IVRCL Infrastructures & projects Ltd. Khambhalia-Kalyanpur-Okha Mandal Groups Civil Works Status As on 24.11.08 S.No Name of the ESR SBC Excavtion PCC 1 Pir Lakhasar H/W 10 15 1 1 1 1 1 1 1 1 UP 2 Keshod Dhar H/W 8 15 1 1 1 1 1 3 Khambhalia H/W 12 20 1 1 1 Dept. Deleted in our scope Vide Lr. No: PB/Kham.-Kal/ERR/2518. Dt:15.11.07 4 Hansthal H/W 10 20 1 1 1 1 1 1 1 1 1 1 UP 5 Juvanpar H/W 4 20 1 1 1 1 1 6 L owerali H/W 15 20 1 1 1 1 1 Total 6 6 6 5 5 2 2 2 1 1 0 IVRCL Infrastructures & projects Ltd. Khambhalia-Kalyanpur-Okha Mandal Groups Civil Works Status As on 24.11.08 S.No Name of the Sump Activitys SBC Excavtion PCC 1 Pir Lakhasar H/W 20 1 1 1 1 1 1 1 1 1 UP 2 Keshod Dhar H/W 25 1 1 1 1 1 1 1 1 1 1 3 Khambhalia H/W 25 1 1 1 1 1 1 1 1 1 1 4 Bhatia H/W 60 1 1 1 1 UP 5 Samlasar H/W 1 1 1 1 1 1 1 1 1 1 1 6 Dhrasanvel H/W 3 1 1 1 1 1 UP TOTAL 6 6 6 6 5 4 4 4 4 3 SNO. Office Building Qty. Activitys SBC Excavtion undatio Wall Roof 1 Khambhalia H/W 240 1 1 1 1 1 1 1 1 Total 240 1 1 1 1 1 1 1 1 0 0 y in Height in Mt Location Finalised Survey Com le te d Design Com lete d Design A roved RCC Raft  Shaft/ Bottom Dome/ RCC Container Capacit y in Lacs  Finalise  Survey Com lete d  Comple Design A roved RCC Raft Side Wall  Dome/ Area in Sqm Location Finalised Survey Completed Design Completed Design Approved
Transcript
Page 1: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 1/14

IVRCL Infrastructures & projects Ltd.Khambhalia-Kalyanpur-Okha Mandal Groups

Civil Works Status As on 24.11.08

No Name of the ESR SBC Excavtion PCC

Pir Lakhasar H/W 10 15 1 1 1 1 1 1 1 1 UP

2 Keshod Dhar H/W 8 15 1 1 1 1 1

3 Khambhalia H/W 12 20 1 1 1 Dept. Deleted in our scope Vide Lr. No: PB/Kham.-Kal/ERR/251

4 Hansthal H/W 10 20 1 1 1 1 1 1 1 1 1

5 Juvanpar H/W 4 20 1 1 1 1 1

6 Lowerali H/W 15 20 1 1 1 1 1

Total 6 6 6 5 5 2 2 2 1

IVRCL Infrastructures & projects Ltd.

Khambhalia-Kalyanpur-Okha Mandal Groups

Civil Works Status As on 24.11.08

No Name of the SumpActivitys

SBC Excavtion PCC

Pir Lakhasar H/W 20 1 1 1 1 1 1 1 1 1 UP

Keshod Dhar H/W 25 1 1 1 1 1 1 1 1 1 1

Khambhalia H/W 25 1 1 1 1 1 1 1 1 1 1

4 Bhatia H/W 60 1 1 1 1 UP

Samlasar H/W 1 1 1 1 1 1 1 1 1 1 1

Dhrasanvel H/W 3 1 1 1 1 1 UP

TOTAL 6 6 6 6 5 4 4 4 4 3

O. Office Building Qty.

Activitys

SBC Excavtion undatio Wall Roof

Khambhalia H/W 240 1 1 1 1 1 1 1 1

Total 240 1 1 1 1 1 1 1 1 0 0

y inHeight

in Mt

Location

Finalised

Survey

Com leted

Design

Com leted

Design

A roved

RCC

Raft

 

Shaft/ B

Do

Capacit

y in

Lacs

 

Finalise

 

Survey

Com leted

 

CompleDesign

A roved

RCC

Raft

Side

Wall

 

Dome/

Area in

Sqm

Location

Finalised

Survey

Completed

Design

Completed

Design

Approved

Page 2: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 2/14

IVRCL Infrastructures & projects Ltd.Khambhalia-Kalyanpur-Okha Mandal Groups

Civil Works Status As on 24.11.08

Water Treatment Plants

S.No Description of Item

1 Location Finalised 1

2 Survey Completed 1

3 SBC 1

4 Hydraulic Design Completed 1

5 Design Completed 1

6 Design Approved 1

7 Excavtion 1

8 PCC 1

9 1

10 Aeration Fountain 0

11 Inlet chamber -

12 1

13

14 Filter beds U/P

15 -

16 Chlorine store room U/P

17 -

Bhatia head work WTP

(877 M3/hr)

Supply Item: MS Pipe line Flash

mixer to Clarifloculator

MS/CI pipeline from flash mixer to

clariflocculator

RCC channel from clariflocculator to

filter beds

Byepass MS/CI pipeline from

Clariflocculator to clear water sump

Other ancillary and miscellaneous

work

Page 3: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 3/14

IVRCL InKhamb

D a i

Dia of Pipe in "mmLaying Length in RMT 

Today Till Date Balance

DI Pipe line:

1 450-K-9 25575 138 17056 8519

2 450-K-7 2850 0 1440 1410

3 400-K-7 17975 0 9750 8225

4 350-K-9 1425 0 0 1425

5 350-K-7 39950 0 14407 25543

6 300-K-9 855 0 0 855

7 300-K-7 9890 0 9883 7

8 250-K-9 22930 0 19109 3821

9 250-K-7 5540 0 4828 712

10 200-K-9 95 0 0 95

11 450-K-9 (Dept) 3000 0 0 3000

TOTAL 130085 138 76473 53612

HDPE Pipe line:

Dia of pipe in mmLaying Length in RMT 

Today Till Date Balance

Sl.

No

As per BOQ

Quantity in

RMT 

Sl.

No

As per BOQ

Quantity in

RMT 

Page 4: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 4/14

1 250-PE-100 35715 0 30694 5021

2 200-PE-100 43670 0 35845 7825

3 180-PE-100 6360 0 6360 0

4 160-PE-100 52755 0 46286 6469

5 140-PE-100 76420 0 59756 16664

6 110-PE-100 44400 0 34496 9904

7 90-PE-100 68950 0 42979 25971

TOTAL 328270 0 256416 71854

GRAND TOTAL 458355 138 332889 125466

M/s. IVRCL

Page 5: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 5/14

Page 6: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 6/14

frastructures & Projects Limitedhalia, Kalyanpur & Okha Mandal Groups

y P r o g r e s s R e p o r t

Khambhalia Kalyanpur

BOQ Till date Balance BOQ Till date Balance

0 0 0 0 0 0

2850 1440 1410 0 0 0

4675 1530 3145 0 0 0

1425 0 1425 0 0 0

39950 14407 25543 0 0 0

855 0 855 0 0 0

9890 9883 7 0 0 0

8680 7551 1129 14250 11558 2692

5540 4828 712 0 0 0

95 0 95 0 0 0

0 0 0 0 0 0

73960 39639 34321 14250 11558 2692

Khambhalia Kalyanpur

BOQ Till date Balance BOQ Till date Balance

Page 7: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 7/14

10920 10376 544 17195 17118 77

22135 19077 3058 21535 16768 4767

6360 6360 0 0 0 0

34290 30850 3440 18465 15436 3029

56010 46646 9364 13760 10210 3550

14880 10882 3998 29520 23124 6396

45430 33800 11630 23520 11912 11608

190025 157991 32034 123995 94568 29427

263985 197630 66355 138245 106126 32119

M/s. GWSSB

17110 17116 -6

1440 1434 6

9990 9750 240

0 0 0

7464 15463 -7999

0 0 0

9883 9883 0

21108 19109 1999

4828 4828 0

 

Page 8: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 8/14

0 0 0

0 0 0

30692 30694 -233789 35845 -2056

6360 6222 138

47018 46286 732

55497 60256 -4759

34006 34496 -490

38467 42979 -4512

Page 9: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 9/14

DATE :03.01.2009

Okha

BOQ Till date Balance BOQ Till date

25575 17056 8519 9835 0 0

0 0 0 643 0 0

13300 8220 5080 9621 0 0

0 0 0 0 0 0

0 0 0 10739 0 0

0 0 0 0 0 0

0 0 0 8644 0 0

0 0 0 18440 0 0

0 0 0 3722 0 0

0 0 0 0 0 0

3000 0 3000 0 0 0

41875 25276 16599 61644 0 0

Okha

BOQ Till date Balance

Dept.

Certified

(Laying)

Dept.

Certified

Page 10: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 10/14

7600 3200 4400 29839 0 0

0 0 0 31133 0 0

0 0 0 4965 0 0

0 0 0 43958 0 0

6650 2900 3750 47921 0 0

0 0 0 33812 0 490

0 0 0 36893 0 -2733

14250 6100 8150 228521 0 -2243

56125 31376 24749 290165 0 -2243

Page 11: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 11/14

Page 12: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 12/14

Bal.

0

0

0

0

0

0

0

0

0

0

0

0

Page 13: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 13/14

0

0

0

0

0

-490

2733

2243

2243

Page 14: Node Connective DPR

8/6/2019 Node Connective DPR

http://slidepdf.com/reader/full/node-connective-dpr 14/14


Recommended