+ All Categories
Home > Documents > NEXT 15 20 25 510 Coop. Agreement EC & SW Project Coordinatn Wetlands Misc. 5 5 5 5 10 15 20 25 20...

NEXT 15 20 25 510 Coop. Agreement EC & SW Project Coordinatn Wetlands Misc. 5 5 5 5 10 15 20 25 20...

Date post: 18-Dec-2015
Category:
Upload: nickolas-price
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
62
Welcome To Big Board Facts
Transcript
  • Slide 1
  • Slide 2
  • Slide 3
  • NEXT
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • 15 20 25 510 Coop. Agreement EC & SW Project Coordinatn Wetlands Misc. 5 5 5 5 10 15 20 25 20 Team One Team Two Team Three Team Four Team Five Team Six
  • Slide 10
  • Cooperative Agreement Question for 5 Points Does DNR notify DOT when they do projects? Show Answer
  • Slide 11
  • Cooperative Agreement Answer for 5 Points Yes, before taking any action that may impact transportation planning or a transportation facility. Back to Board
  • Slide 12
  • Show Answer Cooperative Agreement Question for 10 Pts Are utilities covered under the Cooperative Agreement?
  • Slide 13
  • Cooperative Agreement Answer for 10 Points On projects directed and supervised by DOT it is DOTs decision whether the utility goes through the OE or DOT. Back to Board
  • Slide 14
  • Cooperative Agreement Question for 15 Points If the formal conflict resolution process goes to the Secretaries and they cannot agree what happens? Show Answer
  • Slide 15
  • Cooperative Agreement Answer for 15 Points The Secretaries either agree on a solution or agree the issues will be resolved through alternatives means or processes. Back to Board
  • Slide 16
  • Coop Agt Question 20 Pts During construction events that cause or threaten to cause harm there is an abbreviated conflict resolution process. What if it makes it to the Secretaries office and they dont agree? Show Answer
  • Slide 17
  • Cooperative Agreement Answer for 20 Points DNR Secretary may proceed with taking enforcement action. Back to Board
  • Slide 18
  • Cooperative Agreement Question for 25 Points How many attachments are there to the Cooperative Agreement and what are they? Show Answer
  • Slide 19
  • Coop Ag. Answer-25 Pts 1-Compensatory Mitigation for Unavoidable Wetland Losses 2-A1 MOU on EC & SW Mgmt 3-A2 MOU WPDES Agreement 4-Water Xings & Floodplain Enchmts 5-VisualImpact on LowerWI Rverwy 6-A3 MOU on T&E Species Consultn 7-A4 MOU Authorizing SW Discharges to state waters Back to Board
  • Slide 20
  • Erosion Control & SW Question for 5 Points What is the main function of a ditch check? Show Answer
  • Slide 21
  • Erosion Control & SW Answer for 5 Points To reduce the velocity of channelized runoff water. Back to Board
  • Slide 22
  • Erosion Control & SW Question for 10 Points In order to be included on the PAL, land applied polymer must reduce rilling by this percent. Show Answer
  • Slide 23
  • Erosion Control & SW Answer for 10 Points What is 50% Back to Board
  • Slide 24
  • Erosion Control & SW Question for 15 Points According to Trans 401 what is the states dewatering standard? Show Answer
  • Slide 25
  • Erosion Control & SW Answer for 15 Points Reduce sediment in the discharge water to the MEP and does not cause an erosion problem prior to entering a water. Back to Board
  • Slide 26
  • Erosion Control & SW Question for 20 Points Approximately how many times larger is the max. apparent opening size of FF fabric to a max. size clay particle? Show Answer
  • Slide 27
  • Erosion Control & SW Answer for 20 Points FF Fabric = 0.595 mm Clay particle
  • Misc. Question for 20 Pts What is super mature; about 3 billion to 500 million years old; resides in 3 distinct layers; has a size of 0.42- 0.84mm; can withstand 4,000-6,000 psi; is >99% pure quartz? Show Answer
  • Slide 57
  • Miscellaneous Answer for 20 Points Frac Sand Back to Board
  • Slide 58
  • Miscellaneous Question for 25 Points Per the WisDOT Banking Agreement and technical guidelines with DNR & the Feds, what is practicable? Show Answer
  • Slide 59
  • Miscellaneous Answer for 25 Points Available and capable of being done after taking into consideration cost, existing technology and logistics in light of the project purpose. Back to Board
  • Slide 60
  • Show Question
  • Slide 61
  • Big Points Question What is so special about our Cooperative Agreement? Show Answer 302928272625242322212019181716151413121110987654321
  • Slide 62
  • Big Points Answer for Big Points Only state in the union that uses it and allows for repeated contact between the agencies. Back to Board
  • Slide 63
  • Big Board Facts 2010 Jeff Ertzberger All rights reserved. All Clipart copyright GraphicsFactory.com All Rights Reserved. Some images have been modified from original version.GraphicsFactory.com This presentation may not be sold, or redistributed in any form without written permission of the author. For even more template games and great resources visit: uncw.edu/EdGames By using this game you are agreeing to our terms of use.terms of use End

Recommended