  • 5/20/2018 Nisava River Bridge-RO

    1/17

    Construction

    Pod peste raul Niava

    Vedere de ansamblu

  • 5/20/2018 Nisava River Bridge-RO

    2/17

    Construction

    Pod peste raul Niava

    Pod peste raul Niava, autostrada NiBelgrade-Ni-Skopje, Iugoslavia

    Pod din beton armat, continuu pe trei

    deschideri: construit in 1959/1960 Lungimea podului:

    L = 14,0 + 68,0 + 14,0 = 96,0 m

    Latimea podului:B = 18,36 m

    Proiect:

  • 5/20/2018 Nisava River Bridge-RO

    3/17

    Construction

    Pod peste raul Niava

    Sectiune longitudinala

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    4/17

    Construction

    Pod peste raul Niava

    La mijlocul deschiderii In dreptul reazemului

    Pod peste raul NiavaSectiuni

  • 5/20/2018 Nisava River Bridge-RO

    5/17

    Construction

    Pod peste raul Niava

    Rezistenta insuficienta la incovoieredatorata cresterii traficului

    Deasupra reazemelor, pe directie

    longitudinala:

    Crapaturi transversale mari intablier

    Riscul corodarii armaturilor

    In tablier, pentru momentele

    incovoietoare datorate incarcarilor

    concentrate

    Pod peste raul Niava

    Problema:

  • 5/20/2018 Nisava River Bridge-RO

    6/17

    Construction

    Pod peste raul Niava

    Placi pretensionate din CarboDurCFRP tip S914 dispuse deasupra

    reazemelor

    Lungimea placilor: max. 33,0 m

    Numarul placilor: 108

    Lungime totala CarboDur: cca. 3200 m

    Forta de pretensionare:

    Vo= 135 kN

    Durata lucrarii: 15 iulie - 30 octombrie 2001

    Pod peste raul Niava

    Solutia:

  • 5/20/2018 Nisava River Bridge-RO

    7/17

    Construction

    Pod peste raul Niava

    Consultant & Contractor

    MOSTOGRADNJA Ltd. Co.

    Civil Engineering and Construction Company Belgrad,Iugoslavia

    Pretensionarea placilor Sika CarboDur CFRP S914

    cu ajutorul unui sistem

    proiectat, testat, construit si brevetat deMOSTOGRADNJA

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    8/17

    Construction

    Pod peste raul Niava

    Distributia placilor pretensionate din CarboDur CFRPLungime max. 33 m

    Sectiune longitudinala

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    9/17

    Construction

    Pod peste raul Niava

    Placi CarboDur CFRP tip S914,

    nepretensionate, pentru tablierul

    podului

    Lungimea placilor : 4 - 5 m

    Numarul placilor : 400

    Lungime totala CarboDur

    : cca. 1800 m

    Pod peste raul Niava

    Solutia:

  • 5/20/2018 Nisava River Bridge-RO

    10/17

    Construction

    Pod peste raul Niava

    Echipament auxiliar pentru aplicarea placilor CarboDur

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    11/17

    Construction

    Pod peste raul Niava

    Aplicarea Sikadur-30 si a placilor de CarboDur

    pe tablierul podului

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    12/17

    Construction

    Pod peste raul Niava

    Pregatirea placilor de ancoraj

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    13/17

    Construction

    Pod peste raul Niava

    Sistemul de ancorare - detaliu

    Actiunea de pretensionare

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    14/17

    Construction

    Pod peste raul Niava

    Actiunea de pretensionare

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    15/17

    Construction

    Pod peste raul Niava

    Echipamentul de pretensionare

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    16/17

    Construction

    Pod peste raul Niava

    Sistemul de ancoraj in timpul intaririi

    adezivului epoxi Sikadur-30

    Pod peste raul Niava

  • 5/20/2018 Nisava River Bridge-RO

    17/17

    Construction

    Pod peste raul Niava

    Protectia termica a placilor

    pretensionate CarboDur CFRP

    Solutia cu Sistem Sika

    Pod peste raul Niava