  • 8/18/2019 Nisava River Bridge

    1/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    View

  • 8/18/2019 Nisava River Bridge

    2/17

      2

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    Bridge over Nišava River, Niš Belgrade-Niš-

    Skopje Highway ugoslavia 

    Reinforced concrete continuous three spansbridge: built in 1959/1960

    Length of the bridge

    L = 14,0 + 6,0 + 14,0 = 96,0 !"idth of the bridge:

    # = 1,$6 !

    The !roject

  • 8/18/2019 Nisava River Bridge

    3/17

      3

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    Longitudinal section

  • 8/18/2019 Nisava River Bridge

    4/17

  • 8/18/2019 Nisava River Bridge

    5/17

      5

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    "nsu##icient #le$ural strength due

    to increased tra##ic load

    '(er supports in longitudinal direction Large trans(ersal crac)s in the bridge dec)

     Ris*ue of corrosion in reinforce!ent steel

    n the bridge dec) for local bending !o!ents due toconcentrated load

    The !ro%le&

  • 8/18/2019 Nisava River Bridge

    6/17

      6

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    !restressed Car%o'ur C(R! plate Typ

    S)*+ over supports

    Length of plates : !a- $$,0 !

    .u!ber of plates : 10

    otal arbour : ca- $200 !

    3restressing force : o = 1$5 .

    Construction !hase *th. /uly-01th. 2cto%er 311*

    The Solution

  • 8/18/2019 Nisava River Bridge

    7/17

      7

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    onsultant ontractor

    7'8'R%.% Ltd- o-

    i(il ;ngineering and onstruction o!pan< #elgrade,ugosla(ia

    3restressing of 8i)aarbour >R3 plate 8914

     ?ith a 8

  • 8/18/2019 Nisava River Bridge

    8/17

      8

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    istribution of prestressed arbour >R3 plates 

    Length : max. 33 m

    Longitudinal section

  • 8/18/2019 Nisava River Bridge

    9/17

      9

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    Traditional-non prestressed Car%o'ur

    C(R! plate Type S)*+ #or the %ridge deck

    Length of plates: 4 & 5 !

    .u!ber of plates: 400

    otal arbour: ca- 100 !

    The Solution

  • 8/18/2019 Nisava River Bridge

    10/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    45uip&ent #or 6pplicationo# Car%o'ur plates

  • 8/18/2019 Nisava River Bridge

    11/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    %pplication of 8i)adur&$0 and of arbour

    plate on the bridge dec)

  • 8/18/2019 Nisava River Bridge

    12/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    3reparation of

    anchorage plates

  • 8/18/2019 Nisava River Bridge

    13/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    Detail of anchorage system

    3restressing in progress

  • 8/18/2019 Nisava River Bridge

    14/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    3restressing in progress

  • 8/18/2019 Nisava River Bridge

    15/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    3restressing e*uip!ent

  • 8/18/2019 Nisava River Bridge

    16/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    %nchorage s

  • 8/18/2019 Nisava River Bridge

    17/17

      1

    Sika Romania

           C     o     n     s      t     r     u     c      t       i     o     n

    The Nišava River Bridge

    e!perature protection of 3restressed

    arbour >R3 plate s


Recommended