    CostOS Estimating 2010

    new open mindtechnologies

    Brief Overview

    www.nomitech.eu www.costdatabase.eu

    http://www.nomitech.eu/http://www.nomitech.eu/
  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    2/23

    What is Cost Estimating?

    Cost Estimating is our effort to predict the Cost ofProjects, Production and Activities

    It is the foundation on which we base our decisions, if

    we want to accomplish things, and not waste ourresources

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    3/23

    How do you perform Cost Estimating?

    Not at all

    By handWith spreadsheets

    With line items / line item databases

    With Resource Cost Databases

    - What is the size of the investment?- What accuracy do you want to achieve?- How much time do you have available to

    spent on the estimate?

    - How many people are available to work onthe estimate?

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    4/23

    What is the problem with commonEstimating Methods?

    Not at all:

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    5/23

    By hand:

    What is the problem with commonEstimating Mathods?

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    6/23

    Excel:1. We can not find easily historical data

    2. We need to do repetitive work (crew composition,productivity calculation)

    3. We cannot share cost data with our colleagues. What ifsomebody leaves the company?

    4. We need to do repetitive work to build the projectschedule/program

    5. We might forget cells when making sums

    6. What if quantity takeoff changes? We need to manuallyinput new data

    What is the problem with commonEstimating Methods?

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    7/23

    With line items:1. We cannot check how the unit price was extracted

    2. It is time consuming to get updated costs if salaries ormaterial prices change

    3. We can not take into account local energy prices forequipment (heavy civil)

    4. It is very easy to shoot out unit prices and thus makemistakes

    5. We cannot get the activity durations.

    What is the problem with commonEstimating Methods?

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    8/23

    What are Resource Cost Databases?

    The Cost of all of our activities (usually described as BOQItems), depends on the Cost of the Resources that we use.The resources are categorised as follows:

    - Material

    - Labour

    - Equipment

    - Subcontractor

    - ConsumablesThere is always a relation between resources and cost. And

    this relation is captured in a Relational Resource CostDatabase

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    9/23

    Why use a Resource Cost Database?

    It stores the relation between Tasks and Resources(Our Experience)

    We can reuse previous estimates to get updated cost(Our Speed)

    We can build our own knowledge base (Our Accuracy)

    We can set standards and processes (Our Future)

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    10/23

    Nomitech - Products

    CostOS Estimating.

    - Estimators Everyday Tool

    -User Friendly

    - Easy to learn

    CostOS screenshots

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    11/23

    What other software are you using?

    Fully Integrated with :

    MS Excel (sync mode)

    Primavera P6 (sync mode)

    MS Project On-Screen Takeoff (sync mode)

    SAP

    @Risk Financial ERPs (Singular Logic, Atlantis ERP)

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    12/23

    How Cost OS Enterprise works?

    SERVER DB

    USER1 USER2

    Project1

    (BOQ 1-X) Project2

    (BOQ X - Z)

    Approval Reports

    Selling Price

    Priced BOQs

    Suppliers

    Material

    Equipment

    Labor

    Subcontractors

    Consumables

    Real Time

    Online DB

    Suppliers, MaterialsEquipment, Labour

    Subcontractors

    Priced BOQs

    Technologies

    Market Analysis

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    13/23

    Do I have access to knowledge bases withCostOS?

    1. NODOC: Nomitech OnlineDatabase of Cost (Worldwide)

    2. Richardson: CDOL Process Plant CostDatabase (Worldwide)

    3. RS Means Cost Database (US focused)

    4. Spons Cost Database (UK & Ireland)

    5. InfoCredit Group Business Database (M. East)

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    14/23

    What other information despite rates is covered bythe NODOC

    Links to Costdatabase.eu

    Various ways to search MATERIAL SPECSAND 3D VIDEOS

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    15/23

    What other information despite rates is covered bythe NODOC

    Link to Costdatabase.eu

    Various ways to search EQUIPMENTTECHNICALCHARACTERISTICS

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    16/23

    How can I apply the Richardson Process PlantDatabase internationally?

    Nomitech is the first company to implement the RichardsonDB as Relational Resource Database. We haverecreated the database

    This allows you to:

    Apply the database internationally

    Use the resources to create your own assemblies

    Find reference to the CDOL while searching resources andBOQs

    Not to convert English units to Metric

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    17/23

    Can I also search for specs through the RichardsonProcess Plant Database?

    Link to Cost Data OnLine (CDOL)

    Various ways to search

    The results are Groupedfor Easier Navigation

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    18/23

    RS Means Database

    MechanicalElectrical

    Heavy CivilFacility InstallationsResidential (US)Remodeling & Renovation

    InteriorLite ComercialGreen Building Technologies

    -> Also Implemented as Relational DBs

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    19/23

    Quantity Takeoff

    CostOS is fully integratedwith special QuantityTakeoff software:

    - Accelerate by 80% yourtake off process

    - Promote Team Working

    - Keep records for futurechecks of your estimate

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    20/23

    What can I get together with the software

    Technical support

    Basic Training

    Advanced Training

    System Installation

    Customizations

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    21/23

    What can I expect from Cost OS in the near Future?

    Embedded BIM Technology Automating the Estimating Process

    and bridging the gap between design

    and construction

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    22/23

    Nomitech worldwide presence

    03/12/09

    Carribean: NataxE-Logistics

    Cyprus, Lebanon: IS Works Ltd

    Iran, Turkey:NPSN Co.

    CentralGreece &

    Serbia:MarathonSystems Ltd

    Northern Greece& Bulgaria:Ergodesign Ltd

    Ireland: PPP Ltd

    US, Canada,Caribbean : MiamiMicro Inc

    South Korea:

    UIT SolutionsInc

    UK: Forgetrack Ltd

    Qatar, Oman, Bahrain: Mica Qatar

    Inc

    Australia: Mark ReevesArgentina:Metacontrol SA

  • 7/31/2019 nomitechlinkedin-12724054706464-phpapp02

    23/23

    Any well know partners of Nomitech?

    SUN MICROSYSTEMS

    IBM Business Partner

    Oracle Certified Partner

    (Joint Campaign Primavera CostOS in various countriesstarting in November 2009)


Recommended