+ All Categories
Home > Documents > nhai.org.innhai.org.in/spw/CorrespondenceIssues/1558-CEG... · Created Date: 2/4/2015 12:01:05 PM

nhai.org.innhai.org.in/spw/CorrespondenceIssues/1558-CEG... · Created Date: 2/4/2015 12:01:05 PM

Date post: 15-May-2018
Category:
Upload: truongnguyet
View: 221 times
Download: 5 times
Share this document with a friend
4
CONSULTING ENGINEERS GROUP LTD An ISO 9001 : 2000 Company House No. 1312 1313, Deshpande Layo!t, Behind Day 2 Day Super Market, Wardhaman Nagar, NAGPUR - 440008. Tei No 0712 - 2761115, Fax No. 2761117. Emarl : ceg [email protected] cEG/NGPByp/Stru-I/ 7 2-2o|s /t 5 5 I To, Sh. Shri Ram Mishra DGM (T) & Project Director, Bunglow No. 2, Shubhankar Apptt., Plot No. 159, Ambazari Hill Top, Ramnagar, Nagpur - 440033 Ph: 0712 2249376, 2249589 . -tL A Februa ry 2 015 sub: Independent Engineer services for 4 laning of lvladhya pradesh /[,laharashtra Border Nagpur section of NH-7 from Km.652.000 (New Km.653.225) to Km.729.000 including construction of Kamptee-Kanhan and Nagpur Bypass and Maintenance of already 4 laned section from Km.14.585 to Km.36.600 NH_7 (Nagpur-Hyderabad section) in the state Maharashtra under NHDp phase-II on DBFOT Basis. Reg: Comments toll plaza at Borkhedi on NH-7 at km 35+600 _ IOT Infrastructure and Energy Services ltd, Ref: Your letter No. N HAI/ PIU/N GP/N H- 7/Access /2015/3027 dated 29.01.2015. Dear Sir, Please refer to your above cited letter. The observations and comments on the proposed - Petroleum Terminal by IOT Infrastructure & energy services Ltd. are given below. 1) The letter from lY/s lor representing that as per the 34 Notification, the toll plaza Administration block / other facilities are coming on the land bearing Survey No. 126/I and 726/2 and these buildings / blocks affect the security, safety and operation of the proposed petroleum terminal adjacent to the permanent Integrated Toll plaza location. 2) The letter also states that terminal facilities are being finalysed leaving 75mts from the center of highways as per the norms. 3) The center line of 16 lane permanent Integrated toll plaza is located at Km 35+600 and Administrative block / facilities are located on the RHS of highway and these are planned as per the guide lines of IRC-SP-84 and relevant provisions for the operation of toll plaza " 4) The distance between the center line of the highway to the boundary of the Iand for the Administrative block is 97.50 mts as per the toll plaza plan. Hence an area of 100x22.50 (97.50-75) i.e. 2250 sqm area is beyond the control line of 75 mts. 5) The boundary walls for the safety / security of the toll plaza administratjve block are also planned as the cash handling facility is housed in this block. The Administrative block buildings / other facilities are planned within this area with necessary setbacks. 6) The detailed plan of Petroleum Terminal and obligatory safe distance are required for assessing the actual distance from the terminal to the Administrative blocks / fa c i lities. 7) The land acquisition process for construction of permanent integrated toll plaza at this location is already under progress, 34 Notification has been published and IMR is u nder progress also. B) The land bearing the Survey No. 125 and 126 etc cover the jand required for the construction of toll lanes (PQc area) and Administration block as brought out in the letter. ilead oflice : CEG Tower, 8"11 (G), Malviya lndust.ialArea, JAIPUR - 7 (Rajasthan) lNDlATel : 014'! " ?751801 / 802 / $03 Fax : 2751306.
Transcript

CONSULTINGENGINEERS GROUP LTD

An ISO 9001 : 2000 Company

House No. 1312 1313, Deshpande Layo!t,Behind Day 2 Day Super Market,Wardhaman Nagar, NAGPUR - 440008.Tei No 0712 - 2761115, Fax No. 2761117.Emarl : ceg [email protected]

cEG/NGPByp/Stru-I/ 7 2-2o|s /t 5 5 ITo,Sh. Shri Ram MishraDGM (T) & Project Director,Bunglow No. 2, Shubhankar Apptt.,Plot No. 159, Ambazari Hill Top,Ramnagar, Nagpur - 440033Ph: 0712 2249376, 2249589

. -tLA Februa ry 2 015

sub: Independent Engineer services for 4 laning of lvladhya pradesh /[,laharashtraBorder Nagpur section of NH-7 from Km.652.000 (New Km.653.225) toKm.729.000 including construction of Kamptee-Kanhan and Nagpur Bypass andMaintenance of already 4 laned section from Km.14.585 to Km.36.600 NH_7(Nagpur-Hyderabad section) in the state Maharashtra under NHDp phase-II onDBFOT Basis.

Reg: Comments toll plaza at Borkhedi on NH-7 at km 35+600 _ IOTInfrastructure and Energy Services ltd,

Ref: Your letter No. N HAI/ PIU/N GP/N H- 7/Access /2015/3027 dated 29.01.2015.

Dear Sir,

Please refer to your above cited letter. The observations and comments on the proposed -Petroleum Terminal by IOT Infrastructure & energy services Ltd. are given below.

1) The letter from lY/s lor representing that as per the 34 Notification, the toll plazaAdministration block / other facilities are coming on the land bearing Survey No.126/I and 726/2 and these buildings / blocks affect the security, safety andoperation of the proposed petroleum terminal adjacent to the permanent IntegratedToll plaza location.

2) The letter also states that terminal facilities are being finalysed leaving 75mts fromthe center of highways as per the norms.

3) The center line of 16 lane permanent Integrated toll plaza is located at Km 35+600and Administrative block / facilities are located on the RHS of highway and these areplanned as per the guide lines of IRC-SP-84 and relevant provisions for the operationof toll plaza

"

4) The distance between the center line of the highway to the boundary of the Iand forthe Administrative block is 97.50 mts as per the toll plaza plan. Hence an area of100x22.50 (97.50-75) i.e. 2250 sqm area is beyond the control line of 75 mts.

5) The boundary walls for the safety / security of the toll plaza administratjve block arealso planned as the cash handling facility is housed in this block. The Administrativeblock buildings / other facilities are planned within this area with necessary setbacks.

6) The detailed plan of Petroleum Terminal and obligatory safe distance are requiredfor assessing the actual distance from the terminal to the Administrative blocks /fa c i lities.

7) The land acquisition process for construction of permanent integrated toll plaza atthis location is already under progress, 34 Notification has been published and IMR isu nder progress also.

B) The land bearing the Survey No. 125 and 126 etc cover the jand required for theconstruction of toll lanes (PQc area) and Administration block as brought out in theletter.

ilead oflice : CEG Tower, 8"11 (G), Malviya lndust.ialArea, JAIPUR - 7 (Rajasthan) lNDlATel : 014'! " ?751801 / 802 / $03 Fax : 2751306.

9) There is a proposal for container handling facility by M/s ICD near / adjacent to thetoll plaza location on Hyderabad side. The details of the location are ihown in thesketch attached. The approach,/ access road to this container handling facility hasbeen proposed at about Km 35+850 on Survey No. 100.

10)The approach road to the existing petroleum terminal / depot of M/s BpCL (Km35+100) joins the highway at km 35+280 on Nagpur side.

11)The underground tunnel is provided to access the toll booths from the Administrativeblock for safety and secured cash handling facility. Shifting of toll plaza would affectthese existing and proposed accesses and approaches.

1Z)The sketch showing the toll plaza administrative block, approach road to the [4/sBPCL and proposed container depot M/s ICD and location of the proposed petroleumterminal of M/s IOT is attached herewith.

This is for your information please.

Tha n king You,

You rs fa ith lu lly,

B.S.

Acting Team Lead e r

Encl: As above

CC: 1. Project Incharge, ONBPCL, Nagpur - For2. Sh. Nirmal lit Singh, Executive Director,3. Director (Projects), HQ CEG Jaipur - For

informatio n please.CEG, New Delhi - for information pleaseinformation please.

U mesh

Page 2

Rua

\R

N-ld

2zPI

r*1)'1,

";t{qGEL

,. k{LD'a

Arnyrexttfu-1

_. PKoPttsE aTDlt ?t A-> n

LM 3S,6oo

- trn,o-d.

^-,-'QO-' t-t(:

'1, ' "-

rt1 ['Rr:lnP It

466tpv)o'l c u-tt'*

---n5

f

xnr &,$J.?.X"

Pp,oeotE D

AKFAr.ll

Il

I

LI

I

II

III

P*6o3ts6th

t2tr-1l"oo=D ',ti

/1.D

0 -.,,,nn9+J\ D

"\ ,1

n"i-u

n.vALJo

St-;-ca

tE2A':1

r'r'

3̂z.>

r

IIlt

\

iI

\

I

Ktt r=s

I

III

trni

'rd

P(apoqrg-TbL/- ,

AKaa

,..>_*_. -Tb

1-AKgl\ il--r-44 L

R'PC.LD EPr-,l.-

[ifi.-tsi;

q,}\F€"N4J_

){IfsT- S'.Voao

rst

Jt-.r.t

1-<.

vEt\cf *

ef€ o

\i

Lond 4ar.Toll'Plez16

.

Ad-in. Oioclc

'\'il-f,

trWl

,".\u

q

9{,

I.

)1r-u

ill;tt

9 Cr

7gr

?.h--r

q""

, -ir-i.

I 'r'I --i

)

.x{ i':to)

'H-..--

:toY

& -1.ct'o-t-,-A D1

YHxti'4 rc'*ri8"l


Recommended