+ All Categories
Home > News & Politics > Nj future non contiguous clustering 11-7-12 banisch

Nj future non contiguous clustering 11-7-12 banisch

Date post: 19-Jun-2015
Category:
Upload: new-jersey-future
View: 322 times
Download: 6 times
Share this document with a friend
Description:
Development transfer case study in Mt. Olive, NJ.
Popular Tags:
21
Move It, Buster! Planning for Non-Contiguous Clustering in New Jersey Development Transfer Case Study Mount Olive Township, Morris County, NJ Prepared by Banisch Associates, Inc. 111 Main Street, Flemington, New Jersey 08822 908 782 0835
Transcript
Page 1: Nj future non contiguous clustering 11-7-12 banisch

Move It, Buster!Planning for

Non-Contiguous Clusteringin New Jersey

Development Transfer Case Study

Mount Olive Township,

Morris County, NJ

Prepared by Banisch Associates, Inc.

111 Main Street, Flemington, New Jersey 08822 908 782 0835

Page 2: Nj future non contiguous clustering 11-7-12 banisch

Non-Contiguous Parcel Clustering in NJ

First authorized in 1996, it allows a municipality to approve “planned developments” consisting of two or more different parcels

Allows one parcel to be preserved while its density is transferred and developed on a different, noncontiguous parcel.

Requires no calculation of the transferable development potential of multiple-owner sending areas and receiving areas.

Page 3: Nj future non contiguous clustering 11-7-12 banisch

Non-Contiguous Parcel Clustering in NJ

Development rights from the sending parcel(s) are transferred to and combined with the development rights at the receiving parcel(s).

Receiving parcel is developed at a higher than otherwise permitted while sending parcel is preserved, for example, as farmland or open space.

Noncontiguous parcel clustering is simpler than TDR involving only a few, or even two, parcels.

Page 4: Nj future non contiguous clustering 11-7-12 banisch

Transfer of Development Rights in New Jersey Municipal Land Use Law Article 15.

40:55D-113 Burlington County Transfer of Development Rights Demonstration Act.40:55D-114 Legislative findings.40:55D-115 Definitions.40:55D-116 Transfer of development programs; Office of State Planning assistance.40:55D-117 Preparation for ordinance adoption.40:55D-118 Sending and receiving zones.40:55D-119 Recordation of permitted uses; effect of use variances.40:55D-120 Submission to county board, Pinelands Commission.40:55D-121 County board’s responsibility; Office of State Planning review.40:55D-122 Recordation; tax assessment.40:55D-123 Review by municipal agencies.40:55D-124 Repeal of ordinance.40:55D-125 Development Transfer Bank.40:55D-125.1Solid waste facility buffer zone; definitions.40:55D-126 Development easement.40:55D-127 Equitable interests.40:55D-128 Farm benefits.40:55D-129 Annual report.

Page 5: Nj future non contiguous clustering 11-7-12 banisch

Residential Cluster Definition per N.J.S.A. 40:55d-7:

“Residential cluster” means a contiguous or noncontiguous area to be developed as a single entity according to a plan containing residential housing units which have a common or public open space area as an appurtenance.

Page 6: Nj future non contiguous clustering 11-7-12 banisch

c. Provide districts for planned developments; provided that an ordinance providing for approval of subdivisions and site plans by the planning board has been adopted and incorporates therein the provisions for such planned developments in a manner consistent with article 6 of P.L.1975, c.291 (C.40:55D-37 et seq.). The zoning ordinance shall establish standards governing the type and density, or intensity of land use, in a planned development. Said standards shall take into account that the density, or intensity of land use, otherwise allowable may not be appropriate for a planned development. The standards may vary the type and density, or intensity of land use, otherwise applicable to the land within a planned development in consideration of the amount, location and proposed use of open space; the location and physical characteristics of the site of the proposed planned development; and the location, design and type of dwelling units and other uses. Such standards may provide for the clustering of development between noncontiguous parcels and may, in order to encourage the flexibility of density, intensity of land uses, design and type, authorize a deviation in various clusters from the density, or intensity of use, established for an entire planned development. The standards and criteria by which the design, bulk and location of buildings are to be evaluated shall be set forth in the zoning ordinance and all standards and criteria for any feature of a planned development shall be set forth in such ordinance with sufficient certainty to provide reasonable criteria by which specific proposals for planned development can be evaluated.

Planned Developments(N.J.S.A. 40:55D-65c)

Page 7: Nj future non contiguous clustering 11-7-12 banisch

Mount Olive Township Morris County, NJ

Project Name: Newfane Associates, Inc. Nature of Application: Residential Major

Subdivision Date initiated: March 1993 Description of parcels:

Lot 32: 28.91 acres Lot 59: 55.40 acres Lot 36: 86.85 ac.

Conventional Zoning: residential one acre lot requirement

Page 8: Nj future non contiguous clustering 11-7-12 banisch
Page 9: Nj future non contiguous clustering 11-7-12 banisch
Page 10: Nj future non contiguous clustering 11-7-12 banisch

Newfane Proposal

Transfer eligible qualifying density from Lot 59 to Lots 32 and 36.

Develop Lots 32 and 36 as a 104-lot residential cluster (20,000 sq. ft. lots served by central water and sanitary sewerage).

Dedicate Lot 59 to the Township for open space and/or active recreation use.

Page 11: Nj future non contiguous clustering 11-7-12 banisch

Step 1: Qualifying Map to determine total density

Conventional layout qualifying map based on one-acre lots for all three tracts to determine total dwelling unit yield Includes streets, stormwater basins, protected

critical slopes and freshwater wetlands Detailed engineering not provided at this step Result: Total of 109 residential lots (ultimately

reduced to a total of 104 residential lots)

Page 12: Nj future non contiguous clustering 11-7-12 banisch
Page 13: Nj future non contiguous clustering 11-7-12 banisch

Step 2: Planning Board Approves Density

A slightly modified overall density of 104 residential lots was established on the qualifying map

Lot 32 : 20 residential lots Lot 59 : 25 residential lots Lot 36 : 59 residential lots

Page 14: Nj future non contiguous clustering 11-7-12 banisch

Step 3: Submission to Township Council for open space consideration

Planning Board reported to the Township Council - evaluated the proposed open space dedication per standards

Township Council approval required developer to: provide water and sewer to open space lot if required by

Township secure any/all permits from NJDEP on open space lot provide $75,000 cash contribution within 6 months of filing

final subdivision plats to improve open space lot for active recreational use

submit title insurance policy in the amount equivalent to fair market value of property

Page 15: Nj future non contiguous clustering 11-7-12 banisch
Page 16: Nj future non contiguous clustering 11-7-12 banisch

Step 4: Planning Board hearings on Preliminary Major Subdivision

Preliminary Major Subdivision approved (103 residential lots) with stipulation: “The transfer of development credits will occur

simultaneously with the first final subdivision approval of a part, if this project is phased, or final approval of the entire project, if it is not.”

Conditions on developer regarding Lot 59 open space lot: convey Lot 59 to the Township within 60 days of filing of

plats cash contribution of $75,000 for recreational use (payment

in stages linked to CO’s) secure NJDEP Letter of Interpretation for Lot 59 off-site road improvements

Page 17: Nj future non contiguous clustering 11-7-12 banisch

Step 5: Planning Board hearings on Final Major Subdivision

Planning Board approved Final Major Subdivision for project (known as Oak Hill I and II) and the transfer of development credits from Lot 59 to other tracts.

Page 18: Nj future non contiguous clustering 11-7-12 banisch
Page 19: Nj future non contiguous clustering 11-7-12 banisch
Page 20: Nj future non contiguous clustering 11-7-12 banisch

Pros and Cons of Noncontiguous Clustering

Pros Easy to set up. Does not require detailed

investigations required for TDR Can be designed to reward preservation of targeted

properties

Cons Not a true development transfer program, since no

sending and receiving areas are designated If it does appear to be TDR-like, it may run afoul of

the lawful use of TDR in NJ. Ad hoc planning, not a comprehensive policy

response.

Page 21: Nj future non contiguous clustering 11-7-12 banisch

Noncontiguous ClusteringHandle with Care…

Without linkage to local goals and policies, noncontiguous clustering can actually interfere with planning and zoning objectives

With too much linkage, it may appear as TDR However, targeting for desired results can be a viable

strategy For instance, allowing noncontiguous clustering only

where the preserved lands are targeted for preservation.

In this way, farmland, parkland, greenways or other desired preservation can be advanced