transport to site

Shore landing operations (pull-in)

Platform pull-in

Cable laying

Page 37: Nexans Investor Day4c0c08a8-3b8b-47a1...In case of fire alarm, follow your Nexans contact to the nearest meeting point Hard hats, protective shoes and safety glasses are mandatory

Nexans Investor Day 37

Nexans Capjet 1MW

Cable burial into seabed by use of water jetting principle

Can be used on cables, umbilicals, rigid and flexible pipelines

Burial depth more than 2,5m into seabed in favourable soil conditions

Water depth more than 1000m

Can also be used for dredging (e.g. uncovering buried cable)

Nexans owns and operates 3 complete CAPJET systems with dedicated Launch & Recovery Systems (LARS)