NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts
Transcript
Page 1: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

NICK TSAMISAERE 423 FALL 2009

Composite Rockoon Parts

Page 2: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Purpose of Project

The ISU Rockoon Team is a project dedicated to launching a Rocket/High-Altitude weather balloon structure to ~85,000 ft. then igniting the payload rocket at this altitude.

Nick Tsamis is the composites group leader for the team and used the project to support the team in building any of the composites necessary for the advancement and success of the project.

Public info about the project: http://wiki.seds.org/index.php/ISU_Rockoon_Project

Page 3: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

What the Project Entails

1) Pre-preg Carbon Fiber electronics tray for the payload box.

2) Pre-preg Carbon Fiber electronics tray for the rocket’s coupler.

3) Pre-preg Carbon Fiber Rocket Fins to be used later for testing and re-design.

Page 4: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

The Current Payload Box

Page 5: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Emphasis of the Project

Weight was the main driving factor in all of the pieces made for this project. The pieces were to replace old fiberglass boards.

Strength was not a major concern. Stress/strain analysis was not necessary for the project due to the non-existence of strength requirements for the pieces. It was assumed that because these pieces are not high-load bearing composites, their strength alone would be more than satisfactory.

A new manufacturing technique is also being tested.

Page 6: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Methodology Used

After weight considerations, manufacturing quality was the second most important aspect of the project.

Extreme care during bagging procedures was criticalThe heated press was used to create a nice finish all

the way throughout the parts as well as a to make a highly reproducible part.

A new methodology for the heated press was used that had never been attempted before.

Since the trays were all to be of the same size and 4 of them were needed, all 4 trays were attempted to be laid together in the same press.

Page 7: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Temperature and Pressure Considerations

Min Temp. – Room Temperature ~80 FMax Temp. – 350 F due to presses abilityMin Press. – 2160 psi Max Press. – 7.2 tons forceOne cycle with temperature and pressure

holds at 250 F and 350 F at 7.2 tons psi.Entire cycle takes about 3 hours

Page 8: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Heated Press Profile Used

Room Temperature,

vacuum sealed

250 Degrees FIncrease pressure to 7.2 tons force

350 Degrees FFull pressure at 7.2 tons force

Cooled to Room Temperature

Pressure returns to normal

Held for 60 minutes

Held for 120 minutes

Temperature increased linearly from room temp to 250 F

Pressure increased linearly from 1.08 tons to 7.2 tons

Temperature decreased linearly from 350 F to 80 F

Pressure decreased linearly from 7.2 tons to 0 tons

Page 9: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

First Layup - Specs

To be used for the electronics tray of the rocket.Needed to be ~.125 inches thickPurpose was to be as lightweight as possibleA 12 inch by 12 inch pre-preg CF sheet was to be

constructed.Total of 15 plies of pre-preg to be used for one

sheetPlies were laid alternating at [08 ,907] for weight

reduction but to maintain durability.After it is made, it is to be cut to 12 inches long

by 74mm wide to fit into the rocket’s coupler

Page 10: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

First Layup - Picture

Page 11: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Electronics Tray - Cut

Page 12: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Electronics Tray – In Rocket’s Coupler

Page 13: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Second Layup – Specs

New manufacturing technique was to be tested4 Trays for the project’s payload box,

(containing the transmitter and any test equipment used for test launches) were to be constructed

All trays were to be 12 inches by 12 inches Again, strength not an issue- used as fiberglass

tray replacements due to the fiberglass being overly heavy (as well as overly rigid)

Total of 6 plies were used for each sheetAgain plies were laid alternating at [03 ,903]

Page 14: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

CF Trays – New Technique

Due to the new technique, we didn’t know what to expect considering the release film specifically.

Bagging technique was similar to any normal bagging except that an extra layer of exterior bagging film was used in between each CF laminae sample for extra security.

Each 6 ply sample was wrapped first with one sheet of release file on each side, then one sheet of exterior bagging film. The entire sample was then put under vacuum and heat-pressed.

Page 15: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Fiberglass Trays to be replaced

Page 16: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Pre-preg CF Replacement Trays

Page 17: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Tray Results

The new procedure worked very well. The four sheets were of a very fine quality and all were within 4 grams of each other!

Weight considerations: The fiberglass trays are 8 in. by 8 in. sheets weighing in at

average of 130 grams each. The CF trays were 12 in. by 12 in. sheets weighing in at

average of 120 grams each.Overall weight drop of 41% !!The trays are still within strength requirements,

(they hold all necessary electronics with ease) and less rigid (easier for our box to handle)

Page 18: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Bending Issue with Tray 4

It is evident in the image that the fourth final product has a severe bend to it.

It is my belief that this is not due to the manufacturing procedure, but rather to an occurrence before the laminae were bagged to get pressed. One of the samples had weight placed on it in the lab and the sample was not pressed and refrozen so I believe this is the reason.

Page 19: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Bending Issue with Tray 4

Another possible option is that perhaps one of the plies was not alternated.

This seems less likely to me as there were only 6 plies total and the beginning and ending sheets were in different directions

This implies that the mis-alternating error would have had to have happened twice in the same sample.

Again, still possible, perhaps not plausible.

Page 20: NICK TSAMIS AERE 423 FALL 2009 Composite Rockoon Parts.

Overall Results

Overall the project was a terrific success! The parts are of a very fine quality and they

work!The rocket’s electronics tray has already

been put to use and is performing just as we had hoped.

The trays will be installed as the last designs for the new payload box is finalized.

The 4th sample that ending up bending will not be wasted. The team has plans to put it to use in testing for thermal conductivity and perhaps tests to help us better our final rocket fin design.