PRE-ENGINEERED BUILDINGS NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX!
Transcript
Page 1: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

NO COST OVERRUNS.NO DELAYS.NOW YOU CAN RELAX!

Page 2: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

EVEREST PRE-ENGINEERED BUILDINGS

With Everest Pre-Engineered Buildings, we promise you a complete building solution that takes care of all your construction needs. We don’t just deliver, we do it the right way!

Earnestly committed to cultivate a system where the customer is kept ‘within the loop’, we are absolutely transparent and process-driven in our workflow. Everest Pre-Engineered Buildings are an example of systematic development. From structural design to installation, our customised ERP runs on SAPR3 platform that enable you to track the status of your project at any point of time. Timely performance, excellent service backup and a faster response time are the reasons that renowned companies like Vodafone, Ericsson, DLF, Walmart, GM, Britannia, Godrej, Ambuja and ACC have trusted only Everest for their Pre-Engineered Building needs.

Everest Steel Building Plant at RoorkeeInset of the Plant2 3

Page 3: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

ON TIME,EVERY TIME!

Trusted for over 79 years

Complete transparency in working system

Galvanised Purlins

Constructed over 1000 buildings

System driven

Fast and On Time Deliveries

World class design & engineering softwares

Complete project management including erection

High tensile steel members (345MPa)

Completed site at RISHI FIBC Solutions Plant, Baroda

The Everest Edge

Everest ensures that timely delivery through systematic flow of processes. At every point in the construction process, checkpoints minimise errors thereby saving on time. Through our process-driven approach, reaction time decreases considerably; resulting in faster, accurate project completion.

RISHI FIBC Plant, Baroda during initial stages of construction

Roorkee Plant at night

4 5

Page 4: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

Everest is one of the very few companies to effectively implement and practice ERP. Our in-house SPEED module, built on SAPR3, has been a sound contributor in streamlining the entire manufacturing process and maximising overall efficiency. This system helps us deliver high quality products, on time, every time!

A seamless integration of processes, from Request For Quotation (RFQ) to Project Handover

Sequential supply system for the various blocks comprising the overall building

Daily project updates for the customer

Absolute transparency in working for all stakeholders

Reduced reaction time to provide faster and accurate project completion

Dedicated section for uploading of all drawings so that they can be retrieved at any time for any requirement later

Ensures:

Design Section at Everest

Driven by

Winner of best SAP

implementationAward

6 7

Page 5: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

ARHAM LOGISTICS

Two precision engineered buildings connected with well-designed PEB pathway

Innovative clear span construction

Span: 63ft

Key Features

Location: Bhiwandi/ MumbaiArea: 6,10,404 sqftUsage: WarehouseYear of Construction: 2009

M. J. LOGISTIC SERVICES LTD.

Intricate L-shaped building with more loading and unloading docks

One intermediate column for both buildings EMS1

Designed for future expansion

Key Features

Location: Palwal, Haryana Area: 1,93,680 sqftUsage: WarehouseYear of Construction: 2008

LOGISTICAL UNITS AND WAREHOUSES

8 9

BK TYRE

Intricate L-shaped building with more loading and unloading docks

One intermediate column for both buildings EMS1

Clear height: 39ft

Key Features

Location: Bhiwadi, Rajasthan Area: 1,42,032 sqftUsage: Warehouse for Finished GoodsYear of Construction: 2011

SHREE SHUBHAM LOGISTICS LTD.

Jack Beam provided to increase bay space by 49ft

IS-Standard building with heavy collateral loads

Multiple buildings with Louvers, Doors, Ridge Vents and Insulation

Key Features

Location: Alwar/ Deesa/ Jodhpur/ Rajkot/ Ramganj MandiArea: 5,64,900 sqftUsage: WarehouseYear of Construction: 2009

VIJAY LOGISTICS

Very large clear span building

Clear height: 30ft

Highly satisfied repeat customer

Key Features

Location: Betul/ Hisar/ PuneArea: 10,00,000 sqftUsage: Warehouse/ Satsang HallYear of Construction: 2008 - 2013

Span of building 72 m (EMS-II)

Intermittent Lean-to along side walls

Combination of ridge vent, turbo vents & louvers for efficient ventilation system

S. B. OVERSEAS

Key Features

Location: Kolkata, West Bengal Area: 1,21,094 sqftUsage: FMCG & Consumer Goods Storage Unit Year of Construction: 2011

Page 6: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

MCNALLY BHARAT ENGG. CO. LTD.

50 MT crane in 4 spans (total 200 MT)

Ridge Height: 77ft

Mezzanine, Walkway, Roof Monitor and other accessories

Key Features

Location: Asansol, West BengalArea: 1,20,000 sqftUsage: Heavy Fabrication FactoryYear of Construction: 2008

FACTORY BUILDINGS

10 11

LOTUS TECH PARK (TRIDENT)

Building designed for temperature load of +/- 30 degrees

Structure arrangement for housing Air Humidifiers

Special arrangements to protect structure from rusting due to high humidity

Key Features

Location: Barnala, Punjab Area: 3,00,000 sqftUsage: Textile FactoryYear of Construction: 2010

BRITANNIA INDUSTRIES LTD.

Multi Gable with 40m clear span

A foolproof design for water discharge from the roof

A repeat customer with great satisfaction level

Key Features

Location: Bihar/ Gujarat/ Odisha Area: 6,50,000 sqftUsage: Biscuit Manufacturing FactoryYear of Construction: 2010 - 2013

NSSL LTD.

Curved Roof System

Multiple Crane and Mezzanine System (total 71 cranes)

Mezzanine floor integrated

Key Features

Location: Nagpur, Maharashtra Area: 1,25,000 sqftUsage: Factory for Valve ManufacturingYear of Construction: 2010

GODREJ AGROVET LTD.

Key Features

Location: Kharagpur/ Kanpur/ VaranasiArea: 10,17,384 sqftUsage: Manufacturing Unit for Animal FeedYear of Construction: 2013

32m high Process Building

Challenging, specially cladding installation

Intricate shaped building with high bay-low bay formation

Stiff requirement for Heavy Dead Loads, Deflection and Jack Beam

Large building accessories like Roll-up Doors, Louvers, Windows, Insulation, Crane Maintenance Platform and Lighting Arrestors

Unique Cladding Pattern

JOHN DEERE TRACTORS

Key Features

Location: Patiala, Punjab Area: 80,000 sqftUsage: Tractor Manufacturing UnitYear of Construction: 2011

Page 7: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

KALPANA INDUSTRIES

78m width

Curved roof

High bay-low bay with 20m & 14m respective Clear height

Key Features

JEUMONT ELECTRIC INDIA LTD.

Heavy Crane Load design (60 MT x 2 nos./ 20 MT x 3 nos.)

Insulated Roof and Wall Cladding System

Clear height: 18m

Key Features

Location: Baroda, Gujarat Area: 75,320 sqftUsage: Manufacturing for Heavy ElectricalsYear of Construction: 2011

Location: Kolkata, West BengalArea: 85,810 sqftUsage: FactoryYear of Construction: 2012

OFFICES/ COMMERCIAL BUILDINGS

Multiple Crane System with large span

EOT 5 MT x 4 nos. with crane beams

All secondary members are pre-galvanised

NIRMAL WIRES

Key Features

Location: Kolkata, West Bengal Area: 1,16,380 sqftUsage: Manufacturing Facility for WiresYear of Construction: 2009

ANSAL API LTD.

Key Features

Location: Lucknow, Uttar PradeshArea: 60,000 sqftUsage: Engineering InstituteYear of Construction: 2011

55,000sqft building constructed within 90 days from the date of LOI Smart Steel Product of 14 x 14 m span

Complete with false ceiling and partitions

2

12 13

BHARTI WALMART

Standing Seam Roofing and Puff Panel Wall Cladding System

Precise engineering to connect with RCC buildings

Designed to support heavy Air Conditioning and Utility Units from roof to different locations

Key Features

Location: Amritsar/ Jallandhar/ Lucknow/ Meerut/ Raipur Area: 2,50,000 sqftUsage: Cash Carry StoreYear of Construction: 2008 - 2011

FACTORY BUILDINGS

EVEREST DESIGN CENTRE

G+2 Building

Entirely built form EVEREST products

Setting an example of Green Building Solution

Key Features

Location: Roorkee, Uttarakhand Area: 27,987 sqftUsage: Multistorey OfficeYear of Construction: 2012

Page 8: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGSSPECIALTY BUILDINGS

14 15

MULTI-STOREYED BUILDINGS

I.I.T. MUMBAI

G+3 Building

Laboratory & Office EVEREST- single point building supplier (Internal & External)

Key Features

Location: Powai - Mumbai, Maharashtra Area: 32,938 sqftUsage: Institutional BuildingYear of Construction: 2012

BP ERGO

Certified Green Building

Full area mezzanine

14 m high

Key Features

Location: Nalagarh, Himachal PradeshArea: 1,19,230 sqftUsage: FactoryYear of Construction: 2012

ACC LTD.

Key Features

Location: Roorkee, UttarakhandArea: 32,292 sqftUsage: FactoryYear of Construction: 2009

58 m clear span

25 m clear Height

Lower slope with Higher span

ABC BEARINGS

Double Skin Insulation in complete building

Curved eaves with ACP

Low-BOC water base Paint, certified for Green Building

Key Features

Location: Dehradun, Uttarakhand Area: 13,944sqftUsage: Production Unit for Bearing ManufacturingYear of Construction: 2012

G+4 Building

Removable floors design for Heavy Equipment Installation

Over 110 MT of vessel loading

KAVERI HIRE PURCHASE & DEPOSITS PVT. LTD.

Key Features

Location: Beawar, Rajasthan Area: 1,21,923 sqftUsage: Food Processing UnitYear of Construction: 2013

O. C. SPECIALTIES PVT. LTD.

2 nos. of G+2 Industrial Building

Industrial Louvers all around Pharmaceutical Manufacturing Unit

Over 1 T/sqm floor loading

Key Features

Location: Sholapur, Maharashtra Area: 23,358 sqftUsage: Pharmaceutical Manufacturing UnitYear of Construction: 2013

Page 9: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

OVER 1,000 BUILDINGSACROSS 245 CITIES

IN 27 STATESOver 45 Million sqft covered area

and counting...THE FASTEST GROWING BUILDING SOLUTIONS COMPANY IN INDIA

Over the last five years, Everest Industries has grown in leaps and bounds. A strong order book and proliferating net sales ensured the same. Year after year, Everest Industries has recorded a considerable rise in Operating Profit, PAT, Return on Net and Volume Growth. Today it stands amongst the best in evolving business with innovation.

Turnover 229.65 253.06 325.79 285.14 529.45 680.90 721.59 886.86 1014.00

0

200

400

600

800

1000

1200

2004-05 2005-06 2006-07 2007-08

2008-09

2009-10 2010-11 2011-12 2012-13(July ‘08 - start of PEB

Business)

Everest Industries Limited Turnover (Rs. in Crore)

16 17

Page 10: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

STRENGTH AND SAFETY

At Everest, the safety of employees is paramount. Training on safety is conducted at regular intervals and in addition, permanent safety officers are deployed at every unit to ensure maximum safety. Primary and Secondary fall protection is maintained and PPE is used at all sites for utmost safety. Every single employee at Everest is insured. All the safety practices at Everest are in accordance with the globally-acknowledged pre requisites, thereby giving you a perfect Building Solutions provider to partner with.

Where Safety is a Priority

18 19

Cladding with Boom LiftSite Erection with Boom lift

Page 11: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

Everest Pre-Engineered Steel Buildings are 100% custom designed to provide maximum space utilisation, excellent strength and highest safety standards.

Our basic architectural measures include:

Building Width: the distance from the outside of the eave strut of one sidewall to the outside of the eave strut of the facing wall

Building Length: the distance between the outside flanges of endwall columns in the facing endwall

End Bay Length: the distance from the outside of the outer flange of endwall columns to the centre line of the first interior frame columns

Interior Bay Length: the distance between the centre lines of two adjacent interior main frame columns, which usually range from 6m, 7.5m and 9m to 15m

Frame Cross Section

Anchor Bolt Plan Everest Lean - TO (ELT)

Everest Roof System (ERS) Everest Multi Gable (EMG)

Everest Multi Span (EMS-2) Everest Multi Span (EMS-3)

Everest Clear Span (ECS) Everest Multi Span (EMS-1)

The Building Height is the eave height, which is the length from the foot of the main frame column base plate to the top outer point of the eave strut and can measure up to a height of 30m. In the case of columns that are recessed or elevated from the finished floor, the eave height is the distance from the finished floor to the top of the eave strut. The Roof Slope is the angle that the roof forms with respect to the horizontal and is commonly 1/10. Everest buildings are designed to meet every stringent local and international code - IS (Indian Standard), AISC (American Institute of Steel Construction), AISI (American Iron & Steel Institute), MBMA (Metal Building Manufacturers Association) and AWS (American Welding Society).

FRAMING SYSTEMS

Everest Mono Slope (EMS)20 21

Page 12: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

BUILDINGS WITH CRANES

Everest Pre-Engineered Steel Building Systems are ideal for factory buildings and manufacturing facilities that require installation of cranes for material handling. Our buildings can be designed to support various crane systems up to 300 MT.

Jib Crane and Monorail Crane Underhung Crane

Top Running Crane in a Clear Span Building

Joist to Beam Connection at EndwallJoist Connection at Intermediate Beam Mezzanine Beam Connection to Rigid Frame Column

BUILDINGS WITH MEZZANINES

Everest Standard Mezzanine Floor Systems consist of Galvanised Steel Decking supported by joists that are connected to the main mezzanine beams. A reinforced concrete slab (not supplied by Everest) is cast in-situ on top of the steel decking. The primary mezzanine beams usually run across the width of the building and the joists mostly run lengthwise (parallel to the roof purlins).

Mezzanine Plan

22 23Gantry Crane

Semi-Gantry Crane

Page 13: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

ROOF AND WALL CLADDING PANELS

Metal Panels are one of the most aesthetic features of a Metal Building System. ‘Panel’ refers to the metal skin used as roof and wall panels, interior roof and wall liners, partition panels, fascia panels and soffit panels etc.

Everest Steel PanelsThe base metal is high tensile steel with high grade Aluminum Zinc alloy coating, comprising 55% Aluminum and 45% Zinc and weighing 150g/m spread over both sides. This coating offers four times higher resistance to corrosion as compared to galvanised coating.

Everest Colour Coated Steel Panels have a 5-micron primer paint and a 20-micron silicon modified polyester paint applied at the mill on the weather (exterior) face. Everest also offers Pvf 2 (Fluro Polymer) using minimum 70% Kynar/ Hylar - 500 Resin, which ensures that your building continues to look beautiful for a lifetime.

Roof and Wall ProfilesEverest offers a wide variety of modern profiles to suit all applications.

Sheeting Pattern above 3m brick wall

Roof Panels* ER - Everest Roof

Wall Panels* EW - Everest Wall

Sheeting Pattern starting from Finished Floor Level (FFL)

ER - SS - 1750 ER - SS - 2000 ER - SS - 2500 ER - 32 - 251

EW - 30 - 250 EW - 25 - 250 EW - 32 - 251

Sheeting Pattern above 1m brick wall24 25

Page 14: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

PRE-ENGINEERED BUILDINGS

Rishi FIBC Solutions Pvt. Ltd. I KBK Polymers Pvt. Ltd. I Babaji Shivram Clearing & Carriers Pvt. Ltd. Nirlon Ltd. I Everest Industries Ltd. I Vodafone Essar South Ltd. I Amanora Park Town City Corporation Ltd. I Tristar Infrastructure Pvt. Ltd. I Radico Khaitan Ltd. I Aqua Infra Projects Ltd. I Rashtriya Chemicals & Fertilisers Ltd. I Lohia International Ericsson India Pvt. Ltd. I Mcnally Bharat Engineering Co. Ltd. I Aquarius Educational Academy Pvt. Ltd. I HT Press I Tristar Infrastructure Pvt. Ltd. I Jaichandra Hitech Engineering Pvt. Ltd. I Ramkay Enviro Engineers Ltd. I DLF Home Developers Ltd. Agrawal Warehouse & Logistics I Sarla Performance Fibres I M.K.U Holdings Pvt. Ltd. I K.J.V Alloy Conductors Pvt. Ltd. I Angel’s Resort I Shreenidhi Realtors Pvt. Ltd. I Special Engineering Services Ltd. I Jazzcon Engineers I West Bengal Waste Management Ltd. I Tirupati Industries

Cima Shyam Springs Pvt. Ltd. I Eastern Copper Manufacturing Co. I Radha Madhav Industries I Nanda Glass Industries I Agro Shine I Reliance MediaWorks Ltd./Adlabs Films Ltd. I Intertouch Metal Buildings (P) Ltd. I Ashoka Precon Pvt. Ltd. I Arcvac Forgecast Ltd. I Apex Industries I Orient Polymer Pvt. Ltd. I Lion Vidya Mandir I Manmohan Minerals & Chemical Pvt. Ltd. I Instruments A. Chemicals Pvt. Ltd. I Sawan Kirpal Ruhani Mission I Aesthetics Exports (Pvt.) Ltd. I Wolkem India Ltd. I Om Logistics Ltd. I Marine Electricals Pvt. Ltd. I Abhimani Publications Ltd. I Hissar Udyog Pvt. Ltd. I Bhadani Associates I KSE Electricals Pvt. Ltd. I Topez Piping Industries I IFB Industries Ltd. I Met Trade India Ltd. I A C Polycoaters Pvt. Ltd. I Soneko Warehousing Ltd. I Intertouch Metal Buildings (P) Ltd. I Harish Arora I Vijay Logistics Pvt. Ltd. I Ganpati Earthmovers Pvt. Ltd. I Adani Power Ltd. I Indo Asian Fusegear Ltd. I V Kanjana I Raja Ramanna Centre for Advanced Technology I Basukinath Food Processors Pvt. Ltd. I Ganesh Wheat Products Pvt. Ltd. I Easy Mats Private Ltd. I Har International Pvt. Ltd. I Twilight Litaka Pharma Ltd./ Loreal India Pvt. Ltd.

2009 2010 2011 2012 2013

D.S. Group I Cadbury India Ltd. I JMP Industry Pvt. Ltd. I IL & FS Invironmental Infrastr. Services Ltd. I BLA Power Pvt Ltd. I Zebulon’s Warehousing I Hero Motors Ltd. I Patial Builder & Contractors Pvt. Ltd. I Kellogg India Pvt. Ltd. I Spirotech Heat Exchangers Pvt. Ltd. I Ganesh Grains Ltd. I IPF Vikram India Ltd. I Sona Sati Organics Pvt. Ltd. I Prakash Industries Ltd. I Kisan Phosphates Pvt. Ltd. I Archean Chemical Industries Pvt. Ltd. I Crystal Packaging I Crox Oil & Gas Pvt. Ltd. I GSPL Casting Industries I My Home Industries Ltd. I Bharti WalMart I AAP Autowheels Pvt. Ltd. I Sesa Goa I Sunfrost Frozen Foods Pvt. Ltd. I Godrej Agrovet Ltd. I Essar Projects (India) Ltd. I Komarla Feeds & Foods Pvt. Ltd. I Rich Land Developers I OMP India Pvt. Ltd. I Century Pulp & Paper I Aphrodite 4 Wheels Pvt. Ltd. I Crown Weldcare Pvt. Ltd. I Acrysil Ltd. I Caparo Engineers & Construction Ltd. I Garg Acrylics Ltd. I Caparo Engineers & Construction Ltd. I Hindustan Construction Company I Sarda Energy & Food Pvt. Ltd. I Yash Construction I Dhuleva Industries I Apollo Mobikes I Redefine Tech Services Pvt. Ltd. I Amricon Agro Vet Pvt. Ltd. I Mcnally Bharat Engg. Ltd. I Shankar Equipments Ltd. I Kanoria Africa Textiles Plc I JMD Enterprises I Shri Ramji Warehouse I Salasarhanumanji Grains Pvt. Ltd. I Vipasana Industries Pvt. Ltd. I Savair Energy Ltd. I Kajaria Ceramics Ltd. I Sara Automobiles Pvt. Ltd. I Everest Industries Ltd. I Sahara Pure Eatables Corporation Ltd. I Angelique International Ltd. I Pearl Global Industries Ltd. I Om Sai Udyog I Mangala Pundalik Shejul I KNY Projects Pvt. Ltd. I Sunil Hitech Engineers Ltd. I Dhakalia Investment Ltd. I Ventilation Engineering Company I Acrysil Steel Ltd. Servokon System Ltd. I Bhutan Hydro Power Services Ltd. I Sai Enterprises I Aspet Technoplast Pvt. Ltd. I K.K. Breweries Pvt. Ltd. I Vision Parental Pvt. Ltd. I Hindustan Vidyut Products Ltd. I Shilpi Kumar Aggarwal I Maurya Motors Ltd. I Ajay Kumar Agarwal I Radhe Radhe Oil Industries I Ashapura Minechem Ltd.I Adani Power Ltd. I Varivas Properties Ltd. I Lotus Wireless

Tantia Chemicals Pvt. Ltd. I Om Logistics I Adani Power I Sumash Developers Pvt. Ltd. I Maharashtra Shetkari Sugar Ltd. I S M Auto Engg. Pvt. Ltd. I LG Extractions Pvt. Ltd. I SKH MM I Ashapura Group of Industries I Standard International P Ltd. I Honda Siel Car India I Ficus Pax Pvt. Ltd. I Suri Auto Products I Carrfour WC & C Pvt. Ltd. I Lotus Intergrated Taxpark Ltd. I Grindwel Norton I Ravi Steel Pvt. Ltd. I Ranbaxy Laboratory Ltd. I Jeumont Electric India Pvt. Ltd. I Galaxy Cables Pvt. Ltd. I Metflow Controls Pvt. Ltd. I Grindwel Norton I Shree Salasar Polyflex Pvt. Ltd. I CMM Logistics Pvt. Ltd. I Lanxess India Pvt. Ltd. I Excel Paper Packaging Pvt. Ltd. I Integrated Equipments & Infraservices Pvt. Ltd. I HLL Lifecare Ltd. I Padmavathi Agro Mills (P) Ltd. I Krishidhan Seeds Pvt. Ltd. I India Glycols Ltd. I Pipe Hangrs & Supports Pvt. Ltd. I Zest Auto Ltd. I Gateway Impax Pvt. Ltd. I Kiwi Commodities Pvt. Ltd. I Spirotech Heat Exchangers Pvt. Ltd. I Amrit Feeds Ltd. I Minda Investment Ltd.Everton Tea India Ltd. I Leena Maggon I Palu Brothers I Senghani & Senghani Exim Pvt. Ltd. I PSL Ltd. I Vedanta Medicare I Vijay Technocrats Pvt. Ltd. I IndoChem Industries I GTR Aluminium I Celware Logistic Pvt. Ltd. I ABC Bearing Ltd. I Nilkamal Eswaran Plastic. Pvt Ltd. I Capitol Nonwoven Pvt. Ltd. I Standard International Precision I Shreem Electric Ltd. I KJS Concreate I GKP Merchants Pvt. Ltd. I Surya Laxmi Industries I Global Aqua Pvt. Ltd. I BPA Project

Whirlpool India Ltd. I Precision Manufacturing Pvt. Ltd. I Noble Natural Resources (I) P Ltd. I Radhe Agro Industries India Pvt. Ltd. I Hero Motors Ltd. I A One Tex Tech P. Ltd. I Mahipal & Brothers I Metra Agri Industries I M P Khaitan I Krifor Industries Ltd. I Krypton Industries Ltd. I Tender Heart Senior Secondary School I RN Gupta & Co. Ltd. IDhongade Logistics I Abhishek Enterprises I Tata Chemicals Ltd. I Shri Radharasbihari Steel P Ltd. I Lal Chand Rajneesh Kumar I J.K. Paper Ltd. I Sleek International I Hentech Agrovet Pvt. Ltd. I Patial Builder & Contractors P Ltd. I Gajanan Sidhivinayak Foods P Ltd. I Gati KWE Ltd. I Angelique International Ltd. I Rockman Industries Ltd. I Garg Acrylics Ltd. I Kisan Phosphates Pvt. Ltd. I Dabur India Ltd. I Amrit Hatcharies Ltd. I Britannia Industries Ltd. I Micro Polypet P. Ltd. I Crystal Packaging I Enco Engineers Combie I Gadre Autocon I Pentair Water India Pvt. Ltd. I Flexituff International Ltd. I Rahul Internation P. Ltd. I Magicrete Building Solution P. Ltd. I SAPA Profiles India Pvt. Ltd. I Machino Plastics Ltd. I Metro Agri Industries Ltd. I Alkem Laboratories I Bergwerff Organic India Pvt.Ltd. I IQRA Steel & Tube Pvt. Ltd. I Padamshree Inc. I Sneh Quality Spices Pvt. Ltd. I New Holland Fiat (India) Pvt. Ltd. I Noble Natural Resources (I) P Ltd. I Khanna Polyrib Pvt. Ltd. I Fastbuild Blocks Pvt. Ltd. I AAP Autowheels Pvt. Ltd. I TES AMM Recyclers India I SS Sales Corporation Cummins Technologies India Ltd. I Gokuldas Warehousing Corporation I Uttar Banga Sambad I Spaceage Multiproduct Pvt. Ltd. I Elite Electronics Pvt. Ltd. I Cosmic Grace Auto (India) Pvt. Ltd. I Sachdeva Textiles I Transmart India Pvt. Ltd. I Josch Systems

26 27

1,000

200

400

600

800

YEAR

NO

. OF

PR

OJE

CTS

Page 15: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja

Presentations in the brochure or any other Everest Industries Limited publications are correct to the best of the knowledge of the company, at the time of preparation. Everest Industries Limited provides this information in an advisory capacity only and reserves the right to change the specifications without prior intimation.

EVEREST INDUSTRIES LIMITED: Genesis A-32 Mohan Co-operative Industrial Estate Mathura Road New Delhi 110044 India Tel: +91-11-41731951/52 Fax: +91-11-46566370

FOR MORE DETAILS, CONTACT: New Delhi - 9810054479, 9650031191 Mumbai - 9987788005, 9920395301 Pune - 9503058299 Kolhapur - 9987987785 Bengaluru - 9731011497, 9900428148 Kolkata - 9748779833, 9748462052 Bhubaneshwar - 9937170233 Chandigarh - 9779094498, 8283835943 Chennai - 9900428148, 8220276622 Hyderabad - 9652480910 Coimbatore - 8220010050 Jamshedpur - 9771430112 Patna - 9771456152 Nashik - 9867202273 Indore/ Bhopal/ Nagpur/ Raipur/ Ahmedabad/ Vadodara/ Gandhidham - 9987788005

Helpline: 09958037777 I [email protected] I www.everestind.com