Page 1 of 21 North East Waste and Resource Recovery Group 2016 – 2019 Business Plan
Transcript
Page 1: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 1 of 21

North East Waste and Resource Recovery Group

2016 – 2019 Business Plan

Page 2: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 2 of 21

Page 3: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 3 of 21

TABLE OF CONTENTS

From the Deputy Chair .................................................................................................................................. 4

From the Executive Officer ........................................................................................................................... 5

1. Preamble ....................................................................................................................................................................... 7

2. Introduction................................................................................................................................................................... 7

3. Who are we? ................................................................................................................................................................. 7

a. Legislative Objectives ...................................................................................................................................... 8

b. Legislative Functions ....................................................................................................................................... 8

c. North East WRRG Board .................................................................................................................................. 9

d. North East WRRG Resources ........................................................................................................................... 9

4. Summary of 2016-2019 Priority Areas and Objectives ................................................................................................ 10

5. 2016-2019 Priority Area Detail ................................................................................................................................... 11

6. 2016-2019 Budget ....................................................................................................................................................... 17

Page 4: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 4 of 21

From the Deputy Chair

I am pleased to present the North East Waste and Resource Recovery Group's (North

East WRRG) Business Plan for 2016-2019. This is the second Business Plan to be

presented by North East WRRG following the statewide structural changes to the

Regional Waste Management Groups by July 2015, which resulted in the North East

Regional Waste Management Group (NevRwaste) ceasing to operate and the

establishment of North East WRRG under the Environment Protection Act 1970.

Integration and alignment of the North East Waste and Resource Recovery Implementation Plan (North East

Implementation Plan) with the other Waste and Resource Recovery Groups’ Implementation Plans and the

Statewide Waste and Resource Recovery Infrastructure Plan will be a focus for the first half of 2016-2017. The

Implementation Plan, when finalised, will be the key driver of North East WRRG business.

The North East Implementation Plan outlines 10 priority action areas to reduce waste to landfill and improve

recovery of resources in north east Victoria. Over the life of this Business Plan the short term actions (5 years)

in the North East Implementation Plan will be the key delivery mechanisms contributing towards the longer

term priority actions. The Board has directed their resources accordingly.

The last twelve months have been busy finalising the draft North East Implementation Plan in consultation

with key stakeholders. North East WRRG were leaders amongst the Waste and Resource Recovery Groups,

and were the first to go on formal public exhibition, and first to provide statuary notification in line with

legislative requirements.

The past 12 months experienced sadness and change at North East WRRG with the passing of our Chair, Cr.

Don Chambers, in October 2015. Don was passionate about the environment and contributed significantly to

the North East region. He was a leader in waste and resource management. Former North East WRRG

Executive Officer, Brooke Hermans also announced her resignation in late 2015, after a long term career

spanning twelve years with the Board and the former North East Regional Waste Management Group

(NevRwaste). Ms. Hermans provided strategic, professional direction to the Board in her role as Executive

Officer as well as excellent leadership, support and guidance to the staff of North East WRRG.

The Board was pleased to make two formal announcements in April 2016, the appointment of Cr. Ron Janas

as a Director to the Board and the commencement of their new Executive Officer, Kathleen Gosden. Cr. Janas

was recommended to the Board from the North East Local Government Waste Forum where he is one of four

local government representatives. He is the current mayor of Alpine Shire Council and has worked and lived

in the region for 23 years. Ms. Gosden brings skills in senior management from positions held in local and

state government along with technical skills and networks in waste and resource recovery management.

Whilst 2015-2016 has experienced change in the organisation’s leadership, it has not impacted on our ability

to meet our statutory commitments. Delivery of this Business Plan 2016-2019 sees us continuing to work with

our portfolio partners, local governments, alpine resorts and key stakeholders to ensure the north east region

has an integrated, cost effective waste and resource recovery system that meets public health and

environmental protection standards.

Anthony Griffiths

Deputy Chair

Page 5: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 5 of 21

From the Executive Officer

The staff at North East Waste and Resource Recovery Group are enthusiastic about

delivering the 2016-2019 Business Plan.

The past 12 months have been busy finalising the preparation of the draft North East Waste

and Resource Recovery Implementation Plan (North East Implementation Plan) and formally engaging with

portfolio stakeholders, industry and community on the plan. The staff, whilst working strategically on the

North East Implementation Plan have continued to maintain and deliver core activities of North East WRRG,

including the partnership projects, ResourceSmart Schools, Schools Environment Days and the Schools

Environment Education Directory.

The first six months implementation of this Business Plan will see us celebrate a number of key milestones at

the Student Environment Day (SED) activity in August 2016. On the day we will not only deliver the usual SED

activities, but in partnership with our funding supporters we will acknowledge and celebrate the 5000th

student, the 200th school to have participated in the SED activities and the 30th actual SED event.

The year ahead will continue to deliver a mixture of strategic, educational and environmental projects as we

finalise integration and alignment of the North East Implementation Plan, deliver education programs and

coordinate implementation of our partnership projects with member councils and alpine resorts in the region.

The North East Local Government Waste Forum and their Technical Advisory Sub-Committee have been

instrumental in planning our local government and alpine resort projects for the coming year. Proposed

projects were reviewed by the Sub-Committee to align projects with the North East Implementation Plan, an

activity that has not had to be undertaken in previous years. Project priorities include the diversion of

problematic materials from landfill, continuation of community education, and a householder separate and

sort campaign. These, along with support to existing projects and programs, will build on community

awareness and understanding of waste and resource recovery infrastructure and management

complementing and adding value to existing waste and resource recovery services provided by councils and

alpine resorts in the region.

A priority action for North East WRRG during 2016-2017 will be working collaboratively with the other Waste

and Resource Recovery Groups across the state to identify and implement shared service arrangements. These

arrangements, when implemented, will support business operation and continuity to improve efficiencies

whilst maintaining group identity and uniqueness which comes with each waste and resource recover group

region.

The staff of North East WRRG will continue to work closely and effectively with our portfolio partners,

including Sustainability Victoria, the Environment Protection Authority Victoria, the Department of

Environment, Land, Water and Planning and our fellow Waste and Resource Recovery Groups to ensure that

our programs, activities and strategic direction are integrated to deliver best value to North East Victoria.

Kath Gosden

Executive Officer

Page 6: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 6 of 21

Page 7: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 7 of 21

1. Preamble

The priorities and tasks outlined in section 4 and 5 of the Business Plan 2016-2019 are based on the

information available to the Board at the time of preparation. The Board have acknowledged that these

priorities and tasks will need review and possible amendment post discussion and agreement of the following

three (3) key activities that are in progress:-

1. The Hon. Lily D’Ambrosio, Minister for Energy, Environment and Climate Change’s Statement of

Expectations for Waste and Resource Recovery Groups;

2. Alignment and integration of the North East Waste and resource Recovery Implementation Plan with

the other Waste and Resource Recovery Groups’ Implementation Plans and the Statewide Waste and

Resource Recovery Infrastructure Plan; and

3. Shared Services arrangements across Waste and Resource Recovery Groups in consultation with

Department of Environment, Land, Water and Planning.

The risks associated with any amendments required to the Business Plan 2016-2019 as a result of these key

activities will be taken into consideration, and where appropriate articulated during the development and

deliberations processes.

2. Introduction

Under the Environment Protection Act 1970 (49SB), North East Waste and Resource Recovery Group (North

East WRRG) are required to submit an annual Business Plan that sets out the objectives and priorities for the

next three (3) financial years . The plan outlined in this document is for the period commencing 1 July 2016.

3. Who are we?

The North East WRRG was formed on 1 August 2014. The organisation is legislated under the Environment

Protection Act 1970 (EP Act). Prior to 1 August 2014, the North East Regional Waste Management Group

(NevRwaste) coordinated waste and resource recovery programs, initiatives and educational activities in

partnership with the councils, alpine resorts and key stakeholders in the north east region.

The North East WRRG region consists of the municipal districts of the following councils (inclusive of resorts):-

Alpine Shire Council

Benalla Rural City Council

Falls Creek Alpine Resort Management Board

Indigo Shire Council

Mansfield Shire Council

Mount Hotham Alpine Resort Management Board

Mount Buller and Mount Stirling Alpine Resort Management Board

Towong Shire Council

Wangaratta Rural City Council

Wodonga City Council

Page 8: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 8 of 21

a. Legislative Objectives

As outlined in the Environment Protection Act 1970:-

(1) The objectives of a Waste and Resource Recovery Group are:

(a) to undertake waste and resource recovery infrastructure planning to meet the future needs of its waste and resource recovery region while minimising the environmental and public health impacts of waste and resource recovery infrastructure;

(b) to facilitate efficient procurement of waste and resource recovery infrastructure and services for its waste and resource recovery region through the collective procurement of waste management facilities and waste and resource recovery services in the region;

(c) to integrate regional and local knowledge into State-wide waste and resource recovery market development strategies;

(d) to educate businesses and communities within its waste and resource recovery region to reduce waste going to landfill by using waste and resource recovery infrastructure and services efficiently; and

(e) to ensure Regional Waste and Resource Recovery Implementation Plans and programs are informed by local government, business and community and inform State-wide waste and resource recovery planning and programs.

(2) In seeking to achieve its objectives, a Waste and Resource Recovery Group must collaborate with councils, Sustainability Victoria, the Authority, industry, business and the community.

b. Legislative Functions

As outlined in the Environment Protection Act 1970:-

The functions of a Waste and Resource Recovery Group are:

(a) to plan for the future needs of waste and resource recovery infrastructure within its waste and resource recovery region consistently with the State-Wide Waste and Resource Recovery Infrastructure Plan;

(b) to facilitate the provision of waste and resource recovery infrastructure and services by councils within its waste and resource recovery region;

(c) to facilitate the development of contracts for the joint procurement of waste management facilities and waste and resource recovery services within its waste and resource recovery region;

(d) to manage contracts in the performance of its objectives and functions;

(e) to work with Sustainability Victoria, councils, businesses and communities to ensure State-wide waste and resource recovery education programs are adapted to the needs of its waste and resource recovery region and to facilitate the delivery of those education programs;

(f) to advise, with Sustainability Victoria, councils and businesses within its waste and resource recovery region on best practices for waste and resource recovery systems, facilities and services;

(g) to support its waste and resource recovery region’s Local Government Waste Forum to enable the Waste Forum to perform its functions; and

(h) to undertake waste and resource recovery projects as funded by government, councils and other organisations.

Page 9: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 9 of 21

c. North East WRRG Board

The North East WRRG is governed by a board of directors. In accordance with section 49K of the EP

Act (Act), the directors of North East WRRG are appointed by the Governor in Council on the

recommendation of the Minister for Energy, Environment and Climate Change.

Of the eight directors on the board, four must be nominated in accordance with section 49B of the

Act by a Local Government Waste Forum to the Minister and four must be recommended by the

Minister.

The overall role of the board is to ensure that:-

the functions of North East WRRG are fulfilled; and

North East WRRG establishes its governance framework and complies with that framework.

The strategic role of the board includes planning, governance, risk management, stewardship,

performance monitoring and reporting.

As at 1 July 2016, the directors of the North East WRRG Board included:

Director Recommended by

Dr. Timothy Clune Minister for Energy, Environment and Climate Change1

Anthony Griffiths (Deputy Chair) Minister for Energy, Environment and Climate Change

Minister for Environment, Climate Change and Water

Raymond Park Minister for Energy, Environment and Climate Change

Daniel Potter Minister for Energy, Environment and Climate Change

Cr. Ron Janas Local Government Waste Forum

Louise Perrin Local Government Waste Forum

Rodney Roscholler Local Government Waste Forum

Veronica Schilling Local Government Waste Forum

d. North East WRRG Resources

The North East WRRG is a small organisation. As at 1 July 2016, there were four (4) full time and two

(2) part time staff. The organisation is primarily funded through ministerial distribution of the landfill

levy.

Other related project funding is received from local government and alpine resorts within the region

and through grant based funding arrangements, other organisations and, at times, industry.

1 Ministerial appointments of directors’ Clune, Griffiths, Park and Potter made in 2014 under the portfolio of Environment and Climate Change

Page 10: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 10 of 21

The organisation looks proactively for ways to operate more efficiently and effectively and will

continue to investigate and implement improvements

4. Summary of 2016-2019 Priority Areas and Objectives

Priority Area Objective

1. Waste and Resource Recovery

Implementation Plan (WRRIP)

To deliver a WRRIP supported by local government, alpine

resorts and the state within the required legislative timeframes.

2. Local Government and Alpine

Resort Funded Projects

To deliver regionally significant waste and resource recovery

projects including education in consultation with councils and

alpine resorts in the region to progress implementation of the

North East Waste and Resource Recovery Implementation Plan.

3. Collaborative Procurement To support collaborative procurement processes with councils

and alpine resorts in the region that lead to increased resource

recovery and best practice waste management.

4. Stakeholder Relationships To maintain and expand stakeholder relationships with local and

state government, industry and the community, including

supporting the North East Local Government Waste Forum.

5. Regional input into state direction To input regional and local knowledge into state waste and

resource recovery policy and guidance documents.

6. North East WRRG governance and

operations

To establish and maintain effective governance and operational

systems for North East WRRG.

7. Shared Services To work collaboratively with waste and resource recovery

groups across the state to identify and implement shared service

arrangements that deliver organisational efficiencies and cost

benefits to North East WRRG.

Page 11: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 11 of 21

5. 2016-2019 Priority Area Detail

Priority Area 1: Waste and Resource Recovery Implementation Plan (WRRIP)

Objective: To deliver a WRRIP supported by local government, alpine resorts and the state within the required

legislative timeframes.

Links to legislative functions:

49H (a) To plan for the future needs of waste and resource recovery infrastructure within its waste and

resource recovery region consistently with the Statewide Waste and Resource Recovery Infrastructure

Plan.

Measures of success:

Draft WRRIP submitted to Minister for approval by 14 December 2016.

WRRIP supported by 100% of north east local government and alpine resorts.

WRRIP approved by Minister for Energy, Environment and Climate Change.

Tasks When

Feedback and submissions from consultation phase considered By July 2016

Comments from statutory referrals considered By August 2016

Integration and alignment of WRRIP’s across the state By October 2016

Final draft to Minister By 14 December 2016

Project planning for priority actions By June 2017

Draft Monitoring and Evaluation framework By June 2017

Implementation of priority actions 2017-2019 onwards

Priority Area 2: Local Government and Alpine Resort Funded Projects

Objective: To deliver regionally significant waste and resource recovery projects including education in

consultation with councils and alpine resorts in the region.

Links to legislative functions:

49H (e) to work with Sustainability Victoria, councils, businesses and communities to ensure statewide waste

and resource recovery education programs are adapted to the needs of its waste and resource

recovery region and to facilitate the delivery of those education programs.

49H (f) to advise, with Sustainability Victoria, councils and businesses within its waste and resource recovery

region on best practice for waste and resource recovery systems, facilities and services.

49H (h) to undertake waste and resource recovery projects as funded by government, councils and other

organisations.

Measures of success:

90% of agreed funded local government and alpine resort projects delivered during 2016-2019.

Local government and alpine resorts continue to provide stable levels of funding for project delivery.

Page 12: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 12 of 21

90% of projects delivered align with North East Waste and Resource Recovery Implementation Plan.

Tasks When

Annually develop in consultation with local government and

alpine resorts, agreed local project delivery tasks and budgets for

coming year

October 2016 to March

2017, October 2017 to

March 2018, October 2018

to March 2019

Review and amend assessment criteria for projects to incorporate

alignment with the North East Waste and Resource Recovery

Implementation Plan

By December 2016

Annually report on project outcomes to local government and

alpine resorts

Annually in July 2016, 2017

and 2018

Deliver local government and alpine resort funded projects (see

Appendix 1 for 2016-2017 projects)

July 2016 – June 2017

July 2017 – June 2018

July 2018 – June 2019

Priority Area 3: Collaborative Procurement

Objective: To support collaborative procurement processes with councils and alpine resorts in the region

that lead to increased resource recovery and best practice waste management.

Links to legislative functions:

49H (b) to facilitate the provision of waste and resource recovery infrastructure and services by councils within

its waste and resource recovery region.

49H (c) to facilitate the development of contracts for the joint procurement of waste management facilities

and waste and resource recovery services within its waste and resource recovery region.

49H (d) to manage contracts in the performance of its (legislative) objectives and functions.

Measures of success:

List of collaborative procurement and contract management opportunities established and

opportunities explored.

Templates developed to facilitate collaborative waste and resource procurement in councils and

alpine resorts across the north east region.

Regional contracts facilitated by North East WRRG where opportunities have been identified for

collaborative procurement.

Page 13: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 13 of 21

Tasks When

Facilitate and oversee collaborative procurement contracts for north east local government:

- garden waste

- e-waste

- problematic materials

Dec 2016

March 2017

June 2017

Alignment of procurement process and templates for region with

state processes and templates

By June 2017

Identification of collaborative procurement and contract

management opportunities for the region

2016-2017

Priority Area 4: Stakeholder Relationships

Objective: To maintain and expand stakeholder relationships with local and state government, industry and

community, including supporting the North East Local Government Waste Forum and Technical Advisory Sub-

Committee.

Links to legislative functions:

49H (a) to plan for the future needs of waste and resource recovery infrastructure within its waste and

resource recovery region consistently with the Statewide Waste and Resource Recovery Infrastructure

Plan.

49H (b) to facilitate the provision of waste and resource recovery infrastructure and services by councils within

its waste and resource recovery region.

49H (e) to work with Sustainability Victoria, councils, businesses and communities to ensure State-wide waste

and resource recovery education programs are adapted to the needs of its waste and resource

recovery region and to facilitate the delivery of those education programs.

49H (g) to support its waste and resource recovery region’s Local Government Waste Forum to enable the

Waste Forum to perform its functions.

Measures of success:

Maintenance of positive partnerships when compared to 2013-2014 Partnership Analysis

Number of new positive partnerships established when compared to 2013-2014 Partnership Analysis

Page 14: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 14 of 21

Tasks When

Support and strengthen Local Government Waste Forum and

Technical Advisory Sub-Committee meetings incorporating a focus

on Waste and Resource Recovery Implementation Plan priority

areas

By June 2017

Identify and participate in strategic meetings to strengthen and

expand networks and relationships such as local government CEO

forums and meetings, regional development meeting and business

and industry groups

Ongoing

Preparation of discussion paper on matters and issues affecting

councils and resorts in waste management and resource recovery

By June 2018

Review of effectiveness of key partnerships in comparison to

2013-2014 Partnership Analysis

February 18–June 2018

Identification of new key partnerships for inclusion in Partnership

Analysis

By Dec 2017

Priority Area 5: Regional input into state direction

Objective: To input regional and local knowledge into state waste and resource recovery policy and guidance

documents.

Link to legislative objective:

49G (c) to integrate regional and local knowledge into State-wide waste and resource recovery market development strategies.

Measures of success:

North East WRRG submissions or attendance at consultation sessions for key waste and resource

recovery policy and guidance document development.

North East WRRG involvement in state based waste and resource recovery working groups and

committees.

Tasks When

Provide input into state waste and resource recovery policy and

guidance documents

Ongoing

Participate in state, and regional processes that facilitate the

implementation of the boards business plan, the North East Waste

and Resource Recovery Implementation Plan and services and

infrastructure that improve waste and resource recovery in the

region

Ongoing

Work with the Local Government Waste Forum, the Technical

Advisory Sub-Committee and key stakeholders to identify key

regional issues impacting on the delivery of the Waste and

Resource Recovery Implementation Plan

Forum and Technical

Advisory Sub-Committee

meetings

Page 15: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 15 of 21

Priority Area 6: North East WRRG governance and operations

Objective: To establish and maintain effective governance and operational systems for North East WRRG.

Links to legislative functions:

49F A waste and Resource Recovery Group is a public body and a public entity

49F (a) a public body to which Part 7 of the Financial Management Act 1994 applies.

49F (b) a public entity for the purposes of the Public Administration Act 2004.

Measures of success:

Statutory requirements met by the organisation

75% of board policies and procedures reviewed and amended by the review date

75% of operational policies and procedures reviewed and amended by the due date

90% of any audit committee actions delivered within the required timeframe

Tasks When

Charter of Corporate Governance, policies and guidelines

reviewed and maintained

Ongoing

Identify and prepare implementation plan for the review,

amendment or development of operational policies and

procedures

By October 2016

Implement any operational policies or procedures identified as:

high priority

Medium priority

Low priority

By:

Feb 2017

Dec 2017

April 2018

Review corporate records management (hard and soft copy

document) to improve administrative efficiencies

By Dec 2017

Risk register reviewed and maintained Quarterly each year

Board meetings held a minimum of five (5) times per annum Ongoing

Audit Committee meetings held at least three (3) times per annum Ongoing

Submit progress and final reports to acquit project funding in line

with funding agreements

Ongoing

In collaboration with key stakeholders prepare and submit annual

Business Plan

Annually

Submit Annual Report Annually

Undertake Board and organisational performance reviews Annually

Page 16: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 16 of 21

Priority Area 7: Shared Services

Objective: To work collaboratively with Waste and Resource Recovery Groups across the state to identify

and implement shared service arrangements that deliver organisational efficiencies and cost benefits to

North East WRRG.

Link to legislative functions:

49Q (3) the Executive Officer or Chief Executive Officer is responsible to the Waste and Resource recovery group for the carrying out of the Waste and Resource Recovery Group’s functions;

Measures of success:

Shared services established between the Waste and Resource Recovery Groups

Shared services entered into by North East WRRG

Efficiencies and savings derived from shared services to North East WRRG

Tasks When

Details of the Shared Services to be implemented each financial

year (2016-2017, 2017-2018, 2018-2019) involving North East

WRRG finalised

Dec 2017 then Oct 2018, Oct

2019

Shared Services Agreement established between Waste and

Resource Recovery Groups and Department of Environment, Land,

Water and Planning

March 2017

Page 17: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 17 of 21

6. 2016-2019 Budget

Comprehensive operating statement for the financial year ended 30 June

2015-16 2016-17 2017-18 2018-19 2019-20

Income from transactions

Landfill levy revenue $576,240 $552,984 $562,058 $571,360 $580,894

DELWP Project Funding $383,333 $225,000 $225,000 $0 $0

Commonwealth other $234,408 $178,370 $152,492 $152,466 $152,440

Commonwealth grants $0 $0 $0 $0 $0

Interest $8,159 $5,000 $5,000 $5,000 $5,000

Other income $0 $0 $0 $0 $0

Total income from transactions $1,202,140 $961,354 $944,550 $728,826 $738,334

Expenses from transactions

Employee expenses $575,626 $521,782 $431,392 $356,738 $374,198

Depreciation $10,630 $10,896 $8,983 $5,444 $4,334

Audit fees $7,000 $6,200 $6,500 $6,750 $7,000

Other operating expenses $439,817 $590,698 $425,397 $279,313 $285,177

Total expenses from transactions $1,033,074 $1,129,576 $872,272 $648,245 $670,709

Net result from transactions (net operating balance) $169,066 ($168,222) $72,278 $80,581 $67,625

Other economic flows included in net result

Net gain/(loss) on non-financial assets $0 $0 $0 $0 $0

Net gain/(loss) on financial instruments $0 $0 $0 $0 $0

Other gains/(losses) from other economic flows $0 $0 $0 $0 $0

Total other economic flows included in net result $0 $0 $0 $0 $0

Net result $169,066 ($168,222) $72,278 $80,581 $67,625

Comprehensive result $169,066 ($168,222) $72,278 $80,581 $67,625

Page 18: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 18 of 21

Balance Sheets as at 30 June

2015-16 2016-17 2017-18 2018-19 2019-20

Assets

Financial assets

Cash and deposits $295,147 $174,699 $256,418 $348,050 $423,032

Prepayments 0 0 0 0 0

Receivables $188,060 $138,000 $140,262 $142,582 $144,959

Total financial assets $483,207 $312,699 $396,680 $490,632 $567,991

Non-financial assets

Property, plant and equipment $29,123 $20,727 $21,428 $18,576 $16,842

Provisions $0 $0 $0 $0 $0

Other non-financial assets $0 $0 $0 $0 $0

Total non-financial assets $29,123 $20,727 $21,428 $18,576 $16,842

Total assets $512,330 $333,426 $418,108 $509,208 $584,833

Liabilities

Payables $39,294 $35,000 $37,500 $40,000 $40,000

Borrowings

Provisions $89,561 $83,172 $93,076 $101,096 $109,096

Other liabilities $0 $0 $0 0 $0

Total liabilities $128,855 $118,172 $130,576 $141,096 $149,096

Net assets $383,475 $215,253 $287,531 $368,112 $435,737

Equity

Accumulated surplus/(deficit) $235,012 $66,790 $139,068 $219,649 $287,274

Contributed capital $148,463 $148,463 $148,463 $148,463 $148,463

Net worth $383,475 $215,253 $287,531 $368,112 $435,737

Page 19: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 19 of 21

Total balance beginning of period 214,409 65,946 148,463 383,475 235,012 148,463 215,253 66,790 148,463 287,531 139,068 148,463 368,112 219,649 148,463

Transfer of contributed capital - - - - - - - - - - -

Total net surplus/deficit for the period 169,066 169,066 168,222- 168,222- 72,278 72,278 80,581 80,581 67,625 67,625

Total balance as at 30 June 2015 383,475 235,012 148,463 215,253 66,790 148,463 287,531 139,068 148,463 368,112 219,649 148,463 435,737 287,274 148,463

Total 2017-

18

Accumulated

Funds 2018-

19

Contributed

Capital 2018-

19

Statement of Changes in Equity for the period ending 30 June

Total 2015-

16

Contributed

Capital 2016-

17

Contributed

Capital 2017-

18

Total 2018-

19

Contributed

Capital 2019-

20

Contributed

Capital 2015-

16

Accumulated

Funds 2015-

16

Accumulate

d Funds

2019-20

Total 2019-

20

Total 2016-

17

Accumulated

Funds 2016-

17

Accumulated

Funds 2017-

18

Page 20: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 20 of 21

Appendix 1 Local Government and Alpine Resort funded projects 2016-2017

Projects Description Budget

Ongoing programs/projects

School Environment

Education Directory

The Schools Environment Education Directory (SEED) is a partnership

program funded with the North East Catchment Management

Authority. SEED supports schools by maintaining a dedicated website

for environmental education with readymade units as well as running

three school environment days a year in different parts of the Region.

North East WRRG will continue to support the program through the

employment of the officer who implements the program.

$10,000

Resource Smart Schools

programs (RS)

Resource Smart Schools is the State program aimed at engaging

schools in sustainability. Schools sign up and work through a CORE

module as well as 4 other modules, one of which includes Waste. The

program aims for a holistic approach including the integration of the

units into the curriculum, the program is endorsed by the Department

of Education and Early Childhood. North East WRRG will continue

support schools completing the waste unit of RSS.

$15,000

The Living Bin Continued support for the Living Bin program: champions and

collaterals.

$12,500

Training Proposed budget of continued $10K for ‘floating’ training pool which

Technical Advisory Sub-Committee officers can access for refresher

training of facility staff such as: likely to be data training (5K). This will

be combined with WRRIP specific infrastructure funding to support

data software (30K)

Training/Professional Development likely to be tour. (5K)

$10,000

Proposed Projects for 2016-2017 as ranked ‘extremely important/very important’ priority from the TAS

Proposed Project

and

Collective Technical

Advisory Sub-Committee

weighted ranking

Basic Project Description Initial

Budget

Estimate

Most to be

confirmed

Project which addresses

problematic materials

Ranking: Extremely

Important

A project that looks at addressing how the region deals with and can

divert/process/establish markets and or solutions for one or more of

the following problematic materials:

Likely to address waste oil containers at transfer stations/resource

recovery centres (making them OHS compliant)

Also likely to look at installing infrastructure for collection of paint and

batteries (provision of bunded areas)

$10,000

$10,000

Page 21: North East Waste and Resource Recovery Group …...Page 4 of 21 From the Deputy Chair I am pleased to present the North East Waste and Resource Recovery Group's (North East WRRG) Business

Page 21 of 21

(this may be combined with funding from WRRIP specific

infrastructure of 30K – To be confirmed)

Sort and Save project

Ranking: Very Important

Project addressing awareness around householders sorting loads. To

include education and awareness. Measured through auditing/tally

process at RRCs pre and during project.

$35,000

Schools: Very Important Initial proposal was to increase SED/RS funding to undertake extra days. Also to develop a toolkit for officers presenting at schools when delivering waste education sessions.

$0

Project management 20% of project costs (not including Resource Smart Schools or SEED). $26,700

Contingency Funding not specifically allocated to any of the projects above, but

available as a contingency and to attract other funding for projects

$9,300

TOTAL

$129,200

Local Government and

Resorts Income 2016-2017

$138,500

Local Government/Alpine Resort projects being delivered over two financial years (15/16 and 16/17)

PPR (Public place

recycling) Infrastructure

Project around increasing and refurbishing (signage) for public place

recycling systems. Secured up to $75,000 through Australian

Packaging Covenant ($55,000 received in 2015-2016)

$63,500

Illegal dumping Project to raise community awareness, and undertake surveillance of

illegal dumping across the region.

$3,200

Note- the projects listed in Appendix 1 are funded through local government and alpine resorts in the

region. Additionally funding has been sourced through grants, initiatives and sponsorship to value add to

these projects. The North East Waste and Resource Recovery Group facilitate the process through the

regions Local Government Waste Forum and Technical Advisory Sub Committee. The facilitated approach

has enabled regional project delivery targeted at strategic priorities, linked to the draft Waste and

Resource Recovery Implementation Plan.


Recommended