Network Optimization Report of GSM New-build
2015-12-26 Page 1 of 26
Network Optimization Report Template
of GSM Target Network for (Telecom
Circle XX Target Area/Main Cities /Zonal
Town/Main Road/Wereda Towns)
Huawei Technologies Co., Ltd.
December 26, 2015
Network Optimization Report of GSM New-build
2015-12-26 Page 2 of 26
Contents 1 Introduction ......................................................................................................................... 5
1.1 Purpose .................................................................................................................................... 5
1.2 Network Optimization Procedure ............................................................................................ 5
1.3 Scope ....................................................................................................................................... 6
1.4 Test protocol ............................................................................................................................ 6
2 Network Topology ............................................................................................................... 7
2.1 BSC distribution (will be customized according to real scenario) .......................................... 7
2.2 Cluster distribution in case of big cities .................................................................................. 8
3 Target Area Information & Drive Test Route ..................................................................... 9
3.1 Target Area and Drive Test Route Drawing ............................................................................ 9
3.2 Target Area Site List................................................................................................................ 9
3.3 Target Area Site Engineering Parameter ............................................................................... 10
4 Drive Test & OSS KPI ...................................................................................................... 11
4.1 Drive Test KPI (threshold value will be same as like ED7 A11a-1a3) ................................. 11
4.2 OSS KPI (the threshold value should be same like ED-7 A16a-1a) ...................................... 13
5 Drive Test Methodology .................................................................................................... 14
5.1 Call Setup Success Rate ........................................................................................................ 14
5.2 Call Setup Time ..................................................................................................................... 14
5.3 Call completion rate............................................................................................................... 14
5.4 Call Drop Rate ....................................................................................................................... 14
5.5 PDP Context Activation Success Rate .................................................................................. 14
5.6 PDP Context Activation Time ............................................................................................... 15
5.7 FTP EDGE Downlink Throughput according to C/I on BCCH TRX ................................... 15
5.8 FTP EDGE Uplink Throughput according to C/I on BCCH TRX ........................................ 15
5.9 PS Session Termination Success Rate ................................................................................... 15
5.10 Round Trip Time ................................................................................................................... 16
5.11 SDCCH_DROP_RATE ......................................................................................................... 16
5.12 SDCCH_SETUP_BLOCKING_RATE ................................................................................. 16
6 Drive Test Plot ................................................................................................................... 17
6.1 Route & Target Area Information ......................................................................................... 17
6.2 Short Call Best Server BCCH Plot ........................................................................................ 18
6.3 RxLev Coverage Plot............................................................................................................. 18
6.4 RxQual Coverage Plot ........................................................................................................... 19
6.5 Download Throughput Plot ................................................................................................... 20
6.6 Upload Throughput Plot ........................................................................................................ 21
7 Optimization Actions Undertaken ..................................................................................... 22
7.1 RF adjustment ........................................................................................................................ 22
7.2 Parameter optimization .......................................................................................................... 23
7.3 Thematic Optimization .......................................................................................................... 23
8 Attachment ........................................................................................................................ 24
8.1 Engineering parameter table and RF tuning record table ...................................................... 24
Network Optimization Report of GSM New-build
2015-12-26 Page 3 of 26
8.2 Radio parameter optimization record table ............................................................................ 24
8.3 Frequency optimization record table ..................................................................................... 24
8.4 Neighbor list optimization record table ................................................................................. 24
9 Certificate of Network Optimization Target Area Report ................................................. 25
Network Optimization Report of GSM New-build
2015-12-26 Page 4 of 26
Document Version Control and Modification Tracking
Version Editor Modification made Date
Network Optimization Report of GSM New-build
2015-12-26 Page 5 of 26
1 Introduction
1.1 Purpose
The scope of work delivered by Huawei RNO Team on the Network Performance Improvement and
Roll-out Project was a successful achievement. The activities that were implemented during the course of
this program are listed below
Frequency Planning for New Sites
Frequency Retune on Worse Cell List
Neighbors Optimization
Radio Parameter Settings
Correction of Inconsistency Data in the network
Worse Cell Optimization
Alarm monitoring and troubleshooting
Swapped feeder Rectification on New Sites
All activities are properly implemented during the Target Area’s roll out and optimization period.
The Target of the Key Performance Indicator (KPI) is to achieve the threshold listed in chapter 4.
Huawei is intended to provide Ethio Telecom a comprehensive view of the subject Target Area
performance and status within the network to which it has been integrated. This document forms the
formal Final Target Area Acceptance deliverable with-respect-to the subject Target Area.
1.2 Network Optimization Procedure
RNP
Detail Design
RNO
Preparation
Optimization of
Traffic Statistics
KPIs
Coverage
Performance
Optimization
Care for VIP
and Hotspot
Areas
Accepta
nce
Site RF Survey Equipment
Installation,Commissioning &
Implementation
RNP
Preparation
RNO
Tuning
Preparation
DT test
Network
Tuning&
troubleshooting
Initial Tuning
Network
Evaluation
Parameters
audit
RF
Troubleshooting
Huawei & Ethio
Telecom
Ethio
Telecom Huawei
Color Indicator of
Responsibility
Network Optimization Report of GSM New-build
2015-12-26 Page 6 of 26
Radio network optimization aims to improve network performance and maximize the benefit of the
existing network resources through parameter collection, data analysis, parameter adjustment, and
necessary technical means after site integrated and expansion.
Single site verification
To verify the functionality of sites, for example site installation, basic functions of the cell. SSV were
done from the first Target Area site on air
Target Area RF optimization
To control interference & pilot pollution, and optimize coverage & 3G neighbor lists.
Services test & Para. Optimization, Trouble shooting
The parameter optimization and troubleshooting were done along all the project phase. During the
project some key issues which effect 2G network quality were solved. For example, SDCCH call drop
issue, SDCCH congestion issue, 2G Call drop issue and so on.
The detail test method, optimization action and result are showed in the following report content.
1.3 Scope
This document will show in sections:
i. Target area information & DT Route
ii. DT KPI&OSS KPI
iii. DT Result Plots
iv. Optimization Actions Undertaken
v. Attachments
vi. Certificate of Network Optimization Target Area Report
1.4 Test protocol
i. The test tools should use: Nemo outdoor, Actix.
ii. Total drive test distance depend on each Target Area.
iii. Average speed should not more than 40 km/h for town, 60km/h for high way.
iv. All drive test measurement should be done in car with mobile terminals (Phone and data card).
v. Rx-Level should be tested by idle mode locked on G900. RX_Qual should be based on long call.
vi. Coverage Test:
Nemo and mobile terminals for main cities, main roads and Wereda Towns;
Considering finishing the project as per the PIP, Probe and mobile terminals will be used for
isolated sites. One sample isolated site can be selected by ET per circle to make the
comparison test between Probe and Nemo.
Network Optimization Report of GSM New-build
2015-12-26 Page 7 of 26
2 Network Topology
2.1 BSC distribution (will be customized according to real scenario)
Network Optimization Report of GSM New-build
2015-12-26 Page 8 of 26
2.2 Cluster distribution in case of big cities
Network Optimization Report of GSM New-build
2015-12-26 Page 9 of 26
3 Target Area Information & Drive Test Route
3.1 Target Area and Drive Test Route Drawing
3.2 Target Area Site List
Huawei ID Longitude Latitude Configuration
Network Optimization Report of GSM New-build
2015-12-26 Page 10 of 26
3.3 Target Area Site Engineering Parameter
Huawei ID Cell ID BCCH Height Azimuth Tilt(M/E)
Network Optimization Report of GSM New-build
2015-12-26 Page 11 of 26
4 Drive Test & OSS KPI
4.1 Drive Test KPI (threshold value will be same as like ED7 A11a-1a3)
Service Items Threshold Optimized
Value Comment
Voice
Call Setup Counter
GSMCallSetupFailRF Counter
Call Setup Success Rate * >98%
Call Setup Time *
MOC90% of successful
calls <5s
MTC90% of successful
calls <5s
Call completion rate * >97.5%
Call Drop Rate for continuous
calls *
2 drops per hour of voice
call or Static <=0.6%
EDGE
PDP Context Activation
Success Rate *
>98%
PDP Context Activation Time
*
<3s
FTP EDGE Downlink
Throughput according to C/I
on BCCH TRX *
> 140 kbps for C/I >20 dB
> 60 kbps for 10 dB < C/I <
20 dB
> 25 kbps for C/I < 10 dB
FTP EDGE Uplink Throughput
according to C/I on BCCH
TRX *
> 70 kbps for C/I >20 dB
> 30 kbps for 10 dB < C/I <
20 dB
> 10 kbps for C/I < 10 dB
PS Session Termination
Success Rate *
>98%
Round Trip Time
1460 Byte Ping: <2500ms ;
5 packet loss
8 Byte Ping: <800ms ; 5
packet loss
Mobility
GSMSDCCHCallDrop
GSMSDCCHAssigned
SDCCH_SETUP_BLOCKING
_RATE *
≤0.5%
SDCCH Drop Rate * ≤0.5%
Network Optimization Report of GSM New-build
2015-12-26 Page 12 of 26
2G-3G HO Success Rate for
CS Calls
>98%
2G-3G Reselection Success
Rate for PS Calls
>95%
2G HO Success Rate for CS
Calls *
>98%
Coverage RX_ Level for 95% of samples
*
>-84 dBm for urban,
>-94 dbm for suburban
>-99 dbm for road
>-104 dbm for rural
RX_Qual (for 85% of
samples) *
0 to 4
Note:
1. According to purchased service BoQ, all sites should be Optimized (initial tuning SSV and
optimization).
2. The final optimized value to be evaluated against the above target threshold value.
3. If the optimized value doesn’t reach the threshold value, it should be justified and agreed as per the
justification (e.g. coverage, traffic model, etc.) stated in the “comment column” and accepted by ET.
4. For isolated site if there is a drive test route, optimization will be done in such a way and both SSV and
coverage optimization will be done together. The coverage will be optimized to the maximum possible
coverage/interference for the target area.
5. For isolated site if there is no drive test route, some target area around the site will be selected and
both SSV and coverage optimization will be done together. The coverage will be optimized to the
maximum possible coverage/interference for the target area.
6. The optimization report for isolated sites will be only tested and generated for the coverage test (RX_
Level and RX_Qual). For isolated sites, there is no pass criteria.
7. 2G HO Success Rate for CS Calls is only applicable for Wereda towns.
8. Considering finishing the project as per the PIP, optimization will be done for the above most important
KPIs marked with stars for Wereda Towns. In addition, one Wereda town sample will be selected per
circle to be optimized and tested for all items according to the purchased license.
9. The Wereda Town is the administration center of the Wereda and the list will be provided by ET
regional office and agreed by 2 parties.
10. Considering finishing the project as per the PIP, main cities with site number less than 5, the stationary
test is not applicable.
11. Main Road DT is focused on mobility and connectivity, hot spot stationary test is not applicable.
12. If the main road sites cross the POs, the main road DT will be performed at last PO with all the sites
and only SSV acceptance in the previous PO.
Network Optimization Report of GSM New-build
2015-12-26 Page 13 of 26
4.2 OSS KPI (the threshold value should be same like ED-7 A16a-1a)
OSS target KPI should be according to Appendix A16a - 1a - Performance KPIs for
RAN-UTRAN-LTE - Ed7 shown as below (Average of 7 days of 2/12/2014-8/12/2014):
Name
KPIs
Comment Threshold
Day Busy
Hour
(10:00-11:00)
Night Busy
Hour
(21:00-22:00)
CS
K3014:Traffic Volume on TCH(Erl)
2G Call Setup Success Rate_SLA >98%
2G Call completion rate_SLA (>97%) >97%
2G Call Drop Rate for continuous
calls_SLA <=1%
2G SDCCH_
SETUP_BLOCKING_RATE_SLA ≤0.5%
2G SDCCH_DROP_RATE_SLA ≤0.5%
PS
2G Call Setup Success Rate - Data_SLA ≥ 97%
2G Average EDGE throughput per data
TS - DL_SLA ≥38Kbps
2G Average GPRS throughput per data
TS - DL_SLA ≥12Kbps
2G Lost connections Rate – Data_SLA ≤5%
2G PS Session Termination Success
Rate_SLA >98%
Note
1. The OSS KPIs are applicable when the counters are more than 500 in busy hour.
2. If the optimized value doesn’t reach the threshold value, it should be justified and agreed as per the
justification (e.g. coverage, traffic model, etc.) stated in the “comment column” and accepted by ET.
3. Both day busy hour and night busy hour OSS KPI will be put in the above table. The day busy hour is
used for acceptance. The night busy hour is used for optimization reference.
4. If the main road sites cross the POs, the main road OSS KPI will be performed at last PO with all the
sites and only SSV acceptance in the previous PO.
Network Optimization Report of GSM New-build
2015-12-26 Page 14 of 26
5 Drive Test Methodology
5.1 Call Setup Success Rate
1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type = Call by
Call, Setup Timeout = 30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle
Mode, Call Mode = Infinite
5.2 Call Setup Time
1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number (call setup time MOC) =118, Destination Number
(call setup time MTC) =MTC Number, Originate Mode = GSM, Call Type = Call by Call, Setup Timeout =
30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle Mode, Call Mode =
Infinite
5.3 Call completion rate
1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type = Call by
Call, Setup Timeout = 30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle
Mode, Call Mode = Infinite
5.4 Call Drop Rate
1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type =
Continuous Call, Setup Timeout = 30s, Test/Exceptional Interval = 15s, Call Start Mode = Idle Mode, Call
Mode = Infinite
5.5 PDP Context Activation Success Rate
1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background),
Mode = FTP upload & FTP download, Remote File Size: 500k & 2Mb. Initiate EDGE PDP context
Network Optimization Report of GSM New-build
2015-12-26 Page 15 of 26
deactivation. Test Interval = 15s.Repeat = Infinite
5.6 PDP Context Activation Time
1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background),
Mode = FTP upload & FTP download, Remote File Size: 500k & 2Mb. Initiate EDGE PDP context
deactivation. Test Interval = 15s.Repeat = Infinite
5.7 FTP EDGE Downlink Throughput according to C/I on BCCH TRX
1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background),
Download Mode = FTP, Remote File Size: 2Mb. Initiate EDGE PDP context deactivation. Test Interval =
15s.Repeat = Infinite
5.8 FTP EDGE Uplink Throughput according to C/I on BCCH TRX
1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background/
Interactive Preferable). Upload Mode = FTP, Local File Size: 500kb. Initiate EDGE PDP context
deactivation. Test Interval = 15s, Repeat = Infinite
5.9 PS Session Termination Success Rate
1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background),
Mode = FTP upload & FTP download, Remote File Size: 500k & 2Mb. Initiate EDGE PDP context
deactivation. Test Interval = 15s.Repeat = Infinite
Network Optimization Report of GSM New-build
2015-12-26 Page 16 of 26
5.10 Round Trip Time
1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Make sure that the UE supports uplink extended TBF if the network supports this function.
4. Ping IP address predetermined.
5. Hotspots predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation, Packet Size: 8 Byte & 1460 Byte,
Initiate EDGE PDP context deactivation, Test Interval = 1s, Test count = 200
5.11 SDCCH_DROP_RATE
1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type = Call by
Call, Setup Timeout = 30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle
Mode, Call Mode = Infinite
5.12 SDCCH_SETUP_BLOCKING_RATE
1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type = Call by
Call, Setup Timeout = 30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle
Mode, Call Mode = Infinite
Network Optimization Report of GSM New-build
2015-12-26 Page 17 of 26
6 Drive Test Plot
6.1 Route & Target Area Information
Network Optimization Report of GSM New-build
2015-12-26 Page 18 of 26
6.2 Short Call Best Server BCCH Plot
6.3 RxLev Coverage Plot
Network Optimization Report of GSM New-build
2015-12-26 Page 19 of 26
6.4 RxQual Coverage Plot
Network Optimization Report of GSM New-build
2015-12-26 Page 20 of 26
6.5 Download Throughput Plot
Network Optimization Report of GSM New-build
2015-12-26 Page 21 of 26
6.6 Upload Throughput Plot
Network Optimization Report of GSM New-build
2015-12-26 Page 22 of 26
7 Optimization Actions Undertaken
7.1 RF adjustment
Site ID Cell ID Azimuth Mechanical + Electrical Purpose
Network Optimization Report of GSM New-build
2015-12-26 Page 23 of 26
7.2 Parameter optimization
BSC/R
NC Cell ID MML Parameter Name
Current
Value
Proposed
Value
Modification
Reason
7.3 Thematic Optimization
Site ID LLD Configuration Current Configuration
Network Optimization Report of GSM New-build
2015-12-26 Page 24 of 26
8 Attachment
8.1 Engineering parameter table and RF tuning record table
Engineering parameter table(cluster11).xls
RF tuning record table(cluster11).xls
8.2 Radio parameter optimization record table
Radio parameter optimization record table(Cluster11).xls
8.3 Frequency optimization record table
NONE
8.4 Neighbor list optimization record table
NONE
Network Optimization Report of GSM New-build
2015-12-26 Page 25 of 26
9 Certificate of Network Optimization Target Area Report
It is hereby agreed that the Target Area named below meet the specifications, the drive test and OSS
performance criteria with preconditions to be satisfied under “Additional Information”. Ethio Telecom and
Huawei, by signing this paper, confirm that the Target Area has been successfully giving service as per
main contract agreement.
Target Area Name :
Date of Operation : DD/MM/YYYY
Additional Information :
Site List:
Index Site ID Site Name
Network Optimization Report of GSM New-build
2015-12-26 Page 26 of 26
On behalf of Huawei
On behalf of Ethio Telecom
Originator:…………………………. Approved by:…………………………..
Signature:………………………….. Signature:………………………………..
Date: ………………………….. Date: ………………………………..