NODAL MARKET EDUCATION NODAL MARKET EDUCATION Outage Scheduler
Transcript
Page 1: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

NODAL MARKET EDUCATIONNODAL MARKET EDUCATION

Outage Scheduler

Page 2: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Legal Disclaimer

Protocol DisclaimerThi t ti id l i f th TThis presentation provides a general overview of the Texas Nodal Market Implementation and is not intended to be a substitute for the ERCOT Nodal Protocols as amendedsubstitute for the ERCOT Nodal Protocols, as amended from time to time. If any conflict exists between this presentation and the ERCOT Nodal Protocols, the ERCOTpresentation and the ERCOT Nodal Protocols, the ERCOT Nodal Protocols shall control in all respects.

For more information, please visit:

http://nodal.ercot.com/protocols/index.html

Slide 2

http://nodal.ercot.com/protocols/index.html

Page 3: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Legal Admonition

Antitrust AdmonitionERCOT t i tl hibit k t ti i t d th iERCOT strictly prohibits market participants and their employees, who are participating in ERCOT activities, from using their participation in ERCOT activities as a forum forusing their participation in ERCOT activities as a forum for engaging in practices or communications that violate antitrust laws. The ERCOT Board has approved guidelines forlaws. The ERCOT Board has approved guidelines for Members of ERCOT Committees, subcommittees, and working groups to be reviewed and followed by each market participant attending ERCOT meetings.

Slide 3

Page 4: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Housekeeping

• Restrooms• Refreshmentse es e s• Attendance sheet• Breaks • Questions• Evaluation

Pl ff ll hPlease turn off cell phones & other electronics

Slide 4

Page 5: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Course Outline

• Market Participant Outage Scheduler User Interface

O t E t R l d E l• Outage Entry Rules and Examples• ERCOT Outage Scheduler Interface• Outage Reports• Outage Reports• Outage information on the MIS

Slide 5

Page 6: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Objectives

• Review ERCOT market rules for outage coordination

• Describe roles and responsibilities of ERCOT and Market Participants

• Demonstrate and discuss how TSP & QSE outages are• Demonstrate and discuss how TSP & QSE outages are entered into the Outage Scheduler.

• Briefly demonstrate the OS User Guides for QSEs and TSPsBriefly demonstrate the OS User Guides for QSEs and TSPs

• Briefly demonstrate the OS WBTs for QSEs and TSPs

• Discuss Outage Reports• Discuss Outage Reports.

• Discuss accessing Outage information on the MIS

Slide 6

Page 7: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

External Web Services

Notable Feature• External Web Services (EWS) allow TSPs and QSEs with

Resources to exchange outage data in XML format• File upload with return feature in Requestor User InterfaceAll Outage Coordination and Scheduling rules apply to EWSAll Outage Coordination and Scheduling rules apply to EWS

Users!

XML

Slide 7

Page 8: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage Scheduler User Interface

Page 9: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage Scheduler

What is the Outage Scheduler?• Critical application used by• Critical application used by

QSEs and TSPs to submit notifications or requests for outages to ERCOT

Requirement• Energization or removal of equipment in the Network

Operations Model requires submission in Outage SchedulerScheduler

Slide 9

Page 10: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage Coordination

What Do Congestion

Revenue RightsCongestion

Revenue RightsCRR AwardsPTP Awards

Outages Affect?

Day-Ahead Day-Ahead

Energy AwardsAncillary Service AwardsSecurity AnalysisReliability Unit Commitment

Adjustment Period Adjustment Period

Outage Evaluation

OUTAGESOUTAGESSecurity AnalysisAS DeploymentReliability Unit CommitmentReliability Unit CommitmentOutage Evaluation

Real-TimeReal-TimeRT Security AnalysisSCEDReal-Time Real-Time SCED Forced Outage Detection

SettlementsP t R l TiP t R l Ti

Slide 10

Outage ReportsPost Real TimePost Real Time

Page 11: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage Types

There are two outage categories: Transmission and ResourceResource

Transmission Resource

Planned

Maintenance

Planned

Maintenance

1

212

Forced

Remedial Sw.

Forced

Opportunity

34

34

Opportunity

Simple

5

6

Slide 11

p6

Page 12: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Transmission Outage Rules

TSPs can view all transmission and resource outagesresource outages.•A TSP may create a transmission outage for any operating company, station or y p g p y,equipment.

•A TSP can not create a resource outage.

•A TSP can not change the name of the requesting company. That is tied to the digital certificatedigital certificate.

•A TSP can not edit an outage created by another requesting company

Slide 12

another requesting company.

Page 13: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Resource Outage Rules

• QSEs may only schedule and view outages submitted by their company for the Resources in their portfolioin their portfolio

• Must log in separately for sub-QSEs.

QSE t i t i i t• QSEs cannot view transmission outages inside the Outage Scheduler.

• QSEs can access Approved Accepted• QSEs can access Approved, Accepted, Proposed and Rejected outages in the MIS.

• Scheduled outages on Resource Entity-g yowned Transmission Assets must be scheduled by a TSP on behalf of the QSE (per TSP submittal rules)

Slide 13

(per TSP submittal rules).

Page 14: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Logging On

• Access OS from Market Information System (MIS)Digital Certificate required• Digital Certificate required

• For multiple Digital Certificates, must select one

Slide 14

Page 15: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Logging On

• Multiple Outage Scheduler windows which are totally independent of one another may be opened in separateindependent of one another may be opened in separate browser sessions.

• MIS automatically logs out after 30 minutes of inactivity –click the OS Refresh often - in each open session! Any non-submitted requests in any open sessions will be lost!non submitted requests in any open sessions will be lost!

• For QSEs: All of the Resources in their portfolio will be available Must log in separately for Sub-QSEs

Slide 15

Page 16: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen

Slide 16

Page 17: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen

• 25 outages are displayed per page.• Summary Screen will display up to 7000 outages.• Use Custom Filter to find particular outages.• Use Page Arrows at bottom to page up and down the requests

Slide 17

Page 18: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen

Default sort order is determined by:

• Current Date falls within the Planned start to Planned End periodp• Request Date – based on the time of submission

Slide 18

Page 19: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen – Sorting Column Data

• Columns may be sorted in ascending and descending order.• To reverse the sort, click the column heading area• All data will be re sorted based on the selected column• All data will be re-sorted based on the selected column• For multiple levels of sorting, export the data to a .csv spreadsheet.

Click on the Column Heading area to re-sortre sort

Slide 19

Page 20: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen

Click OS Refresh often due to 30 Minute Timeout Rule

Slide 20

Page 21: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen

Printing Summary Information

Slide 21

Page 22: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Print Information Summary

Insert Printed Summary example here.

Slide 22

Page 23: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen

Exporting Data fieldsExporting Data fields

Slide 23

Page 24: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen – Export .xml format

Information shown represents One (1) OutageOne (1) Outage

Slide 24

Page 25: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen – Export.csv format

Slide 25

Page 26: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Summary Screen – Export.csv format

Slide 26

Page 27: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Outage Selection Screen

Slide 27

Page 28: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Outage Selection Screen

Slide 28

Page 29: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Create Outage Screen

General Information is pre-populated from digital certificate.

Acme Electric Use pull down to select other TSP Operating Companies.

Slide 29

Page 30: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Create Outage Screen

General InformationGeneral Information is pre-populated from digital certificate.

512-222-1234

For QSEs – Operating Company cannot be changed. Must Log in separately for sub-QSEs

Slide 30

Page 31: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Create Outage Screen

Remembers the last phone number entered from previous session.

This should be the number you wouldRequired Field

This should be the number you would want an ERCOT Outage Coordinator or System Operator to contact you at!

Slide 31

Page 32: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Create Outage Screen

TSP Required Data

Slide 32

Page 33: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Create Outage Screen

QSE Required Data

Slide 33

Page 34: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Create Outage Screen

Using the Calendar Widget:• enter PS first – automatically populates ES, PE and LEy p p ,• Entering PE automatically populates LE• Revising PS or PE automatically populates ES or LE

Manually entering data into any field revises that field only!

Slide 34

Page 35: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage Entry Screen

Detailed instruction on using the Calendar Widget may be found in:

• Section 7 of the QSE or TSE Outage Scheduler Users Guides• Section 7 of the QSE or TSE Outage Scheduler Users Guides• The New Outages > Enter New Outages section of the Outage Scheduler Web-Based Training module.

Slide 35

Page 36: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Create Outage Screen

Nature of Work Pull-down• Required Field• Pre-populated with generic e popu ated t ge e c

TSP or QSE types of work.

Slide 36

Page 37: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Nature of Work Pulldowns

Transmission Outages Resource OutagesAssociated Equipment OutageBreaker Maintenance

Black Start TestBoroscopeCLine Maintenance

Line Rebuild/UpgradeRelay Work Repair Hot Spot

Combustion Inspection and RepairCooling Water Problems/RepairsExhaust Problems/RepairsFeedwater Problems/Repairs

Repair/Replace Damaged EquipmentReplace EquipmentSwitch MaintenanceSwitch Repair/Replace

Fuel Limitation/Lack of Fuel AvailabilityFuel Problems/RepairsGas Company Pipeline WorkInlet Air Problems/Repairs

Transformer MaintenanceTransformer Repair/ReplaceTransformer TestingNew Equipment Energization

Lack of Steam Load AvailabilityMothballedOverhaulSteam Turbine Limited/Unavailableq p g

Retirement of Old EquipmentOther*Unknown*

Tube LeakTurbine/Generator Vibration/RepairNew Equipment EnergizationRetirement of Old Equipment

Slide 37

Retirement of Old EquipmentOther*Unknown** Enter reason in Requestor Notes

Page 38: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Emergency Restoration

TSP Required Data Only• Whole numbers only – no decimals.y• Cannot be longer than the outage duration• Rounds up for fractional hours (i.e. 8.5 hour outage

equals a 9 hour maximum restoration valueequals a 9 hour maximum restoration value

Slide 38

Page 39: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Project Name Field

• TSP Outage Types only.g yp y• Not a required field• Use to relate outages to a project• Up to 16 Characters

Slide 39

Page 40: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Selecting Equipment Fields

• Top down Hierarchyp y• Select Station first to pre-populate lower fields• Select additional equipment to create Group Outages• Higher selections clear lower fields

Slide 40

Page 41: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Selecting Equipment Fields

TSP  Equipment Type Code Definition

CB Circuit Breaker

LN LineLN Line

DSC Disconnect

XF Transformer

SC Series Compensator

LD Load

SVC Static Var Compensator

QSE  Equipment Type Code Definition

UN Unit

LR Load Resource

Slide 41

Page 42: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

Note: For TSP & QSE Planned Outages –cannot use Recurring and Group feature at the same time.

Recurring Outages• Defaults to No

Slide 42

Page 43: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

Maximum of50 Occurrences

2010

Repeats Field – decide first if outage is Weekly or

Maximum duration is 24 hours

first if outage is Weekly or Periodic

Slide 43

Page 44: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

4 3

x x x

2010 08

x x

4

Slide 44

Page 45: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

4 3

x

2010 08

x

Slide 45

Page 46: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

IMPORTANT NOTE:• Validate dates before submittal!

O S b itt d h t b

Slide 46

• Once Submitted – each outage becomes a separate, stand-alone outage request!

Page 47: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

2010

Repeats Periodically field

Slide 47

Page 48: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

Planned Start Date is always the first outage plus…

8 14 1

2010 08

Slide 48

Page 49: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

Planned Start date counts as one outage plus

8 4 3

2010 08

Slide 49

Page 50: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Recurring Outages

Planned Start date counts as one outage plus

Again - IMPORTANT NOTE:• Validate dates before submittal!• Once Submitted – each outage becomes a

Slide 50

gseparate, stand-alone outage request!

Page 51: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Grouped Outage Example

Station B

BS 1Station U

Station A O

AS-1 AB-1 AS-2

BS-1

BS-2

BB-1

-A Line ABStation G

Station C

O

OAS-3 AB-2 AS-4

AB 3

Bus

-A

S-5

Line AB

Line AD Station F

C

Station DC

AS-6 AB-3 AS-7

AS-8 AB-4 AS-9

Bus

-B C

Segment AC

SegmentCF

SegmentFGC

C O O

C C C

C

Station E

OEB-1 ES-1EG-1 Line AG Outage

Slide 51

C C CStation E

Page 52: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Grouped Outage Example

TSP Owned Resource Owned

L04

S040

CD03

C CT03

MT03QSE

B1 B2 B3 CD02

S040

C200 CT02

XT02MT02

C300 CT03

B4 B5 B6 SD01

200

S100 ST01

MT01

L01 L02 L03

S010 S020 S030XT01

MT01

Slide 52

Page 53: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Grouped Outages

• Submitted as a Group• Evaluated and Approved/Rejected as a Group• May be Cancelled as a Group• Actual Start and Actual End times apply to all outages in the group

• Group Name required if multiple Equipment selected

• Defines grouped outage• Up to 8 Characters

N t lid t d i t b• Not validated against – may be duplicated

30 Max

Slide 53

Page 54: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Associated Equipment

Associated Equipment table expandsp

Slide 54

Page 55: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage State

Selected Equipment always defaults to the state opposite theSelected Equipment always defaults to the state opposite the Normal State defined in the Network Operations Model

Slide 55

Page 56: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Entering & Viewing Notes

If no Notes section is collapsedIf no Notes, section is collapsed

Click on the Blue Arrow to Expand or Collapse the Notes section

Slide 56

Page 57: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Enter/View Notes

Requestor Notes• Enter reason when using “Other” or

“Unknown” for Nature of Work• For Supplemental Information• Up to 1000 characters

Slide 57

Page 58: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Enter/View Notes

• Previously submitted Notes appear with date/time stamp.• Cannot be edited or removed.• Original Notes only will be included if Copied

Slide 58

Page 59: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Enter/View Notes

RAP or SPS Notes• Required if disabling or impacting a

Remedial Action Plan or SpecialRemedial Action Plan or Special Protection System

• TSPs only• Up to 1000 charactersUp to 1000 characters

Slide 59

Page 60: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Special Protection Systems & Remedial Action Plans

Important: the following TSP actions are required if outages impact a Remedial Action Plan or Special Protection Systemimpact a Remedial Action Plan or Special Protection System.

•Enter information in the Notes area shown below.

•Email notes to OPSOutageCoordination@ercot com•Email notes to [email protected].

Call ERCOT Outage Coordination at 512-248-6841 if additional explanation is necessary.additional explanation is necessary.

Slide 60

Page 61: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Enter/View Notes

Supporting Information• Explanation of how an outage qualifies as a forced outage• Up to 1000 characters

R i d b f t i A t l E d f ll f d t t• Required before entering Actual End for all forced outage types:– Forced outages– Forced Extensions

Unavoidable Extensions– Unavoidable Extensions– Remedial Switching Actions

Slide 61

Page 62: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Enter/View Notes

ERCOT Reviewer NotesR d O l• Read Only

Slide 62

May 5, 2009 Sys. Coordinator. Rejected due to conflicting outages.

Page 63: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

System Validation

When submitting Outage requests, validation checks for:• Conflicting existing outages• Conflicting existing outages• Required fields are complete

Error Messages are unique!

Slide 63

Page 64: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Cancellation & Withdrawal of Outage Rules

ERCOT can review & withdraw approval to ensure reliabilityB f A l f Aft A l freliabilityBefore Approval of

OutageAfter Approval of

Outage

ERCOT can reject outage ERCOT can withdraw outage

TSP or QSE can cancel TSP or QSE can cancel outageoutage TSP or QSE can cancel outage

Slide 64

Page 65: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Withdrawal of Approved Outages

Withdrawal of Inactive Outage • No Actual Start entered• No Actual Start entered• Status changes to Withdrawn• All fields become read-onlyAll fields become read only

Withdrawal of Active Outage• Actual Start entered• Actual Start entered• Status changes to Withdrawn • All fields are read-only, except for Actual End, which must y, p ,

be entered by the Requesting Entity

Slide 65

Page 66: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Canceling Outages

• Coordinating with ERCOT• Reschedule date unknown• Reschedule within next

season• Will not reschedule

Slide 66

Page 67: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Canceling Outages

• Outage must be inactive (No Actual Start entered)

• Only Outage statuses:– Received at ERCOT

Approved– Approved– Accepted

• Only ERCOT can cancel Forced Outages entered in error• Only ERCOT can cancel Forced Outages entered in error

Slide 67

Page 68: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Entry Rules Example

Actual Start and Actual

Actual Start field will notaccept entries until two hours prior to the Planned Start time.

Actual Start and Actual End Dates/Times may also be entered on the Summary Screen

Actual Start can be edited for two hours.

Date/Time Entry Rules Example:Example:

AS Must be ≥ Planned Start minus 2 hours, ≤ current time, and <

Slide 68

QSEPlanned End

Page 69: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Entry Rules Example

Actual End field not available for entries until after the Actual Start has been Submitted.

Actual End can be edited For two hours.

REMINDER:

New Planned End field will not appear until <3 days before Planned End

When entering Actual end, Supporting Information isRequired for:• Forced• Forced Extensions

Slide 69

QSEForced Extensions

• Unavoidable Extensions• Remedial Switching

Page 70: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Date/Time Entry Rules - Entering Actual Start

• Actual Start field will not be enterable until two hours before Planned Start.

• Actual Start may be changed for up to two hours after submittal.Actual Start may be changed for up to two hours after submittal.New Actual Start must be earlier than the old Actual Start.New Actual Start must also be later than the Planned Start minus two

hours.

• Entering the Actual End changes the Actual Start to read-only.

•You may ask ERCOT to delete the Actual Start. Once deleted, it can be entered again – restarting the two-hour editing window.

Note When the t o ho r entr period e pires the Act al Start field ill stillNote: When the two-hour entry period expires, the Actual Start field will still appear to be enterable. Attempts to update will generate an error message.

Slide 70

QSE

Page 71: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Date/Time Entry Rules - Entering Actual End

• Actual End field will not appear until after the Actual Start has been submitted.

• Actual End may be changed for two hours after submittal New Actual End must be earlier than the old Actual End.

• You may ask ERCOT to delete the Actual End. Once deleted, it can be entered again – restarting the two-hour editing window.

Note: When the two-hour entry period expires, the Actual End field will still appear to be enterable. Attempts to update will generate an error message. The Actual End never displays as read-only

Slide 71

QSE

Page 72: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Entry Rules Example – Summary Page

Slide 72

Page 73: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Warning Messages

Warnings Summary TabWarnings Summary Tab

Individual Warning

Slide 73

Page 74: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Warnings Tab Example

Click on Column Headings to Sort by Column

Slide 74

Page 75: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Warnings Tab Example

Slide 75

Page 76: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Warning Messages – Actual Start & End Summary

Condition Warning Message

Current time is 30 minutes after Planned Start and no Outage XXXNNNNNNN is late with Actual StartActual Start has been entered

Current time is 30 minutes before Planned End and no Actual End has been entered

Outage XXXNNNNNNN will end in 30 minutes. Please take appropriate action.

Note: If no Actual End is entered, this Warning Message will stay active until 30 minutes afterthe Planned End. At exactly 30 minutes after Planned End, this message disappears and thePlanned End, this message disappears and the following warning condition becomes effective.

Current time is 30 minutes after Planned End and no Actual End has been entered

Outage XXXNNNNNNNN is late with Actual End

Actual End for an Unavoidable Extension, Forced Outage or Forced Extension is submitted with no Supporting Information

Outage XXXNNNNNNNN is pending completion. Supporting Information is missing.

Slide 76

XXXNNNNNNNN = Outage Identifier

Page 77: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Summary Screen – Show/Hide Columns

Slide 77

Page 78: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Summary Screen – Show/Hide Columns

Slide 78

Page 79: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Custom Filter Screen - TSPs

If no Dates or Entry Fields are selected, clicking y , gApply will return all records for the RequestingCompany (up to 7000).

When specifying a date range, may enter Request and/or Effective datesRequest and/or Effective dates.

When Filtering for a specific Outage ID or GroupName, a Date range is not required.

Slide 79

Page 80: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Custom Filter Screen - QSEs

If no Dates or Entry Fields are selected, clicking Apply will return all records for the RequestingCompany (up to 7000).

When specifying a date range, may enter Request and/or Effective dates.

When Filtering for a specific Outage ID or Group Name, a Date range is not required.

Slide 80

Page 81: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Custom Filter Screen - QSEs

Slide 81

Page 82: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Custom Filter Screen

TSP & QSE Filtering Maximums

Field Name Maximum ValuesOutage Type Multiple

Outage Status MultipleOutage Status u t p e

Requesting Company – TSPs Only Up to 5

Operating Company – TSPs Only Up to 5

Station Up to 15

Equipment Type Up to 15

Equipment Name Up to 15

Slide 82

Page 83: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Custom Filter Screen - TSP

MultipleMultiple

5

5 15 15 15

Slide 83

Page 84: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Copying Outages

• All outages may be copied, regardless of type/statusExact copy (requestor must modify prior to re submittal)• Exact copy (requestor must modify prior to re-submittal)

• Copies original Requestor Notes only

Slide 84

Page 85: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage Entry ExamplesOutage Entry Examples

Page 86: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Nodal Outage Types

Planned

Transmission

Planned

Resource

1 1Planned

Maintenance

Forced

Planned

Maintenance

Forced

1

23

1

23Forced

Remedial Sw.

O t it

Forced

Opportunity

3

45

34

Opportunity

Simple

5

6

Slide 86

Page 87: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage Summary Screen

C t N O t t fi ldCreate New Outage entry fields

Slide 87

Page 88: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Outage Selection Screen

Slide 88

Page 89: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Outage Selection Screen

Slide 89

Page 90: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Planned OutagesPlanned Outages

Page 91: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Planned Outages

QSEs/TSPs:•Must provide Rolling 12-month Outage Plan

•Continuous updates required

Outage Plans affect: • Network models• Planning & operations functions• CRR Auctions

Slide 91

Page 92: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Planned Outages

ERCOT: •In-depth reviews of 12-month plans with TSPs

•At least twice each year•At least twice each year

Slide 92

Page 93: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Planned Outages

Planned Outages for ResourcesTimelines for Response for Resource Planned Outages

1Timelines for Response for Resource Planned Outages

If QSE submits t t ERCOT will approve or reject…outage request… pp j

1-2 days prior Within 8 business hours of receipt*1 2 days prior Within 8 business hours of receipt

3-8 days prior Before 1800 hours, two days prior to start of proposed Outagey p prior to start of proposed Outage

8+ days prior Must accept, but may discuss reliability and scheduling impacts to minimize hazards/costs

Slide 93

scheduling impacts to minimize hazards/costs

* Eight Hour Business Rule Applies

Page 94: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Planned Outages

Planned Outages for Reliability Must Run resourcesTi li f R f R li bili R Pl d

1

Timelines for Response for Reliability Resource Planned Outages (Reliability Must Runs & Black Starts)

Request for Approval

ERCOT will Approve or Reject

Not less than 30 days

15 days before start of proposed Outage

More than 45 days 30 days before the start of proposed OutageMore than 45 days 30 days before the start of proposed Outage

Slide 94

Page 95: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Resource Planned Request Screen

Slide 95

Page 96: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Resource Deratings

• Change in Resource’s High Sustained Limit (HSL) from a temporary change in the power plant capabilityfrom a temporary change in the power plant capability

• Occurs when Resource capability reduced by 10% or 10 MW from loss of auxiliary equipment or other conditionsy q p

Slide 96

Derated HSL < Maximum HSL

Page 97: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Resource Derating Coordination

If Derating to last 48+ hours, QSE must:C i t ith ERCOT• Communicate with ERCOT

• Update Current Operating Plan• Submit Planned Maintenance or Forced Derating• Submit Planned, Maintenance, or Forced Derating

Derated Resource

Slide 97

Page 98: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Resource Deratings

Enter new HSL & LSL Values& LSL Values

XXX YYY

Slide 98

Page 99: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Resource Deratings

TIP – use the Group feature to submit an outage request and a derating request at the same time.

i I bi d l t i if h tti d b ti t bi d thi.e. In a combined cycle train - if shutting down combustion turbines reduces the output from associated steam turbines - enter the outage request and the derating request in the same submittal!

Enter Zero’s (0’s) for off line Resourcesoff-line Resources and derated values for limited Resources.

0 0

0

######

0

Slide 99

0 0

Page 100: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Resource Entity-Owned Asset Outages

Resource Entity-Owned Transmission Assets ((breakers switches transformers (main((breakers, switches, transformers (main power, auxilliary & stand-by) and other related equipment)) outages:

•QSEs may only schedule outages on Resources

•QSEs must request that a TSP schedule Resource Entity-Owned Transmission Asset outages on their behalfoutages on their behalf

•Outages must meet TSP submittal requirements

Slide 100

Page 101: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Resource Entity-Owned Assets

TSP Owned Resource Entity - OwnedS O ed esou ce t ty O ed

L04

S040

CD03

C CT03

MT03QSETSP

B1 B2 B3 CD02

S040

C200 CT02

XT02MT02

C300 CT03

B4 B5 B6 SD01

200

S100 ST01

MT01

L01 L02 L03

S010 S020 S030XT01

MT01

Also applies to transmission assets owned and operated by Wind Generation

Slide 101

Resources

Page 102: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE & TSP Grouped Outages

TSP Owned Assets Resource Entity-Owned AssestsS O ed ssets esou ce t ty O ed ssests

L04

S040

CD03

C CT03

MT03

QSE OnlyTSP Only

B1 B2 B3 CD02

S040

C200 CT02

XT02MT02

C300 CT03TSP

B4 B5 B6 SD01

200

S100 ST01

MT01

L01 L02 L03

S010 S020 S030XT01

MT01

Slide 102

Page 103: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Planned Outages

Timelines for Response for TSP Planned Outages

If TSP submits outage request… ERCOT will approve or reject…

91 d * 75 d *91+ days* 75 days*

46–90 days* 30 days*

9–45 days* 4 days*

4 8 days* No later than 1800 hours 3 days*4–8 days No later than 1800 hours 3 days

3 days* No later than 1800 hours 2 days*

Slide 103

*Prior to Planned Start Date/Time

Page 104: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Planned Outage

Slide 104

Page 105: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Maintenance OutagesMaintenance Outages

Page 106: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE & TSP Maintenance Outages

• Initiated manually to remove equipment from service to perform work on componentsperform work on components

• Required to prevent a potential forced outage • Could be postponed brieflyp p y• Cannot be postponed until next planned outage

Outage Equipment must beOutageLevels

Equipment must beremoved from service…

1 Within 24 hours

2 Within 2 – 7 days

Slide 106

3 Within 8 – 30 days.

Page 107: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Communication

If Maintenance Outage occurs:QSE t d t C t O ti Pl• QSE must update Current Operating Plans

• Verbal communication with ERCOT may be necessary

Slide 107

Maintenance Outage

Page 108: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Maintenance Outage Example

Planned Start Date & Time will determine Maintenancewill determine Maintenance 1, 2 or 3.

Slide 108

Page 109: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Maintenance Level 1 Example

Slide 109

Page 110: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Unavoidable Extensions

• Apply to Planned, Maintenance & Simple Outages

O l O U id bl E t i ll d• Only One Unavoidable Extension allowed

• Must be entered before Planned End

• New Forced Outage required after Planned End

Scheduled Return Time Unavoidable ExtensionWork exceeds

scheduled return time

Slide 110

Page 111: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Unavoidable Extensions

New Planned End field will not appear until <3will not appear until <3

days before Planned End.

Slide 111

Page 112: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Forced OutagesForced Outages

Page 113: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE & TSP Forced Outages

• Initiated by protective relay (or manually)

I i h ld l d i l• In response to equipment that could lead to a potential event, or poses threat to people, equipment, or public safety

Notification Requirements ERCOT Action

• Verbally communicate outage immediately.

• Submit into Outage Scheduler as soon as

• Default Accept status automatically assigned when submitted.

practicable.

• QSEs must update COP.

Slide 113

Page 114: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Forced Outage

Slide 114

Page 115: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Forced Outage

Slide 115

Page 116: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Forced Outages & Forced Extensions

Forced OutagesTrip Time Forced Outage

Submit as soonas practicable

Forced Extensions apply to Forced OutagesScheduled Return Time Forced Extension

Work exceeds

• Only one Forced Extension Allowed

Work exceeds scheduled return time

Slide 116

• Only one Forced Extension Allowed

• Must be entered prior to the Planned End or…

Page 117: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Forced Extensions

New Planned End field willNew Planned End field will not appear until <3 days

before Planned End.

Slide 117

Page 118: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Opportunity OutagesOpportunity Outages

Page 119: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Opportunity Outage

TSP Resource

• May be approved by

TSP Opportunity Outage

• May be accepted by

Resource Opportunity Outage

May be approved by ERCOT when a specified Resource will be outaged

• May be accepted by ERCOT when a specific Resource has been

• TSP has an outage “Received at ERCOT” for Transmission Elements

forced off-line

• Resource had been previously accepted for aTransmission Elements

associated with the Resource

previously accepted for a planned outage to begin during the next eight days

Slide 119

Page 120: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage Sequence of Events

1. The QSE has a previously Accepted or Approved Planned Outage on a Resource with a Planned Start date of eight (8)Outage on a Resource with a Planned Start date of eight (8) calendar days or less.

2 The QSE submits a Forced Outage on the Resource with the2. The QSE submits a Forced Outage on the Resource with the approved Planned Outage. The Forced Outage Planned End date cannot overlap with the Approved Planned Outages Planned Start date.a ed Sta t date

3. Warning Message “Conditions for a Resource Opportunity Outage (XXXNNNNNNNN) are met due to an incoming Forced Outage (XXXNNNNNNNN) with Planned End Date (MM-DD-YY)” is generated.

Slide 120

Page 121: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage Sequence of Events

1. The QSE has a previously Accepted or Approved Planned Outage on a Resource with a Planned Start date of eight (8)Outage on a Resource with a Planned Start date of eight (8) calendar days or less.

2 The QSE submits a Forced Outage on the Resource with the2. The QSE submits a Forced Outage on the Resource with the approved Planned Outage. The Forced Outage Planned End date cannot overlap with the Approved Planned Outages Planned Start date.a ed Sta t date

3. Warning Message “Conditions for a Resource Opportunity Outage (XXXNNNNNNNN) are met due to an incoming Forced Outage (XXXNNNNNNNN) with Planned End Date (MM-DD-YY)” is generated.

Slide 121

Page 122: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage Sequence of Events

1. The QSE has a previously Accepted or Approved Planned Outage on a Resource with a Planned Start date of eight (8)Outage on a Resource with a Planned Start date of eight (8) calendar days or less.

2 The QSE submits a Forced Outage on the Resource with the2. The QSE submits a Forced Outage on the Resource with the approved Planned Outage. The Forced Outage Planned End date cannot overlap with the Approved Planned Outages Planned Start date.a ed Sta t date

3. Warning Message “Conditions for a Resource Opportunity Outage (XXXNNNNNNNN) are met due to an incoming Forced Outage (XXXNNNNNNNN) with Planned End Date (MM-DD-YY)” is generated.

Slide 122

Page 123: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage

Slide 123

Page 124: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE - Opportunity Outage

4. QSE accesses the appropriate Update Outage Request screen and decides to “Yes” take the Resource Opportunity Outage.

• When “Yes” is checked and Update Submitted – the Outage Scheduler takes the Planned End of the Forced Outage and automatically uses it as the Planned Start of the Opportunity Outage.automatically uses it as the Planned Start of the Opportunity Outage.

• The Opportunity Outage basically fills in the time period between the Forced Outage and the Planned Outage.

• When the Resource Opportunity Outage is approved, the Outage Scheduler uses the approval date/time as the Actual end of the Forced

d h A l S f h O i Ooutage and the Actual Start of the Opportunity Outage.

Slide 124

Page 125: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE - Opportunity Outage

5. QSE accesses the appropriate Update Outage Request screen and decides to “No” not take the Opportunity Outage.

• When “No” is checked, a Warning Message is generated and the Planned Outage reverts back to its original state.

• In summary, the Resource experiences a Forced Outage and then comes back on-line until the start of the original Planned Outage.

Slide 125

Page 126: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage

Slide 126

Page 127: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage Warning Messages

Condition Warning Message

A Forced Outage has been submitted for a Resource /

Conditions for a Resource Opportunity Outage which has an accepted/approved outage scheduled to begin in less than 8 calendar days.

(XXXNNNNNNNN) are met due to an incoming Forced Outage (XXXNNNNNNNN) with Planned End Date

Th Pl d E d f F d O hi h i d h R O i O (XXXNNNNNNNN) hThe Planned End of Forced Outage which triggered the Resource Opportunity Outage has passed.  The Resource Opportunity Outage automatically reverts back to the original accepted/approved Planned Outage.

Resource Opportunity Outage (XXXNNNNNNNN) has been reverted.  The Planned End for the Designated Outage (XXXNNNNNNNN) has passed.

The QSE elects to not take the Opportunity Outage by checking the “No” radio button on the Update Outage 

The Potential Opportunity has been cancelled by the Participant, so the Outage has been reset to its original 

Request screen state.

The QSE has requested that ERCOT Cancel the Forced Outage

Conditions for a Resource Opportunity Outage (XXXNNNNNNNN) no longer exist due to the Forced Outage (XXXNNNNNNNN) being cancelled

Slide 127

Outage (XXXNNNNNNNN) being cancelled.

Page 128: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage Warning Messages

Condition Warning Message

A Forced Outage has been submitted for a Resource /

Conditions for a Resource Opportunity Outage which has an accepted/approved outage scheduled to begin in less than 8 calendar days.

(XXXNNNNNNNN) are met due to an incoming Forced Outage (XXXNNNNNNNN) with Planned End Date

Th Pl d E d f F d O hi h i d h R O i O (XXXNNNNNNNN) hThe Planned End of Forced Outage which triggered the Resource Opportunity Outage has passed.  The Resource Opportunity Outage automatically reverts back to the original accepted/approved Planned Outage.

Resource Opportunity Outage (XXXNNNNNNNN) has been reverted.  The Planned End for the Designated Outage (XXXNNNNNNNN) has passed.

The QSE elects to not take the Opportunity Outage by checking the “No” radio button on the Update Outage 

The Potential Opportunity has been cancelled by the Participant, so the Outage has been reset to its original 

Request screen state.

The QSE has requested that ERCOT Cancel the Forced Outage

Conditions for a Resource Opportunity Outage (XXXNNNNNNNN) no longer exist due to the Forced Outage (XXXNNNNNNNN) being cancelled

Slide 128

Outage (XXXNNNNNNNN) being cancelled.

Page 129: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage Warning Messages

Condition Warning Message

A Forced Outage has been submitted for a Resource /

Conditions for a Resource Opportunity Outage which has an accepted/approved outage scheduled to begin in less than 8 calendar days.

(XXXNNNNNNNN) are met due to an incoming Forced Outage (XXXNNNNNNNN) with Planned End Date

Th Pl d E d f F d O hi h i d h R O i O (XXXNNNNNNNN) hThe Planned End of Forced Outage which triggered the Resource Opportunity Outage has passed.  The Resource Opportunity Outage automatically reverts back to the original accepted/approved Planned Outage.

Resource Opportunity Outage (XXXNNNNNNNN) has been reverted.  The Planned End for the Designated Outage (XXXNNNNNNNN) has passed.

The QSE elects to not take the Opportunity Outage by checking the “No” radio button on the Update Outage 

The Potential Opportunity has been cancelled by the Participant, so the Outage has been reset to its original 

Request screen state.

The QSE has requested that ERCOT Cancel the Forced Outage

Conditions for a Resource Opportunity Outage (XXXNNNNNNNN) no longer exist due to the Forced Outage (XXXNNNNNNNN) being cancelled

Slide 129

Outage (XXXNNNNNNNN) being cancelled.

Page 130: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE Opportunity Outage Warning Messages

Condition Warning Message

A Forced Outage has been submitted for a Resource /

Conditions for a Resource Opportunity Outage which has an accepted/approved outage scheduled to begin in less than 8 calendar days.

(XXXNNNNNNNN) are met due to an incoming Forced Outage (XXXNNNNNNNN) with Planned End Date

Th Pl d E d f F d O hi h i d h R O i O (XXXNNNNNNNN) hThe Planned End of Forced Outage which triggered the Resource Opportunity Outage has passed.  The Resource Opportunity Outage automatically reverts back to the original accepted/approved Planned Outage.

Resource Opportunity Outage (XXXNNNNNNNN) has been reverted.  The Planned End for the Designated Outage (XXXNNNNNNNN) has passed.

The QSE elects to not take the Opportunity Outage by checking the “No” radio button on the Update Outage 

The Potential Opportunity has been cancelled by the Participant, so the Outage has been reset to its original 

Request screen state.

The QSE has requested that ERCOT Cancel the Forced Outage

Conditions for a Resource Opportunity Outage (XXXNNNNNNNN) no longer exist due to the Forced Outage (XXXNNNNNNNN) being cancelled

Slide 130

Outage (XXXNNNNNNNN) being cancelled.

Page 131: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

Request for Approval Approval / Acceptance Rejection

• TSP should attempt to perform work during a scheduled Resource outage.

• Flags ERCOT & TSP

R t t b l tg g

• If no Resource outage is planned, TSP may submit an Opportunity outage

• Resource outage must be equal to or greater than TSP outage duration

TSP t b bl t li hg

• Specific Resource must be identified in request.

• TSP must be able to accomplish the work within specified time period

Th it i l ti• There are no security violations

• If all above true, ERCOT may Approve

Slide 131

Page 132: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

TSP Owned Resource Owned

B1 B2 B3

TSP Owned

GD02

Resource OwnedL04

S040

XT01MT01B1 B2 B3 GD02

G200

G100

GT02

GT01

MT01

B4 B5 B6 GD01

L01 L02 L03

S010 S020 S030XT02MT01

To perform maintenance on TSP-owned switches,

Slide 132

GT01 needs to be off-line.

Page 133: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

Stage 1TSP owned switches between Breakers B5 and B6• TSP-owned switches between Breakers B5 and B6 require annual maintenance

• TSP contacts the appropriate QSE or Resource and makes them aware f th tof the request

• TSP and Resource attempt to schedule maintenance during a planned Resource outage

• If no Resource outage is planned or scheduled, TSP submits an opportunity outage request

TSP Owned

Resource Owned

B1 B2 B3

L04S040

G200

G100

GT02

GT01

Slide 133

B4 B5 B6

L01 L02 L03

S010 S020 S030

100 GT01

Page 134: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

Stage 1 (cont’d)• The Opportunity outage request must include

the desired outage duration and a specified Resource

• Enter an HSL of Zero (0) if the Resource must be off-line or a maximum ( )HSL value if the Resource can be on-line, but limited.

• Once submitted, outage request stays in status: “Received at ERCOT” waiting for specified Resource outage to occurwaiting for specified Resource outage to occur

• Opportunity outage requests will only stay in “Received at ERCOT” status pending approval for 90 days

Slide 134

Page 135: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

Stage 2• If a QSE submits a Planned, Forced or Maintenance outage request on

a designated resource identified in the opportunity outage request, the Outage Scheduler will generate a Warning Message for ERCOT and the TSP.

• The Designated Resource outage duration must be equal to or greater than the duration specified by the TSP.p y

Slide 135

Page 136: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

Stage 2 (cont’d)• When the TSP receives the Warning Message:• When the TSP receives the Warning Message:

– TSP must verify and confirm that they can perform their work during the outage durations

– TSP must enter desired planned start and planned end dates and times in the opportunity outage request

– ERCOT will evaluate the request and if no security violations occur, issue approval

Slide 136

Page 137: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

Stage 2 (cont’d)If th R t i f ffi i t• If the Resource outage is of sufficient duration, but the TSP cannot perform their work for any reason, the TSP must Cancel the opportunity outage (the TSP may then submit a new request)

Logistics, site arrangements, or work schedules may prevent the TSP from being able to take advantage of thebeing able to take advantage of the opportunity outage.

Slide 137

Page 138: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Warning Messages Summary

Condition Warning Message

A Designated Resource in a pending TSP Opportunity Outage has submitted a Planned Outage which meets the scheduling criteria

Conditions for a Transmission Opportunity Outage (XXXNNNNNNNN) are met due to an incoming Designated Resource Outage (XXXNNNNNNNN)scheduling criteria. Resource Outage (XXXNNNNNNNN).

The QSE has cancelled the outage on the Designated Resource identified in

The Designated Resource Outage has been cancelled The Opportunitythe Designated Resource identified in

the TSPs Opportunity Outage request.been cancelled. The Opportunity Outage is no longer available.

Slide 138

Page 139: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Warning Messages Summary

Condition Warning Message

A Designated Resource in a pending TSP Opportunity Outage has submitted a Planned Outage which meets the scheduling criteria

Conditions for a Transmission Opportunity Outage (XXXNNNNNNNN) are met due to an incoming Designated Resource Outage (XXXNNNNNNNN)scheduling criteria. Resource Outage (XXXNNNNNNNN).

The QSE has cancelled the outage on the Designated Resource identified in

The Designated Resource Outage has been cancelled The Opportunitythe Designated Resource identified in

the TSPs Opportunity Outage request.been cancelled. The Opportunity Outage is no longer available.

Slide 139

Page 140: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

Stage 1

DesignatedResources

Desiredd ti d

0

duration and equipment

Slide 140

Page 141: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

Stage 2

Enter Zero (0) during submittal if the Resource must be off-line

0

Remains in OS

must be off-line or revised HSL if the Resource can be on-line, but limited

for 90 days, thenautomatically expires on this date

Slide 141

Page 142: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage – Entered Not Yet Submitted Status

A Designated Resourcehas submitted a Planned, Forced or Maintenance Outage request.

0

Note: the duration between the

Enter Planned Start &Planned End dates/times

between the Planned Start and the Planned End cannot exceed the original Outage

Slide 142

Planned End dates/timesDuration requested.

Page 143: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

0

Once Approved, follows the same lifecycle as a

Planned Outage

Slide 143

Page 144: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Opportunity Outage Warnings Tip

QSEs and TSPs will only receive Opportunity Outage notifications viaQSEs and TSPs will only receive Opportunity Outage notifications via the Outage Scheduler Warning Message system. Warning Messages are not “pushed” out to any Market Participants!

To be notified of Opportunity Outages, Entities must either:• Closely monitor their Warning Messages, or• Use Custom Filters to monitor possible Opportunity Outage situations.p pp y g

Tip: Watch for the ENYS (Entered Not yet Submitted) status show below!

Slide 144

Page 145: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

TSP Opportunity Outage

0

Pending

Slide 145

Page 146: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Remedial Switching Actions

Page 147: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

What is a Remedial Switching Action?

• Some switches/breakers may need to be opened or closed to prevent security violations in Real-Timeto prevent security violations in Real-Time.

• TSPs and ERCOT identify and document any switching actions as part of the Network Operations Model definition of p pRemedial Action Plans (RAPs).

Slide 147

Page 148: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Remedial Switching Action (RSA)

Usage

•Mitigate security violations

•During outage evaluation or l ti ditiunusual operating conditions

Example• High imports

138C

• Unusual generation patterns

Slide 148

Page 149: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Remedial Switching Action (RSA)

Usage

•Entered in Outage Scheduler

•A type of Forced Outage

•Lists switches and breakers affected

•Transparent to all Market Participants138C

Slide 149

Page 150: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Timeline Requirements for RSAs

• If active longer than 3 days, must submit Planned OutageIf common occurrence must be entered into Network Model• If common occurrence, must be entered into Network Model as a Remedial Action Plan

Outage SchedulerDay 1 Day 2 Day 3

Remedial Switching

SubmitPlanned g

Action Outage

Slide 150

Page 151: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Remedial Switching Action (continued)

ERCOT mustA ll R di l S it hi A ti i t• Approve all Remedial Switching Actions prior to implementation by TSPs

• Post such outages to the MIS Secure Area os suc ou ages o e S Secu e ea• Produce statistics reporting use of RSAs

Remember: Outage Scheduler treats RSA as a forced outageRSA as a forced outage

Slide 151

Page 152: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Remedial Switching Action

1. Closing a Normally Open or Opening a Normally Closed Bus Section Breaker

Line 1

G

1138C

G

Auto 1Bus

Section Breaker

138G

EPS

Auto 3138A138E

Slide 152

Line 2Line 3Line 4Line 5Line 6 CB 1

CB 10

Page 153: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Remedial Switching Action

1. Closing a Normally Open or Opening a Normally Closed Bus Section Breaker

2. Opening Low Side Breaker(s) on Autotransformers Line 1

G

12 138C

G

Auto 1Bus

Section Breaker

138G

EPS

Auto 3138A138E

Slide 153

Line 2Line 3Line 4Line 5Line 6 CB 1

CB 10

Page 154: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Remedial Switching Action

1. Closing a Normally Open or Opening a Normally Closed Bus Section Breaker

2. Opening Low Side Breaker(s) on Autotransformers3. Single ending a Transmission Line to reduce line flow

Line 1

G

12 138C

G

Auto 1Bus

Section Breaker

138G

EPS

Auto 3138A138E

3

Slide 154

Line 2Line 3Line 4Line 5Line 6 CB 1

CB 10

Page 155: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Remedial Switching Action

1. Closing a Normally Open or Opening a Normally Closed Bus Section Breaker

2. Opening Low Side Breaker(s) on Autotransformers3. Single ending a Transmission Line to reduce line flow4. Single Ending or de-energizing an Underground

Transmission Line

Line 1

GTransmission Line

12 138C

G

Auto 1Bus

Section Breaker

138G

EPS

Auto 3138A138E

3

Slide 155

4Line 2Line 3Line 4Line 5Line 6 CB 1

CB 10

Page 156: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

RSA Create Outage Screen

NOTE

Slide 156156

Page 157: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Simple Outage

Page 158: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Simple Transmission Outage

Request forAppro al

Approval / Acceptance RejectionApproval Rejection

• Submitted between 1 and 2 days in advance

• Within 8 business hours after receipt at ERCOTadvance

• Outage must have a restoration time of 1 hour or less

• Duration of the outage must be 12

ERCOT• Eight-Hour Business Rule Applies

Duration of the outage must be 12 hours or less

• Must not change load flow or direction

• Must not cause a topology change• Must not cause LMPs to change

Slide 158

Page 159: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Simple Transmission Outage (continued)

• TSP must control all involved equipment

• Line(s) must have a single switch or breaker to isolate it from the remaining energized system

• Ongoing bus outage may be expanded to include single• Ongoing bus outage may be expanded to include single-ended lines

• Opposite end of the line/equipment to be included in theOpposite end of the line/equipment to be included in the existing outage must be isolated from the next bus through opening a single switch or breaker

Slide 159

Page 160: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Simple Transmission Outage

Station B

BS 1

• Scheduled Outage on Breakers AB-1 and AB-2.

• Breakers isolated through

Station A C

AS-1 AB-1 AS-2

BS-1

BS-2

BB-1

-A Line ABStation G

Breakers isolated through Switches AS-1 to AS-5

Station C

O

OAS-3 AB-2 AS-4

AB 3

Bus

-A

S-5

Line AB

Line AD Station F

C

Station DC

AS-6 AB-3 AS-7

AS-8 AB-4 AS-9

Bus

-B C

Line AC LineCF

LineFGC

C C C

C C CLegend

C

Station E

OEB-1 ES-1EG-1

Slide 160

C C C- Closed Breaker - Open Breaker

- Open Switch - Closed Switch

C OStation E

Page 161: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Simple Transmission Outage

Station B

BS 1

Can Line AB be taken as a Simple

Transmission

Station A O

AS-1 AB-1 AS-2

BS-1

BS-2

BB-1

-A Line ABStation G

Transmission Outage?

Can Line AD be taken as a Simple

Transmission Outage?

Station C

O

OAS-3 AB-2 AS-4

AB 3

Bus

-A

S-5

Line AB

Line AD Station F

C

Station DC

AS-6 AB-3 AS-7

AS-8 AB-4 AS-9

Bus

-B C

Line AC LineCF

LineFGC

C O O

C C C

C

Station E

OEB-1 ES-1EG-1

Slide 161

C C CStation E

Page 162: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Simple Transmission Outage

Station B

BS 1

Station A O

AS-1 AB-1 AS-2

BS-1

BS-2

BB-1

-A Line ABStation G

Station C

O

OAS-3 AB-2 AS-4

AB 3

Bus

-A

S-5

Line AB

Line AD Station F

C

Station DC

AS-6 AB-3 AS-7

AS-8 AB-4 AS-9

Bus

-B C

Line AC LineCF

LineFGC

C O O

C C C

CCould the TSP have set up the Line AB Outage in a different way without using a SimpleStation E

OEB-1 ES-1EG-1

Slide 162

C C C way without using a Simple Transmission Outage?

Station E

Page 163: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Simple Outage Screen

Slide 163

Page 164: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

“Be Aware” Tip

In an open Browser session – if you leave a Detailed Outage entry page without submitting the outage, access the Summary Page page t out sub tt g t e outage, access t e Su a y ageand open a new outage request – the original outage disappears –with no Warning!!

Slide 164

Summary Detailed

Page 165: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

ERCOT Outage Scheduler CapabilitiesFor Outage Coordinators and

System Operators

Page 166: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

ERCOT’s Outage Scheduler Capabilities

With respect to the Market Participants Nodal Market Outage Scheduler interface ERCOT Outage Coordinators andScheduler interface, ERCOT Outage Coordinators and System Operators may only edit or perform the following functions:

• Change Outage Status (Study, Accept, Approve, Reject or Withdraw)

• Delete Actual Start or Actual End times.

• Enter Reviewer Notes

• Cancel Forced Outages entered in error

Slide 166

Page 167: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

ERCOT Market Information System

Page 168: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Market Information System – Accessing Outage Information

Slide 170

Page 169: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Market Information System – Accessing Outages

Slide 171

Page 170: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Market Information System – Accessing Outages

Slide 172

Page 171: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Market Information System – Accessing Outages

MIS Approved & Accepted Outages summary .csv formatFormat useful for multiple filtering and data sorts, etc.Contains all Active and future OutagesContains all Active and future Outages

Slide 173

Page 172: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage ReportsOutage Reports

Page 173: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Outage Reporting

• ERCOT posts individual QSE/RE and TSP outage scheduling data on MIS Secure areaoutage scheduling data on MIS Secure area monthly for informational purposes.

• Detailed Reporting and Performance p gMonitoring information is found in Nodal Protocol 8 and Nodal Operating Guide 9.

Slide 175

Page 174: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

QSE & TSP Outage Reports

Posted on MIS SecureN b f O R b i d i• Number of Outage Requests submitted in advance

• Number of Outages by Outage Type• Number of Outages by Outage Type

• Total number of Outages that were requested, accepted, approved, cancelled and withdrawnapproved, cancelled and withdrawn

• Planned versus Actual Monthly and Annual Statistics

Slide 176

Page 175: NODAL MARKET EDUCATION - ercot.org...QSE B1 B2 B3 CD02 C 200 CT02 XT02 MT02 300 B4 B5 B6 SD01 S 100 ST01 MT01 L01 L02 L03 S010 S020 S030 XT01 Slide 52. Grouped Outages • Submitted

Supplemental References

The following Outage Scheduler documents and training material will be available at ERCOT commaterial will be available at ERCOT.com

•Outage Scheduler User Guide for TSPsOutage Scheduler User Guide for TSPs

•Outage Scheduler User Guide for QSEs

•Outage Scheduler Web Based Training•Outage Scheduler Web-Based Training