6
1 NIRANTHARA JYOTHI SCHEME: NIRANTHARA JYOTHI SCHEME: Niranthara Jyothi Project is a prestigious scheme Niranthara Jyothi Project is a prestigious scheme of Government of Karnataka, to provide 24 hrs 3 of Government of Karnataka, to provide 24 hrs 3 phase power supply to non-agricultural loads like phase power supply to non-agricultural loads like domestic, commercial, water supply, street light, domestic, commercial, water supply, street light, rural industries, milk dairies etc., in rural rural industries, milk dairies etc., in rural areas by segregating the agricultural loads, which areas by segregating the agricultural loads, which is a boon to the rural economy. is a boon to the rural economy. Objectives : Objectives : This will enable BESCOM to give 24X7 supply to This will enable BESCOM to give 24X7 supply to Non-Agricultural loads in Rural areas Non-Agricultural loads in Rural areas Reduction in transformer failure Reduction in transformer failure Increase in metered sales Increase in metered sales Reduction in technical losses Reduction in technical losses Improved load management Improved load management The plan of implementation and progress is shown The plan of implementation and progress is shown separately. separately. NIRANTHARA JYOTHI SCHEME
Transcript
Page 1: NIRANTHARA JYOTHI SCHEME:

1

NIRANTHARA JYOTHI SCHEME:NIRANTHARA JYOTHI SCHEME:

Niranthara Jyothi Project is a prestigious scheme of Niranthara Jyothi Project is a prestigious scheme of Government of Karnataka, to provide 24 hrs 3 phase Government of Karnataka, to provide 24 hrs 3 phase power supply to non-agricultural loads like domestic, power supply to non-agricultural loads like domestic, commercial, water supply, street light, rural commercial, water supply, street light, rural industries, milk dairies etc., in rural areas by industries, milk dairies etc., in rural areas by segregating the agricultural loads, which is a boon to segregating the agricultural loads, which is a boon to the rural economy. the rural economy.

Objectives :Objectives : This will enable BESCOM to give 24X7 supply to Non-This will enable BESCOM to give 24X7 supply to Non-

Agricultural loads in Rural areasAgricultural loads in Rural areas

Reduction in transformer failureReduction in transformer failure

Increase in metered salesIncrease in metered sales

Reduction in technical lossesReduction in technical losses

Improved load managementImproved load management The plan of implementation and progress is shown separately.The plan of implementation and progress is shown separately.

NIRANTHARA JYOTHI SCHEME

Page 2: NIRANTHARA JYOTHI SCHEME:

• Phase IPhase I

– 25 Lots, 260 feeders, 19 taluks.25 Lots, 260 feeders, 19 taluks.– Project cost :Rs 355.85 cr.Project cost :Rs 355.85 cr.– Expected completion : June-2013.Expected completion : June-2013.

• Phase IIPhase II– 24 lots, 289 feeders, 22 taluks. 24 lots, 289 feeders, 22 taluks. – Project cost :Rs 385.71 cr.Project cost :Rs 385.71 cr.– Work Award issued for 6 Lots, 86 feeders , DWA issued in Nov Work Award issued for 6 Lots, 86 feeders , DWA issued in Nov

2011, Jan-2012 ,works under progress.2011, Jan-2012 ,works under progress.– Work Award issued for 10 Lots ,96 feeders , DWA issued in Work Award issued for 10 Lots ,96 feeders , DWA issued in

Oct, Nov 2012,Works under progress.Oct, Nov 2012,Works under progress.– For the 93 feeders, LOI is issued and works under progress.For the 93 feeders, LOI is issued and works under progress.

STAGES OF IMPLEMENTATION

2

Page 3: NIRANTHARA JYOTHI SCHEME:

3

Note:* All works relating to 11KV Distribution network is completed in respect of 260 feeders and for the balance feeders to be commissioned requires, segregation and realignment of LT lines.

269*

Page 4: NIRANTHARA JYOTHI SCHEME:

Sl. NOName of the Circle

Name of the Division

Lot NoTotal No of NJ feeders

(Actual)

STATUS OF NJ FEEDERS AS ON 24.06.13

No. Feeders Completed

No. Feeders Commissioned

No. of feeders work under

progress

1 2 3 4 5 6 7 8

1 KOLAR

Chikkaballapura 8 : Bagepalli 11 11 11 0

SUB TOTAL   11 11 11 0

Chintamani 9 : Shidlagatta 14 14 13 0

SUB TOTAL SUB TOTAL 14 14 13 0

TOTAL (A)   25 25 24 0

2 TUMKUR

Tumkur

13 : Tumkur-1 16 16 15 0

14 : Tumkur-2 9 9 9 0

16 : Gubbi-1 11 11 11 0

17 : Kunigal-1 8 8 7 0

18 : Kunigal-2 8 8 7 0

SUB TOTAL   52 52 49 0

Tiptur11: Tiptur-1 6 6 6 0

12: Tiptur-2 6 6 6 0

SUB TOTAL   12 12 12 0

Madhugiri

24: Madhugiri-1 11 11 10 0

25: Madhugiri-2 & Sira-1

13 13 13 0

26: Sira-2 11 11 11 0

SUB TOTAL   35 35 34 0

TOTAL(B)   99 99 95 0

STATUS OF NIRANTHARA JYOTHI PHASE-I IN BESCOM4

Page 5: NIRANTHARA JYOTHI SCHEME:

Sl. NOName of the

CircleName of the Division Lot No

Total No of NJ feeders (Actual)

STATUS OF NJ FEEDERS AS ON 24.06.13

No. Feeders Completed

No. Feeders Commissioned

No. of feeders work under progress

1 2 3 4 5 6 7 8

3 DAVANGERE

Chirtadurga 1: Hosadurga 13 13 8 0Sub Total   13 13 8 0

Davangere2: Channagiri 18 18 15 0

3: Jagalur 9 9 9 0

Sub Total   27 27 24 0

Harihara4: Harapanahalli 10 10 10 0

5: Honnali 11 11 10 0

Sub Total   21 21 20 0

Hiriyur20: Hiriyur-1 9 9 9 021: Hiriyur-2 7 7 7 0

Sub Total   16 16 16 0

TOTAL(C)   77 77 68 0

4BANGALORE

RURAL

Chandapura 7: Anekal 5 5 5 0Sub Total   5 5 5 0

Ramanagara22: Kanakapura-1 9 9 7 0

23: Kanakapura-2 10 10 8 0Sub Total   19 19 15 0

Yelahanka

19: Hosakote-2 7 7 7 0

20(A) :Hosakote-1 11 11 11 0

10: Devanahalli 17 17 15 0

Sub Total   35 35 33 0

TOTAL(D)   59 59 53 0

 

GRAND TOTAL (A+B+C+D)  

260 260 240 0

STATUS OF NIRANTHARA JYOTHI PHASE-I IN BESCOM 5

Page 6: NIRANTHARA JYOTHI SCHEME:

Sl No

Name of

the Circle

Name of the

Division

Lot No./Taluk

Total No. of

NJ feeder

s propos

ed

Total No. of NJ

feeders Completed

Total No. of NJ feeders

Commissioned

Status

1 2 3 4 5 6 7 8

1Bangal

ore Rural

Nelamangala

1:Doddaballapura

17 5 _DWA issued on

10.11.11work under progress.

2Tumku

rMadhugi

ri9:Koratager

e11 3 _

DWA issued on 21.01.12

work under progress

3Tumku

rTiptur

8:Chikkanayakanahalli (part-2)

8 WUP _DWA issued on

10.11.11work under progress

4 Kolar KGF10:Bangarpe

t/KGF

16 WUP _DWA issued on

10.11.11work under progress.

5 KolarChintam

ani13:Chintama

ni15 5 2

DWA issued on 10.11.11

work under progress.

6 KolarChiikabal

lapura16:Gowribid

anur19 2 _

DWA issued on 10.11.11

work under progress.

Total 86 15 2  

STATUS OF NIRANTHARA JYOTHI PHASE-II IN BESCOM

6