Low Cost, Low Carbon Fibre Footprint • Phil Dickenson, Sales Director
Welcome • Focus on how highly mechanised duct, poling system and innova?ve fibre installa?on techniques will lower your engineering costs and reduce your carbon footprint.
• Civil engineering: • 50-‐70% project capital • 50-‐70% project carbon footprint • Any saving makes a big difference
Benefits • Defined Projects
Ø Delivered for less • Time • Money • Environmental Impact
• Defined Budget Ø Deliver more
• Capture more end users • Generate more revenue
About Us • SCD is an innova?ve civil engineering and cabling contractor specialising in cabled ducted systems
Markets • Power and Renewable Energy
• Na?onal Grid Customer Connec?ons • On-‐shore Wind Farms • Off-‐shore Wind Farms
• Dark Fibre • ADIT Framework • OGC Telecom Networks
• Motorways and Highways • Civil engineering works • Op?cal fibre works
Markets • Urban Traffic Control
• Traffic Light communica?ons • IP Infrastructures
• Urban Security • CCTV • ANPR
• Universi?es and Colleges • Structured Cabling • U?li?es
Markets • Next Genera?on Access
Ø Digital Region • Thales/KCom
- 1,200km subduc?ng and 6,000km op?cal fibre
Ø Bal?c Business Quarter • Gateshead Council/Alcatel-‐Lucent
- Duc?ng and op?cal fibre
Ø Easaield Business Park, Scarborough • NYnet
- Duc?ng
Ø Fibre to the Home • University of Hull
- Duc?ng and op?cal fibre
Next Genera?on Access
Technologies • Tradi?onal Open-‐cut • Slot Cucng • Micro-‐trenching • Mechanised trenching • Telegraph Poles
Slot Cucng • Slot Cucng
• 60-‐125m per day • Slot • 20mm wide • 200mm deep
Micro-‐trenching • Micro-‐trenching
• 200-‐800m per day • Micro-‐trench • 60mm wide • 350mm deep
Mechanised Trenching • Mechanised Trenching
• 200-‐800m per day • Telecoms Trench • 130mm wide • To 550mm deep
Telegraph Poles • Telegraph Poles
• Various heights and finishes available • Pole mounted furniture • Op?cal splifers • Tube Distribu?on Closures
Comparisons
Dimensions
20 x 200mm
60 x 350mm
130 x 500mm
300 x 600mm
40mm wearing course
Financial and Time • Real project data
• Won in compe??ve tender • Fully inclusive • Civil engineering • Traffic management • Out of hours working (nights and Sundays) • Special engineering difficul?es • Health and Safety (CDM 2007)
• Times based on one team doing all the work
Financial and Time • Different Loca?ons
• Canterbury • Southern, urban, historic
• Blackburn • Northern, urban and semi-‐rural
• Slot Cucng • 12mm blown fibre tube • 150mm deep slot
• Tradi?onal Open Cut • 100mm telecommunica?ons duct • NJUG depths
Financial and Time • Canterbury
• Slot & Open Cucng 53m/day £49/m • Open Cut 19m/day £109/m
• Blackburn • Slot & Open Cucng 62m/day £47/m • Open Cut 32m/day £76/m
• Average • Slot & Open Cucng 57m/day £48/m • Open Cut 24m/day £91/m
0
1
2
3
4
5
6
Slot Cut Poling Side Cut Cleanfast Open Cut
Tonnes CO2 per 300m Duct
Personnel Travel
Plant Emissions
Timber
Quarried Materials
Environmental
How could it be even befer? • Planning permission for poles • Flexibility on no?cing
• Large projects have 3 month no?ce • No?ce costs can be waived by the Council • NGA by the Council for the Council
• Na?onal agreement for reinstatement • Currently local HAUC agreement • Partnership approach to new technology
Q&A Session • Frank Kler