NMSU NM DEPT OF AGRICULTURE NEW CONSTRUCTION / … · 12 vacuum on / off swtich, deck mounted,...

Date post: 21-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
85
CH053 CH052 CH051 CHEMISTRY LAB C106 BV C105 CLEAN LAB C105A GRINDING C105B SAMPLE STOR C103 RECEIPT & DATA ENTRY C101 STOR CS111 W CR112 M CR113 MECH CM114 ICP-MS C110 INSTRUMENT RM C108 WASHING C102 BALANCE RM C106B CHEM & FLAM STOR C106A EQ & STOR C107 CH053 CH052 CH051 (BELOW) CH016 CH080 CH081 CH091 CH092 CH093 CH090 CH083 CH084 CH076 CH008 CH009 CH014 CH015 CH019 CH020 CH013 CH057 CH058 CH006 CH007 CH070 CH010 CH035 CH027 CH037 CH029 CH028 CH005 CH003 CH004 CH050 CH049 CH002 CH017 CH082 CH077 CH085 CH023 CH012 CH039 CH040 CH011 CH059 CH060 CH061 CH031 CH032 CH089 CH062 CH063 CH078 CH045 CH047 CH046 CH025 CH026 CH074 CH075 CH038 CH030 CH024 CH088 CH086 CH041 CH042 CH001 CH043 CH071 CH018 CH054 CH055 CH034 CH033 CH048 CH022 CH021 N2 CYLINDER CH073 CH079 CH056 CH057 CH036 CH044 CH066 CH067 CH065 CH064 CH069 CH068 (BELOW) CH072 CH087 5 QL-904 4 QL-904 1 A 2 3 4 5 6 B C D E 1 2 3 4 5 6 NO T FO R CON STRUC T ION PROJECT REVISIONS SHEET NO DRAWING NAME SEAL DATE REVIEWED BY PROJECT NO DRAWN BY 50% CONSTRUCTION DOCUMENTS 08/02/2020 411 North Tenth Street, Suite 400 St. Louis, Missouri 63101 t. 314-289-9202 f. 314-289-6167 www.herainc.com 8/5/2020 4:58:51 PM NMSU NM DEPT OF AGRICULTURE NEW CONSTRUCTION / RENOVATION LAS CRUCES, NEW MEXICO QL - 142 ENLARGED LAB EQUIPMENT PLAN - CHEMISTRY JHL 19 - 0056.001 CJH N 0' 2' 4' 8' 16' 1/4" = 1'-0" 1 ENLARGED LAB EQUIPMENT PLAN - CHEMISTRY LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES SHOWN 1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC 2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC 3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC 4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC 5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC 6 OVERHEAD CORD REEL - SEE ELEC 7 DUPLEX ELECTRICAL OUTLET - SEE ELEC 8 DUPLEX DATA OUTLET - SEE ELEC 9 FLOOR DRAIN - SEE PLUMBING 10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING 11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL 12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC 13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR 14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR 15 EXISTING FLOOR DRAIN TO REMAIN 16 TOMBSTONE - SINGLE SIDED, 2 ELECTRICAL OUTLETS - SEE ELEC 17 TOMBSTONE - SPECIAL PLUG - SEE ELEC 18 COAT HOOKS 19 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL
Transcript
  • CH053CH052CH051

    CHEMISTRY LAB

    C106

    BV

    C105

    CLEAN LAB

    C105A

    GRINDING

    C105B

    SAMPLE STOR

    C103

    RECEIPT & DATAENTRY

    C101

    STOR

    CS111

    W

    CR112

    M

    CR113

    MECH

    CM114

    ICP-MS

    C110

    INSTRUMENT RM

    C108WASHING

    C102

    BALANCE RM

    C106B

    CHEM & FLAMSTOR

    C106A

    EQ & STOR

    C107

    CH053CH052CH051

    (BELOW)

    CH016

    CH080

    CH081

    CH091

    CH092

    CH093

    CH090

    CH083CH084

    CH076

    CH008

    CH009

    CH014

    CH015

    CH019

    CH020

    CH013

    CH057

    CH058

    CH006

    CH007

    CH070

    CH010

    CH035

    CH027

    CH037

    CH029

    CH028

    CH005CH003 CH004

    CH050

    CH049

    CH002

    CH017

    CH082

    CH077

    CH085

    CH023 CH012

    CH039

    CH040

    CH011

    CH059 CH060

    CH061

    CH031

    CH032

    CH089

    CH062 CH063

    CH078

    CH045

    CH047

    CH046

    CH025

    CH026

    CH074CH075

    CH038

    CH030

    CH024

    CH088

    CH086

    CH041

    CH042

    CH001

    CH043

    CH071

    CH018

    CH054 CH055

    CH034

    CH033

    CH048

    CH022

    CH021

    N2CYLINDER

    CH073

    CH079

    CH056

    CH057

    CH036

    CH044

    CH066 CH067

    CH065CH064

    CH069 CH068

    (BELOW)

    CH072

    CH087

    5

    QL-904

    4

    QL-904

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    411 North Tenth Street, Suite 400St. Louis, Missouri 63101t. 314-289-9202 f. 314-289-6167www.herainc.com

    8/5

    /20

    20

    4:5

    8:5

    1 P

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    QL-142

    ENLARGED LABEQUIPMENT PLAN- CHEMISTRY

    JHL

    19-0056.001

    CJH

    N

    0' 2' 4' 8' 16'

    1/4" = 1'-0"1

    ENLARGED LAB EQUIPMENT PLAN - CHEMISTRY

    LABORATORY FURNISHINGS AND EQUIPMENT KEYED NOTES

    SHOWN

    1 ELECTRICAL RACEWAY (WIREMOLD) - SEE ELEC

    2 TOMBSTONE - DOUBLE SIDED, 4 ELECTRICAL OUTLETS, EACH SIDE - SEE ELEC

    3 TOMBSTONE - DOUBLE SIDED, 2 DATA OUTLETS, EACH SIDE - SEE ELEC

    4 TOMBSTONE - SINGLE SIDED, 4 ELECTRICAL OUTLETS - SEE ELEC

    5 TOMBSTONE - SINGLE SIDED, 2 DATA OUTLETS - SEE ELEC

    6 OVERHEAD CORD REEL - SEE ELEC

    7 DUPLEX ELECTRICAL OUTLET - SEE ELEC

    8 DUPLEX DATA OUTLET - SEE ELEC

    9 FLOOR DRAIN - SEE PLUMBING

    10 WALL SUPPLY AND DRAIN BOX, RECESSED - SEE PLUMBING

    11 ISLAND COUNTERTOP AND BASE IN ECHELON LEVEL 1 AND 2 - SEE STRUCTURAL

    12 VACUUM ON / OFF SWTICH, DECK MOUNTED, WIRED TO VACUUM PUMP CABINET - SEE ELEC

    13 EXISTING ELECTRICAL PANELS TO REMAIN; LEAVE AREA CLEAR

    14 EXISTING WALL PLUMBING ITEM TO REMAIN; LEAVE AREA CLEAR

    15 EXISTING FLOOR DRAIN TO REMAIN

    16 TOMBSTONE - SINGLE SIDED, 2 ELECTRICAL OUTLETS - SEE ELEC

    17 TOMBSTONE - SPECIAL PLUG - SEE ELEC

    18 COAT HOOKS

    19 FLOOR TO CEILING FILLER PANEL BETWEEN FUME HOOD AND WALL

  • CT

    R T

    OP

    H4

    " U

    NO

    1"

    SE

    E E

    LE

    CC

    AB

    H

    SE

    E C

    SW

    K T

    YP

    E

    3" NOM

    1" UNOUTILITY SPACE

    CAB D

    CTR TOP D

    4"

    NO

    M

    CEILING (SEE ARCH)

    WALL CAB

    BACKING, TYP

    UCL, WHERE INDICATED

    RACEWAY (SEE ELEC)

    SEALANT, TYP.

    SPLASH

    CTR TOP

    BASE CAB

    UTILITY SPACEFRAMING (DASHED)@ 48"O.C. MAX

    1" UNO1" UNO

    CAB D

    UTILITY SPACE

    CAB D

    CTR TOP D

    BENCH TOP ITEMS (DASHED),WHERE OCCURS

    CTR TOP

    BASE CABINETS

    UTILITY SPACEFRAMING (DASHED)@ 48" O.C. MAX

    APPLIED BASE,(SEE ARCH)

    CT

    R T

    OP

    H

    CAB D

    SLOPED TOP (DASHED) WHERE INDICATED

    APPLIED BASE, (SEE ARCH)

    1X WD CLEAT

    CT

    R T

    OP

    H

    CTR TOP D

    CAB D 1" UNO

    1x WD CLEAT

    ABOVE CTR ITEMS (DASHED), WHERE INDICATED

    BACKING, TYP.

    APERIMETER

    BISLAND / PENINSULA

    CPERIMETER - CTR TOP

  • WORK SURFACE

    4" H NOM TABLE FRAME

    2" SQ NOM TABLE LEGS

    LOWER H FRAME, LEG RAIL & OFFSET STRETCHER

    BEL - FRONT/BACK

    APLAN

    CTYP

    W

    TYP UNO1" OVERHANG

    DH

    BTYP

    CEL - SIDES

    BACK

    FRONT

    LE

    FT

    CT

    R T

    OP

    T

    LEVELING DEVICES OR CASTERS AS SCHEDULED

    WORK SURFACE

    TABLE FRAME

    TABLE LEGS

    RIG

    HT

    WORK SURFACE

    3" H NOMHVY DUTY TABLE FRAME

    2" SQ NOM TABLE LEGS

    LOWER U FRAME, LEG RAILS & BACK STRETCHER

    BEL - FRONT/BACK

    APLAN

    CTYP

    W

    TYP UNO1" OVERHANG

    DH

    BTYP

    CEL - SIDES

    BACK

    FRONT

    LE

    FT

    CT

    R T

    OP

    T

    LEVELING DEVICES OR CASTERS AS SCHEDULED

    WORK SURFACE

    HVY DUTY TABLE FRAME

    TABLE LEGS

    RIG

    HT

    WORK SURFACE

    CANTILEVER TABLE FRAME

    CART FRAME

    BEL - FRONT

    APLAN

    CTYP

    W

    D

    H (

    WK

    SU

    RF

    AC

    E)

    H (

    FR

    AM

    E)

    B

    CEL - RIGHT

    BACK

    FRONT

    LE

    FT

    CT

    R T

    OP

    T

    CASTERS, TYPE AS SCHEDULED

    WORK SURFACE

    CANTILEVER TABLE FRAME

    HANGING RAIL

    CART FRAME

    RIG

    HT

    1"

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    411 North Tenth Street, Suite 400St. Louis, Missouri 63101t. 314-289-9202 f. 314-289-6167www.herainc.com

    8/5

    /20

    20

    4:5

    8:5

    3 P

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    QL-902

    LABORATORYTABLE ANDMOBILE CARTDETAILS

    JHL

    19-0056.001

    CJH

    1/2" = 1'-0"1

    DETAIL - STANDARD METAL TABLE FRAME - TYPE A1/2" = 1'-0"

    2DETAIL - HEAVY DUTY METAL TABLE FRAME - TYPE B

    1/2" = 1'-0"3

    DETAIL - STANDARD DUTY MOBILE CART

  • W D

    CLG(SEE ARCH)

    PTN

    CABINET ANCHOR KIT PER MFR (T&B)

    BACKING,TYP

    SPEC PURPOSESAFETY CABINET

    AELEVATION

    BSECTION

    H

    B

    LEV CLG ESCUTCHEON

    LEVSWIVEL

    LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 51"

    LEV HOOD - CLEAR DOME HOOD;NOMINAL 14" DIAMETER

    10"

    NO

    M

    6' -

    2"

    CE

    ILIN

    G H

    (SE

    E A

    RC

    H)

    FLOOR

    6"

    1' -

    0"

    1' -

    0"

    LEV CLG BRACKET

    EXH DUCT - SEE MECH

    LEV DUCT CONNECTION

    LEV LOWER ANCHOR PLATE

    LEV UPPER ANCHOR PLATE

    SCF SUPPORT FRAMINGSEE ARCH

    CLG - SEE ARCH

    STRUCTURE ABOVE

    FACE OF PTN(SEE ARCH)OR LAB CSWK (SEE LAB PLANS)

    SCF P1000T

    GAS CYLINDER BRACKET

    NOM 9" DIA GAS CYLINDER,VERIFY W/ OWNER (OFOI)

    TOP & BOT BRACKETS & SCF ASSEMBLY (SAFETY STRAPS & CHAINS NOT SHOWN)

    NOM 1'-0" OC VERIFY W/ BRACKET MFR

    APLAN

    BELEVATION

    B

    1' - 0" 1' - 0"

    1' -

    3"

    AL

    IGN

    TO

    P O

    F B

    RA

    CK

    ET

    W

    / C

    TR

    TO

    P @

    SIN

    K

    CSECTION

    BACKING, TYP.

    1" MIN TYP

    # OF BRACKETS VARIES -SEE PLAN

    C

    PTN

    Z-ANCHORBRACKET @24" OC MAX

    BACKING

    GAS CYLINDERRACK TUBE FRAME

    CYLINDERVERIFY W/ OWNER (OFOI)B

    APLAN

    BELEVATION

    CSECTION

    # OF RACK MODULESVARIES, SEE PLAN

    12" TYP

    RACKTUBING

    RA

    CK

    TU

    BIN

    G

    1-3

    CY

    LIN

    DE

    RS

    DE

    EP

    , S

    EE

    PL

    AN

    2' -

    6"

    RACK TUBING

    OPEN

    OPEN

    OP

    EN

    OP

    EN

    1' -

    3"

    FLOOR ANCHORS

    SAFETY CHAINS

    GAP

    C

    3' - 0"RACK

    TUBINGRACK

    TUBING

    3' -

    0" RA

    CK

    TU

    BIN

    G

    # OF RACK MODULES VARIES (2 MAX) SEE PLAN

    RACK TUBE FRAME

    SAFETY CHAINS

    DEWAR/TRANSPORTER

    APLAN

    B

    3' -

    4"

    2' -

    0"

    BELEVATION

    CSECTION

    C

    OPEN

    OPEN

    OPEN

    OPEN

    PTN(SEE ARCH)

    Z-ANCHOR BRACKETS, 2 PER MODULE

    BACKING

    SAFETY CHAINS

    FLOOR ANCHORS

    RACK TUBING & STIFFENERS

    LEV CLG ESCUTCHEON

    LEVSWIVEL

    LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 51"

    LEV HOOD - ROUND METAL HOOD;NOMINAL 10" DIAMETER

    10"

    NO

    M

    7' -

    0"

    CE

    ILIN

    G H

    (SE

    E A

    RC

    H)

    FLOOR

    6"

    1' -

    0"

    1' -

    0"

    LEV CLG BRACKET

    EXH DUCT - SEE MECH

    LEV DUCT CONNECTION

    LEV LOWER ANCHOR PLATE

    LEV UPPER ANCHOR PLATE

    SCF SUPPORT FRAMINGSEE ARCH

    CLG - SEE ARCH

    STRUCTURE ABOVE

    LEV CLG ESCUTCHEON

    LEV SWIVEL

    LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 60"

    LEV HOOD - ROUND METAL HOOD;NOMINAL 10" DIAMETER

    10"

    NO

    M

    7' -

    10

    "CE

    ILIN

    G H

    (SE

    E A

    RC

    H)

    FLOOR

    6"

    1' -

    0"

    1' -

    0"

    LEV CLG BRACKET

    EXH DUCT - SEE MECH

    LEV DUCT CONNECTION

    LEV LOWER ANCHOR PLATE

    LEV UPPER ANCHOR PLATE

    SCF SUPPORT FRAMINGSEE ARCH

    CLG - SEE ARCH

    STRUCTURE ABOVE

    LEV CLG ESCUTCHEON

    LEV SWIVEL

    LEV TUBES & JOINTS - TOTAL LENGTH NOMINAL 60"

    LEV HOOD - CLEAR DOME HOOD;NOMINAL 14" DIAMETER

    10"

    NO

    M

    7' -

    10

    "CE

    ILIN

    G H

    (SE

    E A

    RC

    H)

    FLOOR

    6"

    1' -

    0"

    1' -

    0"

    LEV CLG BRACKET

    EXH DUCT - SEE MECH

    LEV DUCT CONNECTION

    LEV LOWER ANCHOR PLATE

    LEV UPPER ANCHOR PLATE

    SCF SUPPORT FRAMINGSEE ARCH

    CLG - SEE ARCH

    STRUCTURE ABOVE

    CLG(SEE ARCH)

    AELEVATION

    BSECTION

    B

    RAMP

    HANDEL

    GLASS DOORS (BOTH SIDES)

    CHAMBERWIDTH

    CHAMBERDEPTH

    PTR(SEE ARCH)

    CH

    AM

    BE

    RH

    EIG

    HT

    D

    CLG(SEE ARCH)

    PTN

    ANCHORCAB PERMFR

    BACKING,TYP

    AELEVATION

    BSECTION

    H

    SUPPLY DUCT -SEE MECH

    B

    FIRE PROTECTION

    PLUMBING - SEE MEP

    W

    VENT

    HANDLE

    ACCESS PANEL

    WINDOW

    W

    MANIFOLD

    CINSIDE OF CABINET

    SPRINKLER HEAD

    GAS CYLINDER

    CYLINDER RESTRAINT

    CE

    ILIN

    G H

    CT

    R T

    OP

    H

    CEILING SHROUD

    CEILING (SEE ARCH)

    SERVICEFITTINGSWHERE OCCUR

    UMBILICAL, REMOVABLEPANEL

    UMBILICAL FIXED PANEL(PTN WHERE OCCURS)

    PANEL REINFORCEMENT

    UTILITY SPACE FRAMING@ CTR TOP OPNG, TYP

    UMBILICAL OVERLAP @ CURB

    CURB @ UMBILICAL

    1-5/8" x 7/8" SCF PIPING SPTT & B @ 48" OC MAX

    CTR TOP

    X

    AELEVATION

    BSECTION

    1"

    5"

    CU

    RB

    4"

    2"

    2"

    +/-

    QL-0XX

    A

    QL-0XX

    B

    QL-0XX

    C

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    411 North Tenth Street, Suite 400St. Louis, Missouri 63101t. 314-289-9202 f. 314-289-6167www.herainc.com

    8/5

    /20

    20

    4:5

    8:5

    4 P

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    QL-903

    LABORATORYDETAILS -ACCESSORIES

    JHL

    19-0056.001

    CJH

    1/2" = 1'-0"4

    SPECIAL PURPOSE SAFETY CABINET - FLAMMABLE/HAZARDOUS

    1/2" = 1'-0"8

    SECTION - LOCAL EXHAUST VENT TYPE-A1 (CEILING)

    1/2" = 1'-0"1

    GAS CYLINDER BRACKET1/2" = 1'-0"

    2GAS CYLINDER RACK TYPE A

    1/2" = 1'-0"3

    GAS CYLINDER RACK TYPE-C (DEWAR/TRANSFER)

    1/2" = 1'-0"9

    SECTION - LOCAL EXHAUST VENT TYPE-A2 (CEILING)1/2" = 1'-0"

    10SECTION - LOCAL EXHAUST VENT TYPE-A3 (CEILING)

    1/2" = 1'-0"11

    SECTION - LOCAL EXHAUST VENT TYPE-A4 (CEILING)

    1/2" = 1'-0"5

    PASS THRU - FLOOR MOUNTED1/2" = 1'-0"

    6GAS CYLINDER CABINET

    1" = 1'-0"7

    UMBILICAL, (METAL) TYP EL & SECTION

  • 2-FITTING GROUP1-FITTING GROUP

    /SIDEOF CABINET

    3-FITTING GROUP

    ISLA

    ND

    /P

    EN

    INS

    ULA

    BACK SPLASH @ PERIMETER CTR TOP (DASHED)

    SERVICE FITINGS

    /SIDEOF CABINET

    /SIDEOF CABINET

    3"

    SP

    LA

    SH

    5 1/2" 5 1/2" 5 1/2"

    PE

    RIM

    ET

    ER

    CT

    R T

    OP

    D

    ISL

    AN

    D /

    PE

    NIN

    SU

    LA

    7"

    ELEC / DATA PEDESTAL

    /SIDEOF CABINET

    FRONT EDGEOF CTR TOP

    6"CUP SINK

    CUP SINK - PERIMETER

    7" 7"

    /SIDEOF CABINET

    FITTING HANDLES

    CUP SINK -CENTERED ON ISLAND/PENINSULA

    SINK

    PW SERVICE FITTING

    TYPES WHERE OCCURS, SEE LAB PLANS

    SPLASH

    CTR TOP

    CL

    SIN

    K D

    NO

    M.

    4 1

    /2"

    CT

    R T

    OP

    D

    SERVICES

    SINK

    3"

    10" 10"

    SINK BASE CAB

    SINK W UNOEQ

    UNOEQ

    H/C

    EW

    FLOOR

    H -

    SE

    E P

    LA

    N

    SEE PLAN

    SERVICE FITTING

    UMBILICAL TO CONCEAL UTILITIES RUNNING FROM THE CEILING TO THE UTILITY CHASE BEHIND THE CASEWORK

    STANDING HEIGHT CASEWORK, COUNTERTOP 36" AFF

    SITTING HEIGHT CASEWORK, COUNTERTOP 30" AFF

    UTILITY CHASE BETWEEN CASEWORK

    COUNTERTOPCOUNTERTOP

    CUSTOM HEIGHT BACKSPLASH TO FILL BETWEEN THE 30" AND 36" COUNTERTOP

    ADD FRAMING AS NEEDED TO SUPPORT CUSTOM BACKSPLASH

    FLOOR, SEE ARCH

    CEILING, SEE ARCH

    UMBILICAL TO CONCEAL UTILITIES RUNNING FROM THE CEILING TO THE UTILITY CHASE BEHIND THE CASEWORK

    STANDING HEIGHT CASEWORK, COUNTERTOP 36" AFF

    UTILITY CHASE BETWEEN CASEWORK AND FINISH PANEL

    COUNTERTOP

    ADD FRAMING AS NEEDED TO SUPPORT FINISH PANEL

    FLOOR, SEE ARCH

    CEILING, SEE ARCH

    METAL FINISH PANEL

    1"

    W

    CUP SINK, WHERE OCCURS

    NO

    M 3

    6"

    D

    APLAN

    B

    UPPER BYPASS(DASHED) PERHOOD VENTILATIONTYPE

    CEILING ENCLOSURE

    CEILING (SEE ARCH)

    DUCT AND TRANSITION(SEE MECH)

    BASE CABINETS (SEE ELEV)C

    TR

    T

    OP

    H

    34

    " M

    AX

    A

    IR F

    OIL

    /

    HOOD WORK SURFACE / FLUSH AIRFOIL

    SASH

    ACCESS PANEL OR REMOVABLE PANEL

    4"

    CL

    G H

    (S

    EE

    A

    RC

    H)

    54

    " N

    OM

    H

    UTILITY SERVICES (SEE PLAN)

    BELEVATION

    PER MFR,TYP

    PE

    R M

    FR

    W

    NO

    M 3

    6"

    D

    APLAN

    B

    UPPER BYPASS(DASHED) PERHOOD VENTILATIONTYPE

    CEILING ENCLOSURE

    CEILING (SEE ARCH)

    DUCT AND TRANSITION(SEE MECH)

    SUPPORT STAND

    CT

    R

    TO

    P H

    2' -

    6"

    HOOD WORK SURFACE / FLUSH AIRFOIL

    SASH

    ACCESS PANEL OR REMOVABLE PANEL

    4"

    CL

    G H

    (S

    EE

    A

    RC

    H)

    54

    " N

    OM

    H

    UTILITY SERVICES (SEE PLAN)

    BELEVATION

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    411 North Tenth Street, Suite 400St. Louis, Missouri 63101t. 314-289-9202 f. 314-289-6167www.herainc.com

    8/5

    /20

    20

    4:5

    8:5

    5 P

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    QL-904

    LABORATORYDETAILS -SERVICES ANDFUME HOODSECTIONS

    JHL

    19-0056.001

    CJH

    1/2" = 1'-0"3

    PLAN - DECK MOUNTED FITTING LOCATIONS1/2" = 1'-0"

    1TYPICAL SINK SERVICE FITTING PLAN

    1/2" = 1'-0"2

    EL - WALL FITTING LOCATIONS

    1/2" = 1'-0"5

    CHEMISTRY MAIN LAB - EAST ISLAND BENCH1/2" = 1'-0"

    4CHEMISTRY MAIN LAB - WEST ISLAND BENCH

    1/2" = 1'-0"6

    FUME HOOD - GENERAL PURPOSE1/2" = 1'-0"

    7FUME HOOD - GENERAL PURPOSE - SITTING HEIGHT

  • KEY PLAN

    NO

    RT

    H

    LEGEND

    REFERENCE KEYNOTES

    SHEET KEYNOTES ?

    GENERAL SHEET NOTES

    A. PLAN DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRID LINE, UNLESS NOTED OTHERWISE.

    B. REFER TO FINISH LEGEND ON AFXXX FOR MORE FINISH INFORMATION.C. ALL INTERIOR FINISHES FLAME SPREAD REQUIREMENTS SHALL BE COMPLIANT WITH IBC

    2015/ SECTION 803.X D. REFER TO REFLECTED CEILING PLANS FOR CEILING FINISH INFORMATION, INCLUDING

    ACCENT PAINT LOCATIONS.E. FOR ALL FINISH TRANSITIONS THAT OCCUR AT DOORWAYS, TRANSITION MATERIAL AT

    CENTERLINE OF DOOR WHEN CLOSED, REF AF621 FOR MORE DETAILS.F. GYPSUM BOARD WALLS TO BE PAINTED P-1, UNLESS NOTED OTHERWISE.G. GYPSUM BOARD WALLS WITHOUT TILE AND ALL CASEWORK TOEKICKS TO RECEIVE RB-1,

    UNLESS NOTED OTHERWISEH. CERAMIC TILE TO BE CENTERED IN ROOM, UNLESS NOTED OTHERWISE. AVOID USING

    LESS THAN HALF THE WIDTH OF STANDARD TILES.I. EXPOSED INTERIOR STEEL TO BE PAINTED P-X, UNLESS NOTED OTHERWISE. J. HOLLOW METAL DOORS AND FRAMES TO BE PAINTED P-X, UNLESS NOTED OTHERWISE.K. ALL OUTSIDE GYP BOARD CORNERS TO RECEIVE CORNER GUARDS WP-X; CORNERS WITH

    WALL TILE TO RECEIVE INTEGRAL CORNER GUARDS, REF AFXXX.

    XX-X FLOOR FINISH

    EXTENTS OF SPECIALTY WALL FINISH

    XX-X

    FLOORING CHANGE, TRANSITION REQUIRED

    FLOORING PATTERN CHANGE, TRANSITION NOT REQUIRED

    N.I.C.

    C

    F

    E

    D

    EQ & STORC107

    CHEM & FLAMSTORC106A

    BALANCE RMC106B

    INSTRUMENTRMC108

    WASHINGC102

    CHEMISTRYLABC106

    BVC105

    CLEAN LABC105A GRINDING

    C105B

    SAMPLE STORC103

    RECEIPT &DATA ENTRY

    C101

    WCR112

    MCR113

    MECHCM114

    STORCS111

    ICP-MSC110

    FIREC109

    RF-2RF-2

    RF-2

    RF-2

    RF-2

    RF-2RF-2

    RF-2

    RF-2

    RF-2

    C-1

    T-1

    T-1

    C-2

    C-2

    C-2

    (E)2 (E)1(E)3(E)4(E)5

    (E)C

    (E)B

    (E)A.1

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    8/1

    0/2

    02

    0 1

    :38

    :29

    PM

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    ULT

    UR

    EN

    EW

    CO

    NS

    TR

    UC

    TIO

    N /

    RE

    NO

    VA

    TIO

    N

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    AF101C

    LEVEL 1 FINISHFLOORPLAN-CHEMISTRY

    Approver

    19-0056.001

    NJ

    1/8" = 1'-0"A1AF-FP-1 - CHEMISTRY FINISH PLAN

    FINISH LEGEND

    03 3511 CONCRETE FINISHES (C-X)C-1 FINISH POLISHED

    NOTES

    C-2 FINISH SEALED

    06 4100 PLASTIC LAMINATE (PL-X)PL-1 MFG TBD

    PRODUCT TBDFINISH TBDEDGE BAND TBD

    06 8316 FIBERGLASS REINFORCED PANELING (FRP-X)FRP-1 MFG MARLITE

    TYPE STANDARDCOLOR WHITEFINISH SMOOTHNOTES JANITORS ROOM

    09 3000 TILING (T-X)T-1 MFG TBD

    STYLE TBDCOLOR TBDSIZE TBDGROUT TBDINSTALLATION TBDNOTES FLOOR TILE

    T-2 MFG TBDSTYLE TBDCOLOR TBDSIZE TBDGROUT TBDINSTALLATION TBDNOTES WALL TILE

    09 5100 ACOUSTICAL CEILINGS (AC-X)AC-1 MFG ARMSTRONG

    PRODUCT FISSURED-755EDGE SQUARESIZE 24" X 48"GRID PRELUDE 15/16" GRID WHITE

    AC-2 MFG ARMSTRONGPRODUCT GEORGIAN HIGH WASHABILITYEDGE SQUARESIZE 24" X 48"GRIDE PRELUDE 15/16" GRID WHITE

    09 6500 RESILIENT FLOORING (RF-1)RF-1 MFG

    PRODUCTSIZECOLOR

    RF-2 MFGPRODUCTSIZECOLOR

    09 6500 RESILIENT FLOORING (RA-X)RA-1 MFG JOHNSONITE

    STYLE 4" RUBBERCOLOR TBD

    09 6700 FLUID-APPLIED FLOORING (FF-X)FF-1 MFG

    PRODUCTCOLOR

    09 6813 TILE CARPETING (TCP-X)TCP-1 MFG

    PRODUCTSTYLECOLORNOTES

    09 9123 PAINTING (P-X)P-1 MFG

    COLORLRVNOTES

    P-2 MFGCOLORLRVNOTES

    P-3 MFGCOLORLRVNOTES

    P-4 MFGCOLORLRVNOTES

    10 2600 WALL AND CORNER GUARDS (CG-X)CG-1 MFG KOROGUARD

    MODEL CORNER GUARDSIZE 1" FLANGENOTES 8'-0" FROM TOP OF BASEFINISH STAINLESS STEEL

    12 3600 COUNTERTOPS - SOLID SURFACE (SS-X)SS-1 MFG CORIAN

    COLOR TBDTHICKNESS 1/2"

    AREA M

    AREA C

    AREA N

  • DNDN

    KEY PLAN

    NO

    RT

    H

    LEGEND

    REFERENCE KEYNOTES

    SHEET KEYNOTES ?

    GENERAL SHEET NOTES

    A. PLAN DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRID LINE, UNLESS NOTED OTHERWISE.

    B. REFER TO FINISH LEGEND ON AFXXX FOR MORE FINISH INFORMATION.C. ALL INTERIOR FINISHES FLAME SPREAD REQUIREMENTS SHALL BE COMPLIANT WITH IBC

    2015/ SECTION 803.X D. REFER TO REFLECTED CEILING PLANS FOR CEILING FINISH INFORMATION, INCLUDING

    ACCENT PAINT LOCATIONS.E. FOR ALL FINISH TRANSITIONS THAT OCCUR AT DOORWAYS, TRANSITION MATERIAL AT

    CENTERLINE OF DOOR WHEN CLOSED, REF AF621 FOR MORE DETAILS.F. GYPSUM BOARD WALLS TO BE PAINTED P-1, UNLESS NOTED OTHERWISE.G. GYPSUM BOARD WALLS WITHOUT TILE AND ALL CASEWORK TOEKICKS TO RECEIVE RB-1,

    UNLESS NOTED OTHERWISEH. CERAMIC TILE TO BE CENTERED IN ROOM, UNLESS NOTED OTHERWISE. AVOID USING

    LESS THAN HALF THE WIDTH OF STANDARD TILES.I. EXPOSED INTERIOR STEEL TO BE PAINTED P-X, UNLESS NOTED OTHERWISE. J. HOLLOW METAL DOORS AND FRAMES TO BE PAINTED P-X, UNLESS NOTED OTHERWISE.K. ALL OUTSIDE GYP BOARD CORNERS TO RECEIVE CORNER GUARDS WP-X; CORNERS WITH

    WALL TILE TO RECEIVE INTEGRAL CORNER GUARDS, REF AFXXX.

    XX-X FLOOR FINISH

    EXTENTS OF SPECIALTY WALL FINISH

    XX-X

    FLOORING CHANGE, TRANSITION REQUIRED

    FLOORING PATTERN CHANGE, TRANSITION NOT REQUIRED

    N.I.C.

    MARKETING

    M136

    OFFICE

    M146

    STOR

    MA101

    C-2

    C-2

    TCP-1

    TCP-1

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    8/1

    0/2

    02

    0 1

    :38

    :31

    PM

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    ULT

    UR

    EN

    EW

    CO

    NS

    TR

    UC

    TIO

    N /

    RE

    NO

    VA

    TIO

    N

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    AF101M

    LEVEL 1 FINISHFLOORPLAN-MARKETING

    Approver

    19-0056.001

    NJ

    1/8" = 1'-0"A1AF-FP-1 - MARKETING FINISH PLAN

    AREA M

    AREA C

    AREA N

    03 3511 CONCRETE FINISHES (C-X)C-1 FINISH POLISHED

    NOTES

    C-2 FINISH SEALED

    09 5100 ACOUSTICAL CEILINGS (AC-X)AC-1 MFG ARMSTRONG

    PRODUCT FISSURED-755EDGE SQUARESIZE 24" X 48"GRID PRELUDE 15/16" GRID WHITE

    09 6813 TILE CARPETING (TCP-X)TCP-1 MFG

    PRODUCTSTYLECOLORSIZEINSTALLNOTES

    09 6500 RESILIENT FLOORING (RA-X)RA-1 MFG JOHNSONITE

    STYLE 4" RUBBERCOLOR TBD

    09 9123 PAINTING (P-X)P-1 MFG

    COLORLRVNOTES

    P-2 MFGCOLORLRVNOTES

    P-3 MFGCOLORLRVNOTES

    P-4 MFGCOLORLRVNOTES

    FINISH LEGEND

  • DN

    DN

    KEY PLAN

    NO

    RT

    H

    LEGEND

    REFERENCE KEYNOTES

    SHEET KEYNOTES ?

    GENERAL SHEET NOTES

    A. PLAN DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRID LINE, UNLESS NOTED OTHERWISE.

    B. REFER TO FINISH LEGEND ON AFXXX FOR MORE FINISH INFORMATION.C. ALL INTERIOR FINISHES FLAME SPREAD REQUIREMENTS SHALL BE COMPLIANT WITH IBC

    2015/ SECTION 803.X D. REFER TO REFLECTED CEILING PLANS FOR CEILING FINISH INFORMATION, INCLUDING

    ACCENT PAINT LOCATIONS.E. FOR ALL FINISH TRANSITIONS THAT OCCUR AT DOORWAYS, TRANSITION MATERIAL AT

    CENTERLINE OF DOOR WHEN CLOSED, REF AF621 FOR MORE DETAILS.F. GYPSUM BOARD WALLS TO BE PAINTED P-1, UNLESS NOTED OTHERWISE.G. GYPSUM BOARD WALLS WITHOUT TILE AND ALL CASEWORK TOEKICKS TO RECEIVE RB-1,

    UNLESS NOTED OTHERWISEH. CERAMIC TILE TO BE CENTERED IN ROOM, UNLESS NOTED OTHERWISE. AVOID USING

    LESS THAN HALF THE WIDTH OF STANDARD TILES.I. EXPOSED INTERIOR STEEL TO BE PAINTED P-X, UNLESS NOTED OTHERWISE. J. HOLLOW METAL DOORS AND FRAMES TO BE PAINTED P-X, UNLESS NOTED OTHERWISE.K. ALL OUTSIDE GYP BOARD CORNERS TO RECEIVE CORNER GUARDS WP-X; CORNERS WITH

    WALL TILE TO RECEIVE INTEGRAL CORNER GUARDS, REF AFXXX.

    XX-X FLOOR FINISH

    EXTENTS OF SPECIALTY WALL FINISH

    XX-X

    FLOORING CHANGE, TRANSITION REQUIRED

    FLOORING PATTERN CHANGE, TRANSITION NOT REQUIRED

    N.I.C.

    C

    65421

    B

    A

    7

    M

    L

    K

    J

    H

    F

    E

    D

    G

    STORAGE118A

    COOL STOR

    112B

    KIT PREP112C

    SEED LAB

    110

    M

    R107B

    W

    R107A

    OFFICE102D

    OFFICE

    102C

    OFFICE

    102B

    OFFICE

    102A

    ECHELONLEVEL 1 AND 2

    116B

    PROVERSTATION

    120

    ELEC115 OIL/AF

    STOR

    112D

    MDF

    T111

    ENGINE LAB

    112A

    DRUM STOR

    117

    MAIN LAB

    112

    JAN

    J109

    LAB OFFICES

    102

    CENTRALRECEIVING

    114

    MECH/BOILERM119

    VESTIBULE

    123

    DOCK STAGING

    121

    RECEIPT DATAENTRY

    116

    LARGE MASS

    118

    MECHM116

    BV

    116A

    VEST

    103ACORRIDOR

    103

    CORRIDOR

    101

    VEND

    104

    UR105

    RF-1

    RF-1 RF-1 RF-1 RF-1

    C-2C-2

    C-2

    C-1

    C-1

    C-2

    C-1

    T-1 T-1

    T-1

    FF-1

    FF-1

    FF-1

    C-2

    C-2

    C-1

    C-1

    C-1

    C-1

    C-1

    C-1

    C-2

    C-1

    31.7 6.3

    FF-1

    RF-1

    H.1

    G.5

    K.8

    2.61.2

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    8/1

    0/2

    02

    0 1

    :38

    :36

    PM

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    ULT

    UR

    EN

    EW

    CO

    NS

    TR

    UC

    TIO

    N /

    RE

    NO

    VA

    TIO

    N

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    AF101N

    LEVEL 1 FINISHFLOOR PLAN -NEW LAB

    Approver

    19-0056.001

    NJ

    NO

    RT

    H

    1/8" = 1'-0"A3AF-FP-1 - NEW LAB

    AREA M

    AREA C

    AREA N

  • 09 32 00.08

    ??

    ?09 32 00.20?

    EX

    CE

    PT

    WH

    ER

    E N

    OT

    ED

    OT

    HE

    RW

    ISE

    IN

    DW

    GS

    4"

    09 32 00.14

    09 32 00.13

    09 00 00.01

    03 30 00.14

    09 32 00.15

    09 68 00.C1

    09 68 00.C1

    09 60 00.0209 32 00.21

    WALL BEYOND

    09 2116-A

    09 32 00.11

    ?

    09 68 00.C1

    09 32 00.19?

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    8/1

    0/2

    02

    0 1

    :38

    :40

    PM

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    ULT

    UR

    EN

    EW

    CO

    NS

    TR

    UC

    TIO

    N /

    RE

    NO

    VA

    TIO

    N

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    AF621N

    FINISH LEGEND -NEW LAB

    Approver

    19-0056.001

    NJ

    FINISH LEGEND

    03 3511 CONCRETE FINISHES (C-X)C-1 FINISH POLISHED

    NOTES

    C-2 FINISH SEALED

    06 4100 PLASTIC LAMINATE (PL-X)PL-1 MFG TBD

    PRODUCT TBDFINISH TBDEDGE BAND TBD

    06 8316 FIBERGLASS REINFORCED PANELING (FRP-X)FRP-1 MFG MARLITE

    TYPE STANDARDCOLOR WHITEFINISH SMOOTHNOTES JANITORS ROOM

    09 3000 TILING (T-X)T-1 MFG TBD

    STYLE TBDCOLOR TBDSIZE TBDGROUT TBDINSTALLATION TBDNOTES FLOOR TILE

    T-2 MFG TBDSTYLE TBDCOLOR TBDSIZE TBDGROUT TBDINSTALLATION TBDNOTES WALL TILE

    09 5100 ACOUSTICAL CEILINGS (AC-X)AC-1 MFG ARMSTRONG

    PRODUCT FISSURED-755EDGE SQUARESIZE 24" X 48"GRID PRELUDE 15/16" GRID WHITE

    AC-2 MFG ARMSTRONGPRODUCT GEORGIAN HIGH WASHABILITYEDGE SQUARESIZE 24" X 48"GRIDE PRELUDE 15/16" GRID WHITE

    12" = 1'-0"B4Resilient to Resilient

    12" = 1'-0"B5Resilient to Tile

    12" = 1'-0"A5Cove Base Detail

    09 6500 RESILIENT FLOORING (RF-1)RF-1 MFG

    PRODUCTSIZECOLOR

    RF-2 MFGPRODUCTSIZECOLOR

    09 6500 RESILIENT FLOORING (RA-X)RA-1 MFG JOHNSONITE

    STYLE 4" RUBBERCOLOR TBD

    09 6700 FLUID-APPLIED FLOORING (FF-X)FF-1 MFG

    PRODUCTCOLOR

    09 6813 TILE CARPETING (TCP-X)TCP-1 MFG

    PRODUCTSTYLECOLORNOTES

    09 9123 PAINTING (P-X)P-1 MFG

    COLORLRVNOTES

    P-2 MFGCOLORLRVNOTES

    P-3 MFGCOLORLRVNOTES

    P-4 MFGCOLORLRVNOTES

    10 2600 WALL AND CORNER GUARDS (CG-X)CG-1 MFG KOROGUARD

    MODEL CORNER GUARDSIZE 1" FLANGENOTES 8'-0" FROM TOP OF BASEFINISH STAINLESS STEEL

    12 3600 COUNTERTOPS - SOLID SURFACE (SS-X)SS-1 MFG CORIAN

    COLOR TBDTHICKNESS 1/2"

    12" = 1'-0"A3Tile Corner W/ Cut Tile

    12" = 1'-0"C5Concrete to Carpet

    12" = 1'-0"C4Resilient to Carpet

    12" = 1'-0"A4Resilient to Resinous

    12" = 1'-0"C3Wall Tile W/ Metal Trim

    12" = 1'-0"B3Tile to Carpet

  • KEY PLAN

    NO

    RT

    H

    REFERENCE KEYNOTES

    SHEET KEYNOTES ?

    GENERAL SHEET NOTES

    A. FOR REFERENCE ONLY

    C

    F

    E

    D

    EQ & STORC107

    CHEM & FLAMSTORC106A

    BALANCE RMC106B

    INSTRUMENTRMC108

    WASHINGC102

    CHEMISTRYLABC106

    BVC105

    CLEAN LABC105A

    GRINDINGC105B

    SAMPLE STORC103

    RECEIPT &DATA ENTRY

    C101

    WCR112

    MCR113

    MECHCM114

    STORCS111

    ICP-MSC110

    FIREC109

    (E)2 (E)1(E)3(E)4(E)5

    (E)C

    (E)B

    (E)A.1

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    8/1

    0/2

    02

    0 1

    :38

    :42

    PM

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    ULT

    UR

    EN

    EW

    CO

    NS

    TR

    UC

    TIO

    N /

    RE

    NO

    VA

    TIO

    N

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    IF101C

    LEVEL 1FURNITUREPLAN-CHEMISTRY

    Approver

    19-0056.001

    NJ

    1/8" = 1'-0"1LEVEL 1 FINISH FLOOR PLAN-AREA B

    FOR REFERENCEONLY

  • DN

    UP

    DN

    DN

    MARKETING

    M136

    OFFICE

    M146

    STOR

    MA101

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    8/1

    0/2

    02

    0 1

    :38

    :44

    PM

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    ULT

    UR

    EN

    EW

    CO

    NS

    TR

    UC

    TIO

    N /

    RE

    NO

    VA

    TIO

    N

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    IF101M

    LEVEL 1FURNITURE PLAN- MARKETING

    Approver

    19-0056.001

    NJ

    1/8" = 1'-0"A5LEVEL 1 FURNITURE PLAN

    NO

    RT

    H

    FOR REFERENCEONLY

  • .

    DN

    DN

    C

    65421

    B

    A

    7

    M

    L

    K

    J

    H

    F

    E

    D

    G

    3

    3'-9 3/4"3'-8"

    1.7 6.3

    H.1

    G.5

    K.8

    2.61.2

    KEY PLAN

    NO

    RT

    H

    REFERENCE KEYNOTES

    SHEET KEYNOTES ?

    GENERAL SHEET NOTES

    A. FOR REFERENCE ONLY

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NO

    T F

    OR

    CO

    NS

    TR

    UC

    TIO

    N

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    8/1

    0/2

    02

    0 1

    :38

    :47

    PM

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    ULT

    UR

    EN

    EW

    CO

    NS

    TR

    UC

    TIO

    N /

    RE

    NO

    VA

    TIO

    N

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    IF101N

    LEVEL 1FURNITUREPLAN-NEW LAB

    Approver

    19-0056.001

    Author

    1/8" = 1'-0"A1IF-FP-1 - NEW LAB

    FOR REFERENCEONLY

  • ABBREVIATIONS

    ABBR. DESCRIPTION ABBR.

    ABOVE FINISHED FLOOR

    ACCESS DOOR

    DIAMETER

    DOWN

    DRINKING FOUNTAIN

    EXISTING

    EXPANSION

    FEET PER MINUTE

    FEET PER SECOND

    GALLONS PER MINUTE

    HORSEPOWER

    HERTZ

    INCHES PER SECOND

    KILOWATTS

    LAVATORY

    DESCRIPTION

    AFF

    A.D.

    DIA

    DN

    DF

    (E)

    EXP

    FPM

    FPS

    GPM

    HP

    HZ

    IPS

    kW

    LAV

    POUNDS

    THOUSAND BTU'S PER HOUR

    NEW

    NOT IN CONTRACT

    NOMINAL

    ON CENTER

    PHASE

    POINT OF CONNECTION

    TEMPERATURE

    TYPICAL

    URINAL

    VOLTAGE

    VENT THROUGH ROOF

    WATER CLOSET

    LBS

    MBH

    (N)

    N.I.C.

    NOM

    OC

    PH

    POC

    TEMP

    TYP

    URN

    V

    VTR

    WC

    GENERAL NOTES

    A. ALL AREAS ARE TO BE CONSIDERED AS FINISHED SPACES UNLESS NOTED OTHERWISE. SEE FLOOR PLANS AND DETAILS FOR ADDITIONAL REQUIREMENTS. ALL PIPING WORK IS TO BE CONCEALED UNLESS NOTED OTHERWISE.

    B. COORDINATE FINAL LOCATIONS OF ALL FIXTURES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION.

    C. COORDINATE UNDERGROUND PIPING WITH STRUCTURAL.D. COORDINATE LOCATION OF ALL MECHANICAL, ELECTRICAL AND FIRE

    PROTECTION EQUIPMENT WITH THEIR TRADE DRAWINGS AND INSTALLING CONTRACTORS.

    E. NOTE THAT THE IDENTIFICATION LABELS TO BE USED/MADE FOR ALL SYSTEMS MUST USE THE OWNER'S ROOM NUMBERS AND ROOM NAMES, NOT THE NUMBERS OR NAMES ON THE CONSTRUCTION DOCUMENTS. MEET WITH OWNER TO REVIEW AND CONFIRM ROOM NUMBERS AND NAMES PRIOR TO LABELING SYSTEMS.

    F. ALL FINAL SCHEDULES AND TAGS ARE TO BE UPDATED AND CONFORM TO THE OWNER'S ROOM NUMBERS AND ROOM NAMES, NOT THE NUMBERS OR NAMES ON THE CONSTRUCTION DOCUMENTS. MEET WITH OWNER TO REVIEW AND CONFIRM ROOM NUMBERS AND NAMES PRIOR TO GENERATING FINAL TAGS AND LABELS.

    G. PERFORM ALL CUTTING AND PATCHING NECESSARY TO PERFORM WORK. MATCH EXISTING MATERIALS, FINISHES, FIRE RATINGS, PAINT COLORS, ETC. IN ALL AREAS OF PATCHING.

    H. PROVIDE ACCESS PANEL AS REQUIRED TO ACCESS EQUIPMENT, VALVES, CLEAN-OUT, ETC.; INSTALL ACCESS PANELS SUCH THAT TOP IS 36" ABOVE THE FINISHED FLOOR.

    I. ALL CLEAN-OUT COVERS AND FLOOR DRAIN GRATE/STRAINERS SHALL BE A SATIN NICKEL FINISHED WITH TAMPER PROOF SCREW UNLESS NOTED OTHERWISE.

    J. MINIMUM PIPE SIZE IS 3/4" UNLESS INDICATED OTHERWISE.

    1. GENERAL NOTES

    A. SUBMISSION OF PROPOSAL DIRECTLY OR INDIRECTLY IN CONNECTION WITH THIS WORK SHALL IMPLY THAT THE BIDDER HAS EXAMINED THE JOB SITE UNDER WHICH HE WILL BE OBLIGATED TO OPERATE SHOULD THEY BE AWARDED THE WORK UNDER THIS CONTRACT. NO EXTRA CHARGE WILL BE ALLOWED FOR FAILURE OF ANY BIDDER TO EXAMINE THE SITE PRIOR TO BID.

    B. CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL DIMENSIONS IN THE FIELD, AND SHALL ADVISE THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE PERFORMING THE WORK.

    C. DO NOT SCALE DRAWINGS.

    D. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE ALL HANGERS AND SUPPORTS REQUIRED FOR A COMPLETE INSTALLATION.

    E. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER AND ALL OTHER CONTRACTORS.

    F. CONTRACTOR SHALL PROVIDE LABOR TO RECEIVE, UNLOAD, STORE, PROTECT, AND TRANSFER TO POINT OF INSTALLATION, OWNER FURNISHED ITEMS.

    G. WHERE CONDUIT, CABLES, DUCTWORK, OR PIPING PASSES THROUGH FIRE RATED FLOORS OR WALLS, THE SLEEVES SHALL BE COMPLETELY SEALED WITH A FIRE STOP MATERIAL BEING SUITABLE FOR THIS SERVICE. THIS MATERIAL SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE MANUFACTURER TO MAINTAIN THE FIRE RATING OF THE PENETRATED WALL OR FLOOR.

    H. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CORING AS IT RELATES TO HIS WORK.

    I. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL SUPPLY THE ENGINEER WITH (1) COMPLETE SET OF FULL SIZE AS-BUILT DOCUMENTS AND (3) COPIES OF OPERATIONS AND MAINTENANCE MANUALS (SHALL BE OBTAINED AT CONTRACTOR'S EXPENSE).

    J. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL SUPPLY THE ENGINEER WITH (1) COMPLETE SET OF FULL SIZE AS-BUILT DOCUMENTS AND (3) COPIES OF OPERATIONS AND MAINTENANCE MANUALS (SHALL BE OBTAINED AT CONTRACTOR'S EXPENSE.

    2. SUMMARY AND SCOPE OF WORK:

    A. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE EXTENT, GENERAL CHARACTER AND LOCATION OF THE WORK INCLUDED. OFFSETS AND/OR CHANGES IN ELEVATION OF PIPING DUE TO STRUCTURAL OR OTHER INTERFERENCES SHALL BE PROVIDED WITHOUT EXTRA COST.

    B. CONTRACTOR SHALL VERIFY AND EVALUATE ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK.

    C. SUBCONTRACTOR SHALL VERIFY EXISTENCE AND LOCATION OF ALL UTILITY SERVICES AND COORDINATE AS REQUIRED BY THEIR RESPECTIVE AREA OF THE CONSTRUCTION, NOTIFYING THE PRIME CONTRACTOR OF VARIATIONS OR CONFLICTS.

    D. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY FOR THE INSTALLATION OF COMPLETE AND OPERATING SYSTEMS.

    E. PROVIDE ONE YEAR GUARANTEE AGAINST DEFECTIVE MATERIALS AND WORKMANSHIP AFTER FINAL ACCEPTANCE BY OWNER.

    F. ENTIRE DEMOLITION AND NEW WORK INSTALLATION SHALL CONFORM TO ALL APPLICABLE LAWS, CODES, AND REGULATIONS OF MUNICIPAL, STATE AND FEDERAL AUTHORITIES.

    G. SHOP DRAWINGS: SUBMIT MATERIAL LIST AND SHOP DRAWINGS FOR MAJOR EQUIPMENT AND MATERIALS TO THE ARCHITECT/ENGINEER FOR APPROVAL.

    H. IF NOT SPECIFICALLY DEFINED IN THESE CONSTRUCTION DOCUMENTS, MATERIALS AND/OR EQUIPMENT AND DELIVERY TO MAINTAIN CONSTRUCTION SCHEDULE.

    I. THE MANUFACTURER OF EQUIPMENT OR MATERIALS FIRST NAMED ON THE DRAWINGS IS THE BASIS OF DESIGN. OTHER MANUFACTURERS, IF LISTED, ARE CONSIDERED GENERAL EQUIVALENTS ONLY. WHERE CONTRACT DOCUMENTS PERMIT SELECTION OF EQUIVALENTS, OR WHERE SUBSTITUTIONS ARE AUTHORIZED, COORDINATE CLEARANCE AND OTHER INTERFACE REQUIREMENTS WITH MECHANICAL AND OTHER WORK.

    i. PROVIDED NECESSARY ADDITIONAL ITEMS SO THAT SELECTED OR SUBSTITUTED ITEM OPERATES EQUIVALENT TO THE BASIS OF DESIGN AND PROPERLY FITS IN THE AVAILABLE SPACE ALLOCATED FOR THE BASIS OF DESIGN.

    ii. PROVIDED ALL FEATURES WHICH RE STANDARD ON THE BASIS OF DESIGN PLUS ANY SPECIFIED OPTIONS.

    iii. BE RESPONSIBLE FOR ASSURING THAT PIPING, CONDUIT, DUCT, FLUE, AND OTHER SERVICE LOCATIONS FOR GENERAL EQUIVALENTS OR SUBSTITUTIONS DO NOT CAUSE ACCESS, SERVICE, OR OPERATIONAL DIFFICULTIES ANY GREATER THAN WOULD BE ENCOUNTERED WITH THE BASE DESIGN.

    J. THE CONTRACTOR SHALL SECURE ALL PERMITS OR APPLICATIONS AND PAY ANY AND ALL FEES.

    K. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR PIPING. DO NOT LEAVE PIPING OPEN ENDED.

    L. WHERE USED, THE TERM “PROVIDE” SHALL MEAN “FURNISH AND INSTALL”.

    M. INSTALL ALL SHOCK ABSORBERS IN ACCORDANCE WITH THE LATEST “PLUMBING AND DRAINAGE INSTITUTE STANDARDS” FOR WATER HAMMER ARRESTORS.

    N. LOCATE ACCESS PANELS (INCLUDING BUT NOT LIMITED TO THOSE SHOWN ON PLANS). IN NON ACCESSIBLE CEILINGS AND WALLS FOR ALL VALVES, SHOCK ABSORBERS, CLEANOUTS AND ALL OTHER ITEMS THAT REQUIRE ACCESS TO PROPERLY MAINTAIN OR SERVICE THE BUILDING.

    O. PROVIDE CLEANOUTS AS REQUIRED BY CODE.

    P. INSTALL WORK SO AS TO BE READILY ACCESSIBLE FOR OPERATION, MAINTENANCE, AND REPAIR. MINOR DEVIATIONS FROM DRAWINGS MAY BE MADE TO ACCOMPLISH THIS, BUT CHANGES WHICH INVOLVE EXTRA COST SHALL NOT BE MADE WITHOUT PRIOR APPROVAL.

    Q. ALL VENT THRU ROOF (VTR) ROOF PENETRATIONS INDICATED ON PLANS ARE PRELIMINARY. FINAL LOCATIONS SHALL BE COORDINATED WITH ALL TRADES. ALL VTR'S SHALL BE A MINIMUM OF 10'-0” FROM ALL FRESH AIR INTAKE OPENINGS.

    3. PLUMBING EQUIPMENT AND PIPING IDENTIFICATION

    A. PROVIDE IDENTIFICATION OF ALL EQUIPMENT, PIPES, AND VALVES.

    B. IDENTIFICATION DEVICES TO BE USED SHALL INCLUDE THE FOLLOWING:i. PLASTIC PIPE MARKERS

    ii. VALVE TAGS AND EQUIPMENT TAGS

    4. INSULATION

    A. ALL HOT WATER PIPING TO BE INSULATED WITH 1” FIBERGLASS INSULATION. ALL COLD WATER PIPING TO BE INSULATED WITH ½” ANY TYPE INSULATION.

    B. PLENUM RATED FIRE RETARDANT JACKET ON PIPE INSULATION.

    C. VALVES AND FITTINGS: PREMOLDED FIBERGLASS FITTINGS OR RADIAL MITERED SEGMENTS OF PIPE INSULATION, INSULATING CEMENT, FIBERGLASS REINFORCING CLOTH, AND MASTIC, VAPOR SEAL INSULATION ON CW PIPING.

    5. SUPPORTS AND HANGERS

    A. ALL PIPE SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE IN A NEAT AND WORKMANLIKE MANNER. THE USE OF WIRE AND PREFORMED METAL TO SUPPORT PIPES WILL NOT BE PERMITTED. SPACING OF PIPE SUPPORTS SHALL BE IN ACCORDANCE WITH PLUMBING CODE. SUPPORT NEW PIPING WITH UNISTRUCT ATTCHED TO BUILDING STRUCTURE PURLINS AND THREADED ROD TO PIPE HANGER.

    6. DOMESTIC WATER SUPPLY PIPING

    A. PROVIDE TYPE “L” HARD DRAWN COPPER TUBING WITH 125 PSI SOLDER JOINTS, COPPER OR BRASS FITTINGS. ALL SOLDER TO BE “NO LEAD” TYPE.

    B. FLUX: NONAGGRESSIVE, NONCORROSIVE TYPE, “NO LEAD” TYPE.

    C. VALVES: COLD AND HOT WATER, BALL VALVES, 2 INCHES AND SMALLER, 600 PSI WOG, SERVICEABLE IN LINE, SOLDER ENDS.

    7. SANITARY DRAINAGE AND VENT PIPING

    A. ABOVE GRADE:i. SCHEDULE 40 PVC SHALL BE ACCEPTABLE WHERE ALLOWED BY CODE, EXCEPT WHERE

    OTHERWISE NOTED.

    ii. DRAINAGE PIPING SHALL RUN AS STRAIGHT AS POSSIBLE AND SHALL HAVE LONG TURN FITTINGS.

    iii. ALL VENT PIPING SHALL BE SLOPED TO DRAIN BACK TO FIXTURES.

    iv. CONTRACTOR IS RESPONSIBLE FOR PROPER FLASHING OF THE VENT PIPING RUN THROUGH THE ROOF OR WALL.

    8. TESTING

    A. PLUMBING SYSTEMS SHALL BE CLEANED/FLUSHED AND FLOW AND PRESSURE TESTED IN ACCORDANCE WITH STANDARD PRACTICE AND PLUMBING CODE.

    PLUMBING SPECIFICATIONS

    RISER UP

    RISER UP

    RISER DOWN

    RISER DROP

    BRANCH - TOP CONNECTION

    BRANCH - BOTTOM CONNECTION

    BRANCH - SIDE CONNECTION

    DIRECTION OF FLOW

    CAP ON END OF PIPE

    COLD WATER (CW)

    HOT WATER (HW)

    HOT WATER RECIRCULATING (HWR)

    WASTE (W)

    GREASE WASTE (GW)

    VENT-ABOVE (V)

    VENT-BELOW (V)

    GAS (G)

    ROOF DRAIN (RD)

    OVERFLOW ROOF DRAIN (ORD)

    COMPRESSED AIR (CA)

    VACUUM (VAC)

    POINT OF CONNECTION

    POINT OF DISCONNECT

    EQUIPTMENT DESIGNATION

    AREA DRAIN

    BACKFLOW PREVENTOR (REDUCED ZONE)

    BACKFLOW PREVENTOR (DOUBLE CHECK VALVE ASSEMBLEY)

    BALL VALVE

    BUTTERFLY VALVE

    CHECK VALVE

    CIRCUIT SETTING BALANCING VALVE

    CLEANOUT (FLOOR)

    CLEANOUT (WALL)

    DOUBLE CLEANOUT (FLOOR)

    FIXTURE ISOLATION VALVE

    FLEXIBLE CONNECTION

    FLOOR DRAIN

    FLOOR SINK

    FLOOR SWITCH

    GAS COCK

    DESCRIPTION

    LEGEND

    SYMB. DESCRIPTIONSYMB.

    GAS METER

    GAS PRESSURE REGULATOR

    HOT WATER HEATER

    HOSE BIBB WITH VACUUM BREAKER

    GATE VALVE

    GATE VALVE, ANGLE

    GUAGE WITH GUAGE COCK/ PRESSURE INDICATOR

    GLOBE VALVE

    GLOBE VALVE, ANGLE

    LIFT CHECK VALVE

    OPEN SITE DRAIN

    PLUG VALVE

    PRESSURE GUAGE

    PRESSURE REDUCING VALVE (PRV)

    PRESSURE TRAMSMITTER OR PRESSURE SWITCH

    PUMP

    RELIEF/SAFETY VALVE

    ROOF DRAIN

    SOLENOID VALVE

    STRAINER

    STRAINER WITH BLOW OFF VALVE

    SWING CHECK VALVE

    TEMPERATURE GUAGE

    TEMPERATURE AND PRESSURE RELIEF VALVE

    TEMPERATURE TRANSMITTER

    THERMOMETER/TEMPER-ATURE INDICATOR

    THREE WAY CONTROL VALVE

    TWO WAY CONTROL VALVE

    UNION - SCREWED OR FLANGE

    VACUUM BREAKER

    VALVE IN RISE OR DROP

    WALL HYDRANT

    WATER HAMMER ARRESTER

    WATER METER

    GM

    WH

    WM

    HB

    PI/GA

    OS

    PT/PS

    RD

    S

    TP

    TT

    TH/TI

    RTU

    #

    GAS

    ADR

    CBV

    CO

    CO

    FD

    FS

    FS

    SA

    RD

    ORD

    DCOTG

    PLUMBING SHEET LIST

    P001 LEGENDS & SPECIFICATIONS

    PD101M PLUMBING DEMOLITION PLAN - MARKETING - BLDG 330

    PLD101C PLUMBING WASTE & VENT DEMOLITION PLAN - BLDG 643

    PL101C PLUMBING WASTE & VENT PLAN - BLDG 643

    PP101C PLUMBING WATER PLAN - BLDG 643

    PG101C PLUMBING GASES PLAN - BLDG 643

    P141C PLUMBING ROOF PLAN - BLDG 643

    PL101N PLUMBING WASTE & VENT PLAN - NEW BLDG

    PP101N PLUMBING WATER & GAS PLAN - NEW BLDG

    PG101N PLUMBING GASES PLAN - NEW BLDG

    P141N PLUMBING ROOF PLAN - NEW BLDG

    P401C PLUMBING ENLARGED PLANS - BLDG 643

    P601C PLUMBING DIAGRAMS - BLDG 643

    P401N PLUMBING ENLARGED PLANS - NEW BLDG

    P601N PLUMBING DIAGRAMS - NEW BLDG

    P501 PLUMBING DETAILS

    P502 PLUMBING DETAILS

    P701 PLUMBING SCHEDULES

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:1

    7 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    P001

    LEGENDS &SPECIFICATIONS

    CE

    19-0056.001

    PU

  • FS

    FS

    W2"ø 4"ø W

    2"ø

    W1/2"ø

    2"ø W

    1/2"ø1/2"ø

    3"ø

    1/2"ø

    1/2

    2"ø

    2" (E) VTR

    2" (E) VTR

    1' 1/2" (E) VTR

    3"ø

    (E)

    DW

    (E)

    V

    (E) DW

    (E) CW

    (E) HWR(E) HW

    (E) HWR

    (E) HW

    (E) CW

    (E) DW(E) A

    (E) G(E) V

    METROLOGY LAB

    137

    VEST

    141

    PROVER

    142

    STOR

    140

    MASS

    139

    MASS

    138

    ECHELON 1

    136

    OFFICE

    146

    ENGINE LAB

    101

    STOR

    110

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:2

    5 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PD101M

    PLUMBINGDEMOLITIONPLAN -MARKETING -BLDG 330

    CE

    19-0056.001

    PU

    A. VERIFY AND COORDINATE WITH EXISTING CONDITIONS IN FIELDB. REVIEW AND COORDINATE WITH LAB CONSULTANT DRAWINGS AND ALL

    TRADES.C. PATCH HOLES FROM DEMOLITION WORK. PROVIDE FINISH TO MATCH

    SURROUNDING SURFACES. COORDINATE WITH ARCHITECTURAL.

    GENERAL SHEET NOTES

    1. DISCONNECT EXISTING DOMESTIC CW + HW + SANITARY DRAIN AND VENTING FROM CASEWORK AND PARTITION TO BE REMOVED. COORDINATE WITH ARCHITECTURAL DRAWINGS.

    2. CUT DRAIN BACK BELOW FLOOR IN ROOM. PROVIDE NEW FLOOR CLEANOUT TO TERMINATE PIPE. CUT AND PATCH FLOOR AS REQUIRED. REMOVE VENTING UP INTO CEILING SPACE. CAP AND PROVIDE PERMANENT LABEL.

    3. REMOVE PIPING FROM CEILING SPACE OF ROOM; BACK TO CEILING OF ADJACENT ROOM AND CAP. COORDINATE EXTENT OF WORK IN FIELD.

    4. REMOVE HOW WATER SUPPLY AND RETURN PIPING FROM CEILING SPACE OF ROOM; BACK TO CEILING OF ADJACENT ROOM AND CAP. RECONNECT PIPING TO MAINTAIN LOOP FOR CIRCULATION. COORDINATE EXTENT OF WORK IN FIELD.

    5. REMOVE FLOOR SINK\FLOOR DRAIN COMPLETELY. CUT DRAIN BACK BELOW FLOOR IN ROOM. PROVIDE NEW FLOOR CLEANOUT TO TERMINATE PIPE. CUT AND PATCH FLOOR AS REQUIRED. REMOVE VENTING UP INTO CEILING SPACE. CAP AND PROVIDE PERMANENT LABEL.

    6. REMOVE LARGE WATER LINE BACK TO ADJACENT ROOM AND CAP.

    SHEET KEYNOTES

    1/8" = 1'-0"1PLUMBING DEMOLITION PLAN - BLDG 330

    NORTH

    1/8" = 1'-0"2330 BASEMENT PLUMBING DEMOLITION LEVEL

    KEY PLAN

    NO

    RT

    H

    M

    CN

  • W

    ORD

    RD

    W

    V

    LA

    B-S

    AN

    4" SAN VTR

    3" LAB VTR

    LV

    LS

    LAB-VENT

    LAB-SAN

    1

    1

    1

    (E)WC

    (E)LAV

    (E)WC(E)LAV

    (E)UR

    (E)CW

    (E)JS

    5

    3

    2

    2

    4

    5

    OFFICE

    106

    STORAGE

    107

    OFFICE

    108

    OFFICE

    110

    COPY

    111

    WOMEN

    112

    MEN

    113

    MEP

    114

    ENTRY

    101

    OFFICE

    105

    OFFICE

    104B

    OFFICE

    104A

    OFFICE

    103

    OFFICE

    104

    FIRE RISER

    109

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:3

    5 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PLD101C

    PLUMBINGWASTE & VENTDEMOLITIONPLAN - BLDG 643

    CE

    19-0056.001

    PU

    GENERAL SHEET NOTES

    1. REMOVE EXISTING PIPING TO FACILITATE WALL DEMOLITION.2. EXISTING TOILET ROOM FIXTURES TO REMAIN3. EXISTING JANITOR SINK TO REMAIN4. EXISTING DWF FIXTURES TO REMAIN5. EXISTING RAINWATER PIPING TO REMAIN

    SHEET KEYNOTES

    1/4" = 1'-0"1PLUMBING WASTE & VENT DEMOLITION PLAN - BLDG 643

    NORTH

    A. INSTALL WASTE PIPING BELOW SLAB AT 1/4" PER FOOT SLOPE.B. FOR COUNTERTOP AND WALL MOUNTED PLUMBING FIXTURES (LAVATORIES,

    COUNTERTOP SINKS), PROVIDE A T-PATTERN WALL CLEANOUT BELOW PLUMBING FIXTURE. CLEANOUT SHALL BE CAST IRON DRAINAGE T-PATTERN, 90 DEGREE BRANCH FITTING WITH SQUARE HEAD BRASS SCREW PLUGS OF THE SAME SIZE AS THE PIPE UP TO AND INCLUDING 4". WALL CLEANOUTS IN FINISHED AREAS SHALL BE ZURN NO. Z-1460-8 WITH POLISHED STAINLESS STEEL OR CHROME PLATED METAL COVER.

    C. PROVIDE WALL CLEANOUT FOR ALL PLUMBING FIXTURES UNLESS NOTED OTHERWISE.

    D. PROVIDE MANUFACTURED TRAP SEAL FOR ALL FLOOR SINKS AND FLOOR DRAINS.

    M

    CN

    KEY PLAN

    NO

    RT

    H

  • CHEMISTRY LAB

    C106

    INSTRUMENT RM

    C108

    EQ & STOR

    C107

    CHEM & FLAM

    STOR

    C106A

    BALANCE RM

    C106B

    WASHING

    C102

    RECEIPT & DATA

    ENTRY

    C101

    BV

    C105

    CLEAN LAB

    C105A

    GRINDING

    C105B

    SAMPLE STOR

    C103

    STOR

    CS111

    W

    CR112

    M

    CR113

    MECH

    CM114

    ICP-MS

    C110

    2" CAP FOR FUTURE

    W V

    ORD

    RD

    W

    V

    W

    V

    V

    W

    W

    W

    V

    V

    FCO

    FCO

    FCO

    SS-1 SS-1

    SS-1

    EY-1

    LS-1

    LS-1

    LS-1

    LS-1

    LS-1

    LS-1

    LS-1

    DCO DCO

    FD

    (E)FD (E)FD

    (E)WC

    (E)LAV

    (E)WC(E)LAV

    (E)UR

    (E)CW

    (E)JS

    FD-1

    FD-1

    FD-1

    9

    1

    1

    2

    6

    .3

    4

    5

    . . 53

    4

    .

    5

    5

    4

    .

    4

    5 4

    7

    9

    4

    38

    LS-1

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:3

    0 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PL101C

    PLUMBINGWASTE & VENTPLAN - BLDG 643

    CE

    19-0056.001

    PU

    A. INSTALL WASTE PIPING BELOW SLAB AT 1/4" PER FOOT SLOPE.B. FOR COUNTERTOP AND WALL MOUNTED PLUMBING FIXTURES (LAVATORIES,

    COUNTERTOP SINKS), PROVIDE A T-PATTERN WALL CLEANOUT BELOW PLUMBING FIXTURE. CLEANOUT SHALL BE CAST IRON DRAINAGE T-PATTERN, 90 DEGREE BRANCH FITTING WITH SQUARE HEAD BRASS SCREW PLUGS OF THE SAME SIZE AS THE PIPE UP TO AND INCLUDING 4". WALL CLEANOUTS IN FINISHED AREAS SHALL BE ZURN NO. Z-1460-8 WITH POLISHED STAINLESS STEEL OR CHROME PLATED METAL COVER.

    C. PROVIDE WALL CLEANOUT FOR ALL PLUMBING FIXTURES UNLESS NOTED OTHERWISE.

    D. PROVIDE MANUFACTURED TRAP SEAL FOR ALL FLOOR SINKS AND FLOOR DRAINS.

    GENERAL SHEET NOTES

    1. EXISTING TOILET ROOM FIXTURES TO REMAIN2. EXISTING JANITOR SINK TO REMAIN3. PROVIDE NEW BELOW FLOOR SANITARY PIPING AND CONNECTION. SAW

    CUT FLOOR AS REQUIRED TO ACCESS EXISTING PIPING; PATCH FLOOR TO MATCH EXISTING.

    4. PROVIDE NEW VENT PIPING BELOW FLOOR AND CONNECTION. SAW CUT FLOOR AS REQUIRED TO ACCESS EXISTING PIPING; PATCH FLOOR TO MATCH EXISTING.

    5. ROUTE NEW VENT PIPING CONCEALED UP INSIDE EXISTING WALL. CUT WALL AS REQUIRED; PATCH TO MATCH EXISTING.

    6. EXISTING DWF FIXTURES TO REMAIN7. EXISTING RAINWATER PIPING TO REMAIN8. ROUTE NEW VENT PIPING INSIDE CASEWORK CHASE, OVER TO UTILITY

    COLUMN AND UP TO CEILING.9. CONNECT NEW FIXTURE DRAIN TO EXISTING SANITARY AND VENT PIPE IN

    WALL.

    SHEET KEYNOTES

    1/4" = 1'-0"1PLUMBING WASTE & VENT PLAN - BLDG 643

    NORTH

    M

    CN

    KEY PLAN

    NO

    RT

    H

  • CHEMISTRY LAB

    C106

    BV

    C105

    CLEAN LAB

    C105AGRINDING

    C105B

    SAMPLE STOR

    C103

    RECEIPT & DATA

    ENTRY

    C101

    STOR

    CS111

    W

    CR112

    ICP-MS

    C110

    M

    CR113

    MECH

    CM114

    EQ & STOR

    C107

    CHEM & FLAM

    STOR

    C106A

    BALANCE RM

    C106B

    WASHING

    C102

    INSTRUMENT RM

    C108

    HWCW

    HWCW

    CW

    HW

    CW

    HW

    HW

    R

    CW

    CW

    HW

    HWR

    LS-1

    LS-1

    LS-1

    EY-1

    LS-1

    LS-1

    LS-1

    SS-1SS-1

    LS-1

    SS-1

    CW

    HW

    HW

    CW

    (E)WC

    (E)LAV

    (E)WC

    (E)LAV

    (E)UR

    (E)CW

    (E)JS

    3

    3

    3

    3

    6

    6

    7

    8

    4

    13

    13

    LS-1

    5

    13

    3

    1

    4

    10

    9

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:3

    6 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PP101C

    PLUMBINGWATER PLAN -BLDG 643

    CE

    19-0056.001

    PU

    A. COLD AND HOT WATER DROPS/RISES TO FIXTURES SHALL BE VERTICAL BETWEEN THE FRAMING STUDS.

    B. PROVIDE BALL VALVES FOR ALL WATER ISOLATION AND SUPPLY TAKE-OFFS.C. WATER HAMMER ARRESTERS SHALL HAVE MAINTENANCE ACCESS IN THE

    FORM OF AN ACCESS PANEL.

    GENERAL SHEET NOTES

    1. ROUTE PIPING IN CEILING SPACE2. EXISTING DOMESTIC COLD WATER, HOT WATER AND HOT-WATER-RETURN

    SERVICE TO BUILDING TO REMAIN SUPPLY IS FROM ADJACENT BUILDING 330. PIPING ENTERS UNDERGROUND AND RISES UP IN CHASE.

    3. DROP 1/2" CW & HW DOWN IN WALL TO SINK. ROUTE NEW PIPING CONCEALED UP INSIDE EXISTING WALL. CUT WALL AS REQUIRED; PATCH TO MATCH EXISTING.

    4. DROP 1/2" CW & HW DOWN IN WALL TO SINK5. DROP 1/2" CW & HW DOWN IN UTILITY COLUMN TO SERVE NEW ISLAND

    SINK. ROUTE PIPING INSIDE CASEWORK TO FIXTURE.6. EXISTING TOILET ROOM FIXTURES TO REMAIN7. EXISTING JANITOR SINK TO REMAIN8. EXISTING DWF FIXTURES TO REMAIN9. PROVIDE NEW WATER LINE TO FEED ROOFTOP GAS HUMIDIFIER. CONNECT

    TO WATER LINE IN MECHANICAL ROOM; INSTALL BACKFLOW PREVENTER ON WALL OVER SINK; EXTEND LINE TO UNIT ON ROOF.

    10. NEW WATER LINE UP TO ROOF GAS FIRED HUMIDIFIER. ROUTE UP THROUGH CURB.

    SHEET KEYNOTES

    1/4" = 1'-0"1PLUMBING WATER PLAN - BLDG 643

    NORTH

    M

    CN

    KEY PLAN

    NO

    RT

    H

  • CHEMISTRY LAB

    C106

    EQ & STOR

    C107

    CHEM & FLAM

    STOR

    C106A

    BALANCE RM

    C106B

    INSTRUMENT RM

    C108

    WASHING

    C102

    RECEIPT & DATA

    ENTRY

    C101

    SAMPLE STOR

    C103

    GRINDING

    C105B

    CLEAN LAB

    C105A

    BV

    C105

    STOR

    CS111

    W

    CR112

    M

    CR113

    ICP-MS

    C110

    MECH

    CM114

    (E)WC

    (E)LAV

    (E)WC(E)LAV

    (E)UR

    (E)CW

    (E)JS

    CAV

    CAV

    CAV

    VCA

    CA

    V

    CAV V

    CA

    CAV

    4

    5

    5

    5

    5

    23

    5

    5

    1

    4

    6

    G

    G

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:2

    6 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PG101C

    PLUMBINGGASES PLAN -BLDG 643

    Approver

    19-0056.001

    Author

    A. SEE LAB DRAWINGS FOR COORDINATION

    GENERAL SHEET NOTES

    1. EXISTING GAS, COMPRESSED AIR AND VACUUM SERVICE TO BUILDING TO REMAIN SUPPLY IS FROM ADJACENT BUILDING 330. PIPING ENTERS UNDERGROUND AND RISES UP IN CHASE. NOTE THAT VACUUM IS NOT USED IN THE PROJECT.

    2. VACUUM PUMP IN CASEWORK UNDER COUNTER, SEE LAB DRAWINGS.3. ROUTE VACUUM PIPING INSIDE WALL, AND UP TO CEILING.4. ROUTE PIPING IN CEILING SPACE5. ROUTE NEW PIPING DROP CONCEALED INSIDE EXISTING WALL. CUT AND

    PATCH WALL AS REQUIRED.6. NEW GAS LINE UP TO ROOF GAS FIRED HUMIDIFIER. ROUTE UP THROUGH

    CURB.

    SHEET KEYNOTES

    1/4" = 1'-0"1PLUMBING GASES PLAN - BLDG 643

    NORTH

    M

    CN

    KEY PLAN

    NO

    RT

    H

  • EXISTING AHU-1

    C1

    H

    C1

    ERU

    C1

    LEF

    ENERGY RECOVERY UNIT

    GAS-FIRED STEAM

    HUMIDIFIER

    11

    4

    56

    3

    2

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:1

    8 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    P141C

    PLUMBING ROOFPLAN - BLDG 643

    CE

    19-0056.001

    PU

    A. PROVIDE SUPPORTS FOR ALL PIPING ON ROOF. SUPPORTS TO KEEP PIPE A MINIMUM OF 6” ABOVE ROOF SURFACE. PROVIDE SLIP-SHEET UNDER ALL SUPPORTS. COORDINATE WITH ROOFING CONTRACTOR.

    GENERAL SHEET NOTES

    1. EXISTING ROOF DRAIN TO REMAIN.2. EXISTING ROOF WATER HYDRANT TO REMAIN.3. EXISTING SANITARY VENT THROUGH ROOF TO REMAIN4. PROVIDE 1” CONDENSATE DRAIN PIPE FROM STEAM HUMIDIFIER TO ROOF

    DRAIN\SCUPPER. PROVIDE SLIP SHEET, BLOCKING, AND ATTACHMENTS AS NEEDED.

    5. PROVIDE NEW GAS CONNECTION TO NEW GAS HUMIDIFIER ON ROOF. SEE FLOOR PLAN.

    6. PROVIDE NEW WATER CONNECTION TO NEW GAS HUMIDIFIER ON ROOF. SEE FLOOR PLAN.

    SHEET KEYNOTES

    1/4" = 1'-0"1PLUMBING ROOF PLAN - BLDG 643

    NORTH

    M

    CN

    KEY PLAN

    NO

    RT

    H

  • MARKETING

    M136

    STOR

    MA101

    OFFICE

    M146

    (E) CW

    (E) HWR

    (E) HW

    (E) CW

    (E) DW

    G

    32

    1

    3

    4

    G

    G

    6

    CW

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:3

    8 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PP101M

    PLUMBINGWATER PLAN -BLDG 330

    Approver

    19-0056.001

    Author

    A. PROVIDE BALL VALVES FOR ALL WATER ISOLATION AND SUPPLY TAKE-OFFS.B. PAINT ALL EXTERIOR GAS PIPING TO MATCH EXISTING WALL.

    GENERAL SHEET NOTES

    1. EXISTING GAS METER AND REGULATOR ON GRADE.2. PROVIDE NEW GAS CONNECTION AHEAD OF REGULATOR AND PROVIDE NEW,

    SECOND REGULATOR TO FEED NEW GAS BOILER.3. ROUTE NEW GAS LINE ON WALL. ROUTE LINE UP WALL AND OVER TOP OF AIR

    SHAFT, AND FENCE\WALL, OVER TO AREA WAY; ROUTE DOWN WALL TO BASEMENT.

    4. ROUTE NEW GAS PIPE DOWN WALL IN AREA WAY TO BASEMENT.5. ROUTE NEW GAS PIPE FROM AREA WAY, THROUGH BASEMENT, TO NEW

    BOILER.6. PROVIDE NEW COLD WATER SUPPLY TO NEW BOILER. PROVIDE BACKFLOW

    PREVENTER AT BOILER.

    SHEET KEYNOTES

    1/8" = 1'-0"1PLUMBING PLAN - BLDG 330

    1/8" = 1'-0"2330 BASEMENT LEVEL PLUMBING PLAN

  • .

    DN

    1 2 3 4 5 7

    M

    L

    K

    J

    H

    G

    F

    E

    D

    C

    B

    A

    LAB OFFICES

    102

    OFFICE

    102D

    OFFICE

    102C

    OFFICE

    102B

    OFFICE

    102A

    CORRIDOR

    103

    VEST

    103A

    MDF

    T111JAN

    J109M

    R107B

    W

    R107A

    VEND

    104

    U

    R105

    SEED LAB

    110

    COOL STOR

    112B

    KIT PREP

    112C

    ELEC

    115

    OIL/AF

    STOR

    112D

    DRUM STOR

    117

    ENGINE LAB

    112AMAIN LAB

    112 CORRIDOR

    101

    DOCK STAGING

    121

    VESTIBULE

    123STORAGE

    118A

    ECHELON LEVEL

    1 AND 2

    116B

    BV

    116A

    MECH

    M116

    RECEIPT DATA

    ENTRY

    116

    LARGE MASS

    118

    PROVER STATION

    120

    FCO

    OSI

    FCO

    FD-1

    FD-1

    FD-1

    FCO

    FCO

    FD-1

    FD-1

    FD-1

    FCO

    FD-1

    KS-1

    LS-1

    LS-1

    SS-1SS-2

    LS-1

    LS-1

    CENTRAL

    RECEIVING

    114

    MECH/BOILER

    M119

    FD-2FD-2FD-2

    FCO

    VTR

    VTR

    FD-1

    LS-1

    FD-1

    VTR

    VTR

    FCO LS-1

    PL101N3

    VTR

    4

    FD-21110

    35

    478

    3

    7

    7

    7

    7

    7

    7

    7

    64

    13

    13

    4

    135

    13

    13

    3

    3

    4

    4

    35

    9

    6

    3

    7

    7

    3

    5

    3

    6

    64

    VTR 5

    8

    1

    2

    14

    FCO

    18

    AD1 17

    AD1

    17

    AD1

    AD1

    17

    17

    AD1

    17

    15

    16

    FS-1

    FCO

    2 4 5 7

    M

    L

    K

    3 4 5

    E

    D

    WC-1WC-1

    UR-1 WC-1

    LAV-2 WC-1

    JS-1

    LAV-2

    LAV-2

    LAV-2

    LAV-2

    FD-1

    WCO

    FD-1

    FD-1

    W W

    V

    VTR

    5

    DWF

    1

    11

    1

    FCO

    VEND

    104

    U

    R105

    W

    R107A

    M

    R107B

    JAN

    J109

    OIL/AF

    STOR

    112D

    KIT PREP

    112C

    SEED LAB

    110

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:3

    4 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PL101N

    PLUMBINGWASTE & VENTPLAN - NEW BLDG

    CE

    19-0056.001

    PU

    GENERAL SHEET NOTES

    1. SEE CIVIL DRAWINGS FOR CONTINUATION, ROUTE PIPING BELOW GRADE2. COORDINATE CLEANOUT TO GRADE LOCATION WITH ARCHITECT AND CIVIL.3. ROUTE PIPING BELOW FLOOR SLAB4. ROUTE PIPING IN CEILING SPACE. ROUTE AT RIGHT ANGLES TO STRUCTURE;

    COORDINATE FINAL ROUTING WITH ARCHITECT.5. ROUTE VENT PIPING UP TO 4” VTR, SEE ROOF PLAN. COORDINATE FINAL

    LOCATION WITH ALL TRADES.6. ROUTE ROOF DRAINAGE PIPING IN CEILING SPACE. ROUTE AT RIGHT ANGLES

    TO STRUCTURE; COORDINATE FINAL ROUTING WITH MECHANICAL DUCTWORK AND ARCHITECT.

    7. ROOF DRAIN ABOVE, SEE ROOF PLAN. COORDINATE FINAL LOCATION WITH ARCHITECTURAL ROOF PLAN.

    8. PRIMARY ROOF DRAIN AND OVERFLOW ROOF DRAIN, CONCEALED DOWN INSIDE OF WALL. EXTEND DRAIN HORIZONTALLY AND TERMINATE IN FLUSH DRAIN SCUPPER 12” ABOVE FINISHED SURFACE; COORDINATE WITH STRUCTURAL AND ARCHITECTURAL DETAILS. COORDINATE WORK WITH ALL TRADES.

    9. SEE ENLARGED PLAN FOR ADDITIONAL WORK IN THIS AREA10. OIL & SAND SEPARATOR FOR TRENCH DRAIN; COORDINATE FINAL LOCATION

    WITH ARCHITECT, STRUCTURAL AND OWNER.. INSTALL BELOW SLAB AND EXTEND ACCESS COLAR TO BE FLUSH WITH FLOOR; PROVIDE BELOW GRADE FIELD ADJUSTABLE RISER SYSTEM TO ACCOMMODATE FOR INLET-OUTLET DEPTH.. COVER SHALL PROVIDE WATER/GASTIGHT SEAL AND HAVE A MAXIMUM 16,000 LBS LOAD CAPACITY. PROVIDE 8” DEEP CONCETE APRON OXTENDIGN 12” PAST ALL SIDES. INSTALL PER MANUFACTURER REQUIREMENTS. SEE SPECIFICATION.

    11. CONCRETE TRENCH TO CAPTURE WATER DRAINED FROM TESTING VESSELS. INSTALL FLOOR DRAINS IN THE BOTTOM OF THE TRENCH AND ROUTED DRAIN LINE THROUGH OIL SEPARATOR. CENTER DRAINS IN TRENCH AND SLOPE TRENCH FLOOR TOWARD DRAINS. SEE STRUCTURAL DRAWINGS FOR DETAILS.

    12. CONCRETE PIT\TRENCH TO CAPTURE WATER DRAINED FROM TESTING VESSELS. INSTALL FLOOR DRAIN IN THE BOTTOM OF THE TRENCH AND ROUTED DRAIN LINE THROUGH OIL SEPARATOR. CENTER DRAINS IN PIT SLOPE TRENCH FLOOR TOWARD DRAINS. SEE STRUCTURAL DRAWINGS FOR DETAILS.

    13. COORDINATE FINAL LOCATION OF FLOOR DRAIN WITH MECHANICAL EQUIPMENT LAYOUT.

    14. EXTEND 3” SANITARY VENT LINE FROM GREASE INTERCEPTOR. COORDINATE FINAL LOCATION AND ROUTING IN FIELD.

    15. DOWNSPOUT FROM GUTTER ABOVE, SHOWN FOR REFERENCE, SEE ARCHITECTURAL PLANS. PROVIDE 6” CAST IRON BOOT EXTENDING 24” ABOVE WALKWAY, TO CAPTURE WATER FROM DOWN SPOUT.

    16. PROVIDE 6” UNDERGROUND DRAIN FROM DOWNSPOUT CONNECTION TO CONNECT TO AREA DRAIN PIPING.

    17. PROVIDE 4” AREA DRAIN IN CONCRETE WALKWAY. CONNECT DRAIN TO 6”DRAIN LINE TO DAY-LIGHT AT DOCK.

    18. PROVIDE 6” AREA DRAINPIPE TO ALLOW AREA DRAINS TO SPILT TO GRADE AT DOCK. NO TRAPS OR VENTING REQUIRED FOR THIS LOCALIZED SYSTEM. SEE ARCHITECTURAL DOCK DETAILS.

    SHEET KEYNOTES

    1/8" = 1'-0"1PLUMBING WASTE & VENT PLAN - NEW BLDG

    NORTH

    1/8" = 1'-0"2MEZZANINE PLUMBING WASTE & VENT PLAN

    DCOTG

    A. INSTALL WASTE PIPING BELOW SLAB AT 1/4" PER FOOT SLOPE.B. FOR COUNTERTOP AND WALL MOUNTED PLUMBING FIXTURES (LAVATORIES,

    COUNTERTOP SINKS), PROVIDE A T-PATTERN WALL CLEANOUT BELOW PLUMBING FIXTURE. CLEANOUT SHALL BE CAST IRON DRAINAGE T-PATTERN, 90 DEGREE BRANCH FITTING WITH SQUARE HEAD BRASS SCREW PLUGS OF THE SAME SIZE AS THE PIPE UP TO AND INCLUDING 4". WALL CLEANOUTS IN FINISHED AREAS SHALL BE ZURN NO. Z-1460-8 WITH POLISHED STAINLESS STEEL OR CHROME PLATED METAL COVER.

    C. PROVIDE WALL CLEANOUT FOR ALL PLUMBING FIXTURES UNLESS NOTED OTHERWISE.

    D. PROVIDE MANUFACTURED TRAP SEAL FOR ALL FLOOR SINKS AND FLOOR DRAINS.

    KEY PLAN

    NO

    RT

    H

    M

    CN

    NOT TO SCALE3PLUMBING WASTE & VENT - ENLARGED PLAN

    DS

    DS

    DS

    DS

    DS

    DS

    11

    3

    4

    5

    12

  • .

    DN

    1 2 3 4 5 7

    M

    L

    K

    J

    H

    G

    F

    E

    D

    C

    B

    A

    LAB OFFICES

    102

    OFFICE

    102D

    OFFICE

    102C

    OFFICE

    102B

    OFFICE

    102A

    CORRIDOR

    103

    VEST

    103A

    MDF

    T111

    JAN

    J109

    M

    R107BW

    R107A

    VEND

    104

    U

    R105

    SEED LAB

    110

    COOL STOR

    112B

    KIT PREP

    112CELEC

    115OIL/AF

    STOR

    112D

    DRUM STOR

    117

    ENGINE LAB

    112A

    MAIN LAB

    112

    MECH/BOILER

    M119

    CORRIDOR

    101

    DOCK STAGING

    121

    VESTIBULE

    123 STORAGE

    118A

    ECHELON LEVEL

    1 AND 2

    116B

    BV

    116A

    MECH

    M116

    RECEIPT DATA

    ENTRY

    116

    LARGE MASS

    118

    PROVER STATION

    120

    WH

    WH

    TO ENGINE

    WH

    WH

    SS-2

    LS-1

    LS-1

    WC-1

    WC-1UR-1

    WC-1

    LAV-2 WC-1

    KS-1

    JS-1

    LS-1

    SS-1

    LS-1

    46

    5

    13

    6

    3

    3

    5

    5

    CENTRAL

    RECEIVING

    114

    1110

    3

    52

    1

    9

    9

    5

    3

    5 5

    5LAV-2LAV-2

    8

    8

    8

    7

    5

    5

    5

    3

    3

    7

    WH6

    HB

    18

    19

    1717

    18

    2 4 5 7

    M

    L

    K

    14

    16

    15 15

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:3

    9 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PP101N

    PLUMBINGWATER & GASPLAN - NEW BLDG

    CE

    19-0056.001

    PU

    GENERAL SHEET NOTES

    1. DOMESTIC WATER SERVICE TO BUILDING. SERVICE TO EXTEND FROM SITE HOT-BOX WITH BACKFLOW PREVENTER, SEE CIVIL DRAWINGS FOR CONTINUATION AND ROUTING.

    2. DOMESTIC WATER SERVICE TO BUILDING. TRANSITION UNDERGROUND WATER PIPE TO RISE-UP ON INTERIOR OF BUILDING. PROVIDE PRESSURE REDUCING STATION AND MAIN VALVE.

    3. ROUTE PIPING IN CEILING SPACE4. ROUTE 3” WATER LINE UP TO ROOF STRUCTURE AND MEZZANINE. SEE

    MEZZANINE PLAN.5. DROP 1/2" CW & HW DOWN IN WALL TO SINK6. DROP 3/4" CW DOWN INSIDE INTERIOR WALL TO WALL HYDRANT. PROVIDE

    VALVE IN CEILING SPACE INSIDE BUILDING IN AN ACCESSIBLE LOCATION.7. DROP 1/2" CW DOWN IN WALL TO ICE MAKER WALL BOX \ DWF.8. DROP 1.25" CW DOWN IN WALL TO WC.9. DROP 1/2" CW & HW DOWN IN WALL TO SAFETY SHOWER\EYEWASH AND

    MIXING VALVE. PROVIDE FINAL CONNECTIONS TO SS. MOUNT MIXING VALVE ON WALL ADJACENT TO UNIT. COORDINATE FINAL LAYOUT WITH ARCHITECT.

    10. CONNECTION TO WATER HEATER. SEE PIPING DIAGRAM.11. HOT WATER RE-CIRC PUMP. SEE PIPING DIAGRAM.12. ROUTE 3” WATER LINE UP TO ROOF STRUCTURE AND MEZZANINE. SEE

    MEZZANINE PLAN.13. WATER DOWN FROM MEZZANINE.14. HANG WATER PIPING TIGHT TO STRUCTURE AND EXTEND OVER TO

    MEZZANINE PLATFORM.15. PROVIDE FILL FOR PROVER STATIONS; 2” BALL VALVE AND THREADED

    COUPLING TO MATE WITH FIRE HOUSE FITTING; COORDINATE FITTING WITH OWNER. EXTEND 2” COPPER PIPE DOWN AND LOCATE VALVE AT HEIGHT\LOCATION DEFINED BY OWNER SO PERSONNEL CAN REACH VALVE. LOCATE ASSEMBLY DIRECTLY OVER PROVER FILL; COORDINATE FINAL LOCATION WITH OWNER.

    16. WATER DOWN TO WALL HYDRANT17. COLD WATER SERVICE TO FEED HUMIDIFIERS. WATER DOWN TO BACK FLOW

    PREVENTER ON WALL.18. WATER CONNECTION TO HUMIDIFIERS ON WALL19. WATER CONNECTION UP TO HUMIDIFIER IN ROOF TOP RTU.

    SHEET KEYNOTES

    1/8" = 1'-0"1PLUMBING WATER & GAS PLAN - NEW BLDG

    NORTH

    1/8" = 1'-0"2MEZZANINE PLUMBING WATER & GAS PLAN - NEW

    A. COLD AND HOT WATER DROPS/RISES TO FIXTURES SHALL BE VERTICAL BETWEEN THE FRAMING STUDS.

    B. PROVIDE BALL VALVES FOR ALL WATER ISOLATION AND SUPPLY TAKE-OFFS.C. WATER HAMMER ARRESTERS SHALL HAVE MAINTENANCE ACCESS IN THE

    FORM OF AN ACCESS PANEL.

    KEY PLAN

    NO

    RT

    H

    M

    CN

  • .

    DN

    1 2 3 4 5 7

    M

    L

    K

    J

    H

    G

    F

    E

    D

    C

    B

    A

    LAB OFFICES

    102

    OFFICE

    102D

    OFFICE

    102C

    OFFICE

    102B

    OFFICE

    102A

    CORRIDOR

    103

    VEST

    103A

    MDF

    T111

    JAN

    J109

    M

    R107B

    W

    R107A

    VEND

    104

    U

    R105

    SEED LAB

    110

    COOL STOR

    112B

    KIT PREP

    112CELEC

    115

    OIL/AF

    STOR

    112D

    DRUM STOR

    117

    ENGINE LAB

    112A

    MAIN LAB

    112

    MECH/BOILER

    M119

    CORRIDOR

    101

    DOCK STAGING

    121

    VESTIBULE

    123 STORAGE

    118A

    ECHELON LEVEL

    1 AND 2

    116B

    BV

    116A

    MECH

    M116

    RECEIPT DATA

    ENTRY

    116

    LARGE MASS

    118

    PROVER STATION

    120

    GG

    G

    GAS METER

    SEE CIVIL FOR CONTINUATION

    UP TO ROOF

    CA

    CA

    HOOD HOOD

    SPACE

    CA

    CA

    TOOL

    4

    4

    3

    13

    3

    2

    109

    9

    8

    7

    6 11

    1

    5

    5

    N1

    DWH

    CENTRAL

    RECEIVING

    114

    1

    LAC

    2 4 5 7

    M

    L

    K

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:2

    8 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    PG101N

    PLUMBINGGASES PLAN -NEW BLDG

    CE

    19-0056.001

    PU

    A. COORDINATE FINAL ROUTING OF PIPING WITH MECHANICAL WORK.B. COORDINATE FINAL CONNECTIONS TO LAB EQUIPMENT WITH LAB DRAWINGS.

    GENERAL SHEET NOTES

    1. FLOOR MOUNTED AIR COMPRESSOR FOR LAB USE. PROVIDE VIBRATION ISOLATION FROM FLOOR.

    2. AIR FILTER AND MATER REGULATOR SET TO 100PSI. COORDINATE FINAL SETTINGS WITH LAB REQUIREMENTS.

    3. ROUTE COMPRESSED AIR PIPING OVERHEAD IN CEILING CAVITY. 1” PIPE.4. COMPRESSED AIR DROP. PROVIDE REGULATOR AND QUICK CONNECT ON

    WALL. COORDINATE FINAL OUTLET HEIGHT WITH OWNER AND LAB EQUIPMENT.

    5. COMPRESSED AIR DROP CONNECTING TO HOOD. PROVIDE REGULATOR ON WALL ADJACENT TO HOOD. COORDINATE FINAL CONNECTION AND REQUIREMENTS WITH LAB DRAWINGS.

    6. GAS SERVICE FROM SITE; SEE SITE CIVIL DRAWINGS FOR CONTINUATION.7. FREE STANDING GAS METER AND REGULATOR FOR GAS SERVICE TO

    BUILDING. SEE DETAIL. SEE CIVIL DRAWING FOR FINAL LOCATION.8. GAS REGULATOR TO REDUCE PRESSURE TO 2PSI TO SERVE BUILDING.

    COORDINATE FINAL SIZE WITH BUILDING LOADS.9. PROVIDE CONTINUOUS SLEEVE FOR ALL GAS PIPING FROM METER, UP INTO

    MECHANICAL ROOM. PROVIDE VENTS AT EACH END. SEE DETAIL XXX10. ROUTE GAS PIPING OVERHEAD IN CEILING CAVITY.11. GAS CONNECTION TO DOMESTIC WATER HEATER12. GAS CONNECTION TO BOILER13. GAS UP THROUGH ROOF TO EQUIPMENT, SEE ROOF PLAN.

    SHEET KEYNOTES

    1/8" = 1'-0"1PLUMBING GASES PLAN - NEW BLDG

    NORTH

    1/8" = 1'-0"2MEZZANINE PLUMBING GASES PLAN

    KEY PLAN

    NO

    RT

    H

    M

    CN

  • 1 2 3 4 5 7

    M

    L

    K

    J

    H

    G

    F

    E

    D

    C

    B

    A

    N1

    LEF

    OA

    2

    RTU

    3

    RTU

    N1

    ERU

    RD

    RDRD

    RD

    RD

    RD

    RD

    RDRD

    RD

    VTR

    VTR

    VTR

    VTR

    VTR

    2

    2

    3

    3

    1

    1 1

    4

    1

    4

    1

    2

    2

    2

    1

    1

    11

    1

    VTR

    2

    4

    5WH

    5 WH

    3

    3

    1

    RTU

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    1 2 3 4 5 6

    NOT F

    OR C

    ONST

    RUCT

    ION

    PROJECT

    REVISIONS

    SHEET NO

    DRAWING NAME

    SEAL

    DATE

    REVIEWED BY

    PROJECT NO

    DRAWN BY

    50%CONSTRUCTION

    DOCUMENTS

    08/02/2020

    4343 Pan American Fwy NE, Suite 239

    Albuquerque, New Mexico 87107 USA

    505.877.4499 main - 512.744.4444 fax

    www.eeace.com

    EEA Project No. #V20200032

    CONSULTING ENGINEERS

    8/6

    /20

    20

    8:3

    6:2

    0 A

    M

    NM

    SU

    NM

    DE

    PT

    OF

    AG

    RIC

    UL

    TU

    RE

    NE

    W C

    ON

    ST

    RU

    CT

    ION

    / R

    EN

    OV

    AT

    ION

    LA

    S C

    RU

    CE

    S, N

    EW

    ME

    XIC

    O

    P141N

    PLUMBING ROOFPLAN - NEW BLDG

    CE

    19-0056.001

    PU

    GENERAL SHEET NOTES

    1. COMBINATION ROOF DRAIN WITH CONCENTRIC OVERFLOW DRAIN. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION TO COORDINATE WITH ROOF AND INSULATION PITCH. SEE WASTE & VENT FLOOR PLAN FOR DRAIN PIPING.

    2. SANITARY VENT UP THROUGH ROOF; SEE FLOOR PLAN FOR BELOW.3. ROOF GUTTER DOWNSPOUT SHOWN FOR REFERENCE, SEE ARCHITECTURAL

    DRAWINGS.4. PROVIDE 1” CONDENSATE DRAIN PIPE FROM RTU TO ROOF DRAIN\SCUPPER.

    PROVIDE SLIP SHEET, BLOCKING, AND ATTACHMENTS AS NEEDED. SEE CONNECTION DETAIL

    5. WALL MOUNTED WH FOR CLEANING RTU’S. CONNECT TO COLD WATER PIPING IN CEILING BELOW. COORDINATE FINAL LOCATION WITH NMSU BEFORE INSTALLATION.

    SHEET KEYNOTES

    1/8" = 1'-0"1PLUMBING ROOF PLAN - NEW

    NORTH

    A. PROVIDE SUPPORTS FOR ALL PIPING ON ROOF. SUPPORTS TO KEEP PIPE A MINIMUM OF 6” ABOVE ROOF SURFACE. PROVIDE SLIP-SHEET UNDER ALL SUPPORTS. COORDINATE WITH ROOFING CONTRACTOR.

    KEY PLAN

    NO

    RT

    H

    M

    CN

  • PLUMBING VENT THROUGH FLAT ROOF DIAGRAM

    TWO WAY CLEANOUT DIAGRAM

    PIPE SLEEVE THROUGH FLOOR DIAGRAM

    EXTERIOR WALL SLEEVE DIAGRAM

    WATER SHOCK ARRESTOR DIAGRAM CLEANOUT DIAGRAM

    WALL CLEANOUT DIAGRAMGAS REGULATOR DIAGRAM

    MEDIUM TO LOW PRESSURE

    GAS CONNECTION TO EQUIPMENT DIAGRAM TOILET AREA FLOOR DIAGRAM

    WATER CLOSET DETAIL

    BACK-TO-BACK WALL HUNG

    SIZEAP.D.I.PPP FIXTURE UNIT

    SYMBOL

    F2"

    1/2"

    SIZE

    1-1/4"

    1-1/2"

    3/4"

    1"

    AB

    E

    D

    C

    9"155 - 330

    1 - 11

    114 - 154

    12 - 32

    61 - 11333 - 60

    RATINGS

    5"

    9"7"

    7"

    5"

    B

    A

    B

    2"

    1/2"

    3/4"

    1-1/4"

    1-1/2"

    1"

    SIZE

    GG

    REFER TO ARCHITECTURAL DETAILS

    FOR PIPE PENETRATION

    REFER TO PLANS FOR

    SIZE AND LOCATION

    REFER TO ARCH. DWGS. FOR

    ROOF CONSTRUCTION.

    WASTE AND VENT SYSTEM

    NOT TO SCALE

    SEWER

    FERRULE & PLUG

    C.I. CLEANOUT

    FINISHED FLOOR OR PAVED AREA

    PROVIDE 18"X18"X6" CONCRETE PAD

    WHEN FINISHING AT EXTERIOR OF

    BUILDING.

    NOT TO SCALE

    SEWER

    CLEANOUT ACCESS COVER (FCO)

    24"

    1/2" MINIMUM GAPSTD. WEIGHT PIPE

    SLEEVE

    FIRE RATED CAULK

    -EXTEND

    3/4" ABOVE FLOOR

    PIPE THROUGH FLOOR

    CONCRETE

    FLOOR

    NOT TO SCALE

    1" MIN.

    PIPE O.D.

    1" MIN.

    INTERIOREXTERIOR

    LINK SEAL

    WALL WALL

    SCH. 10 STL. OR

    C.I. WALL SLEEVE

    FILL W/ MASTIC

    NOT TO SCALE

    PISTON TO PROVIDE A PERMANENT

    BARREL FABRICATED O