NGL-Recovery Expander-Compressor Commissioning
(Case Study)( y)
By Nabil Madani,
Sr. Rotating Equipment EngineerSr. Rotating Equipment Engineer
Outline
o Commissioning Background
o Description of the NGL Process.
o Description of the NGL expanders-compressors.
o Initial startup issues, troubleshooting and solutions:
• 0% IGV speed overshoot.
• Decrease of the Bearing housing temperature.
o Recommendations.o
Commissioning Background
o Late 2008, 1st LNG Mega-Train (7.8 MT/Y) commissioning and start-up started at Qatargas Train-4 facilities.
o The majority of the Machinery commissioning was divided into three phases :
• Driver solo run (Uncoupled run), except for expanders-compressors.
• Coupled commissioning run (Air run and safe-fluid run), except for expanders-compressors.
• Normal run (Startup for duty).
o January 2009, 1st NGL expander-compressor was started.
NGL Unit Process Description
Lean NG (Unit-OUT)
Natural Gas (Unit-IN)
G, -
44de
gC
ASV
60 B
arG
28 BarG, 22 degC
1deg
C
etha
nize
r
35 B
arG
, 4
Seal Gas (External)
E C De-
M
30 BarG 77degC
Magnetic Bearing
JT
Simplified NGL Recovery Process P&ID
30 BarG, -77degCNGL
(Unit-OUT)
NGL Expander-Compressor Description
SGM
M
MM
PTPDC
M
MM
PDT
M M MM
PT
EXPANDER COMPRESSOR
Simplified Expander-Compressor Cross Sectional Drawing
PTPT
Pre-startup Checks
o NGL Expanders-Compressors were delivered with a dummy Mechanical Center Section (MCS), the duty MCS was packaged inside a preservation container under N2.
o The following adjustments and clearances were set during the duty MCS installation:
• Expander and Compressor wheels clearances.
• Inlet Guide Vanes Close clearance (0% IGV) and Open clearance (100% IGV).
• Actuator stoppers (Close/Open) and stroke adjustment.
o Controls tuning and final assembly checks.
o All the adjustments and clearances were recorded.
0% IGV Speed Overshoot
30.0
40.0
11000
12000
Max Continuous Speed (10400 RPM)
Over-speed Trip (11200 RPM)
906219.5
0 0
10.0
20.0
8000
9000
10000Max. Continuous Speed (10400 RPM)
-20.0
-10.0
0.0
6000
7000
8000
eg C
RPM
SpeedOulet Temperature
-40.0
-30.0
4000
5000
DeR
De-Methanizer Temperature @ Startup (- 37 DegC)
Excepted Start-up Speed Range
-70.0
-60.0
-50.0
1000
2000
3000p p p g
-73.1-80.0
70.0
0
1000
0 30 60 90 120
150
180
210
240
270
300
330
360
390
420
450
Seconds
IGV Mechanism
IGV Mechanism (Illustration Video Only)
IGV Mechanism
Fixed Pivot Holder Shifting (Illustration Video Only)
0% IGV Speed Overshoot
Solution:
o Addition of two dowel pins between the holder and the support preventing rotational movements.
Facts:
o Expander speed reached 87% of the total speed range at 0% IGV.
o Outlet temperature dropped from 19 to -73 deg C within 7 mn.
o There is no contractual limitation in either the speed or the outlet conditions when starting the machines with the IGV at 0%.
o API-617 Chapter 4 “Expanders Compressors” do not limit speed or the outlet conditions with the IGV at 0%.
Bearing Temperature Decrease
30.0
40.0
4500
5000
10.0
20.0
3500
4000
SpeedExpander Thrust Bearing Temperature
-10.0
0.0
2500
3000
eg C
RPM
Expander Thrust Bearing TemperatureExpander Journal Bearing Temperature
-30.0
-20.0
1500
2000
DeR
-50.0
-40.0
500
1000
-60.00
0 30 60 90 120
150
180
210
240
270
300
330
360
390
420
450
480
510
540
570
600
630
660
690
720
750
780
Seconds
Bearing Temperature Decrease
SGM
M
MM
PTPDC
M
MM
PDIPDT PDI
M M MM
PT
EXPANDER COMPRESSOR
Simplified Expander-Compressor Cross Sectional Drawing
PTPT
Bearing Temperature Decrease
Solution:
o Operating procedure and an Extra Delta Pressure transmitter were added to monitor the Delta pressure across the bearing housing during pressurization.
Facts:
o Operations Procedures developed during the construction phase (machine already manufactured) extracted from the Vendor instructions.
o Vendor instructions limited to the package boundaries .
o HAZOP performed for the NGL unit, not specific to expanders.
Recommendations
o Consider maximum speed or expander process p p poutlet limitations at 0% IGV during the engineering
hphase.
o Operations involvement during the early stage of p g y gthe machine engineering.
o Specific Operational review and start-up HAZOP for systems involving expanders.for systems involving expanders.
Thank youThank you …