Next Gen Data Center
KwaiSeng Consulting Systems Engineer [email protected]
© 2006 Cisco Systems, Inc. All rights reserved. 2
Agenda
Optimizing Power Consumptions in Data Center
Speeding Up Data Center Service Deployment
Conclusion
© 2006 Cisco Systems, Inc. All rights reserved. 3
Optimizing Power Consumptions in Data Center
© 2006 Cisco Systems, Inc. All rights reserved. 4
Technology Trends
Multi Core CPU
Proliferation of vmWare
=> more logical servers out of 1 physical server
Drives larger bandwidth
10 G Adoption
Free by 2H 2009
RDMA’s availability
Low Latency Network
Storage consolidation
© 2006 Cisco Systems, Inc. All rights reserved. 5
Challenges in Today’s Data Centers
Power and Cooling
Inefficient resource utilization
Performance requirements and operational complexity
Increasing demands for availability and security
© 2006 Cisco Systems, Inc. All rights reserved. 6
Factors Driving Data Center Power Problems Increasing availability of inexpensive high
-density servers requiring more power, cooling and structured cabling than older data centers
Storage, Storage, Storage Increased awareness of terrorism, natural
disasters and vulnerability of commercial power
Operational savings through consolidation of data centers – less real estate
Explosive growth leading to inadequate capacity or infrastructure – upgrades or wholesale replacement of data center equipment
Infrastructure lifecycle mismatch
© 2006 Cisco Systems, Inc. All rights reserved. 7
Power Supplied in the DC CRAC 50%
Server/Storage 26%
Conversion 11% Network
10% Lighting
3%
– Each watt consumed by IT infrastructure carries a “burden factor” of 1.8 to 2.5 for power consumption associated with cooling, conversion/distribution and lighting Source: APC
Where does the Power Go? Losses in power generate heat
© 2006 Cisco Systems, Inc. All rights reserved. 8
Unified Fabric
Unified Fabric
Storage Network
Mgmt
Network
Back-End Network
Front-End Network
BackupNetwo
rk
Increased Efficiency, Simpler Operations
© 2006 Cisco Systems, Inc. All rights reserved. 9
Unified I/O
# of Cables/Server : 7 Power Consumptions : 7 X 20 W
# of Cables/Server : 7 -> 2 Power Consumptions : 2 X 20 W
140 W -> 40 W
© 2006 Cisco Systems, Inc. All rights reserved. 10
Cisco Nexus 5020 Server Access Switch Delivering Unified Fabric Today
56-Port L2 Switch 40 ports 10 Gigabit Ethernet/ FCoE
/DataCenterEthernet, fixed Two expansion module slots
NX-OS
DC-NM and Fabric Manager
Ethernet + FC 4 Ports 10 Gigabit Ethernet/
FCoE/DataCenterEthernet 4 ports 1/2/4G FC
Fiber Channel 8 ports 1/2/4G FC
Ethernet 6 ports 10 Gigabit Ethernet/
FCoE/DataCenterEthernet
© 2006 Cisco Systems, Inc. All rights reserved. 11
Implementing Unified Fabric with Cisco Nexus Family
10 GbE
10 GbE DCE
Fibre Channel
10 GbE FCoE/DCE
Consolidated I/O Servers to Access Layer
Data Center Ethernet / FCoE Links
Cisco Nexus 5000
Preserves Existing LAN and SAN
Investments
MDS Nexus Catalyst
SAN B LAN SAN A LAN
Preserves Existing Dual SAN Environments
© 2006 Cisco Systems, Inc. All rights reserved. 12
Unified Fabric Extends Benefits of Rack Switching
2 Consolidated 2 SAN
4+ LAN
Unconsolidated I/O Consolidated I/O
CapEx savings
Cable reduction
More servers per rack
$10K to $20K per rack savings or more
Consolidated I/O Benefits
© 2006 Cisco Systems, Inc. All rights reserved. 13
VM-Optimized Services
Enables convergence of multiple traffic types
– Virtual Machines LAN – Virtual Machines SAN – Hypervisor Mgmt LAN – Virtual Infrastructure Services LAN
Scales VM LAN performance – Increase I/O bandwidth – Increase VM density
Accelerates Virtual Infrastructure Services
– Live VM migrations via VMotion and DRS features – Enable additional services
VMotion
10 GbE
10 GbE DCE
Fibre Channel
SAN A
10 GbE FCoE/DCE
LAN SAN B LAN
© 2006 Cisco Systems, Inc. All rights reserved. 14
Server
Unified I/O
Infrastructure Virtualization
Cooling
• Power Efficient Server Blades • Application Virtualization
• Reduces Power Consumption • Reduces Cabling • Simplifies Provisioning
• IP • Storage • Network Services
• CRAC Reduction • Air Flow Improvements • Enhances 1.8/2.5 Burden
Summing up the Power Equation
© 2006 Cisco Systems, Inc. All rights reserved. 15
Speeding Up Data Center Service Deployment
© 2006 Cisco Systems, Inc. All rights reserved. 16
Scenario
Peak client traffic surge toward BIGBARGAIN.COM for last minute online Christmas Shopping.
BIGBARGAIN.COM primary Data Center runs out of capacity to capture the surge transactions
The Surge potentially contributes 10% of the BIGBARGAIN.COM’s online revenue
BIGBARGAIN.COM
OverLoad!!
© 2006 Cisco Systems, Inc. All rights reserved. 17
The Balancing Act : Just for 2 Days ?
Operational Business
Dynamic Environment
Capture the Surge
Time to Market
Capture the Market
What Resource Required?
Doable?
CAPEX/OPEX?
Worth Doing?
© 2006 Cisco Systems, Inc. All rights reserved. 18
Demo Setup
Default Data
Center
OverLoad!!
Alternative Data
Center
© 2006 Cisco Systems, Inc. All rights reserved. 19
Instance Creation in the Virtualized World..
Processing :
• Dual Processor • 2 GB RAM
Storage : • 8 GB LUN • Linux RedHat Ent 5
SAN : • VSAN • LUN Masking • Zoning
Load Balancer :
• Transparent • Routed
IP : • Physical Switch Port • L2/L3
Security : • Firewall Policies • RPF Check • RFC 1918
© 2006 Cisco Systems, Inc. All rights reserved. 20
The overloading scenario.. OVERLOAD!!
Internet
© 2006 Cisco Systems, Inc. All rights reserved. 21
21
© 2005 Cisco Systems, Inc. All rights reserved.
• Simplified Provisioning
• Reproduceable Processes
• Manage Business Processes and Templates
Automation
Session Number Presentation_ID
• Regain IT Asset Control
• Lower Operational Expenses
• Protect and Control Investments
The Enablers..
Virtualization
• Capital Asset Utilization Improvement
• Power Savings
• Storage Virtualization and Policy Based Provisioning
Virtualization Consolidation
Innovation and
Integration
• Data Center Class Platform • Integrated Services
• Unified Network Fabric • Integrated Provisioning
© 2006 Cisco Systems, Inc. All rights reserved. 22
Consolidation Trends
Disparate Physical
Appliance
Consolidated Network Services
Numerous SAN Islands
Larger Enterprise SANs
Numerous Legacy Arrays
Consolidated Storage
Blade Servers
Independent Application Servers
Server Consolidation Blade servers
Storage Consolidation Higher density arrays
SAN Consolidation Increase effective port densities
Network Services Consolidation Physical appliance vs Appliance Aggregator
© 2006 Cisco Systems, Inc. All rights reserved. 23
Data Center Virtualization
FC FC
Network Virtualization VLAN, VRF, MPLS, GRE Independent Path/Policies for Network Segments
Network Service Virtualization
Firewall, Load Balancer, SSL Independent Network Services & Policies for Application
Storage Virtualization VSAN, Storage Independent Storage for Individual Application
Server Virtualization CPU, IO, Server Fabric Independent Compute Resources wrt Application Services
© 2006 Cisco Systems, Inc. All rights reserved. 24
LAN SAN App Delivery Security
Data Center Automation
Storage Servers Client
Service Orchestration
End-to-End Service Provisioning
© 2006 Cisco Systems, Inc. All rights reserved. 25
Prim
ary
Dat
a C
ente
r
Remote/Backup Data Center
Server Clusters
Storage Network
Tape
Disk
Clustered Servers Resilient IP
GE/ 10GE
Security
IDS
Anomaly Detect/Guard
VPN
Application Optimization
File Cache
SSL
Content Switch
SAN
Metro Network Optical/Ethernet
SAN
Integrated Business
Applications
GSS
WAFS
InfiniBand
NAS
L2/L3 Network
Front End Network and Application Security Optimization Acceleration
Data Center Network Topology
Firewall
© 2006 Cisco Systems, Inc. All rights reserved. 26
Overall Solution
Virtualization Layer
VFDC
© 2006 Cisco Systems, Inc. All rights reserved. 27
Speeding Up Data Center Service Deployment Implication to business environment
– BIGBARGAIN.COM is just one of the many virtual instances – Solution allows better value proposition for DC Users
Impact of deploy a application service in minutes
Needs a well define Data Center Architecture – Consolidation – Virtualization – Automation
Implication to Operation Efficiency – Reduce Complexity – Components appear as resources – Enhances Scalability ( Human Resource and Capacity )
© 2006 Cisco Systems, Inc. All rights reserved. 28
Conclusion
© 2006 Cisco Systems, Inc. All rights reserved. 29
What have been discussed so far Going Green. Many aspects to the answer
– Improvement on server’s Power Efficiency – Unified I/O : NICs, Cabling Reduction – Virtualization of Application Services : vmWare – Virtualization of Infrastructure Services : IP, SAN – Burden factor of 1.8 ~ 2.5
Speeding Up Application Service Deployment – Consolidation/Virtualization will be key – Minutes level service deployment is possible – Automation provides Speed/Flexibility for business
Data Center involves many technologies – Integrated Architecture is required – Box level implementation don’t provide the flexibility/speed