    N-13 REV. K ENGLISH 12/ 2012

    PROPERTY OF PETROBRAS 27 pages, Index of Revisions and WG

    Technical Requirements for Paintwork

    Procedure

    This Standard replaces and cancels its previous revision.

    The CONTEC - Authoring Subcommittee provides guidance on theinterpretation of this Standard when questions arise regarding its contents. TheDepartment of PETROBRAS that uses this Standard is responsible for adoptingand applying the sections, subsections and enumerates thereof.

    CONTECComisso de Normalizao

    Tcnica

    Technical Requirement: A provision established as the most adequate and

    which shall be used strictly in accordance with this Standard. If a decision istaken not to follow the requirement (non-conformity to this Standard) it shall bebased on well-founded economic and management reasons, and be approvedand registered by the Department of PETROBRAS that uses this Standard. It ischaracterized by imperative nature.

    Recommended Practice: A provision that may be adopted under the conditionsof this Standard, but which admits (and draws attention to) the possibility ofthere being a more adequate alternative (not written in this Standard) to theparticular application. The alternative adopted shall be approved and registeredby the Department of PETROBRAS that uses this Standard. It is characterizedby verbs of a non mandatory nature. It is indicated by the expression:[Recommended Practice].

    SC - 14

    Copies of the registered non-conformities to this Standard that may contribute

    to the improvement thereof shall be submitted to the CONTEC - AuthoringSubcommittee.

    Proposed revisions to this Standard shall be submitted to the CONTEC -Authoring Subcommittee, indicating the alphanumeric identification and revisionof the Standard, the section, subsection and enumerate to be revised, theproposed text, and technical/economic justification for revision. The proposalsare evaluated during the work for alteration of this Standard.

    Painting and AnticorrosiveCoatings

    The present Standard is the exclusive property of PETRLEOBRASILEIRO S.A. - PETROBRAS, for internal use in the Company, and anyreproduction for external use or disclosure, without previous and expressauthorization from the owner, will imply an unlawful act pursuant to therelevant legislation through which the applicable responsibilities shall beimputed. External circulation shall be regulated by a specific clause of

    Secrecy and Confidentiality pursuant to the terms of intellectual andindustrial property law.

    Introduction

    PETROBRAS Technical Standards are prepared by Working Groups - WG

    (consisting specialized of Technical Collaborators from Company and its Subsidiaries), are

    commented by Company Units and its Subsidiaries, are approved by the Authoring Subcommittees -

    SCs (consisting of technicians from the same specialty, representing the various Company Units and

    its Subsidiaries), and ratified by the Executive Nucleus (consisting of representatives of the Company

    Units and its Subsidiaries). A PETROBRAS Technical Standard is subject to revision at any time by its

    Authoring Subcommittee and shall be reviewed every 5 years to be revalidated, revised or cancelled.PETROBRAS Technical Standards are prepared in accordance with PETROBRAS Technical

    StandardN-1. For complete information about PETROBRAS Technical Standards see PETROBRAS

    Technical Standards Catalog.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-0001http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-0001
  • 7/29/2019 NI-0013

    2/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    2

    Summary

    Summary ................................................................................................................................................. 2Foreword.................................................................................................................................................. 41 Scope................................................................................................................................................... 42 Normative References......................................................................................................................... 43 Terms and Definitions.......................................................................................................................... 64 General Conditions.............................................................................................................................. 6

    4.1 Training Plan of the Work Force ............................................................................................. 64.2 Paint Application Procedure of Executing Agent ................................................................... 74.3 Inspection Procedure ............................................................................................................. 84.4 Plan for Calibration Instruments............................................................................................. 84.5 Storage................................................................................................................................... 84.6 Shelf Life and Paint Revalidation Criteria .............................................................................. 94.7 Surface Preparation ............................................................................................................... 94.8 Mixing, Homogenization and Dilution of Paints...................................................................... 94.9 Paint Application................................................................................................................... 10

    5 Specific Conditions ............................................................................................................................ 135.1 Paints ................................................................................................................................... 13

    5.1.1 Zinc-Rich Paints (PETROBRAS N-1277, N-1661, N-1841 and N-2231)..................... 135.1.2 Solvent-Free Epoxy Finish Paint (PETROBRAS N-2629, N-2680 and N-2912, Types IIand III) .................................................................................................................................... 13

    5.2 Application Process.............................................................................................................. 145.2.1 Air Less Gun ................................................................................................................ 145.2.2 Conventional Gun ........................................................................................................ 145.2.3 Brush............................................................................................................................ 155.2.4 Roller............................................................................................................................ 15

    6 Inspection .......................................................................................................................................... 166.1 Receipt of Paints and Thinners ............................................................................................ 166.2 Surface Preparation ............................................................................................................. 166.3 Roughness Profile................................................................................................................ 16

  • 7/29/2019 NI-0013

    3/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    3

    6.4 Relative Humidity and Temperature..................................................................................... 166.5 Film....................................................................................................................................... 176.6 Adhesion .............................................................................................................................. 17

    6.6.1 General Criteria............................................................................................................ 176.6.2 Description of Tests ..................................................................................................... 18

    6.6.2.1 X Adhesion Test ................................................................................................ 186.6.2.2 Pull-Off Test ......................................................................................................... 18

    6.7 Wet Film Thickness (WFT)................................................................................................... 186.8 Dry Film Thickness (DFT) .................................................................................................... 186.9 Holidays................................................................................................................................ 19

    7 Acceptance and Rejection Criteria.................................................................................................... 197.1 Recept of Paints and Thinners............................................................................................. 197.2 Surface Preparation ............................................................................................................. 197.3 Relative Humidity and Temperature..................................................................................... 197.4 Film....................................................................................................................................... 197.5 Adhesion .............................................................................................................................. 20

    7.5.1 X Adhesion Test ........................................................................................................ 207.5.2 Pull-off Test .................................................................................................................. 20

    7.6 Wet Film Thickness (WFT)................................................................................................... 217.7 Dry Film Thickness (DFT) .................................................................................................... 217.8 Holidays................................................................................................................................ 21

    8 Safety................................................................................................................................................. 21

    Figure

    Figure 1 - Types of Adhesion Failure .................................................................................................... 21

    Table

    Table 1- Training Plan of the Work Force ............................................................................................... 7Table A.1 - Acceptance Criteria for Pull-Off Test .................................................................................. 23

  • 7/29/2019 NI-0013

    4/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    4

    Foreword

    This Standard is the English version (issued in 11/2012) of PETROBRAS N-13 REV. K 11/2012. In case ofdoubt, the Portuguese version, which is the valid document for all intents and purposes, shall be used.

    1 Scope

    1.1 This Standard settles the conditions required for application and quality control of paint systemsfor industrial equipment (see PETROBRAS N-2), piping and pipeline systems (see PETROBRASN-442 and N-2843), painting of galvanized surfaces, ferrous and nonferrous alloys, composite andpolymeric materials (see PETROBRAS N-1021), offshore exploration and production units (seePETROBRAS N-1374) steel structures (see PETROBRAS N-1550), vessels (see PETROBRASN-1192), machinery, electrical equipment, and instruments (see PETROBRAS N-1735), painting ofequipment submerged in seawater (see PETROBRAS N-2037), galvanized tower (see PETROBRASN-2441), tanks, spheres and cylinders (see PETROBRAS N-2913).

    1.2 This Standard also covers conditions for storage and receiving of paints, thinners and safetyrequirements.

    1.3 It is forbidden the use of chromate, sulfates and molybdates based pigments, as well as, thesulfochromate lead and any other substances containing lead and chromate (chromium VI).

    1.4 This Standard is to be applied to procedures started from its issue date.

    1.5 This Standard contains Technical Requirements and Recommended Practices.

    2 Normative References

    The following referenced documents are indispensable for the application of this document. For datedreferences, only the edition cited applies. For undated references, the latest edition of the referenceddocument applies.

    PETROBRAS N-2- Anticorrosive Coating of Industrial Equipment;

    PETROBRAS N-9 - Treatment of Steel Surfaces by Abrasive Blasting and Water Jetting;

    PETROBRAS N-442 - External Painting of Piping for Onshore Facilities;

    PETROBRAS N-1021 - Pintura de Superfcies Galvanizadas, Ligas Ferrosas e noFerrosas, Materiais Compsitos e Polimricos;

    PETROBRASN-1192 - Pintura de Embarcaes;

    PETROBRASN-1202- Iron Oxide-Epoxy Paint;

    PETROBRAS N-1277- Polyamide Zinc Epoxy Base Paint;

    PETROBRASN-1288 - Inspeo de Recebimento de Recipientes Fechados;

    PETROBRAS N-1374-Anticorrosive Coatings for Offshore Exploration and Production Units;

    PETROBRASN-1514- High-Temperature Indicating Paint;

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2843http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0002http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0002http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0002http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0442http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2843http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1021http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1374http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1374http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1550http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1550http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1192http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1735http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1735http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2037http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2441http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2441http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2913http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0002http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0442http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1021http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1192http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1192http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1288http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1288http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1374http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2913http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2843http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2441http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2037http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1735http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1550http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1374http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1374http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1288http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1192http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1192http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1021http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1021http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0442http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0442http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0002http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0002
  • 7/29/2019 NI-0013

    5/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    5

    PETROBRAS N-1550 - Metallic Structure Painting;

    PETROBRAS N-1661 - Zinc Ethyl Silicate Paint;

    PETROBRASN-1735 - Painting of Electrical Equipment, Machines, and Instruments;

    PETROBRASN-1841 - Shop Primer de Zinco Etil-Silicato;

    PETROBRASN-2037- Painting of Equipment Submerged in Seawater;

    PETROBRAS N-2104- Pintura de Sonda Terrestre;

    PETROBRAS N-2137 - Determinao de Descontinuidade em Pelcula Seca de Tinta;

    PETROBRASN-2198- Epoxy-Isocyanate-Iron Oxide Adherence Paint;

    PETROBRAS N-2231 - Paint of Ethyl-Silicate of Zinc -Aluminum;

    PETROBRAS N-2288- Tinta de Fundo Epxi Pigmentada com Alumnio;

    PETROBRAS N-2441- Pintura para Torre Galvanizada;

    PETROBRAS N-2492- Esmalte Sinttico Brilhante;

    PETROBRAS N-2628 - High Thickness Epoxy Polyamide Paint;

    PETROBRAS N-2629- Solvent-Free Epoxy Finish Paint;

    PETROBRAS N-2630- High Thickness Epoxy Zinc Phosphate Paint;

    PETROBRAS N-2677 - Polyurethane Acrylic Paint;

    PETROBRASN-2680 - Surface Tolerant Solvent Free Epoxy Paint for Wet Surfaces;

    PETROBRASN-2843 - Internal Coating of Pipes;

    PETROBRASN-2912- Novolac Epoxy Paint;

    PETROBRAS N-2913- Anticorrosive Coating for Tank, Sphere and Storage Cylinder;

    ABNT NBR 10443 - Tintas e Vernizes - Determinao da Espessura da Pelcula Seca sobreSuperfcies Rugosas;

    ABNT NBR 11003 - Tintas - Determinao de Aderncia;

    ABNT NBR 14847 - Inspeo de Servios de Pintura em Superfcies Metlicas;

    ABNT NBR 15156 - Pintura Industrial;

    ABNT NBR 15158 - Limpeza de Superfcie de Ao por Compostos Qumicos;

    ABNT NBR 15185 - Inspeo de Superfcies para Pintura Industrial;

    ABNT NBR 15218 - Critrios para Qualificao e Certificao de Inspetores de PinturaIndustrial;

    ABNT NBR 15239 - Tratamento de Superfcies de Ao com Ferramentas Manuais eMecnicas;

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1550http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1735http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1735http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2037http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2037http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2037http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2104http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2104http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2137http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2288http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2288http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2441http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2441http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2492http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2492http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2843http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2843http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2913http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2913http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2913http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2843http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2492http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2441http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2288http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2137http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2104http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2037http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1735http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1550
  • 7/29/2019 NI-0013

    6/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    6

    ABNT NBR 15488 - Pintura Industrial - Superfcie Metlica para Aplicao de Tinta -Determinao do Perfil de Rugosidade;

    ABNT NBR 15877: 2010 -Pintura Industrial - Ensaio de Aderncia por Trao;

    ISO 8501-1 - Preparation of Steel Substrates before Application of Paints and RelatedProducts - Visual Assessment of Surface Cleanliness - Part 1: Rust Grades and PreparationGrades of Uncoated Steel Substrates and of Steel Substrates after Overall Removal ofPrevious Coatings;

    ASTM D 4541:2009 - Standard Test Method for Pull-Off Strength of Coatings Using PortableAdhesion Testers;

    NACE VIS 7/SSPC-VIS 4 - Guide and Reference Photographs for Steel Surfaces Preparedby WaterJetting.

    NACE WJ-1/SSPC-SP WJ 1 - Joint Surface Preparation Standard Waterjet Cleaning of

    Metals-Clean to Bare Substrate (WJ-1);

    NACE WJ-2/SSPC-SP WJ 2 - Joint Surface Preparation Standard Waterjet Cleaning ofMetals-Very Thorough Cleaning (WJ-2);

    NACE WJ-3/SSPC-SP WJ 3 - Joint Surface Preparation Standard Waterjet Cleaning ofMetals-Thorough Cleaning (WJ-3);

    NACE WJ-4/SSPC-SP WJ 4 - Joint Surface Preparation Standard Waterjet Cleaning ofMetals-Light Cleaning (WJ-4);

    SSPC SP 11 - Power Tool Cleaning to Bare Metal.

    NOTE For documents referred in this Standard and for which only the Portuguese version isavailable, the PETROBRAS department that uses this Standard should be consulted for anyinformation required for the specific application.

    3 Terms and Definitions

    For the purposes of this document, the terms and definitions indicated in ABNT NBR 15156 areapplied.

    4 General Conditions

    4.1 Training Plan of the Work Force

    4.1.1 Before the start of services, the coating inspector level 2 or renowned professional in industrialpainting area shall develop and implement a training plan with evaluation criteria to the entire workforce involved in painting services, containing at least the topics of Table 1.

    4.1.2 Other equivalent theoretical trainings are accepted replacing the theoretical part of Table 1, atthe discretion of PETROBRAS, through theoretical and practical assessment.

  • 7/29/2019 NI-0013

    7/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    7

    Table 1 - Training Plan of the Work Force

    Hours (h)Course program

    Foreman Blaster Painter

    Theoretical part- Paint purpose;- Activity and responsibility of painter;- Concepts of corrosion: rust grades.

    2 2 2

    - Environmental conditions: ambient temperature,relative humidity, dew point, substrate temperature.

    2 2 2

    - Surface preparation: cleaning with solvents, manualcleaning, mechanical cleaning, abrasive blasting,water jetting.

    4 4 4

    - Types of abrasives, preparation grades of steelsurfaces and roughness profile.

    2 2 1

    - Types of paints and main characteristics, according tothe service to be performed.

    2 2 2

    - Paint preparation: homogenization, dilution, shelf life,induction time, pot-life, mixing ratio.

    2 2 2

    - Paint systems: paint to be used, application methods,dry film thickness, number of coats, interval betweencoats.

    4 4 4

    - Application methods:roller, brush, conventional gunand air less gun;

    - Good practices: stripe coat, wet film measurement,chloride content measurement at the surface.

    4 4 4

    - Main failures and defects: prevention and correction. 4 4 4

    - General requirements of safety, environment, energyefficiency and health (SMES, with its abbreviature inPortuguese): security services, product disposal,personal protective equipment (EPI, with itsabbreviature in Portuguese), collective protectionequipment (EPC, with its abbreviature in Portuguese).

    2 2 2

    - Execution Procedure. 4 2 2

    Practical Part

    - Rust grades of steel surfaces. 1 1 1

    - Identification of surface preparation grades: manual,mechanical, abrasive blasting and water jetting.

    1 1 1

    - Application techniques according to the service to beperformed: roller, brush, conventional gun and air lessgun.

    4 4 4

    - Good practices: stripe coat: wet film measurement,

    chloride content measurement at the surface.

    2 2 2

    4.2 Paint Application Procedure of Executing Agent

    4.2.1 The procedure for application of paint systems for equipment and parts to be painted shallcontain, at least, the following information:

    a) purpose for which the procedure is intended;b) specification of paint system to be used;c) applicable standards;d) instructions for receipt and storage of paints, thinners, and related products;e) paint system execution sequence;

    f) paint application process;g) specification of paints to be used, including suppliers and respective commercial

    references;h) instructions for touchups on the paint system;i) quality control plan.

  • 7/29/2019 NI-0013

    8/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    8

    4.2.2 The entire workforce shall be trained by a coating inspector Level 1 (with proven experience of24 months) or Level 2 on the execution procedure of painting service to be performed.

    4.2.3 The periodicity of training on execution procedure of painting shall be annual or at the discretionof PETROBRAS.

    4.3 Inspection Procedure

    The paint system inspection procedure shall contain, at least, the following information:

    a) objective;b) reference standards;c) criteria for sampling and inspections to be performed;d) apparatus and instruments;

    e) acceptance or rejection criteria;f) forms used for recording results.

    4.4 Plan for Calibration Instruments

    4.4.1 The instruments used in the inspections should have calibration certificate issued bylaboratories accredited by INMETRO.

    4.4.2 It should be prepared a plan for calibration of instruments, which must contain, at least, thefollowing information:

    a) identification of the instrument;b) date of calibration;c) number of calibration certificate;d) frequency of calibration;e) validity of calibration;f) date of next calibration.

    4.5 Storage

    4.5.1 The places for storing paints, varnishes, solvents, and thinners shall be covered, well ventilated,

    not subject to excessive heat, protected against sparks, lightning discharges and direct sunlight.These places shall be exclusive and provided with fire-fighting systems.

    4.5.2 Maximum stacking of containers shall be as follows:

    a) 20 gallons;b) 5 buckets;c) 3 drums (200 L).

    4.5.3 Warehouse storage shall be undertaken based on a first in, first out (FIFO) system and itemsshall be handled in such a manner as to prevent damages.

  • 7/29/2019 NI-0013

    9/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    9

    4.6 Shelf Life and Paint Revalidation Criteria

    4.6.1 Paints with an expired shelf life and which have not been revalidated shall not be used.

    4.6.2 Revalidated paints must not be used for painting interior surfaces, as well as the exteriorsurfaces subject to high temperatures (above 80 C) or condensation and paintwork on surfacesoperating immersed (interior and exterior paintwork).

    4.6.3 For painting surfaces not falling into the cases specified in 4.6.2, paints may be revalidatedtwice, if it is previously authorized in writing by PETROBRAS. The revalidation is the responsibility ofthe paint manufacturer, which must emit a new certificate of analysis specific for revalidation, basedon own technical requirements.

    4.7 Surface Preparation

    4.7.1 Surfaces shall be prepared according to PETROBRAS N-9, ABNT NBR 14847, NBR 15158,NBR 15185, NBR 15239 and SSPC-SP11.

    4.7.2 The degrees of cleanliness of metal surfaces are those specified in the PETROBRASStandards. Specific degrees are assigned to each paint system.

    4.7.3 Machined surfaces of flanges and connections shall be protected from abrasive blasting bymeans of a wooden cover or a plastic sheet.

    4.7.4 Blasting near the newly painted surface shall only be performed when the paint film is dry totouch, so that there is no possibility of impregnation of abrasive.

    4.7.5 The abrasives to be used shall be approved according to PETROBRAS N-9.

    4.8 Mixing, Homogenization and Dilution of Paints

    4.8.1 Every paint shall be homogenized before and during application so as to keep the pigment

    suspended. Paints comprised of 2 or more components, they shall be separately homogenized beforemixing. After mixing, no streaks or strips of different colors shall be observed and the appearance shallbe uniform.

    4.8.2 Homogenization shall occur in the original container, and the paint shall not be removed from itbefore all the settled pigment has been incorporated into the vehicle. However, part of the paint notsedimented may be temporarily removed to facilitate the homogenizing process. Should difficultiesarise in the dispersion of the settled pigment, the paint shall not be used. [Recommended Practice]

    4.8.3 Mixing and homogenizing shall be carried out by a mechanical mixer, with hand mixing beingallowed for containers with a capacity of up to 3,6 L. Paints pigmented with aluminum shall be

    manually mixed. For zinc-rich paints (PETROBRAS N-1277, N-1661, N-1841 and N-2231), mixingshall always be by mechanical means.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009
  • 7/29/2019 NI-0013

    10/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    10

    4.8.4 Mixing operations in open containers shall be carried out in a well-ventilated area away fromsparks or flames.

    4.8.5 The use of air flow beneath the paint surface in order to mix or homogenize it is not permittedunder any circumstances whatsoever.

    4.8.6 In the case of curdling, skinning or thickening in a recently opened can, the paint shall berejected.

    4.8.7 When homogenization is done by hand and is found the presence of sedimentation, the paintfraction that is not sedimented shall be poured into a clean container. The material at the bottom of thecontainer shall then be loosened up by means of a wide spatula, homogenizing the pigment with thevehicle.

    NOTE The part not sedimented that has been removed shall be reincorporated into the paint underagitation until the composition becomes uniform.

    4.8.8 Mixing, homogenization, and dilution shall only be carried out during application.

    4.8.9 Paints shall not remain in spray units and painter's buckets from one day to the other. In thatcase, leftover paint shall be collected into a container, which shall be closed, and once again mixedand/or homogenized before being used again.

    4.8.10 The paints to be sprayed may need to be diluted when a satisfactory application is not possible

    by adjusting or regulating the air pressure and spraying equipment.

    4.8.11 When paint dilution actually proves to be necessary, since previously authorized in writing byPETROBRAS, the thinner specified by the paint manufacturer shall be used. The maximumpercentage of thinner specified in the technical bulletin of the product, based on the applicationmethod to be used, shall not be exceeded.

    4.8.12 For paints comprised of 2 or more components of chemical curing, the induction period and potlife of the mixture shall be observed.

    4.8.13 Dryers must not be added to the paint.

    4.9 Paint Application

    4.9.1 The paint scheme shall be always applied with the paint of the same manufacturer, even at thefactory painting.

    4.9.2 Any promotional painting or shop primer applied shall be removed just before the application ofthe paint systems specified in this Standard, except in cases where the manufacturer ensures theintegrity and performance of the coating.

    4.9.3 Surface preparation and paint application are permitted, wholly or in part, at the manufacturersfacilities or at the job site (onshore or offshore facilities), provided these operations are witnessed by apainting inspector certified and accepted by PETROBRAS.

  • 7/29/2019 NI-0013

    11/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    11

    4.9.4 For equipment or piping to be welded during assembly, a 5 cm strip shall be left unpainted ateach pipe end. The surface of this strip shall be prepared and primer shall be applied there to afterwelding and tests, including hydrostatic testing.

    4.9.5 Before primer is applied, the surfaces subjected to abrasive blasting or water jetting shall beinspected in accordance with PETROBRAS N-9 and ABNT NBR 14847 and NBR 15185 as tocorrosion spots, grease, moisture, and other contaminants. In case of water jetting, immediatelybefore painting, the surfaces that present flash rust grade greater than moderate shall receive freshwater cleaning under high pressure of at least 34 MPa (5 000 psi). For equipment internal coating isaccepted only light flash rust.

    4.9.6 Slots, corners, and depressions that are difficult to paint shall be sealed by means of welds,mastic asphalt, an epoxy mastic or anticorrosive coatings approved by PETROBRAS.

    4.9.6.1 Sealing by means of welds shall be performed before painting.

    4.9.6.2 Sealing by means of epoxy mastic or mastic asphalt may be performed after blasting or rightafter primer application.

    4.9.7 Before each paint coat is applied, the entire surface shall undergo a cleaning process by meansof a vacuum cleaner, a brush, a soft broom, air blowing or a damp cloth to remove the dust. Thecleaning process shall be defined based on the specific conditions of each work.

    4.9.8 No paint shall be applied when the ambient temperature is below 5 C, except in the case of

    paints whose skinning mechanism is exclusively by evaporation of solvents. Such paints may beapplied provided the ambient temperature is 2 C or above.

    4.9.8.1 No paint shall be applied when the ambient temperature is expected to drop below 0 Cbefore the paint is dry-hard.

    4.9.8.2 No paint shall be applied to metal surfaces having temperatures below the dew pointtemperature + 3 C or to surfaces with a temperature above 52 C. In the case of paints based on zincethyl silicate, the temperature of the metal surface shall not exceed 40 C.

    4.9.8.3 No paint shall be applied on rainy, foggy or hazy days or when the relative humidity is higherthan 85 % or when this humidity level is expected to be reached. In case of paints based on ethylsilicate zinc, the relative humidity shall be between 60 % and 85 %.

    4.9.8.4 Paints formulated specifically for application on surfaces with moisture condensation, with aresidual moisture or wet, are not subject to relative humidity and dew point restrictions.

    4.9.9 Reinforcement painting using a broad brush at critical points, such as welded regions, nuts andbolts, sharp edges, cavities and crevices, pits, flanges and flanged valves, edges and beam corners,shall be obligatorily performed on the substrate and between each coat applied (stripe coat), exceptfor zinc-rich inorganic paints.

    4.9.10 Each paint coat shall have a uniform dry film thickness and be free from flaws as thosementioned in 6.5 of this Standard.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009
  • 7/29/2019 NI-0013

    12/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    12

    4.9.11 The recommended thicknesses are those mentioned in the specific PETROBRAS standardsfor each paint system.

    4.9.12 The time intervals (maximum and minimum) between coats shall be those mentioned in thespecific PETROBRAS standards for each paint system. If the time intervals are not informed on thepaint system, the paint manufacturer shall be consulted. In the case of solvent-free epoxy finish paint(see PETROBRAS N-2629andN-2680), provided this is recommended in the specific standard foreach paint system and it is operationally possible, the second coat may be applied as soon as the firstcoat is dry to the touch.

    4.9.13 Equipment, steel structures and piping painted before being assembled shall not be handledbefore the minimum drying period for reapplication of the paint used has elapsed.

    4.9.14 Handling after the drying period mentioned in 4.9.13 shall be effected in such a manner as to

    minimize damages to the painting, using wire ropes with protection or leather straps for small parts.

    4.9.15 The damages in painting of equipment, steel structures and piping segments, due to assemblyand/or transportation processes, shall be touched up using the system originally applied, wheneverthis is operationally acceptable.

    NOTE For the paint of PETROBRASN-1661andN-2231the provisions in 5.1.1.5 shall be followed.

    4.9.16 Regions welded after assembly shall receive the same primer as the original system. Thesurface treatment shall be done by abrasive blasting, grade Sa 2 1/2 from ISO 8501-1. If abrasiveblasting is not possible to be used, the surface preparation shall be performed by mechanical and

    rotation tools according to SSPC-SP 11.

    4.9.17 In the case of epoxy paints, when the time intervals for repainting are exceeded, the previouscoat shall receive a treatment using a rotating brush, sanding or light abrasive blasting for loss ofshine or even the equivalent water jetting on the surface followed by cleaning with non-oily solvent toallow the adhesion of the subsequent coat. Zinc-rich paints shall only be washed with fresh waterunder pressure (1 500 psi to 3 000 psi). For paints in which the skinning mechanism occursexclusively through solvent evaporation, cleaning shall be performed with a cloth dampened with asolvent recommended by the manufacturer. In the case of resinous oil paints (PETROBRASN-2492)the surface should be cleaned with mineral turpentine free from contaminants. [RecommendedPractice]

    4.9.18 During the paint application and drying phase, care shall be taken to prevent contamination ofthe surface by ashes, salt, dust, and other contaminants.

    4.9.19 Machined surfaces and others that are not to be painted, but which require protection, shall becovered with a layer of removable varnish. E.g.: anchor bolts shall be protected with a removablevarnish right after they have been placed.

    4.9.20 Painted steel structures, piping systems and equipment, not yet assembled, shall be kept at acertain distance from each other and from the ground and shall be positioned in such a manner as tominimize the number of areas allowing buildup of rainwater, earth, contamination or deterioration of

    the paint film.

    NOTE Such parts shall be cleaned and touched up with the paint(s) required whenever this isnecessary for maintenance of the film integrity.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2492http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2492http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2492http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661
  • 7/29/2019 NI-0013

    13/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    13

    4.9.21 Recently painted equipment or piping shall not be placed in operation before total curing of thepaints used.

    4.9.22 For maintenance painting only cracked or non-adhering paint shall be removed, when totalrepainting is not required, as a result of a technical and economic analysis.

    4.9.22.1 In those areas in which the original paint presents a thick layer, all edges shall be beveled orreduced by sanding.

    4.9.22.2 Partial repainting shall be done so as to minimize any damage to the part of the painting thatis in good conditions. The paints used shall be compatible with the original paiting scheme andsupplied by the same paint maker, but not necessarily the same one that supplied the paints for theoriginal painting scheme.

    5 Specific Conditions

    5.1 Paints

    5.1.1 Zinc-Rich Paints (PETROBRASN-1277, N-1661,N-1841andN-2231)

    5.1.1.1 Mixing and homogenization shall be performed as uniformly as possible. For silicate-basedpaints, in case the zinc powder is supplied in a separate package, the zinc powder shall be addedslowly to the vehicle and with constant agitation for a uniform mixture to be obtained.

    5.1.1.2 After mixing and homogenization the paint shall pass through a No. 80 to No. 100 meshscreen, except in those cases in which the application equipment has a suitable screen that separatesonly contaminants without separating the pigment.

    5.1.1.3 Spraying shall only be performed with painting equipment with mechanical agitation duringapplication.

    5.1.1.4 Zinc silicate-based paints (PETROBRAS N-1661, N-1841 and N-2231) shall not be appliedwith a brush or roller.

    5.1.1.5 Ethyl silicate-based paints (PETROBRASN-1661 eN-2231) shall not be touched up with thesame product. In that case amide-cured zinc powder epoxy primer (PETROBRASN-1277) shall beused as a substitute only for operating temperatures up to 120 C.

    NOTE For temperatures higher than 120 C there is no zinc-rich paints qualified to perform painttouch ups. In this case, the paint applied shall be removed and the original scheme shouldbe repeated.

    5.1.2 Solvent-Free Epoxy Finish Paint (PETROBRAS N-2629, N-2680 and N-2912, Types IIand III)

    Whenever this is operationally possible, the second coat shall be applied as soon as the first coat isdry to the touch. Otherwise, the minimum and maximum time intervals recommended by themanufacturer of paint shall be respected.

    NOTE In the case of using the above systematic, it is not necessary to measure the film thicknessand perform the adhesion test on the first coat.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277
  • 7/29/2019 NI-0013

    14/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    14

    5.2 Application Process

    All painting shall be applied, preferably, using airless spray gun. In technical impossibility of using theairless gun, other application methods may be used, since approved by PETROBRAS.

    5.2.1 Air Less Gun

    5.2.1.1 It shall be used for applying paints with low or no solvent content, or of high tixotropy,especially when a high productivity and a large thickness per coat are desired.

    EXAMPLE

    Solvent-free epoxy finish paint and paints with a high solids content by volume ( 80 %) asper PETROBRAS N-2628, N-2629,N-2630, N-2680andN-2912 types II and III.

    5.2.1.2 Nozzles shall be those recommended by the manufacturer for the paint to be applied.

    5.2.1.3 The painting equipment shall have air pressure meters and regulators.

    5.2.1.4 The pressure of the pneumatic pump of the painting equipment shall be adjusted according tothe type of paint being sprayed.

    5.2.1.5 During the application, the gun shall be held perpendicularly to the surface and at a constantdistance to ensure the application of a wet coat of paint, and the paint shall reach the surface still in

    sprayed form.

    5.2.1.6 For an even paint coat, shall be overlapped half the width of the previous paint stroke.

    5.2.2 Conventional Gun

    5.2.2.1 It shall be used in paint that requires quality finish.

    5.2.2.2 Compressed air used in the gun shall be free from water and oil. The equipment shall operate

    in a compressed air line provided with filters, containing silica gel and activated carbon, for removal ofwater and oil, respectively. Filters shall be periodically drained during the painting operation.

    5.2.2.3 Painting equipment shall have paint and air pressure meters and regulators.

    5.2.2.4 Air caps, nozzles and needles shall be those recommended by the paint manufacturer for thepaint to be sprayed.

    5.2.2.5 The pressure on the paint in the deposit and the pressure of air in the gun shall be adjustedaccording to the paint being sprayed.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2629http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628
  • 7/29/2019 NI-0013

    15/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    15

    5.2.2.6 The pressure on the paint in the deposit shall be adjusted whenever necessary to make up forvariations caused by raising the gun above the deposit. For paints based on zinc ethyl silicate, the gunand the pressure tank shall be approximately at same level.

    5.2.2.7 The air pressure in the gun shall be sufficiently high to atomize the paint, but not so high as tocause excessive mist, excessive evaporation of solvent or losses by excessive spraying.

    5.2.2.8 During the application, the gun shall be held perpendicularly to the surface and at a constantdistance to ensure the application of a wet coat of paint, and the paint shall reach the surface still insprayed form.

    5.2.2.9 This application method shall not be used in areas with strong winds or in extremely thinstructures leading to excessive paint losses.

    5.2.2.10 For an even paint coat, shall be overlapped half the width of the previous paint stroke.

    5.2.3 Brush

    5.2.3.1 The brush shall be made of natural, vegetable or animal fiber in such a manner that no fibersare released during the paint application process. Brushes shall be kept conveniently clean and freefrom any residues.

    5.2.3.2 To be used for painting small touch-ups, welded regions, irregular surfaces, square edges andcavities, except in the case of silicate based zinc-rich paints.

    5.2.3.3 Brushes shall not be more than 125 mm (5) wide.

    5.2.3.4 Paint shall be applied so that the film does not show pronounced brush marks after drying.

    5.2.3.5 Brushes are also used for correcting dripping or waviness.

    5.2.4 Roller

    5.2.4.1 For application of epoxy paint a specific short nap roller shall be used. Construction materialsshall be properly resistant to paint solvents.

    5.2.4.2 To be used for painting extensive flat areas, cylindrical or spherical areas of long radius,except in the case of silicate-based zinc-rich paints.

    5.2.4.3 The first coat shall be applied in parallel strips and the next coat, crosswise to the previousone. Whenever possible, painting shall be started at the top part.

    NOTE Surface parts with irregularities or inaccessible to the roller shall be painted with a brush or

    gun.

    5.2.4.4 Between 2 adjacent strips of the same coat there shall be a minimum overlapping of 5 cm.

  • 7/29/2019 NI-0013

    16/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    16

    5.2.4.5 Paint shall be applied so that there are no blisters, peeling of the previous coat orimpregnation of fibers removed from the roller.

    6 Inspection

    Inspections shall be performed by qualified inspectors according to ABNT NBR 15218. For carryingout inspections taking thickness into account, the minimum dry film thickness specified in the paintingprocedure standards shall be considered.

    6.1 Receipt of Paints and Thinners

    6.1.1 Verify for each batch of received paint, if the results of the analysis certificate issued by thepaint manufacturer are in accordance with requirements table of the product ready for use defined inthe standard specification of the paint. The analysis certificate shall contain the paint curing time.

    6.1.2 Verify if the shelf life and marking of packaging are in accordance with the specific standardsPETROBRAS for each type of paint.

    6.1.3 In case of paints of two components, verify if the shelf life of each component is the same.

    6.1.4 Verify if the conditions of preservation and the fill level of packaging are in accordance withPETROBRASN-1288.

    6.1.5 Verify if the thinner and paint are from the same manufacturer.

    6.2 Surface Preparation

    6.2.1 A visual inspection shall be performed to check if the surface is free of dust, oil, corrosion spots,and other contaminants according to ABNT NBR14847 and NBR 15185.

    6.2.2 The surface shall be compared with the degree of cleanliness specified in the paint system,based on ISO 8501-1, NACE WJ-1/SSPC-SP WJ 1, NACE WJ-2/SSPC-SP WJ 2,NACE WJ-3/SSPC-SP WJ 3, NACE WJ-4/SSPC-SP WJ 4 and NACE VIS 7/SSPC-VIS 4.

    6.3 Roughness Profile

    The roughness profile shall be determined according to the recommendations in PETROBRAS N-9and ABNT NBR 15488.

    6.4 Relative Humidity and Temperature

    The relative humidity, ambient temperature and substrate temperature shall be measured before paintapplication. The measurements control of relative humidity, ambient temperature and substratetemperature shall be done in a specific report, at intervals of 1 hour. The relative humidity and ambient

    temperature shall be measured at the place where the painting is being done.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1288http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1288http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1288http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009
  • 7/29/2019 NI-0013

    17/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    17

    6.5 Film

    Check if each paint coat (during application and after exposure) is free from flaws and/or defects of thefollowing types:

    a) dripping;b) blistering;c) wrinkling;d) cracking;e) fisheye (craters);f) impregnation of abrasive and/or contaminants;g) peeling;h) oxidation/corrosion;i) inclusion of hairs;j) pores;k) bleeding;l) spotting;

    m) oversprayn) chalking;o) boil.

    NOTA Failures and/or defects caused by actions unrelated to the painting process such asmechanical damage or burns are not in the scope of this standard.

    6.6 Adhesion

    6.6.1 General Criteria

    The areas to be tested shall be indicated by PETROBRAS.

    6.6.1.1 The X Adhesion test established in ABNT NBR 11003, shall be performed after the minimumdrying period for repainting of each coat has elapsed.

    6.6.1.2 The pull-off test shall be performed after total cure of the coating, according toASTM D 4541:2009, Method D - Equipment Type IVorABNT NBR 15877:2010, Annex A.2.

    NOTE 1 Whenever possible, the adhesion test shall be carried out on representative test specimensof the surface being coated, thereby preventing damages to the paint. If that is not possible,the test may be performed on the surface being coated, provided the damaged area is

    properly touched up.NOTE 2 For the purposes of this Standard, representative test specimens is made of the same

    material as the substrate to be coated, with minimum dimensions of 0,5 m x 0,5 m. In case ofpiping, segments of at least 50 cm shall be used. The whole process of coating thespecimen shall be performed simultaneously with the application of the coating on thestructures or equipment, so the same operational conditions (relative humidity, temperatureetc.).

    6.6.1.3 Two test methods to evaluate paint adhesion are established:

    a) pull-off test, according to ASTM D 4541:2009, Method D - Equipment Type IV orABNT NBR 15877:2010,Annex A.2;

    b) X test (method A), according to ABNT NBR11003;

    6.6.1.4 For piping, at least one test shall be performed for every 100 m or fraction of pipe length.

  • 7/29/2019 NI-0013

    18/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    18

    6.6.1.5 For the other items covered by this Standard, a number of tests corresponding, in absolutevalue, to 1 % of the total painted area shall be performed. For example:

    a) for a painted area of 25 m2

    (1 % of 25 is equal to 0,25) at least one adhesion tests shall

    be performed;b) for a 300 m2

    area (1 % of 300 is equal to 3), at least 3 tests shall be performed, distributeduniformly throughout the entire painted area.

    NOTE 1 The referenced criteria is valid when the area is painted using the same batch of paint andthe painting is made at the same day, not being allowed to add the areas in order to quantifythe number of tests.

    NOTE 2 When the painting is made using different batches of the same paint and it does not bemade at the same day, the painted areas shall be identified, mapped and inspectionedseparately in accordance with the criterion established in 6.6.1.5.

    NOTE 3 The adhesion test shall be made priorately in areas which are considered as critical in thepainted structure, such as the Heat Affected Zone (HAZ), by and also in areas where theaccess is hard, which may have faults in the painting.

    6.6.2 Description of Tests

    6.6.2.1 X Adhesion Test

    The X test (method A) shall be performed after applying each coat, based on ABNT NBR 11003regardless of the dry film thickness and for all kind of paints.

    6.6.2.2 Pull-Off Test

    6.6.2.2.1 The test shall be performed after total application of the coating and curing time andwhenever the procedure standard of painting system or contractual requirements determine the test.

    6.6.2.2.2 The test and results record shall be done based on ASTM D 4541:2009, Method D -Equipment Type IV or ABNT NBR 15877:2010,Annex A.2.

    6.7 Wet Film Thickness (WFT)

    6.7.1 During paint application, the WFT shall be carefully monitored by the painter and paintinginspector so as to avoid unacceptable variations in the dry film thickness.

    6.7.2 For piping, at least one measurement shall be performed for every 10 m or fraction of length.

    6.7.3 For the other items covered by this Standard, a number of measurements corresponding, inabsolute value, to 20 % of the total painted area shall be made. For example:

    a) for a painted area of 25 m2

    (20 % of 25 is equal to 5), at least five thicknessmeasurements shall be made, distributed uniformly throughout the entire painted area;

    b) for a 300 m2

    area (20 % of 300 is equal to 60), at least 60 WFT measurements shall bemade, distributed uniformly throughout the entire painted area.

    6.8 Dry Film Thickness (DFT)

    6.8.1 The thickness shall be measured after the minimum drying period for reapplication of each coathas elapsed, in accordance with ABNT NBR 10443.

  • 7/29/2019 NI-0013

    19/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    19

    6.8.2 For piping, thickness measurements shall be made for every 25 m or fraction of pipe length.

    6.8.3 For the other items covered by this Standard, a number of tests corresponding, in absolute

    value, to 10 % of the total painted area shall be performed. For exemple:

    a) for a painted area of 25 m2

    (10 % of 25 is equal to 2,5) at least three adhesion tests shallbe performed, distributed uniformly throughout the entire painted area;

    b) for a 300 m2

    area (10 % of 300 is equal to 30), at least, 30 tests shall be performed,distributed uniformly throughout the entire painted area.

    6.9 Holidays

    The test for determining holidays shall be carried out after the maximum drying period for reapplicationof the paint used on the last finish coat has elapsed. The test shall be carried out in 100 % of the areaaccording to PETROBRAS N-2137 and whenever this is called for by the painting standard of theequipment, structures, and piping.

    7 Acceptance and Rejection Criteria

    7.1 Recept of Paints and Thinners

    Paints and thinners shall attend the requirements of the subsection 6.1. Shall be rejected supplies thatdo not attend the established requirements.

    7.2 Surface Preparation

    7.2.1 The examined surface shall not present traces of the materials mentioned in 6.2.1.

    7.2.2 The surface shall present cleanliness as required in the technical specification for painting.

    7.3 Relative Humidity and Temperature

    Painting services shall be performed in accordance with the following humidity and temperatureconditions:

    a) maximum relative humidity (RU) of 85 %, except in the case of 4.9.8.4; For paints basedon zinc ethyl silicate, the humidity shall be between 60 %and 85 %;

    b) maximum surface temperature of 52 C, except for primer zinc ethyl silicate, in whichcase it is 40 C;

    c) minimum surface temperature of 3 C above dew point, except in the case of 4.9.8.4;d) room temperature: no paint shall be applied when the ambient temperature is below

    5 C, except in the case of paints that are dried exclusively by the evaporation ofsolvents; such paints may be applied if the temperature is not below 2 C.

    7.4 Film

    Flaws and/or defects such as those mentioned in 6.5 shall not be accepted.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2137http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2137http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2137
  • 7/29/2019 NI-0013

    20/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    20

    7.5 Adhesion

    7.5.1 X Adhesion Test

    7.5.1.1 The results of the adhesion test shall be compared with the visual standards ofABNT NBR 11003, in accordance with the criteria described in 7.5.1.2 and 7.5.1.3.

    7.5.1.2 For the adhesion test performed by method A (cross-section in X), the qualitative technicalcriteria for acceptance shall be as follows:

    7.5.1.2.1 Assessments along the incisions: X1 (maximum) when the primer is rich-zinc, the maximumvalue is X2.

    7.5.1.2.2 Assessment on intersection of cross-sections: Y2 (maximum), for any type of paint.

    NOTE The result X2 (maximum) is also valid for subsequent coats to rich-zinc primer coat(PETROBRAS N-1277, N-1661, N-1841andN-2231).

    7.5.1.3 If a test is rejected it shall be repeated at 2 points located 1 m from the previous test. These 2tests shall not be computed in the criteria set out in 6.6.1.4 e 6.6.1.5.

    7.5.1.3.1 If both tests do not show signs of lack of adhesion, repair the paint film on the tested regionsand the test is considered approved.

    7.5.1.3.2 If one of the tests shows signs of lack of adhesion, the entire painting corresponding to thatinspection shall be rejected.

    7.5.2 Pull-off Test

    7.5.2.1 The acceptance criteria for the test are set out in Annex A of this Standard.

    7.5.2.2 The Figure 1 illustrates the types of adhesion failure.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277
  • 7/29/2019 NI-0013

    21/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    21

    Figure 1 - Types of Adhesion Failure

    7.5.2.3 If any test is failed, it shall be repeated at 4 diametrically opposite points, spaced 300 mmfrom the local of the failure of the previous test. These 4 tests should not be included on the criteria

    described in 6.6.1.4 and 6.6.1.5.

    7.5.2.4 If the 4 tests are approved the regions tested shall be repaired and the test is consideredapproved.

    NOTE The repair shall be performed in a circular area with a radius of 200 mm, considering eachfailure as the geometric center.

    7.5.2.5 If at least one of the four tests is failed, all the painting that corresponds to this inspection shallbe rejected.

    7.6 Wet Film Thickness (WFT)

    The minimum wet film thickness (WFT) is obtained by dividing the specified dry film thickness (DFT)by the value of the percentage of solids by volume (SV), multiplied by 100 (WFT = (DFT / SV) x 100).Any measurement found below this value shall be immediately corrected.

    7.7 Dry Film Thickness (DFT)

    7.7.1 No thickness measurement, made according to 6.8.1, shall present a value below the minimumdry film thickness specified in the paint system. Whenever the minimum thickness is found to be

    smaller than that specified, the area shall be mapped by means of new measurements and anadditional coat shall then be applied, or a compensation on the next coat, since the paints are of thesame chemical nature and mechanism of corrosion protection. For silicate based zinc-rich paints(PETROBRAS N-1661, N-1841,N-2231), it shall be totally removed for new application.

    7.7.2 Areas with an increase of up to 40 % in the thickness per coat specified in the paint system areaccepted. For increases above 40 %, the manufacturer shall be contacted about the possibility ofacceptance. For ethyl silicate-based zinc-rich paints (PETROBRASN-1661 andN-2231), an increaseof up to 20 % in the minimum thickness per coat specified in the paint system is accepted.

    7.8 Holidays

    7.8.1 The surface examined according to 6.9 shall not present holidays and the region presentingflaws shall be touched up.

    7.8.2 The test for determining holidays shall be done with a report showing the mapping of porosities.These porosities shall be touched up and re-test shall be done to verify if the touch-ups weresatisfactory.

    8 Safety

    8.1 Paint storage areas shall be provided with a fire-fighting system and may not be used to storeanother type of material.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1841http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661
  • 7/29/2019 NI-0013

    22/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    22

    8.2 Dry and humid abrasive blasting equipment operators shall be duly protected according torecommendations contained in PETROBRAS N-9.

    NOTE The company responsible for water jetting must have a written procedure related to safety

    aspects for execution of the service.

    8.3 In painting application shall be used mask with chemical filter (suitable for protection againstorganic vapors).

    NOTE The mask with mechanical filter is suitable only for protection against dust and should not beused in operations where there is contact with organic vapors.

    8.4 The use of a holiday detector when the weather presents risk of lightning discharges is notallowed.

    8.5 The recommendations of local security organs.

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0009
  • 7/29/2019 NI-0013

    23/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    23

    Annex A - Table

    Table A.1 - Acceptance Criteria for Pull-Off Test

    PETROBRASstandard

    ConditionPainting system

    (PETROBRAS standard)

    Minimumpull-offstrength

    (MPa)

    Type offailure not-acceptable

    11

    stcoat:N-2630(100 m)

    2nd

    coat:N-2677 (70 m)15 A/B

    2 Single coating:N-2231(75 m) 10 A/B

    31

    stcoat:N-1514(15 m)

    2nd

    coat:N-1514(15 m)5 A/B

    41

    st

    coat:N-1661(75 m)2

    ndcoat:N-1202(30 m)

    3rd

    coat: N-2628(100 m)4

    thcoat: N-2677(70 m)

    10 A/B

    5 Single coating:N-2231 (100 m) 10 A/B

    61

    stcoat:N-2680(160 m)

    2nd

    coat: N-2680 (160 m)15 A/B

    7 Single coating:N-2680 (100 m) 15 A/B

    8Alternatively: Single coating:

    N-2912, type I (200 m)12 A/B

    9Single coating:N-2912 type II

    (400 m)15 A/B

    N-2

    10Single coating: N-2912type III

    (400 m)15 A/B

    1 Single coating:N-2231 (75 m) 5 A/B

    21

    stcoat: N-2630(100 m)

    2nd

    coat:N-2677 (70 m)15 A/B

    3

    1st

    coat:N-1661(75 m)2

    ndcoat:N-1202 (30 m)

    3rd

    coat:N-2628(100 m)4th coat: N-2677(70 m)

    15 A/B

    41

    stcoat: N-2680 (160 m)

    2nd

    coat: N-2680 (160 m)15 A/B

    5 Single coating:N-2680(100 m) 15 A/B

    N-442

    6Alternatively: Single coating:

    N-2912, type I (200 m)12 A/B

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0002http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0442http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1514http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0442http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-0002
  • 7/29/2019 NI-0013

    24/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    24

    Table A.1 - Acceptance Criteria for Pull-Off Test(Continuation)

    PETROBRAS

    standard

    ConditionPainting system

    (PETROBRAS standard)

    Minimumpull-off

    strength(MPa)

    Type offailure not-

    acceptable

    Galvanized steel withoutcorrosion

    1st

    coat:N-2198 (20 m)Following coatings: according to

    defined painting system.12 A/B

    Galvanized steel withlocalized corrosion area

    1st

    coat:N-1277 (50 m)Following coatings: according to

    defined painting system.12 A/B

    Galvanized steel withgeneralized corrosion

    area

    1st

    coat: N-2288 (100 m)Following coatings: according to

    defined painting system.15 A/B

    Stainless steel,aluminium, non-ferrousalloys and cast iron -

    atmospheric zone

    1st

    coat:N-2198(15 to 20 m)2

    ndcoat:N-2677 (60 m)

    12 A/B

    Stainless steel,aluminium, non-ferrousalloys and cast iron -immersion conditionsand areas subject to

    pounding, temperatureup to 80C

    1st

    coat: N-2680(150 m)2

    ndcoat: N-2680 (150 m)

    15 A/B

    Stainless steel,aluminium, non-ferrousalloys and cast iron -immersion conditionsand areas subject to

    pounding, temperatureof 80 C to 150 C

    1st

    coat:N-2912 type II (150 m)2

    ndcoat: N-2912 type II (150 m)

    15 A/B

    N-1021

    Composites andpolymeric materials

    1st

    coat:N-2198 (15 to 20 m)2

    ndcoat:N-2677 (60 m)

    12 A/B

    N-1192 Internal cargo tank 1

    st

    coat:N-2680(150 m)2nd

    coat: N-2680(150 m) 15 A/B

    Transition zone alternative B

    1st

    coat:N-2680(150 m)2

    ndcoat:N-2680 (150 m)

    3rd

    coat: N-2680 (150 m)15 A/B

    Atmospheric zone ambient temperature up

    to 80 C

    1st

    coat:N-2680(150 m)2

    ndcoat:N-2680(150 m)

    3rd

    coat:N-2677 (60 m)15 A/B

    Atmospheric zone temperature between

    80 C and 150 C

    1st

    coat:N-2912 tipo II (175 m)2

    ndcoat: N-2912tipo II (175 m)

    15 A/B

    Atmospheric zone

    temperature between150C and 500C

    Single coating:N-2231 (100 m) 10 A/B

    N-1374

    Antiskid floor painting1

    stcoat:N-2680 (150 m)

    2nd

    coat: N-2680 (150 m)3

    rdcoat: antiskid paint (500 m)

    15 A/B

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2288http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1021http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1192http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1374http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-2288http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2198http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1374http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1192http://nortec.engenharia.petrobras.com.br/link.asp?cod=N-1021
  • 7/29/2019 NI-0013

    25/28

    -PUBLIC-

    N-13 REV. K ENGLISH 12 / 2012

    25

    Table A.1 - Acceptance Criteria for Pull-Off Test(Continuation)

    PETROBRASstandard

    ConditionPainting system

    (PETROBRAS standard)

    Minimumpull-offstrength

    (MPa)

    Type offailure not-

    acceptable

    Internal painting ofcargo, ballast, and

    slop tanks

    1st

    coat: N-2680 (150 m)2

    ndcoat: N-2680 (150 m)

    3rd

    coat:N-2680(150 m)15 A/B

    N-1374

    Internal painting ofpotable water tanks

    1st

    coat: certified paint (150 m)2

    ndcoat: certified paint (150 m)

    15 A/B

    11

    stcoat: N-2630(100 m)

    2nd

    coat:N-2677(70 m)15 A/B

    21

    stcoat:N-1277 (50 m)

    2nd

    coat: N-2628 (200 m)3

    rdcoat: N-2677(70 m)

    15 A/BN-1550

    3 Single coating:N-2680 (150 m) 15 A/B

    1st

    coat:N-2630 (100 m)2

    ndcoat:N-2677 (70 m)

    11

    stcoat:N-2680(100 m)

    2nd

    coat:N-2677(70 m)

    15 A/B

    2

    1st

    coat:N-1661(75 m)2

    ndcoat: N-1202(30 m)

    3rd

    coat:N-2628(100 m)4

    thcoat:N-2677 (70 m)

    10 A/B

    3 Single coating:N-2231 (100 m) 10 A/B

    41st coat:N-2680 (160 m)2

    ndcoat: N-2680 (160 m)

    15 A/B

    5 Single coating:N-2680 (100 m) 15 A/B

    N-1735

    6Alternatively: Single coating:

    N-2912, type I (200 m)12 A/B

    Alternative A1

    stcoat:N-2680 (150 m)

    2nd

    coat: N-2680 (150 m)3

    rdcoat:N-2680(150 m)

    15 A/B

    N-2037

    Alternative B1

    stcoat: N-2628(150 m)

    2nd

    coat: N-2628 (150 m)3

    rdcoat:N-2628(150 m)

    15 A/B

    11

    stcoat:N-1277 (70 m)

    2nd

    coat: N-2628 (200 m)15 A/B

    21

    stcoat:N-2630(100 m)

    2nd

    coat:N-2677 (70 m)15 A/B

    Storage of non-potable fresh water

    and fuel oil

    1st

    coat: N-2630(100 m)2

    ndcoat: N-2629 (150 m)

    15 A/B

    Storage of potablefresh water

    1st

    coat: Epoxy paint certified(150 m)

    2nd

    coat: Epoxy paint certified

    (150 m)

    15 A/B

    N-2104

    Group III1

    stcoat:N-2630(100 m)

    2nd

    coat:N-2629 (100 m)3

    rdcoat: N-2629(100 m)

    15 A/B

    http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1374http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1277http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1550http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2630http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1661http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1202http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2677http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2231http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-1735http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2912http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2680http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2037http://nortec.engenharia.petrobras.com.br/link.asp?cod=NI-2628http://nortec.engenharia.petrobras.com.br/link.a

Recommended