NIRANTHARA JYOTHI SCHEME:NIRANTHARA JYOTHI SCHEME:
Niranthara Jyothi Project is a prestigious scheme of Niranthara Jyothi Project is a prestigious scheme of Government of Karnataka, to provide 24 hrs 3 phase Government of Karnataka, to provide 24 hrs 3 phase power supply to non-agricultural loads like domestic, power supply to non-agricultural loads like domestic, commercial, water supply, street light, rural commercial, water supply, street light, rural industries, milk dairies etc., in rural areas by industries, milk dairies etc., in rural areas by segregating the agricultural loads, which is a boon to segregating the agricultural loads, which is a boon to the rural economy. the rural economy.
Objectives :Objectives : This will enable BESCOM to give 24X7 supply to Non-This will enable BESCOM to give 24X7 supply to Non-
Agricultural loads in Rural areasAgricultural loads in Rural areas
Reduction in transformer failureReduction in transformer failure
Increase in metered salesIncrease in metered sales
Reduction in technical lossesReduction in technical losses
Improved load managementImproved load management The plan of implementation and progress is shown separately.The plan of implementation and progress is shown separately.
NIRANTHARA JYOTHI SCHEME
• Phase IPhase I
– 25 Lots, 260 feeders, 19 taluks.25 Lots, 260 feeders, 19 taluks.– Project cost :Rs 355.85 cr.Project cost :Rs 355.85 cr.– Expected completion : June-2013.Expected completion : June-2013.
• Phase IIPhase II– 24 lots, 289 feeders, 22 taluks. 24 lots, 289 feeders, 22 taluks. – Project cost :Rs 385.71 cr.Project cost :Rs 385.71 cr.– Work Award issued for 6 Lots, 86 feeders , DWA issued in Nov Work Award issued for 6 Lots, 86 feeders , DWA issued in Nov
2011, Jan-2012 ,works under progress.2011, Jan-2012 ,works under progress.– Work Award issued for 10 Lots ,96 feeders , DWA issued in Work Award issued for 10 Lots ,96 feeders , DWA issued in
Oct, Nov 2012,Works under progress.Oct, Nov 2012,Works under progress.– For the 93 feeders, LOI is issued and works under progress.For the 93 feeders, LOI is issued and works under progress.
STAGES OF IMPLEMENTATION
2
3
Note:* All works relating to 11KV Distribution network is completed in respect of 260 feeders and for the balance feeders to be commissioned requires, segregation and realignment of LT lines.
269*
Sl. NOName of the Circle
Name of the Division
Lot NoTotal No of NJ feeders
(Actual)
STATUS OF NJ FEEDERS AS ON 24.06.13
No. Feeders Completed
No. Feeders Commissioned
No. of feeders work under
progress
1 2 3 4 5 6 7 8
1 KOLAR
Chikkaballapura 8 : Bagepalli 11 11 11 0
SUB TOTAL 11 11 11 0
Chintamani 9 : Shidlagatta 14 14 13 0
SUB TOTAL SUB TOTAL 14 14 13 0
TOTAL (A) 25 25 24 0
2 TUMKUR
Tumkur
13 : Tumkur-1 16 16 15 0
14 : Tumkur-2 9 9 9 0
16 : Gubbi-1 11 11 11 0
17 : Kunigal-1 8 8 7 0
18 : Kunigal-2 8 8 7 0
SUB TOTAL 52 52 49 0
Tiptur11: Tiptur-1 6 6 6 0
12: Tiptur-2 6 6 6 0
SUB TOTAL 12 12 12 0
Madhugiri
24: Madhugiri-1 11 11 10 0
25: Madhugiri-2 & Sira-1
13 13 13 0
26: Sira-2 11 11 11 0
SUB TOTAL 35 35 34 0
TOTAL(B) 99 99 95 0
STATUS OF NIRANTHARA JYOTHI PHASE-I IN BESCOM4
Sl. NOName of the
CircleName of the Division Lot No
Total No of NJ feeders (Actual)
STATUS OF NJ FEEDERS AS ON 24.06.13
No. Feeders Completed
No. Feeders Commissioned
No. of feeders work under progress
1 2 3 4 5 6 7 8
3 DAVANGERE
Chirtadurga 1: Hosadurga 13 13 8 0Sub Total 13 13 8 0
Davangere2: Channagiri 18 18 15 0
3: Jagalur 9 9 9 0
Sub Total 27 27 24 0
Harihara4: Harapanahalli 10 10 10 0
5: Honnali 11 11 10 0
Sub Total 21 21 20 0
Hiriyur20: Hiriyur-1 9 9 9 021: Hiriyur-2 7 7 7 0
Sub Total 16 16 16 0
TOTAL(C) 77 77 68 0
4BANGALORE
RURAL
Chandapura 7: Anekal 5 5 5 0Sub Total 5 5 5 0
Ramanagara22: Kanakapura-1 9 9 7 0
23: Kanakapura-2 10 10 8 0Sub Total 19 19 15 0
Yelahanka
19: Hosakote-2 7 7 7 0
20(A) :Hosakote-1 11 11 11 0
10: Devanahalli 17 17 15 0
Sub Total 35 35 33 0
TOTAL(D) 59 59 53 0
GRAND TOTAL (A+B+C+D)
260 260 240 0
STATUS OF NIRANTHARA JYOTHI PHASE-I IN BESCOM 5
Sl No
Name of
the Circle
Name of the
Division
Lot No./Taluk
Total No. of
NJ feeder
s propos
ed
Total No. of NJ
feeders Completed
Total No. of NJ feeders
Commissioned
Status
1 2 3 4 5 6 7 8
1Bangal
ore Rural
Nelamangala
1:Doddaballapura
17 5 _DWA issued on
10.11.11work under progress.
2Tumku
rMadhugi
ri9:Koratager
e11 3 _
DWA issued on 21.01.12
work under progress
3Tumku
rTiptur
8:Chikkanayakanahalli (part-2)
8 WUP _DWA issued on
10.11.11work under progress
4 Kolar KGF10:Bangarpe
t/KGF
16 WUP _DWA issued on
10.11.11work under progress.
5 KolarChintam
ani13:Chintama
ni15 5 2
DWA issued on 10.11.11
work under progress.
6 KolarChiikabal
lapura16:Gowribid
anur19 2 _
DWA issued on 10.11.11
work under progress.
Total 86 15 2
STATUS OF NIRANTHARA JYOTHI PHASE-II IN BESCOM