IVRCL Infrastructures & projects Ltd.Khambhalia-Kalyanpur-Okha Mandal Groups
Civil Works Status As on 24.11.08
No Name of the ESR SBC Excavtion PCC
Pir Lakhasar H/W 10 15 1 1 1 1 1 1 1 1 UP
2 Keshod Dhar H/W 8 15 1 1 1 1 1
3 Khambhalia H/W 12 20 1 1 1 Dept. Deleted in our scope Vide Lr. No: PB/Kham.-Kal/ERR/251
4 Hansthal H/W 10 20 1 1 1 1 1 1 1 1 1
5 Juvanpar H/W 4 20 1 1 1 1 1
6 Lowerali H/W 15 20 1 1 1 1 1
Total 6 6 6 5 5 2 2 2 1
IVRCL Infrastructures & projects Ltd.
Khambhalia-Kalyanpur-Okha Mandal Groups
Civil Works Status As on 24.11.08
No Name of the SumpActivitys
SBC Excavtion PCC
Pir Lakhasar H/W 20 1 1 1 1 1 1 1 1 1 UP
Keshod Dhar H/W 25 1 1 1 1 1 1 1 1 1 1
Khambhalia H/W 25 1 1 1 1 1 1 1 1 1 1
4 Bhatia H/W 60 1 1 1 1 UP
Samlasar H/W 1 1 1 1 1 1 1 1 1 1 1
Dhrasanvel H/W 3 1 1 1 1 1 UP
TOTAL 6 6 6 6 5 4 4 4 4 3
O. Office Building Qty.
Activitys
SBC Excavtion undatio Wall Roof
Khambhalia H/W 240 1 1 1 1 1 1 1 1
Total 240 1 1 1 1 1 1 1 1 0 0
y inHeight
in Mt
Location
Finalised
Survey
Com leted
Design
Com leted
Design
A roved
RCC
Raft
Shaft/ B
Do
Capacit
y in
Lacs
Finalise
Survey
Com leted
CompleDesign
A roved
RCC
Raft
Side
Wall
Dome/
Area in
Sqm
Location
Finalised
Survey
Completed
Design
Completed
Design
Approved
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 2/14
IVRCL Infrastructures & projects Ltd.Khambhalia-Kalyanpur-Okha Mandal Groups
Civil Works Status As on 24.11.08
Water Treatment Plants
S.No Description of Item
1 Location Finalised 1
2 Survey Completed 1
3 SBC 1
4 Hydraulic Design Completed 1
5 Design Completed 1
6 Design Approved 1
7 Excavtion 1
8 PCC 1
9 1
10 Aeration Fountain 0
11 Inlet chamber -
12 1
13
14 Filter beds U/P
15 -
16 Chlorine store room U/P
17 -
Bhatia head work WTP
(877 M3/hr)
Supply Item: MS Pipe line Flash
mixer to Clarifloculator
MS/CI pipeline from flash mixer to
clariflocculator
RCC channel from clariflocculator to
filter beds
Byepass MS/CI pipeline from
Clariflocculator to clear water sump
Other ancillary and miscellaneous
work
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 3/14
IVRCL InKhamb
D a i
Dia of Pipe in "mmLaying Length in RMT
Today Till Date Balance
DI Pipe line:
1 450-K-9 25575 138 17056 8519
2 450-K-7 2850 0 1440 1410
3 400-K-7 17975 0 9750 8225
4 350-K-9 1425 0 0 1425
5 350-K-7 39950 0 14407 25543
6 300-K-9 855 0 0 855
7 300-K-7 9890 0 9883 7
8 250-K-9 22930 0 19109 3821
9 250-K-7 5540 0 4828 712
10 200-K-9 95 0 0 95
11 450-K-9 (Dept) 3000 0 0 3000
TOTAL 130085 138 76473 53612
HDPE Pipe line:
Dia of pipe in mmLaying Length in RMT
Today Till Date Balance
Sl.
No
As per BOQ
Quantity in
RMT
Sl.
No
As per BOQ
Quantity in
RMT
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 4/14
1 250-PE-100 35715 0 30694 5021
2 200-PE-100 43670 0 35845 7825
3 180-PE-100 6360 0 6360 0
4 160-PE-100 52755 0 46286 6469
5 140-PE-100 76420 0 59756 16664
6 110-PE-100 44400 0 34496 9904
7 90-PE-100 68950 0 42979 25971
TOTAL 328270 0 256416 71854
GRAND TOTAL 458355 138 332889 125466
M/s. IVRCL
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 5/14
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 6/14
frastructures & Projects Limitedhalia, Kalyanpur & Okha Mandal Groups
y P r o g r e s s R e p o r t
Khambhalia Kalyanpur
BOQ Till date Balance BOQ Till date Balance
0 0 0 0 0 0
2850 1440 1410 0 0 0
4675 1530 3145 0 0 0
1425 0 1425 0 0 0
39950 14407 25543 0 0 0
855 0 855 0 0 0
9890 9883 7 0 0 0
8680 7551 1129 14250 11558 2692
5540 4828 712 0 0 0
95 0 95 0 0 0
0 0 0 0 0 0
73960 39639 34321 14250 11558 2692
Khambhalia Kalyanpur
BOQ Till date Balance BOQ Till date Balance
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 7/14
10920 10376 544 17195 17118 77
22135 19077 3058 21535 16768 4767
6360 6360 0 0 0 0
34290 30850 3440 18465 15436 3029
56010 46646 9364 13760 10210 3550
14880 10882 3998 29520 23124 6396
45430 33800 11630 23520 11912 11608
190025 157991 32034 123995 94568 29427
263985 197630 66355 138245 106126 32119
M/s. GWSSB
17110 17116 -6
1440 1434 6
9990 9750 240
0 0 0
7464 15463 -7999
0 0 0
9883 9883 0
21108 19109 1999
4828 4828 0
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 8/14
0 0 0
0 0 0
30692 30694 -233789 35845 -2056
6360 6222 138
47018 46286 732
55497 60256 -4759
34006 34496 -490
38467 42979 -4512
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 9/14
DATE :03.01.2009
Okha
BOQ Till date Balance BOQ Till date
25575 17056 8519 9835 0 0
0 0 0 643 0 0
13300 8220 5080 9621 0 0
0 0 0 0 0 0
0 0 0 10739 0 0
0 0 0 0 0 0
0 0 0 8644 0 0
0 0 0 18440 0 0
0 0 0 3722 0 0
0 0 0 0 0 0
3000 0 3000 0 0 0
41875 25276 16599 61644 0 0
Okha
BOQ Till date Balance
Dept.
Certified
(Laying)
Dept.
Certified
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 10/14
7600 3200 4400 29839 0 0
0 0 0 31133 0 0
0 0 0 4965 0 0
0 0 0 43958 0 0
6650 2900 3750 47921 0 0
0 0 0 33812 0 490
0 0 0 36893 0 -2733
14250 6100 8150 228521 0 -2243
56125 31376 24749 290165 0 -2243
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 11/14
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 12/14
Bal.
0
0
0
0
0
0
0
0
0
0
0
0
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 13/14
0
0
0
0
0
-490
2733
2243
2243
8/6/2019 Node Connective DPR
http://slidepdf.com/reader/full/node-connective-dpr 14/14