+ All Categories
Home > Documents > North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014.

North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014.

Date post: 01-Jan-2016
Category:
Upload: lizbeth-blake
View: 221 times
Download: 1 times
Share this document with a friend
6
North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014
Transcript
Page 1: North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014.

North Devon stakeholder workshop three; scenario scoring and discussion

Ness Smith10th April 2014

Page 2: North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014.

• For good model outputs, we are asking you to narrow the scenarios down to three or four

• We have defined two criteria to help you in this process;

1. Importance – this could be socially, environmentally, politically or economically important to your organisation and this group

2. Manageability – how much control do we collectively have over the future scenario e.g. climate change as a global management issue versus local IFCA fisheries measures…

Page 3: North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014.

Very important

Not important

Very manageableNot manageable

drop

keep

Page 4: North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014.

Tidal development

MCZs

Nutrients

Aggregate extraction

Blue growth

Aquaculture

Wind-farm development

Page 5: North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014.

Very important

Not important

Very manageableNot manageable

Page 6: North Devon stakeholder workshop three; scenario scoring and discussion Ness Smith 10 th April 2014.

With special thanks to all our partners and funders


Recommended