10
NOC/Engineering Meetin g Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru: Design of JP-KR GbE Ne twork(JP side) Jaehwa Lee: Design of KR-JP GbE Network(KR side)
Transcript
Page 1: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

NOC/Engineering Meeting

Date & Time: 12:00 - 13:00 over Lunch

13:40 - 15:00 at Lotus Hall 1

• Yoshinori Kitatsuji: APAN-JP NOC Report & Plan

• Masaki Hirabaru: Design of JP-KR GbE Network(JP side)

• Jaehwa Lee: Design of KR-JP GbE Network(KR side)

• John Hicks: Abilene Upgrade

Page 2: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

South East Asia Hub

• Sures and Royol will write the South East Asia Hub and its sites/projects.

  Done!• Yong-Jin Park will submit the intra-Asia net

work proposal to Asia Backbone Planning Committee today, and Sures & Royol’s document will be attached.

may be done!

Page 3: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

Traffic

TransPAC-north

JP-Taiwan

JP-China

APAN-JP

Page 4: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

APAN-JP

Page 5: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

APII / Genkai Network (JP side)August 27, 2002

JuniperM10

SINET

Tokyo XPBusan XP

600MATM

2.4 GbpsSONET

600MATM

Kyushu & Yamaguchi

DATAX uZ2.4G-GEB

2 x GbE

ATOMIS5

ATOMIS7

600MATM (DF)17km

JGN

JuniperM10

600MATM

Genkai JuniperM10GbE (DF)

L2

L2

GbE (DF)

Genkai XP (Meinohama)

GbE

Kyushu & Yamaguchi(QGPOP)

Existing

CRL

e!

Tenjin(NTT Com)

GenkaiKyushu U

GbE

APII/GenkaiServers

e!Servers

GbE

GbE

cisco

150M ATM(Backup)

JGN

GbE

150M ATMGbE

ATOMIS 7

APII/Genkai

Page 6: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

APII GbE (KR Side)

KREONet2

KREONet2

SingAREN

Renater 2

STARTAP

KIX

SeoulXP

Seoul

KREONet2

KREONet2

KREONet2

TokyoXP

10G2.4G1GbE to membersJP-KR Connection

Kwangju

Taegu

Pusan

Suwon

TaejonMembers

with 1GbE

access link

From Fukuoka

Page 7: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

• Abilene will have upgraded 10 core nodes (Indy and Chicago are finished).

• The Atlanta node is scheduled for December.

• The Cleveland node is going away.

• Each node will be configured with a Juniper T640

• The GSRs will remain for the time being.

Abilene Upgrade by mid September

Page 8: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

New Abilene Rack Layout

Page 9: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

Rack Layout (cont.)

Page 10: NOC/Engineering Meeting Date & Time: 12:00 - 13:00 over Lunch 13:40 - 15:00 at Lotus Hall 1 Yoshinori Kitatsuji: APAN-JP NOC Report & Plan Masaki Hirabaru:

Reference

Presentation materials will be downloaded from