Scope of work Provision of Towage Services at an LNG-Terminal NIGERIA LNG Towage Services - Bonny Island, Rivers State Project Provision of Towage Services to the Vessels calling at LNG Terminal at Bonny Island Location Bonny Island, Rivers State, Nigeria Client Nigeria LNG Ltd Period Construction: 2016 - 2018 Operations: April 2018 - 2028 Haven 1025 - Scheldedijk 30 I B-2070 Zwijndrecht, Belgium I T +32 3 250 57 95 I F +32 3 250 56 50 I [email protected] I www.ctow.be
Transcript
Page 1: NIGERIA LNG Towage Services - Bonny Island, … of work Provision of Towage Services at an LNG-Terminal NIGERIA LNG Towage Services - Bonny Island, Rivers State Project Provision of

Scope of workProvision of Towage Services at an LNG-Terminal

NIGERIALNG Towage Services - Bonny Island, Rivers State

ProjectProvision of Towage Services to the Vessels calling at LNG Terminal at Bonny Island

LocationBonny Island, Rivers State, Nigeria

ClientNigeria LNG Ltd

PeriodConstruction: 2016 - 2018Operations: April 2018 - 2028

Haven 1025 - Scheldedijk 30 I B-2070 Zwijndrecht, Belgium I T +32 3 250 57 95 I F +32 3 250 56 50 I [email protected] I www.ctow.be

Page 2: NIGERIA LNG Towage Services - Bonny Island, … of work Provision of Towage Services at an LNG-Terminal NIGERIA LNG Towage Services - Bonny Island, Rivers State Project Provision of

NIGERIALNG Towage Services - Bonny Island, Rivers StateGeneral informationNigeria LNG Ltd (NLNG) operates a 6-train LNG Terminal in Nigeria.

The Terminal is called upon by LNG, LPG and condensate tankers.

In collaboration with the Nigerian Ports Authority (NPA), NLNG has, in order to ensure the export of LNG, invested in the improved accessibility of the Bonny River.

The size of typical vessels calling at the Terminalare:L.O.A.: 315.00 mB.O.A: 50.00 mLoaded Draft: 12.20 m

In order for the vessel calls to be safe, NLNG has contracted CTOW to provide Towage Services at the Terminal.

Project DescriptionCTOW is constructing two brand new tugs and one pilot launch for the operation of a High Standard Towage and Pilotage Service at the LNG Terminal.

CTOW will provide the Operational Standards and Emergency Plans, as well as audit the earlier mentioned Plans and Standards.

The vessels will be operated by CTOW’s Nigerian subsidiary CMTON Ltd.

CMTON will operate the vessels with a 100% Nigerian crew under a 10 year Contract.

Main equipmentTugs: “CTOW W377” - 75 T BP type ASD2913 “CTOW W378” - 75 T BP type ASD2913

Pilot launch: “CTOW V499” - 19m type StTen1905

Page 3: NIGERIA LNG Towage Services - Bonny Island, … of work Provision of Towage Services at an LNG-Terminal NIGERIA LNG Towage Services - Bonny Island, Rivers State Project Provision of

Scope of workProvision of Harbour Towage Services

NIGERIAHarbour Towage Services - Onne Port, Rivers State

ProjectProvision of Towage Services to the Vessels calling at Onne Port

LocationOnne Port, Rivers State, Nigeria

ClientNigerian Ports Authority / Bonny Channel Company Ltd

PeriodMay 2014 - ongoing

Haven 1025 - Scheldedijk 30 I B-2070 Zwijndrecht, Belgium I T +32 3 250 57 95 I F +32 3 250 56 50 I [email protected] I www.ctow.be

Page 4: NIGERIA LNG Towage Services - Bonny Island, … of work Provision of Towage Services at an LNG-Terminal NIGERIA LNG Towage Services - Bonny Island, Rivers State Project Provision of

NIGERIAHarbour Towage Services - Onne Port, Rivers StateGeneral informationThe Nigerian Ports Authority (NPA) has the Statutory Right to provide all Towage Services in Nigeria.

NPA has, in order to increase the traffic at Onne Port, improved the accessibility of the Bonny River, through dredging works and improvements to the Aids to Navigation.

The size of vessels calling at the port therefore has increased significantly and the need for high standard towage services has surfaced

In order for the vessel calls to be safe, the Vessel Owners have requested NPA to provide Towage Services.

NPA has contracted its Joint Venture “Bonny Channel Company Ltd” to provide the services with CTOW nv, until a permanent solution is set up.

Project DescriptionCTOW has assisted “Bonny Channel Company Ltd” (BCC). with the operation of a High Standard Towage Service in Onne.

CTOW has provided vessels to BCC for the operations and has provided the necessary back up for the provision of Operational Standards and Emergency Plans, as well as auditing the afore mentioned Plans and Standards.

CTOW has provided three vessels over a period of over two years for the execution of the towage services.

Main equipmentTugs: “DUTCH POWER” 40 T BP “DUTCH PEARL” 40 T BP “SEA ALFA” 50 T BP

Page 5: NIGERIA LNG Towage Services - Bonny Island, … of work Provision of Towage Services at an LNG-Terminal NIGERIA LNG Towage Services - Bonny Island, Rivers State Project Provision of

Scope of workProvision of Towage Services at an LNG-Terminal

NIGERIALNG Towage Services - Bonny Island, Rivers State

ProjectProvision of Towage Services to the Vessels calling at LNG Terminal at Bonny Island

LocationBonny Island, Rivers State, Nigeria

ClientNigeria LNG Ltd

PeriodApril 2016 - April 2018ongoing

Haven 1025 - Scheldedijk 30 I B-2070 Zwijndrecht, Belgium I T +32 3 250 57 95 I F +32 3 250 56 50 I [email protected] I www.ctow.be

Page 6: NIGERIA LNG Towage Services - Bonny Island, … of work Provision of Towage Services at an LNG-Terminal NIGERIA LNG Towage Services - Bonny Island, Rivers State Project Provision of

NIGERIALNG Towage Services - Bonny Island, Rivers StateGeneral informationNigeria LNG Ltd (NLNG) operates a 6-train LNG Terminal in Nigeria.

The Terminal is called upon by LNG, LPG and condensate tankers.

In collaboration with the Nigerian Ports Authority (NPA), NLNG has, in order to ensure the export of LNG, invested in the improved accessibility of the Bonny River.

The size of typical vessels calling at the Terminal are:L.O.A.: 315.00 mB.O.A: 50.00 mLoaded Draft: 12.20 m

In order for the vessel calls to be safe, NLNG has contracted CTOW to provide Towage Services at the Terminal.

Project DescriptionCTOW has mobilised two brand new tugs for the operation of a High Standard Towage Service at the LNG Terminal.

CTOW has provided the Operational Standards and Emergency Plans, as well as auditing the earlier mentioned Plans and Standards.

The vessels are operated by CTOW’s Nigerian subsidiary CMTON Ltd.

CMTON operates the vessels with a 100% Nigerian crew.

Main equipmentTugs: “CTOW BIEKE” - 60 T BP type ASD 2810 “CTOW LALA” - 60 T BP type ASD 2810