Nextef results. CLIC09, Oct. 12-16 T. Higo (KEK). Contents . Quadrant high gradient test status Initial processing and power limit VAC characteristics with Q-mass Dark current BD position Light emission Change in T18 by high gradient processing RF Optical inspection Nextef plan. - PowerPoint PPT Presentation
48
Nextef results CLIC09, Oct. 12-16 T. Higo (KEK)
Transcript
Page 1: Nextef results

Nextef resultsCLIC09, Oct. 12-16

T. Higo (KEK)

Page 2: Nextef results

Contents

• Quadrant high gradient test status– Initial processing and power limit– VAC characteristics with Q-mass– Dark current– BD position– Light emission

• Change in T18 by high gradient processing– RF– Optical inspection

• Nextef plan

2009/10/12-16 2CLIC09 Higo

Page 3: Nextef results

Quad #5 status and near future plan

2009/10/12-16 CLIC09 Higo 3

Page 4: Nextef results

42009/10/12-16 CLIC09 Higo

Page 5: Nextef results

2009/10/12-16 5CLIC09 Higo

Page 6: Nextef results

Target = 15MW

Red=

pow

er (

arbi

trar

y un

it)

Blue

= C

ham

ber v

acuu

m [P

a]

Higher target

So-called 10MW run

So-called 9MW run

2009/10/12-16 6CLIC09 Higo

Page 7: Nextef results

Higher target

So-called 10MW run

So-called 9MW run Gradient limit at 50ns

2009/10/12-16 7

Hard limit at 19MW, 59MV/m, 50ns

CLIC09 Higo

Page 8: Nextef results

Run11 with higher target at 113ns

8

Hard limit at 14MW for 113ns pulse

Powers at breakdown with 113ns pulse width for 60 hours

2009/10/12-16 CLIC09 Higo

Page 9: Nextef results

ACC-IN pulse at hard limit

Tp(ns)51 113

Power (MW)19 14

Ea (MV/m)59 50

Sqrt(Tp)*Power135 147

Limit at similar pulse heating temperature, but more precise comparison is needed.92009/10/12-16 CLIC09 Higo

Page 10: Nextef results

Vacuum characteristics• Vacuum total pressure

– Base pressure at <10-6Pa– Typically processing below 10-5Pa– Increases every time at few to 5MW range if after RF-OFF for

more than several hours• Mass spectrum

– M=2, 28 and 44 increase with RF-ON, but not M=18• Especially when reaching power limit

– M=2 becomes dominant residual gas after an hour or so run – M=27 and 28 change in a similar manner as time, indicating

hydrocarbon-origin surface contamination

2009/10/12-16 10CLIC09 Higo

Page 11: Nextef results

First and Second QMA observations.Check QMA vacuum. QMA-Acc Chamber valve closed.

Large Peak at M=18 (Water). Need more Q mass baking.

090918

090924

All peaks are lowered. After Q mass baked (200deg, 2.5days).2 28

32 44

2009/10/12-16 11CLIC09 Higo

Page 12: Nextef results

First QMA observation with RF OFF.QMA- ACC Chamber valve opened.

Peak at M=2 (H2) largest. Water (18) becomes moderate. Others are M=28 (CO) and 44(CO2).

090924

2009/10/12-16 12CLIC09 Higo

Page 13: Nextef results

QMS (1) :RF Power and gasesPressure of H2 dominated. Pressure of water is inactive.

21828

44

RF Power into Acc

ACC Chamber CCG

10-810-710-610-5

0.0001

Pres

sure

(Pa)

2009/10/12-16 13CLIC09 Higo

Page 14: Nextef results

BD

Acc Chamber CCG

Power Acc In

QMS (2): Cu and Zr

-1 10-7

0

1 10-7

Pres

sure

(Pa) No signal of Cu(M=63) nor Zr (M=89) .

2009/10/12-16 14CLIC09 Higo

Page 15: Nextef results

Breakdown pulse analysis

2009/10/12-16 15CLIC09 Higo

Page 16: Nextef results

Timing distribution for change>2000

2009/10/12-16 16CLIC09 Higo

Page 17: Nextef results

T18 structure Function F[z]

2009/10/12-16 17CLIC09 Higo

Use time difference Rs(rise)-Tr(fall) to calculate BD position.Function F(z) is calculated from design vg(z).

Page 18: Nextef results

Pick up large Rs, Tr change with 50ns

Sampling cut at 448 Sampling cut at 448

Cut at 1000 or 2000 for timing analysis from next page.

2009/10/12-16 18CLIC09 Higo

Page 19: Nextef results

Breakdown cell distribution >1000

713 events were analyzed out of 1919 INTLK. 2009/10/12-16 19CLIC09 Higo

50ns higher target run

Page 20: Nextef results

Breakdown cell distribution >2000

534 events were analyzed out of 1919 INTLK.

2009/10/12-16 20CLIC09 Higo

50ns higher target run

Mostly downstream half.

Simply increasing toward output end.

Indication of BD following some field gradient.

Page 21: Nextef results

BD position of run11 113ns, MW

21

2000

113ns higher target run

It is evident that there is difference than 50ns.

Not increasing toward output side.

Need to check the peak at cell#0.

Need to check those outside structure cell region.

2009/10/12-16 CLIC09 Higo

Page 22: Nextef results

Quad dark current much larger than T18

(Note: Power is just the value in the control program panel. Read 12MW as 19MW, though relative comparison between quad and T18_disk is OK without this.)

T18

Quad

2009/10/12-16 22CLIC09 Higo

Page 23: Nextef results

Spectrum peak at very low energy

2009/10/12-16 23CLIC09 Higo

T18_DiskPeaks at 8MeV/c and 4MeV/c with 108MV/m

Present quadPeak at 1.2MeV/cwith 19MW 59MV/m

Page 24: Nextef results

Possible cause of high dark currentField enhancement due to round chamfer

• Simulation of field enhancement– 1.4 ~ 1.6 at radius– with gap<radius/5, step<radius/2.5

• Only a few tool passes – to shape 50 micron radius– with radius tool of 2mm• If three passed tangential discontinuity by about 30

degree• Can be relaxed by such as EP in future

2009/10/12-16 24CLIC09 Higo

Page 25: Nextef results

Electric field enhancement in a shallow channel with round chamfer

Gap (micron) Bump (micron) Emax / Enominal

0 0 1.39

0 20 1.57

10 20 1.58

Calculation done by T. Abe by CST MS. Waveguide field.

2009/10/12-16 25CLIC09 Higo

Page 26: Nextef results

Other monitors for quad

2009/10/12-16

GVGVPM PMAM

Sl i t

FC

E

E

I P

Louni nel oad

Otsukal oad

DC

I PH

VACI nsul

VAC

I PDC H

H

Vari an I P

187

KX03 425

FCI P

Load

Vari anI P

Q-massWC WCFC

FC

VAC DC

230

FC-MidFC-UPFC-DN

Qmass

PMMirror + camera PM

AM

Quad

Camera

26CLIC09 Higo

Page 27: Nextef results

Light emission observed by usual camera• From side window– Can see several cells near center of structure– Found some BD events with a light emission from a

particular cell• View from upstream beam axis– Found a light emission– Pattern interpretation is not straightforward– Some event showed bright spot smaller than cell size

• Need better optical setup– Time gating, wider view, space resolution, etc.

2009/10/12-16 27CLIC09 Higo

Page 28: Nextef results

Possible future program for quad #5

• NEG installation in progress in this week

• Further run– Longer pulse run at 173ns– Evolution of dark current

• Finish high gradient and --– RF check– Mechanical check– Optical inspection – SEM at CERN?

• Further treatment?– EP ?

• Further high gradient test– Improved optical inspection– Change in dark current– Possibly higher field?

• These become good lessons for us to understand breakdown phenomena.

2009/10/12-16 CLIC09 Higo 28

Page 29: Nextef results

Change in T18 through high gradient test?

2009/10/12-16 29CLIC09 Higo

Page 30: Nextef results

Whole history of processing of T18_VG2.4_Disk #2

0

20

40

60

80

100

120

0

500

1000

1500

2000

2500

3000

0 500 1000 1500 2000 2500 3000 3500 4000

MasterTable_Eacc_Trend till_090610

<Eacc> 51nsec Ushi<Eacc> 113ns Ushi<Eacc> 173n ushi<Eacc> 213n Ushi<Eacc> 253ns UshimotoEacc keep 253ns UshiEacc 51ns UshiEacc 113ns UshiEacc 173ns UshiEacc 213ns UshiEacc 253ns UshiEacc Usahimoto 2/21-3/23Eacc 252ns Usahi 4/1-4/7Eacc 252ns 4/7-14Eacc 312ns 4/14-16Eacc 412ns 4/23-27Eacc 331ns 4/28-5/1Eacc 252ns 5/1-11Eacc 412ns 5/11-6/10

Total BD<Eacc> MV/m Total# BD

RF-ON integrated (hr)

090610

2009/10/12-16 30CLIC09 Higo

Page 31: Nextef results

RF check setup

312009/10/12-16 CLIC09 Higo

Page 32: Nextef results

Input match not changed

322009/10/12-16 CLIC09 Higo

Page 33: Nextef results

Bead pull raw data on Sep. 23

332009/10/12-16 CLIC09 Higo

Page 34: Nextef results

Bead pull amplitude plot 11422MHz

Input side Output side342009/10/12-16 CLIC09 Higo

Correspond to ripple of +-4% in Ea at output end.

Which was not before test.

Page 35: Nextef results

Output match some change

Speculation:

Reflection changed around 11424MHz by G=0.05 level??

Can be source of field staggering

352009/10/12-16 CLIC09 Higo

Page 36: Nextef results

Bead pull feeding from output side

Input side

Output side

362009/10/12-16 CLIC09 Higo

Page 37: Nextef results

Phase advance per cellCondition at 22.7degC in NitrogenBead pull result: 11423.2MHz 120deg/cell

delF 22.7 30C -1.38MHz delF N2 VAC +3.12 delF string no string +0.2MHz Total delF = 1.94MHz

The structure now shows 120deg/cell at 11425.1MHz

Changed by 1.1MHz through high gradient test!?!? Should confirm carefully with SLAC tuning result.

372009/10/12-16 CLIC09 Higo

Page 38: Nextef results

View direction 45deg

View area 60deg

f4.1mm

Focus within 5mm to infinity

2009/10/12-16 38CLIC09 Higo

Page 39: Nextef results

7960.9 7 1 101

60.3 98

110 118.6 127.42009/10/12-16 39CLIC09 Higo

Page 40: Nextef results

Optical inspection upstream

60.3mmInput coupler to cylindrical TM01 line

2009/10/12-16 40CLIC09 Higo

Up WG direct.

Beam axis

Insertion 98.0mm for observing Iris #2.This is the best we can now, only the forward iris at an enough distance.

Iris #

1

Mar

ch I

ris

Iris #

2

Mat

ch ce

ll

Page 41: Nextef results

Optical inspection upstream and middle

Insertion 82.7mmIris #1 at match cell

Insertion 98.0mmIris #2 at first regular cell

2009/10/12-16 41CLIC09 Higo

161.9mm Iris #9 170.9mm Iris #10

Page 42: Nextef results

Optical inspection downstream end

243.2mm Iris #18Upside iris of last regular cell

252.2mm Iris #19Down side iris of last regular cell

261.3mmLast regular cell iris #20

2009/10/12-16 42CLIC09 Higo

Page 43: Nextef results

Optical inspection result and future

• No significant variation was observed– Comparing input to output but

• Need to inspect with better resolution– Change to straight bore scope?– Adjust focal plane?– Should be improved

2009/10/12-16 CLIC09 Higo 43

Page 44: Nextef results

T18_Disk_#2 after high gradient test tentative conclusion

• RF evaluated after high gradient test.– Input matching was kept.– Output matching changed by G=0.05 level.– Average frequency increased by 1.1MHz.– Field ripple±4.4% near output end.

• Some change in RF performance was observed.– Need to compare carefully with SLAC data.

442009/10/12-16 CLIC09 Higo

Page 45: Nextef results

Summary and next plan • Quad– Similar performance as quads tested at SLAC– More test in a few weeks– Inspection and think about the further test

• T18– Measurable change was observed– We need to remind this

• Next plan– TD18 is top priority– Then T24_Disk, TD24_Disk before CDR– followed by T18_Disk#4, ……

2009/10/12-16 CLIC09 Higo 45

Page 46: Nextef results

Nextef Planning revised as of CLIC09

9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 2009 2010 2011

TD18_Quad #5

NWG Cu-005

Component, etc. tests or serving shield-B

A

B

KT-1

C-band Structure Test

PC test and system construction

Nextef B construction?

PC test

TD24_Disk #?

X-band studies

PPM6bLoad, WGValve

Construction to shield-B????

T24_Disk #?TD18_Disk #3 T18_Disk #4??

2009/10/12-16 46CLIC09 Higo

Page 47: Nextef results

Nextef Configuration

KT-1X-band

KT-2C-band

NextefX-band

A

B

2009/10/12-16 47CLIC09 Higo

Page 48: Nextef results

Conclusion • Nextef will run fully dedicated for the

feasibility study of CLIC 100MV/m• Nextef will boost peak power and high power

stability by introducing pulse compression system

• We try to construct a test area in addition to Nextef for key studies

2009/10/12-16 CLIC09 Higo 48